80_FR_13582 80 FR 13532 - Downeast LNG, Inc.; Application for Long-Term Authorization To Export Liquefied Natural Gas Produced From Domestic Natural Gas Resources to Non-Free Trade Agreement Countries for a 20-Year Period

80 FR 13532 - Downeast LNG, Inc.; Application for Long-Term Authorization To Export Liquefied Natural Gas Produced From Domestic Natural Gas Resources to Non-Free Trade Agreement Countries for a 20-Year Period

DEPARTMENT OF ENERGY

Federal Register Volume 80, Issue 50 (March 16, 2015)

Page Range13532-13534
FR Document2015-05952

The Office of Fossil Energy (FE) of the Department of Energy (DOE) gives notice of receipt of an application (Application), filed on October 15, 2014, by Downeast LNG, Inc. (DELNG), requesting long-term, multi-contract authorization to export domestically produced natural gas in a volume equivalent to approximately 168 billion cubic feet (Bcf) per year, or approximately 0.46 Bcf per day. DELNG seeks authorization to export the natural gas as liquefied natural gas (LNG) by vessel from its proposed LNG terminal to be located in Robbinston, Maine, referred to as the Downeast LNG Import-Export Project. DELNG requests authorization to export LNG to any country with which the United States does not have a free trade agreement (FTA) requiring national treatment for trade in natural gas and with which trade is not prohibited by U.S. law or policy (non-FTA countries). DELNG requests this non-FTA export authorization for a 20-year term to commence on the earlier of the date of first export or eight years from the date the authorization is granted. DELNG requests this authorization both on its own behalf and as agent for other entities who hold title to the LNG at the time of export. The Application was filed under section 3 of the Natural Gas Act (NGA). Additional details can be found in DELNG's Application, posted on the DOE/FE Web site at: http://energy.gov/sites/prod/files/ 2014/10/f18/14_173_lng_nfta_talbert.pdf. Protests, motions to intervene, notices of intervention, and written comments are invited.

Federal Register, Volume 80 Issue 50 (Monday, March 16, 2015)
[Federal Register Volume 80, Number 50 (Monday, March 16, 2015)]
[Notices]
[Pages 13532-13534]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-05952]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

[FE Docket No. 14-173-LNG]


Downeast LNG, Inc.; Application for Long-Term Authorization To 
Export Liquefied Natural Gas Produced From Domestic Natural Gas 
Resources to Non-Free Trade Agreement Countries for a 20-Year Period

AGENCY: Office of Fossil Energy, DOE.

ACTION: Notice of application.

-----------------------------------------------------------------------

SUMMARY: The Office of Fossil Energy (FE) of the Department of Energy 
(DOE) gives notice of receipt of an application (Application), filed on 
October 15, 2014, by Downeast LNG, Inc. (DELNG), requesting long-term, 
multi-contract authorization to export domestically produced natural 
gas in a volume equivalent to approximately 168 billion cubic feet 
(Bcf) per year, or approximately 0.46 Bcf per day. DELNG seeks 
authorization to export the natural gas as liquefied natural gas (LNG) 
by vessel from its proposed LNG terminal to be located in Robbinston, 
Maine, referred to as the Downeast LNG Import-Export Project.
    DELNG requests authorization to export LNG to any country with 
which the United States does not have a free trade agreement (FTA) 
requiring national treatment for trade in natural gas and with which 
trade is not prohibited by U.S. law or policy (non-FTA countries). 
DELNG requests this non-FTA export authorization for a 20-year term to 
commence on the earlier of the date of first export or eight years from 
the date the authorization is

[[Page 13533]]

granted. DELNG requests this authorization both on its own behalf and 
as agent for other entities who hold title to the LNG at the time of 
export. The Application was filed under section 3 of the Natural Gas 
Act (NGA). Additional details can be found in DELNG's Application, 
posted on the DOE/FE Web site at: http://energy.gov/sites/prod/files/2014/10/f18/14_173_lng_nfta_talbert.pdf. Protests, motions to 
intervene, notices of intervention, and written comments are invited.

DATES: Protests, motions to intervene or notices of intervention, as 
applicable, requests for additional procedures, and written comments 
are to be filed using procedures detailed in the Public Comment 
Procedures section no later than 4:30 p.m., Eastern time, May 15, 2015.

ADDRESSES: 

Electronic Filing by email

    fergas@hq.doe.gov

Regular Mail

    U.S. Department of Energy (FE-34), Office of Oil and Gas Global 
Security and Supply, Office of Fossil Energy, P.O. Box 44375, 
Washington, DC 20026-4375.

