80_FR_19381 80 FR 19312 - Transcontinental Gas Pipe Line Company, LLC; Notice of Application

80 FR 19312 - Transcontinental Gas Pipe Line Company, LLC; Notice of Application

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 80, Issue 69 (April 10, 2015)

Page Range19312-19313
FR Document2015-08231

Federal Register, Volume 80 Issue 69 (Friday, April 10, 2015)
[Federal Register Volume 80, Number 69 (Friday, April 10, 2015)]
[Notices]
[Pages 19312-19313]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-08231]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket Nos. CP15-117-000; PF14-10-000]


Transcontinental Gas Pipe Line Company, LLC; Notice of 
Application

    Take notice that on March 19, 2015, Transcontinental Gas Pipe Line 
Company, LLC (Transco), Post Office Box 1396, Houston, Texas 77251, 
filed in Docket No. CP15-117-000, an application pursuant to section 7 
of the Natural Gas Act (NGA) for authority to construct and operate its 
Dalton Expansion Project. Specifically, Transco request to construct 
approximately 111.2 miles of new pipeline and install a new 21,830 
horsepower compressor station in Carroll County, Georgia. The proposal 
will provide 448 million cubic feet (MMcf) per day of firm capacity on 
Transco's system. The estimated cost of the project is $471.9 million, 
all as more fully set forth in the application which is on file with 
the Commission and open to public inspection. This filing may also be 
viewed on the Commission's Web site at http://www.ferc.gov using the 
``eLibrary'' link. Enter the docket number, excluding the last three 
digits, in the docket number field to access the document. For 
assistance, call (202) 502-8659 or TTY, (202) 208-3676.
    Any questions regarding this application should be directed to 
Ingrid Germany, Regulatory Analyst, Transcontinental Gas Pipe Line 
Company, LLC, Post Office Box 1396, Houston, TX 77251, by phone: (713) 
215-4015 or email: Ingrid.germany@williams.com. In addition, Transco 
has established a toll-free phone number 1-866-455-9103 so that parties 
can call with questions about the Project and an email support address 
pipelineexpansion@williams.com.
    On April 11, 2014 (CHECK THE DATE), the Commission staff granted 
the Transco's request to utilize the Pre-Filing Process and assigned 
Docket No. PF14-10-000 to staff activities involved the Dalton 
Expansion Project. Now as of filing the March 19, 2015 application, the 
Pre-Filing Process for this project has ended. From this time forward, 
this proceeding will be conducted in Docket No. CP15-117-000, as noted 
in the caption of this Notice.
    Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9, 
within 90 days of this Notice, the Commission staff will issue a Notice 
of Schedule for Environmental Review. If a Notice of Schedule for 
Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the environmental assessment (EA) for this proposal. The issuance of a 
Notice of Schedule for Environmental Review will serve to notify 
federal and state agencies of the timing for the completion of all 
necessary reviews, and the subsequent need to complete all federal 
authorizations within 90 days of the date of issuance of the Commission 
staff's EA.
    There are two ways to become involved in the Commission's review of 
this project. First, any person wishing to obtain legal status by 
becoming a party to the proceedings for this project should, on or 
before the below listed comment date, file with the Federal Energy 
Regulatory Commission, 888 First Street, NE., Washington, DC 20426, a 
motion to intervene in accordance

[[Page 19313]]

with the requirements of the Commission's Rules of Practice and 
Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA 
(18 CFR 157.10). A person obtaining party status will be placed on the 
service list maintained by the Secretary of the Commission and will 
receive copies of all documents filed by the applicant and by all other 
parties. A party must submit 7 copies of filings made with the 
Commission and must mail a copy to the applicant and to every other 
party in the proceeding. Only parties to the proceeding can ask for 
court review of Commission orders in the proceeding.
    However, a person does not have to intervene in order to have 
comments considered. The second way to participate is by filing with 
the Secretary of the Commission, as soon as possible, an original and 
two copies of comments in support of or in opposition to this project. 
The Commission will consider these comments in determining the 
appropriate action to be taken, but the filing of a comment alone will 
not serve to make the filer a party to the proceeding. The Commission's 
rules require that persons filing comments in opposition to the project 
provide copies of their protests only to the party or parties directly 
involved in the protest.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission. Environmental commenters will be 
placed on the Commission's environmental mailing list, will receive 
copies of the environmental documents, and will be notified of meetings 
associated with the Commission's environmental review process. 
Environmental commenters will not be required to serve copies of filed 
documents on all other parties. However, the non-party commenters will 
not receive copies of all documents filed by other parties or issued by 
the Commission (except for the mailing of environmental documents 
issued by the Commission) and will not have the right to seek court 
review of the Commission's final order.
    Motions to intervene, protests and comments may be filed 
electronically via the internet in lieu of paper; see, 18 CFR 
385.2001(a)(1)(iii) and the instructions on the Commission's Web site 
under the ``e-Filing'' link. The Commission strongly encourages 
electronic filings.
    Comment Date: April 23, 2015.

