80_FR_19417 80 FR 19348 - Information Collection Activities: Pipelines and Pipeline Rights-of-Way (ROW); Proposed Collection; Comment Request

80 FR 19348 - Information Collection Activities: Pipelines and Pipeline Rights-of-Way (ROW); Proposed Collection; Comment Request

DEPARTMENT OF THE INTERIOR
Bureau of Safety and Environmental Enforcement

Federal Register Volume 80, Issue 69 (April 10, 2015)

Page Range19348-19352
FR Document2015-08264

To comply with the Paperwork Reduction Act of 1995 (PRA), BSEE is inviting comments on a collection of information that we will submit to the Office of Management and Budget (OMB) for review and approval. The information collection request (ICR) concerns a revision to the paperwork requirements in the regulations under Subpart J, Pipelines and Pipeline Rights-of-Way (ROW).

Federal Register, Volume 80 Issue 69 (Friday, April 10, 2015)
[Federal Register Volume 80, Number 69 (Friday, April 10, 2015)]
[Notices]
[Pages 19348-19352]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-08264]


-----------------------------------------------------------------------

DEPARTMENT OF THE INTERIOR

Bureau of Safety and Environmental Enforcement

[Docket ID BSEE-2015-0003; OMB Control Number 1014-0016; 15XE1700DX 
EX1SF0000.DAQ000 EEEE500000]


Information Collection Activities: Pipelines and Pipeline Rights-
of-Way (ROW); Proposed Collection; Comment Request

ACTION: 60-day notice.

-----------------------------------------------------------------------

SUMMARY: To comply with the Paperwork Reduction Act of 1995 (PRA), BSEE 
is inviting comments on a collection of information that we will submit 
to the Office of Management and Budget (OMB) for review and approval. 
The information collection request (ICR) concerns a revision to the 
paperwork requirements in the regulations under Subpart J, Pipelines 
and Pipeline Rights-of-Way (ROW).

DATES: You must submit comments by June 9, 2015.

ADDRESSES: You may submit comments by either of the following methods 
listed below.
     Electronically go to http://www.regulations.gov. In the 
Search box, enter BSEE-2015-0003 then click search. Follow the 
instructions to submit public comments and view all related materials. 
We will post all comments.
     Email cheryl.blundon@bsee.gov. Mail or hand-carry comments 
to the Department of the Interior; Bureau of Safety and Environmental 
Enforcement; Regulations and Standards Branch; ATTN: Cheryl Blundon; 
45600 Woodland Rd., Sterling, VA 20166. Please reference ICR 1014-0016 
in your comment and include your name and return address.

FOR FURTHER INFORMATION CONTACT: Cheryl Blundon, Regulations and 
Standards Branch at (703) 787-1607 to request additional information 
about this ICR.

SUPPLEMENTARY INFORMATION:
    Title: 30 CFR part 250, subpart J, Pipelines and Pipeline Rights-
of-Way (ROW).
    Form(s): BSEE-0149.
    OMB Control Number: 1014-0016.
    Abstract: The Outer Continental Shelf (OCS) Lands Act at (43 U.S.C. 
1334), authorizes the Secretary of the Interior to prescribe rules and 
regulations to necessary for the administration of the leasing 
provisions of the Act related to mineral resources on the OCS. Such 
rules and regulations apply to all operations conducted under a lease, 
pipeline right-of-way (ROW), or a right-of-use and easement. Section 
1334(e) authorizes the Secretary to grant ROWs through the submerged 
lands of the OCS for pipelines ``. . . for the transportation of oil, 
natural gas, sulphur, or other minerals, or under such regulations and 
upon such conditions as may be prescribed by the Secretary, . . . 
including (as provided in Section 1347(b) of this title) assuring 
maximum environmental protection by utilization of the best available 
and safest technologies, including the safest practices for pipeline 
burial. . . .''
    In addition to the general rulemaking authority of the OCSLA at 43 
U.S.C. 1334, section 301(a) of the Federal Oil and Gas Royalty 
Management Act (FOGRMA), 30 U.S.C. 1751(a), grants authority to the 
Secretary to prescribe such rules and regulations as are reasonably 
necessary to carry out FOGRMA's provisions. While the majority of 
FOGRMA is directed to royalty collection and enforcement, some 
provisions apply to offshore operations. For example, section 108 of

[[Page 19349]]