Hand Delivery or Private Delivery Services (e.g., FedEx, UPS, etc.)

    U.S. Department of Energy (FE-34), Office of Oil and Gas Global 
Security and Supply, Office of Fossil Energy, Forrestal Building, Room 
3E-042, 1000 Independence Avenue SW., Washington, DC 20585.

FOR FURTHER INFORMATION CONTACT: 
    Larine Moore or Marc Talbert, U.S. Department of Energy (FE-34), 
Office of Oil and Gas Global Security and Supply, Office of Fossil 
Energy, Forrestal Building, Room 3E-042, 1000 Independence Avenue SW., 
Washington, DC 20585, (202) 586-9478; (202) 586-7991.
    Cassandra Bernstein U.S. Department of Energy (GC-76), Office of 
the Assistant General Counsel for Electricity and Fossil Energy, 
Forrestal Building, 1000 Independence Ave. SW., Washington, DC 20585, 
(202) 586-9793.

SUPPLEMENTARY INFORMATION: 

DOE/FE Evaluation

    The Application will be reviewed pursuant to section 3(a) of the 
NGA, 15 U.S.C. 717b(a), and DOE will consider any issues required by 
law or policy. To the extent determined to be relevant, these issues 
will include the domestic need for the natural gas proposed to be 
exported, the adequacy of domestic natural gas supply, U.S. energy 
security, and the cumulative impact of the requested authorization and 
any other LNG export application(s) previously approved on domestic 
natural gas supply and demand fundamentals. DOE may also consider other 
factors bearing on the public interest, including the impact of the 
proposed exports on the U.S. economy (including GDP, consumers, and 
industry), job creation, the U.S. balance of trade, and international 
considerations; and whether the authorization is consistent with DOE's 
policy of promoting competition in the marketplace by allowing 
commercial parties to freely negotiate their own trade arrangements. 
Additionally, DOE will consider the following environmental documents:

 Addendum to Environmental Review Documents Concerning Exports 
of Natural Gas From the United States, 79 FR 48132 (Aug. 15, 2014); \1\ 
and
---------------------------------------------------------------------------

    \1\ The Addendum and related documents are available at: http://energy.gov/fe/draft-addendum-environmental-review-documents-concerning-exports-natural-gas-united-states.
---------------------------------------------------------------------------

     Life Cycle Greenhouse Gas Perspective on Exporting 
Liquefied Natural Gas From the United States, 79 FR 32260 (June 4, 
2014).\2\
---------------------------------------------------------------------------

    \2\ The Life Cycle Greenhouse Gas Report is available at: http://energy.gov/fe/life-cycle-greenhouse-gas-perspective-exporting-liquefied-natural-gas-united-states.

Parties that may oppose this Application should address these issues in 
their comments and/or protests, as well as other issues deemed relevant 
to the Application.
    The National Environmental Policy Act (NEPA), 42 U.S.C. 4321 et 
seq., requires DOE to give appropriate consideration to the 
environmental effects of its proposed decisions. No final decision will 
be issued in this proceeding until DOE has met its environmental 
responsibilities.

Public Comment Procedures

    In response to this Notice, any person may file a protest, 
comments, or a motion to intervene or notice of intervention, as 
applicable. Due to the complexity of the issues raised by the 
Applicant, interested parties will be provided 60 days from the date of 
publication of this Notice in which to submit their comments, protests, 
motions to intervene, or notices of intervention.
    Any person wishing to become a party to the proceeding must file a 
motion to intervene or notice of intervention. The filing of comments 
or a protest with respect to the Application will not serve to make the 
commenter or protestant a party to the proceeding, although protests 
and comments received from persons who are not parties will be 
considered in determining the appropriate action to be taken on the 
Application. All protests, comments, motions to intervene, or notices 
of intervention must meet the requirements specified by the regulations 
in 10 CFR part 590.
    Filings may be submitted using one of the following methods: (1) 
Emailing the filing to fergas@hq.doe.gov, with FE Docket No. 14-173-LNG 
in the title line; (2) mailing an original and three paper copies of 
the filing to the Office of Oil and Gas Global Security and Supply at 
the address listed in ADDRESSES; or (3) hand delivering an original and 
three paper copies of the filing to the Office of Oil and Gas Global 
Supply at the address listed in ADDRESSES. All filings must include a 
reference to FE Docket No. 14-173-LNG. Please Note: If submitting a 
filing via email, please include all related documents and attachments 
(e.g., exhibits) in the original email correspondence. Please do not 
include any active hyperlinks or password protection in any of the 
documents or attachments related to the filing. All electronic filings 
submitted to DOE must follow these guidelines to ensure that all 
documents are filed in a timely manner. Any hardcopy filing submitted 
greater in length than 50 pages must also include, at the time of the 
filing, a digital copy on disk of the entire submission.
    A decisional record on the Application will be developed through 
responses to this notice by parties, including the parties' written 
comments and replies thereto. Additional procedures will be used as 
necessary to achieve a complete understanding of the facts and issues. 
If an additional procedure is scheduled, notice will be provided to all 
parties. If no party requests additional procedures, a final Opinion 
and Order may be issued based on the official record, including the 
Application and responses filed by parties pursuant to this notice, in 
accordance with 10 CFR 590.316.
    The Application is available for inspection and copying in the 
Division of Natural Gas Regulatory Activities docket room, Room 3E-042, 
1000 Independence Avenue SW., Washington, DC 20585. The docket room is 
open between the hours of 8:00 a.m. and 4:30 p.m., Monday through 
Friday, except Federal holidays. The Application and any filed 
protests, motions to intervene or notice of interventions, and comments 
will also be available electronically by going to the following DOE/FE 
Web address:

[[Page 13534]]

http://www.fe.doe.gov/programs/gasregulation/index.html.

    Issued in Washington, DC, on March 10, 2015.
John A. Anderson,
Director, Office of Oil and Gas Global Security and Supply, Office of 
Oil and Natural Gas.
[FR Doc. 2015-05952 Filed 3-13-15; 8:45 am]
 BILLING CODE 6450-01-P



                                               13532                         Federal Register / Vol. 80, No. 50 / Monday, March 16, 2015 / Notices

                                               dam to provide instream flow releases to                sediment flushing during the high-flow                         Milestone             Target date
                                               the bypassed reach; (7) a 5,688-foot-long               month of June.
                                               steel penstock varying in diameter from                    PacifiCorp proposes to modify the                  Modified terms and         December 2015.
                                               24 to 16 inches and consisting of buried                project boundary by adding about 8.4                   conditions.
                                               sections or above-ground sections                       acres to encompass a total of 26.4 acres
                                               supported on timber crib trestles; (8) a                of land necessary for project purposes                   o. Final amendments to the
                                               powerhouse containing one impulse                       and for operation and maintenance.                    application must be filed with the
                                               turbine-generator unit with an installed                   m. A copy of the application is                    Commission no later than 30 days from
                                               capacity of 1,100 kilowatts; (9) a 40-foot-             available for review at the Commission                the issuance date of this notice.
                                               long concrete-lined tailrace which                      in the Public Reference Room or may be                   p. A license applicant must file no
                                               conveys powerhouse flows to a 1,000-                    viewed on the Commission’s Web site at                later than 60 days following the date of
                                               foot-long unlined and braided tailrace                  http://www.ferc.gov using the                         issuance of the notice of ready for
                                               channel discharging into the West Fork                  ‘‘eLibrary’’ link. Enter the docket                   environmental analysis provided for in
                                               Wallowa River (West Fork); (10) a 20-                   number excluding the last three digits in             5.22: (1) A copy of the water quality
                                               foot-long, 7.2-kilovolt transmission line               the docket number field to access the                 certification; (2) a copy of the request for
                                               which connects to the Wallowa Falls                     document. For assistance, contact FERC                certification, including proof of the date
                                               substation; and (11) appurtenant                        Online Support. A copy is also available              on which the certifying agency received
                                               facilities.                                             for inspection and reproduction at the                the request; or (3) evidence of waiver of
                                                  The project currently generates an                   address in item h above.                              water quality certification.
                                               average of 7 million kilowatt-hours                        All filings must (1) bear in all capital
                                                                                                                                                               Dated: March 6, 2015.
                                               annually. The dams and existing project                 letters the title ‘‘COMMENTS,’’ ‘‘REPLY
                                                                                                       COMMENTS,’’                                           Nathaniel J. Davis, Sr.,
                                               facilities are owned by PacifiCorp. The
                                                                                                       ‘‘RECOMMENDATIONS,’’                                  Deputy Secretary.
                                               project is operated run-of-river. Up to 1
                                               cubic feet per second (cfs) of flow is                  ‘‘PRELIMINARY TERMS AND                               [FR Doc. 2015–05870 Filed 3–13–15; 8:45 am]
                                               diverted from Royal Purple Creek and                    CONDITIONS,’’ or ‘‘PRELIMINARY                        BILLING CODE 6717–01–P
                                               discharged into the impoundment. Up                     FISHWAY PRESCRIPTIONS;’’ (2) set
                                               to 16 cfs of water (i.e., 15 cfs maximum                forth in the heading the name of the
                                               from East Fork and 1 cfs from Royal                     applicant and the project number of the               DEPARTMENT OF ENERGY
                                               Purple Creek) is diverted through the                   application to which the filing                       [FE Docket No. 14–173–LNG]
                                               intake structure at the East Fork dam                   responds; (3) furnish the name, address,
                                               into the steel penstock and conveyed to                 and telephone number of the person                    Downeast LNG, Inc.; Application for
                                               the powerhouse where it flows through                   submitting the filing; and (4) otherwise              Long-Term Authorization To Export
                                               the single impulse turbine and                          comply with the requirements of 18 CFR                Liquefied Natural Gas Produced From
                                               discharges through the tailrace into the                385.2001 through 385.2005. All                        Domestic Natural Gas Resources to