    Dated: April 2, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-08231 Filed 4-9-15; 8:45 am]
 BILLING CODE 6717-01-P



                                                  19312                            Federal Register / Vol. 80, No. 69 / Friday, April 10, 2015 / Notices

                                                     Applicants: CPV Biomass Holdings,                       Applicants: Southern California                    station in Carroll County, Georgia. The
                                                  LLC.                                                    Edison Company.                                       proposal will provide 448 million cubic
                                                     Description: Supplement to February                     Description: § 205(d) rate filing per              feet (MMcf) per day of firm capacity on
                                                  2, 2015 CPV Biomass Holdings, LLC                       35.13(a)(1): Formula Rate Revision                    Transco’s system. The estimated cost of
                                                  tariff filing.                                          Filing to be effective 1/1/2015.                      the project is $471.9 million, all as more
                                                     Filed Date: 4/1/15.                                     Filed Date: 4/3/15.                                fully set forth in the application which
                                                     Accession Number: 20150401–5746.                        Accession Number: 20150403–5136.                   is on file with the Commission and open
                                                     Comments Due: 5 p.m. ET 4/8/15.                         Comments Due: 5 p.m. ET 4/24/15.                   to public inspection. This filing may
                                                     Docket Numbers: ER15–1443–000.                          Docket Numbers: ER15–1450–000.                     also be viewed on the Commission’s
                                                     Applicants: Appalachian Power                           Applicants: Southwest Power Pool,                  Web site at http://www.ferc.gov using
                                                  Company.                                                Inc.                                                  the ‘‘eLibrary’’ link. Enter the docket
                                                     Description: § 205(d) rate filing per                   Description: § 205(d) rate filing per              number, excluding the last three digits,
                                                  35.13(a)(2)(iii): Power Coordination                    35.13(a)(2)(iii): 2998 RPM Access and                 in the docket number field to access the
                                                  Agreement Amendment to be effective                     Westar Energy Meter Agent Agreement                   document. For assistance, call (202)
                                                  6/1/2015.                                               to be effective 4/1/2015.                             502–8659 or TTY, (202) 208–3676.
                                                     Filed Date: 4/2/15.                                     Filed Date: 4/3/15.                                   Any questions regarding this
                                                     Accession Number: 20150402–5302.                        Accession Number: 20150403–5147.                   application should be directed to Ingrid
                                                     Comments Due: 5 p.m. ET 4/23/15.                        Comments Due: 5 p.m. ET 4/24/15.                   Germany, Regulatory Analyst,
                                                                                                             The filings are accessible in the                  Transcontinental Gas Pipe Line
                                                     Docket Numbers: ER15–1444–000.                                                                             Company, LLC, Post Office Box 1396,
                                                     Applicants: Wheeling Power                           Commission’s eLibrary system by
                                                                                                          clicking on the links or querying the                 Houston, TX 77251, by phone: (713)
                                                  Company.                                                                                                      215–4015 or email: Ingrid.germany@
                                                     Description: § 205(d) rate filing per                docket number.
                                                                                                             Any person desiring to intervene or                williams.com. In addition, Transco has
                                                  35.13(a)(2)(iii): Power Coordination                                                                          established a toll-free phone number 1–
                                                  Agreement Concurrence to be effective                   protest in any of the above proceedings
                                                                                                          must file in accordance with Rules 211                866–455–9103 so that parties can call
                                                  6/1/2015.                                                                                                     with questions about the Project and an
                                                     Filed Date: 4/2/15.                                  and 214 of the Commission’s
                                                                                                          Regulations (18 CFR 385.211 and                       email support address
                                                     Accession Number: 20150402–5303.                                                                           pipelineexpansion@williams.com.
                                                     Comments Due: 5 p.m. ET 4/23/15.                     § 385.214) on or before 5:00 p.m. Eastern
                                                                                                                                                                   On April 11, 2014 (CHECK THE
                                                     Docket Numbers: ER15–1445–000.                       time on the specified comment date.
                                                                                                                                                                DATE), the Commission staff granted
                                                     Applicants: Appalachian Power                        Protests may be considered, but
                                                                                                                                                                the Transco’s request to utilize the Pre-
                                                  Company.                                                intervention is necessary to become a
                                                                                                                                                                Filing Process and assigned Docket No.
                                                     Description: § 205(d) rate filing per                party to the proceeding.
                                                                                                                                                                PF14–10–000 to staff activities involved
                                                  35.13(a)(2)(iii): System Integration                       eFiling is encouraged. More detailed
                                                                                                                                                                the Dalton Expansion Project. Now as of