FOGRMA, 30 U.S.C. 1718, grants the Secretary broad authority to inspect 
lease sites for the purpose of determining whether there is compliance 
with the mineral leasing laws. Section 109(c)(2) and (d)(1), 30 U.S.C. 
1719(c)(2) and (d)(1), impose substantial civil penalties for failure 
to permit lawful inspections and for knowing or willful preparation or 
submission of false, inaccurate, or misleading reports, records, or 
other information. Because the Secretary has delegated some of the 
authority under FOGRMA to BSEE, 30 U.S.C. 1751 is included as 
additional authority for these requirements.
    The Independent Offices Appropriations Act (31 U.S.C. 9701), the 
Omnibus Appropriations Bill (Pub. L. 104-133, 110 Stat. 1321, April 26, 
1996), and OMB Circular A-25 authorize Federal agencies to recover the 
full cost of services that confer special benefits. Under the 
Department of the Interior's (DOI) implementing policy, the Bureau of 
Safety and Environmental Enforcement (BSEE) is required to charge fees 
for services that provide special benefits or privileges to an 
identifiable non-Federal recipient above and beyond those which accrue 
to the public at large. Pipeline and assignment applications are 
subject to cost recovery, and BSEE regulations specify the service 
fees.
    Regulations implementing these responsibilities are among those 
delegated to BSEE. The regulations under 30 CFR 250, Subpart J, pertain 
to pipelines and pipeline rights-of-way (ROWs), a form, and related 
Notices to Lessees (NTLs) and Operators.
    We use the information to ensure that lessees and pipeline ROW 
holders design the pipelines that they install, maintain, and operate 
are performed in a safe manner. BSEE needs information concerning the 
proposed pipeline and safety equipment, inspections and tests, and 
natural and manmade hazards near the proposed pipeline route. BSEE uses 
the information to review pipeline designs prior to approving an 
application for an ROW or lease term pipeline to ensure that the 
pipeline, as constructed, will provide for safe transportation of 
minerals through the submerged lands of the OCS. BSEE reviews proposed 
pipeline routes to ensure that the pipelines would not conflict with 
any State requirements or unduly interfere with other OCS activities. 
BSEE reviews proposals for taking pipeline safety equipment out of 
service to ensure alternate measures are used that will properly 
provide for the safety of the pipeline and associated facilities 
(platform, etc.). BSEE reviews notifications of relinquishment of ROW 
grants and requests to decommission pipelines for regulatory compliance 
and to ensure that all legal obligations are met. BSEE monitors the 
records concerning pipeline inspections and tests to ensure safety of 
operations and protection of the environment and to schedule witnessing 
trips and inspections. Information is also necessary to determine the 
point at which DOI or Department of Transportation (DOT) has regulatory 
responsibility for a pipeline and to be informed of the identified 
operator if not the same as the pipeline ROW holder.
    We use the information in Form BSEE-0149, Assignment of Federal OCS 
Pipeline Right-of-Way Grant, to track the holdership of pipeline ROWs; 
as well as use this information to update the corporate database that 
is used to determine what leases are available for a Lease Sale and the 
ownership of all OCS leases. However, we made a minor revision to this 
form. Under Part A--Assignment--we added in the under legal 
description, ``and any accessory information''. Under Sec.  250.1012, 
pipeline ROW grants can include accessories. Therefore, when 
transferring a Pipeline ROW grant, the description of the pipeline ROW 
grant should identify everything. This will help facilitate BSEE's 
review when an application has been submitted.
    No questions of a sensitive nature are asked. We will protect 
information from respondents considered proprietary under the Freedom 
of Information Act (5 U.S.C. 552) and its implementing regulations (43 
CFR part 2); also under regulations at 30 CFR 250.197, Data and 
information to be made available to the public or for limited 
inspection, and 30 CFR 252, Outer Continental Shelf (OCS) Oil and Gas 
Information Program. Responses are mandatory or are required to obtain 
or retain a benefit.
    Frequency: On occasion and as a result of the requirements.
    Description of Respondents: Potential respondents comprise Federal 
oil, gas, or sulphur lessees and/or operators.
    Estimated Reporting and Recordkeeping Hour Burden: The currently 
approved annual reporting burden for this collection is 55,072 burden 
hours and $1,824,851 non-hour cost burden. In this submission, we are 
requesting a total of 36,564 burden hours and $1,508,968 non-hour cost 
burdens. The following chart details the individual components and 
respective hour burden estimates of this ICR. In calculating the 
burdens, we assumed that respondents perform certain requirements in 
the normal course of their activities. We consider these to be usual 
and customary and took that into account in estimating the burden.

                                                  Burden Table
----------------------------------------------------------------------------------------------------------------
                                                                         Non-hour cost burdens
                                    Reporting &      -----------------------------------------------------------
Citation 30 CFR 250 Subpart J      recordkeeping                                  Average no. of   Annual burden
      and related NTL(s)           requirement *             Hour burden              annual           hours
                                                                                    responses        (rounded)
----------------------------------------------------------------------------------------------------------------
                                  Lease Term (L/T) Pipeline (P/L) Applications
----------------------------------------------------------------------------------------------------------------
1000(b)(1); 1004(b)(5);        Submit application     92.......................  61-new L/T P/L            5,612
 1007(a).                       and all required                                  applications.
                                information and
                                notices to install
                                new L/T P/L.
                                                     -----------------------------------------------------------
                                                              $3,541 x 61 L/T P/L applications = $216,001
                                                     -----------------------------------------------------------
1000(b)(1); 1007(b)..........  Submit application     30.......................  102                       3,060
                                and all required                                  modifications.
                                information and
                                notices to modify a
                                L/T P/L.
                                                     -----------------------------------------------------------
                                                             $2,056 x 102 L/T P/L applications = $209,712
                                                     -----------------------------------------------------------
1000(b)(1);..................  Submit an application    Burden covered under 1014-0010, 30 CFR                 0
                                to decommission a                   250, Subpart Q.
                                lease-term pipeline.
----------------------------------------------------------------------------------------------------------------

[[Page 19350]]