                                               West Fork. The project’s current license                comments, recommendations, terms and                  Non-Free Trade Agreement Countries
                                               requires a minimum instream flow                        conditions or prescriptions must set                  for a 20-Year Period
                                               release of 0.5 cfs or inflow, whichever                 forth their evidentiary basis and
                                               is less, in the bypassed reach. The                     otherwise comply with the requirements                AGENCY:    Office of Fossil Energy, DOE.
                                               current license also mandates that                      of 18 CFR 4.34(b). Agencies may obtain                ACTION:    Notice of application.
                                               PacifiCorp restrict sediment flushing                   copies of the application directly from
                                               from the impoundment to the period                      the applicant. Each filing must be                    SUMMARY:   The Office of Fossil Energy
                                               from May 1 to August 30 to protect                      accompanied by proof of service on all                (FE) of the Department of Energy (DOE)
                                               kokanee salmon.                                         persons listed in the service list                    gives notice of receipt of an application
                                                  PacifiCorp proposes to modify the                    prepared by the Commission in this                    (Application), filed on October 15, 2014,
                                               existing facilities by: (1) Extending the               proceeding, in accordance with 18 CFR                 by Downeast LNG, Inc. (DELNG),
                                               existing 8-inch Royal Purple Creek                      4.34(b) and 385.2010.                                 requesting long-term, multi-contract
                                               diversion pipe approximately 20 feet to                    Register online at http://                         authorization to export domestically
                                               discharge directly into the East Fork                   www.ferc.gov/docs-filing/                             produced natural gas in a volume
                                               upstream of the project impoundment to                  esubscription.asp to be notified via                  equivalent to approximately 168 billion
                                               reduce erosion, (2) realigning the                      email of new filings and issuances                    cubic feet (Bcf) per year, or
                                               existing tailrace channel and                           related to this or other pending projects.            approximately 0.46 Bcf per day. DELNG
                                               constructing a permanent fish passage                   For assistance, contact FERC Online                   seeks authorization to export the natural
                                               barrier and concrete outfall at its                     Support.                                              gas as liquefied natural gas (LNG) by
                                               confluence with the West Fork to                           n. Procedural Schedule:                            vessel from its proposed LNG terminal
                                               prevent fish from entering the tailrace                    The application will be processed                  to be located in Robbinston, Maine,
                                               channel, (3) improving existing and                     according to the following revised                    referred to as the Downeast LNG Import-
                                               constructing new recreational facilities                Hydro Licensing Schedule. Revisions to                Export Project.
                                               to enhance recreation in the project                    the schedule may be made as                              DELNG requests authorization to
                                               area, and (4) installing and operating                  appropriate.                                          export LNG to any country with which
                                               flow monitoring equipment at the                                                                              the United States does not have a free
                                               historic U.S. Geological Survey gage in                         Milestone                  Target date        trade agreement (FTA) requiring
                                               the East Fork bypassed reach to monitor                                                                       national treatment for trade in natural
Rmajette on DSK2VPTVN1PROD with NOTICES




                                               compliance with minimum flows.                          Filing of recommenda-        May 2015.                gas and with which trade is not
                                                                                                          tions, preliminary                                 prohibited by U.S. law or policy (non-
                                               PacifiCorp also proposes to: Increase the
                                                                                                          terms and condi-
                                               minimum flow release in the bypassed                       tions, and prelimi-
                                                                                                                                                             FTA countries). DELNG requests this
                                               reach to 4 cfs from November through                       nary fishway pre-                                  non-FTA export authorization for a 20-
                                               April and 5 cfs from May through                           scriptions.                                        year term to commence on the earlier of
                                               October, and modify the sediment                        Commission issues EA         September 2015.          the date of first export or eight years
                                               management program to only enable                       Comments on EA .......       October 2015.            from the date the authorization is