                                                  Agreement Amendment to be effective                     information relating to filing
                                                                                                                                                                filing the March 19, 2015 application,
                                                  6/1/2015.                                               requirements, interventions, protests,
                                                                                                                                                                the Pre-Filing Process for this project
                                                     Filed Date: 4/2/15.                                  service, and qualifying facilities filings            has ended. From this time forward, this
                                                     Accession Number: 20150402–5304.                     can be found at: http://www.ferc.gov/                 proceeding will be conducted in Docket
                                                     Comments Due: 5 p.m. ET 4/23/15.                     docs-filing/efiling/filing-req.pdf. For               No. CP15–117–000, as noted in the
                                                                                                          other information, call (866) 208–3676                caption of this Notice.
                                                     Docket Numbers: ER15–1446–000.
                                                                                                          (toll free). For TTY, call (202) 502–8659.               Pursuant to section 157.9 of the
                                                     Applicants: Wheeling Power
                                                  Company.                                                  Dated: April 3, 2015.                               Commission’s rules, 18 CFR 157.9,
                                                     Description: § 205(d) rate filing per                Nathaniel J. Davis, Sr.,                              within 90 days of this Notice, the
                                                  35.13(a)(2)(iii): System Integration                    Deputy Secretary.                                     Commission staff will issue a Notice of
                                                  Agreement Concurrence to be effective                   [FR Doc. 2015–08224 Filed 4–9–15; 8:45 am]            Schedule for Environmental Review. If
                                                  6/1/2015.                                               BILLING CODE 6717–01–P
                                                                                                                                                                a Notice of Schedule for Environmental
                                                     Filed Date: 4/2/15.                                                                                        Review is issued, it will indicate, among
                                                     Accession Number: 20150402–5305.                                                                           other milestones, the anticipated date
                                                     Comments Due: 5 p.m. ET 4/23/15.                     DEPARTMENT OF ENERGY                                  for the Commission staff’s issuance of
                                                                                                                                                                the environmental assessment (EA) for
                                                     Docket Numbers: ER15–1447–000.
                                                                                                          Federal Energy Regulatory                             this proposal. The issuance of a Notice
                                                     Applicants: Mid-Georgia Cogen L.P.
                                                                                                          Commission                                            of Schedule for Environmental Review
                                                     Description: Initial rate filing per
                                                                                                                                                                will serve to notify federal and state
                                                  35.12 Market-Based Rate Application to                  [Docket Nos. CP15–117–000; PF14–10–000]
                                                                                                                                                                agencies of the timing for the
                                                  be effective 6/3/2015.
                                                                                                          Transcontinental Gas Pipe Line                        completion of all necessary reviews, and
                                                     Filed Date: 4/3/15.
                                                                                                          Company, LLC; Notice of Application                   the subsequent need to complete all
                                                     Accession Number: 20150403–5037.
                                                                                                                                                                federal authorizations within 90 days of
                                                     Comments Due: 5 p.m. ET 4/24/15.                       Take notice that on March 19, 2015,                 the date of issuance of the Commission
                                                     Docket Numbers: ER15–1448–000.                       Transcontinental Gas Pipe Line                        staff’s EA.
                                                     Applicants: Southwest Power Pool,                    Company, LLC (Transco), Post Office                      There are two ways to become
                                                  Inc.                                                    Box 1396, Houston, Texas 77251, filed                 involved in the Commission’s review of
                                                     Description: § 205(d) rate filing per
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                                                                          in Docket No. CP15–117–000, an                        this project. First, any person wishing to
                                                  35.13(a)(2)(iii): 2825R3 KMEA and                       application pursuant to section 7 of the              obtain legal status by becoming a party
                                                  Westar Energy Meter Agent Agreement                     Natural Gas Act (NGA) for authority to                to the proceedings for this project
                                                  to be effective 4/1/2015.                               construct and operate its Dalton                      should, on or before the below listed
                                                     Filed Date: 4/3/15.                                  Expansion Project. Specifically, Transco              comment date, file with the Federal
                                                     Accession Number: 20150403–5039.                     request to construct approximately                    Energy Regulatory Commission, 888
                                                     Comments Due: 5 p.m. ET 4/24/15.                     111.2 miles of new pipeline and install               First Street, NE., Washington, DC 20426,
                                                     Docket Numbers: ER15–1449–000.                       a new 21,830 horsepower compressor                    a motion to intervene in accordance