 
    Subtotal...................................................................  163 responses..           8,672
                              ----------------------------------------------------------------------------------
                                        $425,713 non-hour cost burdens
----------------------------------------------------------------------------------------------------------------
                                 Right of Way (ROW) P/L Applications and Grants
----------------------------------------------------------------------------------------------------------------
1000(b)(2), (d); 1004(b)(5);   Submit application     107......................  62-new ROW                6,634
 1007(a); 1009(a); 1015; 1016.  and all required                                  grant and P/L
                                information and                                   applications.
                                notices for new P/L
                                ROW grant and to
                                install a new ROW P/
                                L.
                                                     -----------------------------------------------------------
                                                                  $2,771 x 62 applications = $171,802
----------------------------------------------------------------------------------------------------------------
1000(b)(2), (3); 1007(b);      Submit application     45.......................  190                       8,550
 1017.                          and all required                                  modifications.
                                information and
                                notices to modify a
                                P/L ROW grant and to
                                modify an ROW P/L
                                (includes route
                                modifications,
                                cessation of
                                operations, partial
                                relinquishments, hot
                                taps, and new and
                                modified accessory
                                platforms).
                                                     -----------------------------------------------------------
                                                                 $4,169 x 190 applications = $792,110
                                                     -----------------------------------------------------------
1000(b)(3); 1010(h);           Submit application       Burden covered under 1014-0010, 30 CFR                 0
 1017(b)(2)(ii); 1019.          and all required                    250, Subpart Q.
                                information and
                                notices to
                                relinquish P/L ROW
                                grant.
                                                     -----------------------------------------------------------
1015.........................  Submit application     15.......................  15 conversions.             225
                                and all required
                                information and
                                notices for a P/L
                                ROW grant to convert
                                a lease-term P/L to
                                an ROW P/L.
                                                     -----------------------------------------------------------
                                                                    $236 x 15 applications = $3,540
                                                     -----------------------------------------------------------
1016.........................  Request opportunity    5........................  1 request......               5
                                to eliminate
                                conflict when an
                                application has been
                                rejected.
                                                     -----------------------------------------------------------
1018.........................  Submit application     13.......................  275 assignments           3,575
                                and all required
                                information and
                                notices for
                                assignment of a
                                pipeline ROW grant
                                using Form BSEE-0149
                                (burden includes
                                approximately 30
                                minutes to fill out
                                form).
                                                     -----------------------------------------------------------
                                                                 $201 x 275 P/L ROW requests = $55,275
----------------------------------------------------------------------------------------------------------------
    Subtotal...................................................................  543 responses..          18,989
                              ----------------------------------------------------------------------------------
                                       $1,022,727 non-hour cost burdens
----------------------------------------------------------------------------------------------------------------
                                            Notifications and Reports
----------------------------------------------------------------------------------------------------------------
1004(b)(5)...................  In lieu of a           35.......................  1 submittal....              35
                                continuous
                                volumetric
                                comparison system,
                                request
                                substitution; submit
                                any supporting
                                documentation if
                                requested/required.
1007(a)(4)(i)(A); (B); (C)...  Provide specified      4........................  20 submittals..              80
                                information in your
                                pipeline application
                                if using unbonded
                                flexible pipe.
                                                     -----------------------------------------------------------
1007(a)(4)(i)(D).............  Provide results of      For risers, this verification is included               0
                                third party IVA         in the CVA analysis. For jumpers, it is
                                review in your                       not required.
                                pipeline application
                                if using unbonded
                                flexible pipe.
1007(a)(4)(ii)...............  Provide specified      25.......................  40 applications           1,000
                                information in your
                                pipeline application.
1008(a)......................  Notify BSEE before     \1/2\....................  62 notices.....              31
                                constructing or
                                relocating a
                                pipeline.
1008(a)......................  Notify BSEE before     \1/2\....................  87 notices.....              44
                                conducting a
                                pressure test.
1008(b)......................  Submit L/T P/L         18.......................  28 reports.....             504
                                construction report.
1008(b)......................  Submit ROW P/L         19.......................  17 reports.....             323
                                construction report.
1008(c)......................  Notify BSEE of any     \1/2\....................  415 notices....             208
                                pipeline taken out
                                of service.
1008(d)......................  Notify BSEE of any     \1/2\....................  2 notices......               1
                                pipeline safety
                                equipment taken out
                                of service more than
                                12 hours.
1008(e)......................  Notify BSEE of any     3........................  156 notices....             468
                                repair and include
                                procedures.
                                                     -----------------------------------------------------------
                                                                     $388 x 156 notices = $60,528
                                                     -----------------------------------------------------------

[[Page 19351]]