                                          VerDate Sep<11>2014   14:09 Mar 13, 2015   Jkt 235001   PO 00000   Frm 00019   Fmt 4703   Sfmt 4703   E:\FR\FM\16MRN1.SGM   16MRN1


                                                                             Federal Register / Vol. 80, No. 50 / Monday, March 16, 2015 / Notices                                             13533

                                               granted. DELNG requests this                            natural gas supply, U.S. energy security,             protests and comments received from
                                               authorization both on its own behalf                    and the cumulative impact of the                      persons who are not parties will be
                                               and as agent for other entities who hold                requested authorization and any other                 considered in determining the
                                               title to the LNG at the time of export.                 LNG export application(s) previously                  appropriate action to be taken on the
                                               The Application was filed under section                 approved on domestic natural gas                      Application. All protests, comments,
                                               3 of the Natural Gas Act (NGA).                         supply and demand fundamentals. DOE                   motions to intervene, or notices of
                                               Additional details can be found in                      may also consider other factors bearing               intervention must meet the
                                               DELNG’s Application, posted on the                      on the public interest, including the                 requirements specified by the
                                               DOE/FE Web site at: http://energy.gov/                  impact of the proposed exports on the                 regulations in 10 CFR part 590.
                                               sites/prod/files/2014/10/f18/                           U.S. economy (including GDP,                             Filings may be submitted using one of
                                               14_173_lng_nfta_talbert.pdf. Protests,                  consumers, and industry), job creation,               the following methods: (1) Emailing the
                                               motions to intervene, notices of                        the U.S. balance of trade, and                        filing to fergas@hq.doe.gov, with FE
                                               intervention, and written comments are                  international considerations; and                     Docket No. 14–173–LNG in the title
                                               invited.                                                whether the authorization is consistent               line; (2) mailing an original and three
                                               DATES: Protests, motions to intervene or                with DOE’s policy of promoting                        paper copies of the filing to the Office
                                               notices of intervention, as applicable,                 competition in the marketplace by                     of Oil and Gas Global Security and
                                               requests for additional procedures, and                 allowing commercial parties to freely                 Supply at the address listed in
                                                                                                       negotiate their own trade arrangements.               ADDRESSES; or (3) hand delivering an
                                               written comments are to be filed using
                                               procedures detailed in the Public                       Additionally, DOE will consider the                   original and three paper copies of the
                                               Comment Procedures section no later                     following environmental documents:                    filing to the Office of Oil and Gas Global
                                               than 4:30 p.m., Eastern time, May 15,                   • Addendum to Environmental Review                    Supply at the address listed in
                                                                                                          Documents Concerning Exports of                    ADDRESSES. All filings must include a
                                               2015.
                                                                                                          Natural Gas From the United States,                reference to FE Docket No. 14–173–
                                               ADDRESSES:                                                                                                    LNG. Please Note: If submitting a filing
                                                                                                          79 FR 48132 (Aug. 15, 2014); 1 and
                                               Electronic Filing by email                                 • Life Cycle Greenhouse Gas                        via email, please include all related
                                                                                                       Perspective on Exporting Liquefied                    documents and attachments (e.g.,
                                                  fergas@hq.doe.gov                                    Natural Gas From the United States, 79                exhibits) in the original email
                                               Regular Mail                                            FR 32260 (June 4, 2014).2                             correspondence. Please do not include
                                                                                                       Parties that may oppose this                          any active hyperlinks or password
                                                 U.S. Department of Energy (FE–34),                                                                          protection in any of the documents or
                                               Office of Oil and Gas Global Security                   Application should address these issues
                                                                                                       in their comments and/or protests, as                 attachments related to the filing. All
                                               and Supply, Office of Fossil Energy,                                                                          electronic filings submitted to DOE
                                               P.O. Box 44375, Washington, DC 20026–                   well as other issues deemed relevant to
                                                                                                       the Application.                                      must follow these guidelines to ensure
                                               4375.                                                                                                         that all documents are filed in a timely
                                                                                                          The National Environmental Policy
                                               Hand Delivery or Private Delivery                       Act (NEPA), 42 U.S.C. 4321 et seq.,                   manner. Any hardcopy filing submitted
                                               Services (e.g., FedEx, UPS, etc.)                       requires DOE to give appropriate                      greater in length than 50 pages must
                                                                                                       consideration to the environmental                    also include, at the time of the filing, a
                                                 U.S. Department of Energy (FE–34),
                                                                                                       effects of its proposed decisions. No                 digital copy on disk of the entire
                                               Office of Oil and Gas Global Security
                                                                                                       final decision will be issued in this                 submission.
                                               and Supply, Office of Fossil Energy,                                                                             A decisional record on the
                                               Forrestal Building, Room 3E–042, 1000                   proceeding until DOE has met its
                                                                                                       environmental responsibilities.                       Application will be developed through
                                               Independence Avenue SW.,                                                                                      responses to this notice by parties,
                                               Washington, DC 20585.                                   Public Comment Procedures                             including the parties’ written comments
                                               FOR FURTHER INFORMATION CONTACT:                           In response to this Notice, any person             and replies thereto. Additional
                                                 Larine Moore or Marc Talbert, U.S.                    may file a protest, comments, or a                    procedures will be used as necessary to
                                               Department of Energy (FE–34), Office of                 motion to intervene or notice of                      achieve a complete understanding of the
                                               Oil and Gas Global Security and Supply,                 intervention, as applicable. Due to the               facts and issues. If an additional
                                               Office of Fossil Energy, Forrestal                      complexity of the issues raised by the                procedure is scheduled, notice will be
                                               Building, Room 3E–042, 1000                             Applicant, interested parties will be                 provided to all parties. If no party
                                               Independence Avenue SW.,                                provided 60 days from the date of                     requests additional procedures, a final
                                               Washington, DC 20585, (202) 586–9478;                   publication of this Notice in which to                Opinion and Order may be issued based
                                               (202) 586–7991.                                         submit their comments, protests,                      on the official record, including the
                                                 Cassandra Bernstein U.S. Department                   motions to intervene, or notices of                   Application and responses filed by
                                               of Energy (GC–76), Office of the                        intervention.                                         parties pursuant to this notice, in
                                               Assistant General Counsel for Electricity                  Any person wishing to become a party               accordance with 10 CFR 590.316.
                                               and Fossil Energy, Forrestal Building,                  to the proceeding must file a motion to                  The Application is available for
                                               1000 Independence Ave. SW.,                             intervene or notice of intervention. The              inspection and copying in the Division
                                               Washington, DC 20585, (202) 586–9793.                   filing of comments or a protest with                  of Natural Gas Regulatory Activities
                                               SUPPLEMENTARY INFORMATION:                              respect to the Application will not serve             docket room, Room 3E–042, 1000
                                                                                                       to make the commenter or protestant a                 Independence Avenue SW.,
                                               DOE/FE Evaluation                                                                                             Washington, DC 20585. The docket
                                                                                                       party to the proceeding, although
                                                 The Application will be reviewed                                                                            room is open between the hours of 8:00
Rmajette on DSK2VPTVN1PROD with NOTICES




