80_FR_12206 80 FR 12162 - FortisUS Energy Corporation, Central Hudson Gas & Electric Corporation, Tucson Electric Power Company, UNS Electric, Inc., UniSource Energy Development Company; Notice of Institution of Section 206 Proceeding and Refund Effective Date

80 FR 12162 - FortisUS Energy Corporation, Central Hudson Gas & Electric Corporation, Tucson Electric Power Company, UNS Electric, Inc., UniSource Energy Development Company; Notice of Institution of Section 206 Proceeding and Refund Effective Date

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 80, Issue 44 (March 6, 2015)

Page Range12162-12162
FR Document2015-05254

Federal Register, Volume 80 Issue 44 (Friday, March 6, 2015)
[Federal Register Volume 80, Number 44 (Friday, March 6, 2015)]
[Notices]
[Page 12162]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-05254]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. EL15-42-000]


FortisUS Energy Corporation, Central Hudson Gas & Electric 
Corporation, Tucson Electric Power Company, UNS Electric, Inc., 
UniSource Energy Development Company; Notice of Institution of Section 
206 Proceeding and Refund Effective Date

    On February 27, 2015, the Commission issued an order in Docket No. 
EL15-42-000, pursuant to section 206 of the Federal Power Act (FPA), 16 
U.S.C. 824e (2012), instituting an investigation concerning the 
justness and reasonableness of the Fortis MBR Sellers' market-based 
rates in the Tucson Electric balancing authority area.\1\ FortisUS 
Energy Corporation, et al., 150 FERC ] 61,153 (2015).
---------------------------------------------------------------------------

    \1\ For the purpose of this filing, the Fortis MBR Sellers 
include: FortisUS Energy Corporation; Central Hudson Gas and 
Electric Corporation; Tucson Electric Power Company (Tucson 
Electric); UNS Electric, Inc.; and UniSource Energy Development 
Company.
---------------------------------------------------------------------------

    The refund effective date in Docket No. EL15-42-000, established 
pursuant to section 206(b) of the FPA, will be the date of publication 
of this notice in the Federal Register.

    Dated: February 27, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-05254 Filed 3-5-15; 8:45 am]
 BILLING CODE 6717-01-P