 
1008(e)......................  Submit repair report.  4........................  132 reports....             528
1008(f)......................  Submit report of       \1/2\....................  4 reports......               2
                                pipeline failure
                                analysis.
1008(g)......................  Submit plan of         13.......................  19 plans/                   247
                                corrective action                                 reports.
                                and report of any
                                remedial action.
1008(h)......................  Submit the results     1........................  794 results....             794
                                and conclusions of
                                pipe-to-electrolyte
                                potential
                                measurements.
1010(c)......................  Notify BSEE of any     5........................  1 notices......               5
                                archaeological
                                resource discovery.
                                                     -----------------------------------------------------------
1010(d)......................  Notify BSEE of P/L      Not considered IC under 5 CFR 1320.3(h).                0
                                ROW holder's name
                                and address changes.
----------------------------------------------------------------------------------------------------------------
    Subtotal...................................................................  1,778 responses           4,270
                              ----------------------------------------------------------------------------------
                                         $60,528 non-hour cost burdens
----------------------------------------------------------------------------------------------------------------
                                                     General
----------------------------------------------------------------------------------------------------------------
1000(c)(2)...................  Identify in writing P/      Cover by applicable applications                    0
                                L operator on ROW if
                                different from ROW
                                grant holder.
----------------------------------------------------------------------------------------------------------------
1000(c)(3)...................      Mark specific point on P/L where operating responsibility                   0
                                transfers to transporting operator or depict transfer point on a
                                  schematic located on the facility. One-time requirement after
                                  final rule published; now part of application or construction
                                            process involving no additional burdens.
                              -----------------------
1000(c)(4)...................  Petition BSEE for      5........................  1 petition.....               5
                                exceptions to
                                general operations
                                transfer point
                                description.
1000(c)(8)...................  Request BSEE           1........................  1 request......               1
                                recognize valves
                                landward of last
                                production facility
                                but still located on
                                OCS as point where
                                BSEE regulatory
                                authority begins
                                (none received to
                                date).
1000(c)(12)..................  Petition BSEE to       40.......................  1 petition.....              40
                                continue to operate
                                under DOT
                                regulations upstream
                                of last valve on
                                last production
                                facility (one
                                received to date).
1000(c)(13)..................  Transporting P/L       40.......................  1 petition.....              40
                                operator petition to
                                DOT and BSEE to
                                continue to operate
                                under BSEE
                                regulations (none
                                received to date).
                                                     -----------------------------------------------------------
1004(c)......................  Place sign on safety                 See footnote 1                             0
                                equipment identified
                                as ineffective and
                                removed from service.
                                                     -----------------------------------------------------------
1000-1019....................  General departure and  2........................  200 requests...             400
                                alternative
                                compliance requests
                                not specifically
                                covered elsewhere in
                                subpart J
                                regulations.
----------------------------------------------------------------------------------------------------------------
    Subtotal...................................................................  204 responses..             486
----------------------------------------------------------------------------------------------------------------
                                                  Recordkeeping
----------------------------------------------------------------------------------------------------------------
1000-1008....................  Make available to      5........................  128 lease-term              640
                                BSEE design,                                      P/L operators.
                                construction,
                                operation,
                                maintenance,
                                testing, and repair
                                records on lease-
                                term P/Ls.\2\
1005(a)......................  Inspect P/L routes     2 per month = 24.........  128 lease-term            3,072
                                for indication of                                 P/L operators.
                                leakage,\1\ record
                                results, maintain
                                records 2 years.\2\
1010(g)......................  Make available to      5........................  87 P/L ROW                  435
                                BSEE design,                                      holders.
                                construction,
                                operation,
                                maintenance,
                                testing, and repair
                                records on P/L ROW
                                area and
                                improvements.\2\
----------------------------------------------------------------------------------------------------------------
    Subtotal...................................................................  343 responses..           4,147
----------------------------------------------------------------------------------------------------------------
    Total Hour Burdens.........................................................  3,031 responses          36,564
----------------------------------------------------------------------------------------------------------------
    Total Non-Hour Cost Burdens........$1,508,968 non-hour cost burdens........
----------------------------------------------------------------------------------------------------------------
\1\ These activities are usual and customary practices for prudent operators.
\2\ Retaining these records is usual and customary business practice; required burden is minimal to make
  available to BSEE.
* In the future, BSEE will be allowing the option of electronic reporting for certain requirements.


[[Page 19352]]

    Estimated Reporting and Recordkeeping Non-Hour Cost Burden: We have 
identified seven non-hour cost burdens, all of which are the cost 
recovery fees required under 30 CFR 250, Subpart J. However, the actual 
fee amounts are specified in 30 CFR 250.125, which provides a 
consolidated table of all of the fees required under the 30 CFR 250 
regulations. The total of the non-hour cost burden (cost recovery fees) 
in this IC request is an estimated $1,508,968.
    The non-hour cost burdens required in 30 CFR 250, Subpart J (and 
respective cost-recovery fee amount per transaction) are required 
under: Sec.  250.1000(b)--New Pipeline Application (lease term)--
$3,541, Sec.  250.1000(b)--Pipeline Application Modification (lease 
term)--$2,056, Sec.  250.1000(b)--Pipeline Application Modification 
(ROW)--$4,169, Sec.  250.1008(e)--Pipeline Repair Notification--$388, 
Sec.  250.1015(a)--Pipeline ROW Grant Application--$2,771, Sec.  
250.1015(a)--Pipeline Conversion from Lease Term to ROW--$236, Sec.  
250.1018(b)--Pipeline ROW Assignment--$201.
    We have not identified any other non-hour cost burdens associated 
with this collection of information.
    Public Disclosure Statement: The PRA (44 U.S.C. 3501, et seq.) 
provides that an agency may not conduct or sponsor a collection of 
information unless it displays a currently valid OMB control number. 
Until OMB approves a collection of information, you are not obligated 
to respond.
    Comments: Before submitting an ICR to OMB, PRA section 
3506(c)(2)(A) requires each agency ``. . . to provide notice . . . and 
otherwise consult with members of the public and affected agencies 
concerning each proposed collection of information . . .''. Agencies 
must specifically solicit comments to: (a) Evaluate whether the 
collection is necessary or useful; (b) evaluate the accuracy of the 
burden of the proposed collection of information; (c) enhance the 
quality, usefulness, and clarity of the information to be collected; 
and (d) minimize the burden on the respondents, including the use of 
technology.
    Agencies must also estimate the non-hour paperwork cost burdens to 
respondents or recordkeepers resulting from the collection of 
information. Therefore, if you have other than hour burden costs to 
generate, maintain, and disclose this information, you should comment 
and provide your total capital and startup cost components or annual 
operation, maintenance, and purchase of service components. For further 
information on this burden, refer to 5 CFR 1320.3(b)(1) and (2), or 
contact the Bureau representative listed previously in this notice.
    We will summarize written responses to this notice and address them 
in our submission for OMB approval. As a result of your comments, we 
will make any necessary adjustments to the burden in our submission to 
OMB.
    Public Comment Procedures: Before including your address, phone 
number, email address, or other personal identifying information in 
your comment, you should be aware that your entire comment--including 
your personal identifying information--may be made publicly available 
at any time. While you can ask us in your comment to withhold your 
personal identifying information from public review, we cannot 
guarantee that we will be able to do so.