                                               pursuant to section 3(a) of the NGA, 15                   1 The Addendum and related documents are            a.m. and 4:30 p.m., Monday through
                                               U.S.C. 717b(a), and DOE will consider                   available at: http://energy.gov/fe/draft-addendum-    Friday, except Federal holidays. The
                                               any issues required by law or policy. To                environmental-review-documents-concerning-            Application and any filed protests,
                                               the extent determined to be relevant,                   exports-natural-gas-united-states.                    motions to intervene or notice of
                                                                                                         2 The Life Cycle Greenhouse Gas Report is
                                               these issues will include the domestic                  available at: http://energy.gov/fe/life-cycle-
                                                                                                                                                             interventions, and comments will also
                                               need for the natural gas proposed to be                 greenhouse-gas-perspective-exporting-liquefied-       be available electronically by going to
                                               exported, the adequacy of domestic                      natural-gas-united-states.                            the following DOE/FE Web address:


                                          VerDate Sep<11>2014   14:09 Mar 13, 2015   Jkt 235001   PO 00000   Frm 00020   Fmt 4703   Sfmt 4703   E:\FR\FM\16MRN1.SGM   16MRN1


                                               13534                         Federal Register / Vol. 80, No. 50 / Monday, March 16, 2015 / Notices

                                               http://www.fe.doe.gov/programs/                           Description: Crossroads Pipeline                       Filed Date: 3/3/15.
                                               gasregulation/index.html.                               Company Annual Transportation                            Accession Number: 20150303–5077.
                                                 Issued in Washington, DC, on March 10,                Retainage Adjustment Filing.                             Comments Due: 5 p.m. ET 3/16/15.
                                               2015.                                                     Filed Date: 2/27/15.                                   Docket Numbers: RP15–605–000.
                                               John A. Anderson,                                         Accession Number: 20150227–5583.                       Applicants: ExxonMobil LNG Supply
                                                                                                         Comments Due: 5 p.m. ET 3/11/15.                    LLC.
                                               Director, Office of Oil and Gas Global Security
                                               and Supply, Office of Oil and Natural Gas.                Docket Numbers: RP15–598–000.                          Description: Joint Petition for Waiver
                                                                                                         Applicants: Dauphin Island Gathering                of ExxonMobil LNG Supply LLC, et al.
                                               [FR Doc. 2015–05952 Filed 3–13–15; 8:45 am]
                                                                                                       Partners.                                                Filed Date: 2/27/15.
                                               BILLING CODE 6450–01–P                                                                                           Accession Number: 20150227–5607.
                                                                                                         Description: Storm Surcharge Filing,
                                                                                                       no change in rate of Dauphin Island                      Comments Due: 5 p.m. ET 3/11/15.
                                                                                                       Gathering Partners.                                      Docket Numbers: RP15–607–000.
                                               DEPARTMENT OF ENERGY
                                                                                                         Filed Date: 2/27/15.                                   Applicants: Iroquois Gas
                                               Federal Energy Regulatory                                 Accession Number: 20150227–5584.                    Transmission System, L.P.
                                               Commission                                                Comments Due: 5 p.m. ET 3/11/15.                       Description: § 4(d) rate filing per
                                                                                                         Docket Numbers: RP15–599–000.                       154.204: 03/03/15 Negotiated Rates—
                                               Combined Notice of Filings                                Applicants: Hardy Storage Company,                  ConEdison Energy Inc. (HUB) 2275–89
                                                                                                       LLC.                                                  to be effective 3/2/2015.
                                                 Take notice that the Commission has                                                                            Filed Date: 3/3/15.
                                               received the following Natural Gas                        Description: Hardy Storage Company,
                                                                                                       LLC Operational Transactions Report                      Accession Number: 20150303–5151.
                                               Pipeline Rate and Refund Report filings:                                                                         Comments Due: 5 p.m. ET 3/16/15.
                                                                                                       2014.
                                               Filings Instituting Proceedings                           Filed Date: 2/27/15.                                   Docket Numbers: RP15–608–000.
                                                                                                         Accession Number: 20150227–5585.                       Applicants: Northern Natural Gas
                                                 Docket Numbers: PR15–23–000.                                                                                Company.
                                                 Applicants: Bridgeline Holdings, L.P.                   Comments Due: 5 p.m. ET 3/11/15.
                                                                                                                                                                Description: § 4(d) rate filing per
                                                 Description: Submits tariff filing per                  Docket Numbers: RP15–600–000.
                                                                                                                                                             154.204: 20150303 Negotiated Rate to be