                                             VerDate Sep<11>2014   20:09 Apr 09, 2015   Jkt 235001   PO 00000   Frm 00037   Fmt 4703   Sfmt 4703   E:\FR\FM\10APN1.SGM   10APN1


                                                                                   Federal Register / Vol. 80, No. 69 / Friday, April 10, 2015 / Notices                                                  19313

                                                  with the requirements of the                              Dated: April 2, 2015.                               where compensation would be
                                                  Commission’s Rules of Practice and                      Kimberly D. Bose,                                     determined in accordance with state
                                                  Procedure (18 CFR 385.214 or 385.211)                   Secretary.                                            law.
                                                  and the Regulations under the NGA (18                   [FR Doc. 2015–08231 Filed 4–9–15; 8:45 am]               Texas Eastern provided landowners
                                                  CFR 157.10). A person obtaining party                   BILLING CODE 6717–01–P                                with a fact sheet prepared by the FERC
                                                  status will be placed on the service list                                                                     entitled ‘‘An Interstate Natural Gas
                                                  maintained by the Secretary of the                                                                            Facility On My Land? What do I Need
                                                  Commission and will receive copies of                   DEPARTMENT OF ENERGY                                  to Know?’’ This fact sheet addresses a
                                                  all documents filed by the applicant and                                                                      number of typically-asked questions,
                                                  by all other parties. A party must submit               Federal Energy Regulatory                             including the use of eminent domain
                                                  7 copies of filings made with the                       Commission                                            and how to participate in the
                                                  Commission and must mail a copy to                      [Docket No. CP15–90–000]                              Commission’s proceedings. It is also
                                                  the applicant and to every other party in                                                                     available for viewing on the FERC Web
                                                  the proceeding. Only parties to the                     Texas Eastern Transmission, LP;                       site (www.ferc.gov).
                                                  proceeding can ask for court review of                  Notice of Intent To Prepare an                        Summary of the Proposed Project
                                                  Commission orders in the proceeding.                    Environmental Assessment for the
                                                                                                          Proposed Gulf Markets Expansion                          The purpose of the Project would be
                                                     However, a person does not have to                   Project and Request for Comments on                   to provide 650,000 dekatherms per day
                                                  intervene in order to have comments                     Environmental Issues                                  (Dth/d) of natural gas to the Gulf Coast
                                                  considered. The second way to                                                                                 region of Louisiana and Texas from the
                                                  participate is by filing with the                         The staff of the Federal Energy                     natural gas basins in the Northeast and
                                                  Secretary of the Commission, as soon as                 Regulatory Commission (FERC or                        Texas. The Project would consist of the
                                                  possible, an original and two copies of                 Commission) will prepare an                           following facility modifications:
                                                  comments in support of or in opposition                 environmental assessment (EA) that will                  • At the Wheelersburg Compressor
                                                  to this project. The Commission will                    discuss the environmental impacts of                  Station in Scioto County, Ohio to allow
                                                  consider these comments in                              the Gulf Markets Expansion Project                    for bi-directional compression on six,
                                                  determining the appropriate action to be                (Project) involving construction and                  existing 2,500 horsepower (HP)
                                                  taken, but the filing of a comment alone                operation of facilities by Texas Eastern              compressor units;
                                                  will not serve to make the filer a party                Transmission, LP (Texas Eastern) in                      • at the Owingsville Compressor
                                                  to the proceeding. The Commission’s                     Lavaca County, Texas; St. Landry,                     Station in Bath County, Kentucky to
                                                  rules require that persons filing                       Pointe Coupee, and Beauregard                         allow for bi-directional compression;
                                                                                                          Parishes, Louisiana; Scioto, Ohio; Bath                  • at the Mt. Pleasant Compressor
                                                  comments in opposition to the project
                                                                                                          County, Kentucky; Giles County,                       Station in Giles County, Tennessee to
                                                  provide copies of their protests only to
                                                                                                          Tennessee; and Monroe and Franklin                    allow for support of bi-directional
                                                  the party or parties directly involved in
                                                                                                          Counties, Mississippi. The Commission                 compression;
                                                  the protest.
                                                                                                          will use this EA in its decision-making                  • at the Egypt Compressor Station in
                                                     Persons who wish to comment only                     process to determine whether the                      Monroe County, Mississippi to allow for