Douglas W. Morris,
Chief, Office of Offshore Regulatory Programs.
[FR Doc. 2015-08264 Filed 4-9-15; 8:45 am]
 BILLING CODE 4310-VH-P



                                                  19348                            Federal Register / Vol. 80, No. 69 / Friday, April 10, 2015 / Notices

                                                  SUPPLEMENTARY INFORMATION:      Pursuant                responses to all substantive comments                 ADDRESSES:   You may submit comments
                                                  to the National Environmental Policy                    received, and reflects comments and                   by either of the following methods listed
                                                  Act of 1969, the Final SEIS documents                   additional information received during                below.
                                                  the potential direct, indirect, and                     the review period.                                      • Electronically go to http://
                                                  cumulative environmental and                              Copies of the Final SEIS are available              www.regulations.gov. In the Search box,
                                                  socioeconomic effects of the proposed                   for public review at the following                    enter BSEE–2015–0003 then click
                                                  action to construct a municipal, rural                  locations:                                            search. Follow the instructions to
                                                  and industrial (MR&I) water system to                     • Bureau of Reclamation, Dakotas                    submit public comments and view all
                                                  provide drinking water to local                         Area Office, 304 East Broadway Avenue,                related materials. We will post all
                                                  communities and rural water systems in                  Bismarck, ND 58501.                                   comments.
                                                  northwestern North Dakota. The Project                    • Bureau of Reclamation, Great Plains                 • Email cheryl.blundon@bsee.gov.
                                                  is sized to serve projected population                  Regional Office, 316 North 26th Street,               Mail or hand-carry comments to the
                                                  growth through the year 2060. Water                     Billings, MT 59101.                                   Department of the Interior; Bureau of
                                                  provided by the Project would be                          • Bureau of Reclamation, Denver                     Safety and Environmental Enforcement;
                                                  treated to meet the primary drinking                    Office Library, Building 67, Room 167,                Regulations and Standards Branch;
                                                  water standards established by the Safe                 Denver Federal Center, 6th and Kipling,               ATTN: Cheryl Blundon; 45600
                                                  Drinking Water Act. The Project would                   Denver, CO 80225.                                     Woodland Rd., Sterling, VA 20166.
                                                  supply water to specific delivery points.                 • Natural Resources Library, U.S.                   Please reference ICR 1014–0016 in your
                                                  Each community or rural water system                    Department of the Interior, 1849 C Street             comment and include your name and
                                                  would be responsible for connecting to                  NW., Main Interior Building,                          return address.
                                                  the distribution line and delivering                    Washington, DC 20240–0001.                            FOR FURTHER INFORMATION CONTACT:
                                                  water through their water system to end                   • Bismarck Public Library, 515 North                Cheryl Blundon, Regulations and
                                                  users. The Project was authorized by the                5th Street, Bismarck, ND 58501.                       Standards Branch at (703) 787–1607 to
                                                  Garrison Diversion Reformulation Act of                   • Bottineau City Hall, 115 West 6th                 request additional information about
                                                  1986 and the Dakota Water Resources                     Street, Bottineau, ND 58318.                          this ICR.
                                                  Act of 2000 as part of the MR&I Grant                     • Minot Public Library, 516 2nd                     SUPPLEMENTARY INFORMATION:
                                                  Program.                                                Avenue SW., Minot, ND 58701.
                                                     Four action alternatives were                                                                                Title: 30 CFR part 250, subpart J,
                                                                                                            • Mohall Public Library, 115 Main                   Pipelines and Pipeline Rights-of-Way
                                                  evaluated in the Final SEIS. These                      Street West, Mohall, ND 58761.
                                                  alternatives fall into two categories—                                                                        (ROW).
                                                                                                            • North Dakota State Library, 604 East                Form(s): BSEE–0149.
                                                  those using only inbasin water sources                  Boulevard Avenue, Bismarck, ND
                                                  (Souris River and groundwater) and                                                                              OMB Control Number: 1014–0016.
                                                                                                          58505.                                                  Abstract: The Outer Continental Shelf
                                                  those proposing to use water from the
                                                  Missouri River (Lake Sakakawea). The                      Dated: April 2, 2015.                               (OCS) Lands Act at (43 U.S.C. 1334),
                                                  preferred alternative, Missouri River                   John F. Soucy,                                        authorizes the Secretary of the Interior
                                                  and Groundwater Alternative, would                      Deputy Regional Director, Great Plains                to prescribe rules and regulations to