                                               284.123(e) + (g): SOC Contact Updates                     Applicants: Columbia Gulf
                                                                                                                                                             effective 3/4/2015.
                                               to be effective 3/1/2015; Filing Type:                  Transmission, LLC.                                       Filed Date: 3/3/15.
                                               1280.                                                     Description: Columbia Gulf                             Accession Number: 20150303–5216.
                                                 Filed Date: 2/26/15.                                  Transmission, LLC Operational                            Comments Due: 5 p.m. ET 3/16/15.
                                                 Accession Number: 20150226–5194.                      Transactions Report 2014.
                                                                                                                                                                Any person desiring to intervene or
                                                 Comments Due: 5 p.m. ET 3/19/15.                        Filed Date: 2/27/15.
                                                                                                                                                             protest in any of the above proceedings
                                                 284.123(g) Protests Due: 5 p.m. ET 4/                   Accession Number: 20150227–5586.
                                                                                                         Comments Due: 5 p.m. ET 3/11/15.                    must file in accordance with Rules 211
                                               27/15.                                                                                                        and 214 of the Commission’s
                                                 Docket Numbers: PR15–24–000.                            Docket Numbers: RP15–601–000.                       Regulations (18 CFR 385.211 and
                                                 Applicants: Centana Intrastate                          Applicants: Crossroads Pipeline                     § 385.214) on or before 5:00 p.m. Eastern
                                               Pipeline, LLC.                                          Company.                                              time on the specified date(s). Protests
                                                 Description: Submits tariff filing per                  Description: Crossroads Pipeline
                                                                                                                                                             may be considered, but intervention is
                                               284.123(b)(2) + (g): CIPCO Rate Case to                 Company Operational Transactions
                                                                                                                                                             necessary to become a party to the
                                               be effective 3/1/2015; Filing Type: 1310.               Report 2014.
                                                                                                                                                             proceeding.
                                                 Filed Date: 2/27/15.                                    Filed Date: 2/27/15.
                                                 Accession Number: 20150227–5335.                        Accession Number: 20150227–5587.                    Filings in Existing Proceedings
                                                 Comments Due: 5 p.m. ET 3/20/15.                        Comments Due: 5 p.m. ET 3/11/15.                       Docket Numbers: RP15–485–001.
                                                 284.123(g) Protests Due: 5 p.m. ET 4/                   Docket Numbers: RP15–602–000.                          Applicants: Guardian Pipeline, L.L.C.
                                               28/15.                                                    Applicants: Millennium Pipeline                        Description: Tariff Amendment per
                                                 Docket Numbers: PR15–25–000.                          Company, LLC.                                         154.205(b): Amendment to Docket No.
                                                 Applicants: Enable Oklahoma                             Description: Millennium Pipeline                    RP15–485–000—Negotiated Rate PAL
                                               Intrastate Transmission, LLC.                           Company, LLC Operational                              with Exelon to be effective 2/20/2015.
                                                 Description: Submits tariff filing per                Transactions Report 2014.                                Filed Date: 3/3/15.
                                               284.123(e) + (g): Revised Fuel                            Filed Date: 2/27/15.                                   Accession Number: 20150303–5215.
                                               Percentages April 1, 2015 through                         Accession Number: 20150227–5589.                       Comments Due: 5 p.m. ET 3/16/15.
                                               March 31, 2016 to be effective 4/1/2015;                  Comments Due: 5 p.m. ET 3/11/15.                       Any person desiring to protest in any
                                               Filing Type: 1280.                                        Docket Numbers: RP15–603–000.                       of the above proceedings must file in
                                                 Filed Date: 2/27/15.                                    Applicants: TransColorado Gas                       accordance with Rule 211 of the
                                                 Accession Number: 20150227–5536.                      Transmission Company L.                               Commission’s Regulations (18 CFR
                                                 Comments Due: 5 p.m. ET 3/20/15.                        Description: TransColorado Gas                      385.211) on or before 5:00 p.m. Eastern
                                                 284.123(g) Protests Due: 5 p.m. ET 4/                 Transmission Company LLC 2014                         time on the specified comment date.
                                               28/15.                                                  Annual Fuel Gas Reimbursement                            The filings are accessible in the
                                                 Docket Numbers: RP15–556–000.                         Percentage Report.                                    Commission’s eLibrary system by
                                                 Applicants: High Island Offshore                        Filed Date: 2/27/15.                                clicking on the links or querying the
                                               System, L.L.C.                                            Accession Number: 20150227–5592.                    docket number.
                                                 Description: High Island Offshore                       Comments Due: 5 p.m. ET 3/11/15.                       eFiling is encouraged. More detailed
Rmajette on DSK2VPTVN1PROD with NOTICES