                                                  on the environmental review of this                     project is in the public convenience and              support of bi-directional compression;
                                                  project should submit an original and                   necessity.                                               • at the existing launchers and
                                                  two copies of their comments to the                       This notice announces the opening of                receivers at milepost (MP) 231.16, south
                                                  Secretary of the Commission.                            the scoping process the Commission                    of the Union Church Compressor
                                                  Environmental commenters will be                        will use to gather input from the public              Station in Franklin County, Mississippi
                                                  placed on the Commission’s                              and interested agencies on the Project.               to allow for bi-directional in-line
                                                  environmental mailing list, will receive                Your input will help the Commission                   inspection;
                                                  copies of the environmental documents,                  staff determine what issues they need to                 • at the Gillis County Compressor
                                                  and will be notified of meetings                        evaluate in the EA. Please note that the              Station in Beauregard Parish, Louisiana
                                                  associated with the Commission’s                        scoping period will close on May 4,                   to allow for bi-directional compression;
                                                  environmental review process.                           2015.                                                    • at the existing Opelousas
                                                  Environmental commenters will not be                      This notice is being sent to the                    Compressor Station in Saint Landry
                                                  required to serve copies of filed                       Commission’s current environmental                    Parish, Louisiana, to allow for bi-
                                                  documents on all other parties.                         mailing list for this Project. State and              directional compression, and
                                                  However, the non-party commenters                       local government representatives should               installation of an additional 12,500 HP
                                                  will not receive copies of all documents                notify their constituents of this                     electric-driven compressor unit;
                                                  filed by other parties or issued by the                 proposed Project and encourage them to                   • at two existing metering and
                                                  Commission (except for the mailing of                   comment on their areas of concern.                    regulating (M&R) locations at Lottie and
                                                  environmental documents issued by the                     If you are a landowner receiving this
                                                                                                                                                                New Roads Township in Pointe Coupee
                                                  Commission) and will not have the right                 notice, a pipeline company
                                                                                                                                                                Parish, Louisiana (M&R 71287 and M&R
                                                  to seek court review of the                             representative may contact you about
                                                                                                                                                                71424) additions of gas chromatographs;
                                                  Commission’s final order.                               the acquisition of an easement to
                                                                                                                                                                and
                                                                                                          construct, operate, and maintain the
                                                     Motions to intervene, protests and                                                                            • at the new Provident City
                                                                                                          proposed facilities. The company would
                                                  comments may be filed electronically                                                                          Compressor Station in Lavaca County,
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                                                                          seek to negotiate a mutually acceptable
                                                  via the internet in lieu of paper; see, 18                                                                    Texas, installation of a new 5,280 HP
                                                                                                          agreement. However, if the Commission
                                                  CFR 385.2001(a)(1)(iii) and the                                                                               compressor unit.
                                                                                                          approves the Project, that approval
                                                  instructions on the Commission’s Web                                                                             The general location of the project
                                                                                                          conveys with it the right of eminent
                                                  site under the ‘‘e-Filing’’ link. The                                                                         facilities is shown in appendix 1.1
                                                                                                          domain. Therefore, if easement
                                                  Commission strongly encourages                          negotiations fail to produce an                         1 The appendices referenced in this notice will
                                                  electronic filings.                                     agreement, the pipeline company could                 not appear in the Federal Register. Copies of
                                                     Comment Date: April 23, 2015.                        initiate condemnation proceedings                                                                Continued




                                             VerDate Sep<11>2014   20:09 Apr 09, 2015   Jkt 235001   PO 00000   Frm 00038   Fmt 4703   Sfmt 4703   E:\FR\FM\10APN1.SGM   10APN1



Document Created: 2018-02-21 10:08:57
Document Modified: 2018-02-21 10:08:57
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
DatesApril 23, 2015.
FR Citation80 FR 19312 