                                                  use Lake Sakakawea as the primary                       Region.                                               necessary for the administration of the
                                                  water source. This water would be                       [FR Doc. 2015–08142 Filed 4–9–15; 8:45 am]            leasing provisions of the Act related to
                                                  conveyed to the biota water treatment                   BILLING CODE 4332–90–P
                                                                                                                                                                mineral resources on the OCS. Such
                                                  plant where it would be treated using                                                                         rules and regulations apply to all
                                                  conventional treatment processes. After                                                                       operations conducted under a lease,
                                                  treatment at the biota water treatment                  DEPARTMENT OF THE INTERIOR                            pipeline right-of-way (ROW), or a right-
                                                  plant, the water would be conveyed in                                                                         of-use and easement. Section 1334(e)
                                                  a buried pipeline to the Minot water                    Bureau of Safety and Environmental                    authorizes the Secretary to grant ROWs
                                                  treatment plant and blended with water                  Enforcement                                           through the submerged lands of the OCS
                                                  from the Minot and Sundre aquifers.                                                                           for pipelines ‘‘. . . for the transportation
                                                                                                          [Docket ID BSEE–2015–0003; OMB Control                of oil, natural gas, sulphur, or other
                                                  Following this treatment, water would                   Number 1014–0016; 15XE1700DX
                                                  be supplied to Project members through                                                                        minerals, or under such regulations and
                                                                                                          EX1SF0000.DAQ000 EEEE500000]
                                                  a distribution pipeline system.                                                                               upon such conditions as may be
                                                     Some of the resources potentially                    Information Collection Activities:                    prescribed by the Secretary, . . .
                                                  affected by the proposed action that are                Pipelines and Pipeline Rights-of-Way                  including (as provided in Section
                                                  evaluated in the Final SEIS include:                    (ROW); Proposed Collection; Comment                   1347(b) of this title) assuring maximum
                                                  Surface water and groundwater                           Request                                               environmental protection by utilization
                                                  resources, water quality, aquatic                                                                             of the best available and safest
                                                  invasive species, threatened and                        ACTION:   60-day notice.                              technologies, including the safest
                                                  endangered species, socioeconomics,                                                                           practices for pipeline burial. . . .’’
                                                  environmental justice and historic                      SUMMARY:   To comply with the                           In addition to the general rulemaking
                                                  properties. The geographic scope of                     Paperwork Reduction Act of 1995                       authority of the OCSLA at 43 U.S.C.
                                                  analysis generally covers the Missouri                  (PRA), BSEE is inviting comments on a                 1334, section 301(a) of the Federal Oil
                                                  and Souris river basins, and carries                    collection of information that we will                and Gas Royalty Management Act
                                                  analysis into Canada as directed by the                 submit to the Office of Management and                (FOGRMA), 30 U.S.C. 1751(a), grants
                                                                                                          Budget (OMB) for review and approval.
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                  U.S. District Court.                                                                                          authority to the Secretary to prescribe
                                                     A Notice of Availability of the Draft                The information collection request (ICR)              such rules and regulations as are
                                                  SEIS was published in the Federal                       concerns a revision to the paperwork                  reasonably necessary to carry out
                                                  Register on June 27, 2014 (79 FR 36556).                requirements in the regulations under                 FOGRMA’s provisions. While the
                                                  The written comment period for the                      Subpart J, Pipelines and Pipeline Rights-             majority of FOGRMA is directed to
                                                  Draft SEIS was extended 30 days and                     of-Way (ROW).                                         royalty collection and enforcement,
                                                  concluded on September 10, 2014 (79                     DATES: You must submit comments by                    some provisions apply to offshore
                                                  FR 45459). The Final SEIS contains                      June 9, 2015.                                         operations. For example, section 108 of


                                             VerDate Sep<11>2014   20:09 Apr 09, 2015   Jkt 235001   PO 00000   Frm 00073   Fmt 4703   Sfmt 4703   E:\FR\FM\10APN1.SGM   10APN1


                                                                                       Federal Register / Vol. 80, No. 69 / Friday, April 10, 2015 / Notices                                                          19349