                                               System, L.L.C. 2015 Annual Fuel Filing.                   Docket Numbers: RP15–604–000.                       information relating to filing
                                                 Filed Date: 2/26/15.                                    Applicants: Iroquois Gas                            requirements, interventions, protests,
                                                 Accession Number: 20150226–5350.                      Transmission System, L.P.                             service, and qualifying facilities filings
                                                 Comments Due: 5 p.m. ET 3/10/15.                        Description: § 4(d) rate filing per                 can be found at: http://www.ferc.gov/
                                                 Docket Numbers: RP15–597–000.                         154.204: 03/03/15 Negotiated Rates—                   docs-filing/efiling/filing-req.pdf. For
                                                 Applicants: Crossroads Pipeline                       Sequent Energy Management (HUB)                       other information, call (866) 208–3676
                                               Company.                                                3075–89 to be effective 3/2/2015.                     (toll free). For TTY, call (202) 502–8659.


                                          VerDate Sep<11>2014   18:31 Mar 13, 2015   Jkt 235001   PO 00000   Frm 00021   Fmt 4703   Sfmt 4703   E:\FR\FM\16MRN1.SGM   16MRN1



Document Created: 2018-02-21 09:38:03
Document Modified: 2018-02-21 09:38:03
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice of application.
DatesProtests, motions to intervene or notices of intervention, as applicable, requests for additional procedures, and written comments are to be filed using procedures detailed in the Public Comment Procedures section no later than 4:30 p.m., Eastern time, May 15, 2015.
ContactLarine Moore or Marc Talbert, U.S. Department of Energy (FE-34), Office of Oil and Gas Global Security and Supply, Office of Fossil Energy, Forrestal Building, Room 3E-042, 1000 Independence Avenue SW., Washington, DC 20585, (202) 586-9478; (202) 586-7991.