                                                  12162                           Federal Register / Vol. 80, No. 44 / Friday, March 6, 2015 / Notices

                                                  —Energy Imbalance Market Transitional                   DEPARTMENT OF ENERGY                                    l. Deadline for filing additional study
                                                   Committee                                                                                                    requests and requests for cooperating
                                                                                                          Federal Energy Regulatory                             agency status: April 14, 2015.
                                                  —Market Update
                                                                                                          Commission                                              The Commission strongly encourages
                                                     Sponsored by the CAISO, the                          [Project No. 12635–002]
                                                                                                                                                                electronic filing. Please file additional
                                                  teleconferences are open to all market                                                                        study requests and requests for
                                                  participants and staff’s attendance is                  Moriah Hydro Corporation; Notice of                   cooperating agency status using the
                                                  part of the Commission’s ongoing                        Application Tendered for Filing With                  Commission’s eFiling system at http://
                                                  outreach efforts. The teleconferences                   the Commission and Soliciting                         www.ferc.gov/docs-filing/efiling.asp. For
                                                  may discuss matters at issue in the                     Additional Study Requests                             assistance, please contact FERC Online
                                                  above captioned dockets.                                                                                      Support at FERCOnlineSupport@
                                                                                                          February 27, 2015.                                    ferc.gov, (866) 208–3676 (toll free), or
                                                     For further information, contact Saeed                  Take notice that the following                     (202) 502–8659 (TTY). In lieu of
                                                  Farrokhpay at saeed.farrokhpay@                         hydroelectric application has been filed              electronic filing, please send a paper
                                                  ferc.gov (916) 294–0322.                                with the Commission and is available                  copy to: Secretary, Federal Energy
                                                    Dated: February 27, 2015.                             for public inspection.                                Regulatory Commission, 888 First Street
                                                                                                             a. Type of Application: Original Major             NE., Washington, DC 20426. The first
                                                  Nathaniel J. Davis, Sr.,
                                                                                                          License.                                              page of any filing should include docket
                                                  Deputy Secretary.                                          b. Project No.: 12635–002.                         number P–12635–002.
                                                  [FR Doc. 2015–05246 Filed 3–5–15; 8:45 am]                 c. Date filed: February 13, 2015 .                   m. The application is not ready for
                                                  BILLING CODE 6717–01P                                      d. Applicant: Moriah Hydro                         environmental analysis at this time.
                                                                                                          Corporation.                                            n. The proposed project consists of:
                                                                                                             e. Name of Project: Mineville Energy               (1) An upper reservoir located within
                                                  DEPARTMENT OF ENERGY                                    Storage Project.                                      the upper portion of the mine between
                                                                                                             f. Location: The project would be                  elevations 495 and 1,095 feet above
                                                  Federal Energy Regulatory                               located in an abandoned subterranean                  mean sea level (msl), with a surface area
                                                  Commission                                              mine complex 1 in the town of Moriah,                 of 4 acres and a storage capacity of 2,448
                                                                                                          Essex County, New York. No federal                    acre-feet; (2) a lower reservoir in the
                                                                                                          lands are occupied by project works or                lower portion of the mine between
                                                  [Docket No. EL15–42–000]
                                                                                                          located within the project boundary.                  elevations -1,075 and -1,555 feet msl,
                                                                                                             g. Filed Pursuant to: Federal Power
                                                  FortisUS Energy Corporation, Central                                                                          with a surface area of 5.1 acres and a
                                                                                                          Act 16 U.S.C. 791(a)–825(r).
                                                  Hudson Gas & Electric Corporation,                         h. Applicant Contact: James A. Besha,              storage capacity of 2,448 acre-feet; (3) a
                                                  Tucson Electric Power Company, UNS                      P.E., President, Moriah Hydro                         14-foot-diameter and 2,955-foot-long
                                                  Electric, Inc., UniSource Energy                        Corporation, 5 Washington Square,                     upper reservoir shaft connecting the
                                                  Development Company; Notice of                          Albany, NY 12205; or at (518) 456–7712.               upper reservoir to the high-pressure
                                                  Institution of Section 206 Proceeding                      i. FERC Contact: John Mudre, (202)                 penstock located below the powerhouse
                                                  and Refund Effective Date                               502–8902 or john.mudre@ferc.gov.                      chamber floor; (4) a 14-foot-diameter
                                                                                                             j. Cooperating agencies: Federal, state,           and 2,955-foot-long lower reservoir shaft
                                                    On February 27, 2015, the                             local, and tribal agencies with                       connecting the lower reservoir and the
                                                                                                          jurisdiction and/or special expertise                 lower reservoir ventilation tunnel; (5)
                                                  Commission issued an order in Docket
                                                                                                          with respect to environmental issues                  two 6-foot-diameter emergency
                                                  No. EL15–42–000, pursuant to section                                                                          evacuation shafts located between the
                                                  206 of the Federal Power Act (FPA), 16                  that wish to cooperate in the
                                                                                                          preparation of the environmental                      powerhouse chamber and the electrical
                                                  U.S.C. 824e (2012), instituting an                                                                            equipment chamber; (6) a 25-foot-
                                                  investigation concerning the justness                   document should follow the
                                                                                                          instructions for filing such requests                 diameter main shaft extending 2,955
                                                  and reasonableness of the Fortis MBR                                                                          feet from the surface down to the
                                                  Sellers’ market-based rates in the                      described in item l below. Cooperating
                                                                                                          agencies should note the Commission’s                 powerhouse chamber; (7) 15-foot-
                                                  Tucson Electric balancing authority                                                                           diameter high- and low-pressure steel
                                                                                                          policy that agencies that cooperate in
                                                  area.1 FortisUS Energy Corporation, et                                                                        penstocks embedded beneath the
                                                                                                          the preparation of the environmental
                                                  al., 150 FERC ¶ 61,153 (2015).                                                                                powerhouse chamber floor; (8) a 320-
                                                                                                          document cannot also intervene. See, 94
                                                    The refund effective date in Docket                   FERC ¶ 61,076 (2001).                                 foot-long by 80-foot-wide powerhouse
                                                  No. EL15–42–000, established pursuant                      k. Pursuant to section 4.32(b)(7) of 18            chamber, containing 100 reversible
                                                  to section 206(b) of the FPA, will be the               CFR of the Commission’s regulations, if               pump-turbine units, each with a
                                                  date of publication of this notice in the               any resource agency, Indian Tribe, or                 nameplate generating capacity of 2.4
                                                                                                          person believes that an additional                    megawatts; (9) a 274-foot-long by 36-
                                                  Federal Register.
                                                                                                          scientific study should be conducted in               foot-wide underground electrical
                                                    Dated: February 27, 2015.                                                                                   equipment chamber adjacent to the
                                                                                                          order to form an adequate factual basis
                                                  Nathaniel J. Davis, Sr.,                                for a complete analysis of the                        powerhouse chamber; (10) an inclined
                                                  Deputy Secretary.                                       application on its merit, the resource                electrical tunnel connecting the
                                                                                                                                                                electrical equipment chamber to a new
                                                  [FR Doc. 2015–05254 Filed 3–5–15; 8:45 am]              agency, Indian Tribe, or person must file
                                                                                                                                                                115-kilovolt (kV) substation constructed
                                                  BILLING CODE 6717–01–P                                  a request for a study with the
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                                                                                                                                adjacent to an existing single circuit
                                                                                                          Commission not later than 60 days from
                                                                                                                                                                115-kV transmission line located about
                                                                                                          the date of filing of the application, and
                                                                                                                                                                one horizontal mile from the
                                                    1 For the purpose of this filing, the Fortis MBR      serve a copy of the request on the
                                                                                                                                                                underground powerhouse chamber; and
                                                  Sellers include: FortisUS Energy Corporation;           applicant.
                                                  Central Hudson Gas and Electric Corporation;
                                                                                                                                                                (11) appurtenant facilities. The project
                                                  Tucson Electric Power Company (Tucson Electric);          1 The existing mine complex is composed of the      would operate as a closed-loop system
                                                  UNS Electric, Inc.; and UniSource Energy                interconnected Old Bed, Bonanza open pit, and         to meet energy demands and grid
                                                  Development Company.                                    Harmony mines.                                        control requirements. The project would


                                             VerDate Sep<11>2014   18:59 Mar 05, 2015   Jkt 235001   PO 00000   Frm 00025   Fmt 4703   Sfmt 4703   E:\FR\FM\06MRN1.SGM   06MRN1



Document Created: 2018-02-21 09:33:04
Document Modified: 2018-02-21 09:33:04
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation80 FR 12162 