                                                  FOGRMA, 30 U.S.C. 1718, grants the                        a safe manner. BSEE needs information                         OCS leases. However, we made a minor
                                                  Secretary broad authority to inspect                      concerning the proposed pipeline and                          revision to this form. Under Part A—
                                                  lease sites for the purpose of                            safety equipment, inspections and tests,                      Assignment—we added in the under
                                                  determining whether there is                              and natural and manmade hazards near                          legal description, ‘‘and any accessory
                                                  compliance with the mineral leasing                       the proposed pipeline route. BSEE uses                        information’’. Under § 250.1012,
                                                  laws. Section 109(c)(2) and (d)(1), 30                    the information to review pipeline                            pipeline ROW grants can include
                                                  U.S.C. 1719(c)(2) and (d)(1), impose                      designs prior to approving an                                 accessories. Therefore, when
                                                  substantial civil penalties for failure to                application for an ROW or lease term                          transferring a Pipeline ROW grant, the
                                                  permit lawful inspections and for                         pipeline to ensure that the pipeline, as                      description of the pipeline ROW grant
                                                  knowing or willful preparation or                         constructed, will provide for safe                            should identify everything. This will
                                                  submission of false, inaccurate, or                       transportation of minerals through the                        help facilitate BSEE’s review when an
                                                  misleading reports, records, or other                     submerged lands of the OCS. BSEE                              application has been submitted.
                                                  information. Because the Secretary has                    reviews proposed pipeline routes to                              No questions of a sensitive nature are
                                                  delegated some of the authority under                     ensure that the pipelines would not                           asked. We will protect information from
                                                  FOGRMA to BSEE, 30 U.S.C. 1751 is                         conflict with any State requirements or                       respondents considered proprietary
                                                  included as additional authority for                      unduly interfere with other OCS                               under the Freedom of Information Act
                                                  these requirements.                                       activities. BSEE reviews proposals for                        (5 U.S.C. 552) and its implementing
                                                    The Independent Offices                                 taking pipeline safety equipment out of                       regulations (43 CFR part 2); also under
                                                  Appropriations Act (31 U.S.C. 9701), the                  service to ensure alternate measures are                      regulations at 30 CFR 250.197, Data and
                                                  Omnibus Appropriations Bill (Pub. L.                      used that will properly provide for the                       information to be made available to the
                                                  104–133, 110 Stat. 1321, April 26,                        safety of the pipeline and associated                         public or for limited inspection, and 30
                                                  1996), and OMB Circular A–25                              facilities (platform, etc.). BSEE reviews                     CFR 252, Outer Continental Shelf (OCS)
                                                  authorize Federal agencies to recover                     notifications of relinquishment of ROW                        Oil and Gas Information Program.
                                                  the full cost of services that confer                     grants and requests to decommission                           Responses are mandatory or are
                                                  special benefits. Under the Department                    pipelines for regulatory compliance and                       required to obtain or retain a benefit.
                                                  of the Interior’s (DOI) implementing                      to ensure that all legal obligations are                         Frequency: On occasion and as a
                                                  policy, the Bureau of Safety and                          met. BSEE monitors the records                                result of the requirements.
                                                  Environmental Enforcement (BSEE) is                       concerning pipeline inspections and                              Description of Respondents: Potential
                                                  required to charge fees for services that                 tests to ensure safety of operations and                      respondents comprise Federal oil, gas,
                                                  provide special benefits or privileges to                 protection of the environment and to                          or sulphur lessees and/or operators.
                                                  an identifiable non-Federal recipient                     schedule witnessing trips and                                    Estimated Reporting and
                                                  above and beyond those which accrue to                    inspections. Information is also                              Recordkeeping Hour Burden: The
                                                  the public at large. Pipeline and                         necessary to determine the point at                           currently approved annual reporting
                                                  assignment applications are subject to                    which DOI or Department of                                    burden for this collection is 55,072
                                                  cost recovery, and BSEE regulations                       Transportation (DOT) has regulatory                           burden hours and $1,824,851 non-hour
                                                  specify the service fees.                                 responsibility for a pipeline and to be                       cost burden. In this submission, we are
                                                    Regulations implementing these                          informed of the identified operator if                        requesting a total of 36,564 burden
                                                  responsibilities are among those                          not the same as the pipeline ROW                              hours and $1,508,968 non-hour cost
                                                  delegated to BSEE. The regulations                        holder.                                                       burdens. The following chart details the
                                                  under 30 CFR 250, Subpart J, pertain to                      We use the information in Form                             individual components and respective
                                                  pipelines and pipeline rights-of-way                      BSEE–0149, Assignment of Federal OCS                          hour burden estimates of this ICR. In
                                                  (ROWs), a form, and related Notices to                    Pipeline Right-of-Way Grant, to track                         calculating the burdens, we assumed
                                                  Lessees (NTLs) and Operators.                             the holdership of pipeline ROWs; as                           that respondents perform certain
                                                    We use the information to ensure that                   well as use this information to update                        requirements in the normal course of
                                                  lessees and pipeline ROW holders                          the corporate database that is used to                        their activities. We consider these to be
                                                  design the pipelines that they install,                   determine what leases are available for                       usual and customary and took that into
                                                  maintain, and operate are performed in                    a Lease Sale and the ownership of all                         account in estimating the burden.

                                                                                                                              BURDEN TABLE
                                                                                                                                                                                Non-hour cost burdens
                                                    Citation 30 CFR 250
                                                    Subpart J and related                 Reporting & recordkeeping requirement *                                                                                Annual burden
                                                                                                                                                                                      Average no. of
                                                           NTL(s)                                                                                     Hour burden                                                    hours
                                                                                                                                                                                     annual responses              (rounded)

                                                                                                            Lease Term (L/T) Pipeline (P/L) Applications

                                                  1000(b)(1); 1004(b)(5);             Submit application and all required information          92 ...........................    61-new L/T P/L applica-                 5,612
                                                    1007(a).                            and notices to install new L/T P/L.                                                        tions.

                                                                                                                                                              $3,541 × 61 L/T P/L applications = $216,001
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                  1000(b)(1); 1007(b) ........        Submit application and all required information          30 ...........................    102 modifications ...........           3,060
                                                                                        and notices to modify a L/T P/L.

                                                                                                                                                             $2,056 × 102 L/T P/L applications = $209,712

                                                  1000(b)(1); .....................   Submit an application to decommission a lease-                 Burden covered under 1014–0010, 30 CFR                                  0
                                                                                        term pipeline.                                                           250, Subpart Q.




                                             VerDate Sep<11>2014     20:09 Apr 09, 2015   Jkt 235001   PO 00000   Frm 00074   Fmt 4703   Sfmt 4703    E:\FR\FM\10APN1.SGM           10APN1


                                                  19350                                       Federal Register / Vol. 80, No. 69 / Friday, April 10, 2015 / Notices

                                                                                                                                       BURDEN TABLE—Continued
                                                                                                                                                                                                                 Non-hour cost burdens
                                                    Citation 30 CFR 250
                                                    Subpart J and related                          Reporting & recordkeeping requirement *                                                                                                             Annual burden
                                                                                                                                                                                                                        Average no. of
                                                           NTL(s)                                                                                                                  Hour burden                                                             hours
                                                                                                                                                                                                                       annual responses                  (rounded)

                                                        Subtotal ............................................................................................................................................     163 responses ...............                8,672

                                                                                                                                                                                                                        $425,713 non-hour cost burdens

                                                                                                                         Right of Way (ROW) P/L Applications and Grants

                                                  1000(b)(2), (d);                          Submit application and all required information                                  107 .........................        62-new ROW grant and                         6,634
                                                    1004(b)(5); 1007(a);                      and notices for new P/L ROW grant and to in-                                                                          P/L applications.
                                                    1009(a); 1015; 1016.                      stall a new ROW P/L.

                                                                                                                                                                                                    $2,771 × 62 applications = $171,802

                                                  1000(b)(2), (3); 1007(b);                 Submit application and all required information                                  45 ...........................       190 modifications ...........                8,550
                                                    1017.                                     and notices to modify a P/L ROW grant and to
                                                                                              modify an ROW P/L (includes route modifica-
                                                                                              tions,   cessation    of   operations, partial
                                                                                              relinquishments, hot taps, and new and modi-
                                                                                              fied accessory platforms).

                                                                                                                                                                                                   $4,169 × 190 applications = $792,110

                                                  1000(b)(3); 1010(h);                      Submit application and all required information                                      Burden covered under 1014–0010, 30 CFR                                            0
                                                    1017(b)(2)(ii); 1019.                     and notices to relinquish P/L ROW grant.                                                       250, Subpart Q.

                                                  1015 ...............................      Submit application and all required information                                  15 ...........................       15 conversions ...............                225
                                                                                              and notices for a P/L ROW grant to convert a
                                                                                              lease-term P/L to an ROW P/L.

                                                                                                                                                                                                       $236 × 15 applications = $3,540

                                                  1016 ...............................      Request opportunity to eliminate conflict when an                                5 .............................      1 request ........................               5
                                                                                             application has been rejected.

                                                  1018 ...............................      Submit application and all required information                                  13 ...........................       275 assignments ............                 3,575
                                                                                              and notices for assignment of a pipeline ROW
                                                                                              grant using Form BSEE–0149 (burden includes
                                                                                              approximately 30 minutes to fill out form).

                                                                                                                                                                                                $201 × 275 P/L ROW requests = $55,275

                                                        Subtotal ............................................................................................................................................     543 responses ...............               18,989

                                                                                                                                                                                                                       $1,022,727 non-hour cost burdens

                                                                                                                                            Notifications and Reports

                                                  1004(b)(5) ......................         In lieu of a continuous volumetric comparison sys-                               35 ...........................       1 submittal .....................              35
                                                                                              tem, request substitution; submit any supporting
                                                                                              documentation if requested/required.
                                                  1007(a)(4)(i)(A); (B); (C)                Provide specified information in your pipeline ap-                               4 .............................      20 submittals ..................               80
                                                                                              plication if using unbonded flexible pipe.

                                                  1007(a)(4)(i)(D) ..............           Provide results of third party IVA review in your                                  For risers, this verification is included in the                                    0
                                                                                              pipeline application if using unbonded flexible                                  CVA analysis. For jumpers, it is not required.
                                                                                              pipe.
                                                  1007(a)(4)(ii) ..................         Provide specified information in your pipeline ap-                               25 ...........................       40 applications ...............              1,000
                                                                                              plication.
                                                  1008(a) ...........................       Notify BSEE before constructing or relocating a                                  12⁄ ...........................      62 notices ......................              31
                                                                                              pipeline.
                                                  1008(a)     ...........................   Notify BSEE before conducting a pressure test ....                               1⁄2   ...........................    87 notices ......................              44
                                                  1008(b)     ...........................   Submit L/T P/L construction report ........................                      18    ...........................    28 reports .......................            504
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                  1008(b)     ...........................   Submit ROW P/L construction report ....................                          19    ...........................    17 reports .......................            323
                                                  1008(c)     ...........................   Notify BSEE of any pipeline taken out of service ..                              1⁄2   ...........................    415 notices ....................              208
                                                  1008(d)     ...........................   Notify BSEE of any pipeline safety equipment                                     1⁄2   ...........................    2 notices ........................              1
                                                                                              taken out of service more than 12 hours.
                                                  1008(e) ...........................       Notify BSEE of any repair and include procedures                                 3 .............................      156 notices ....................              468

                                                                                                                                                                                                         $388 × 156 notices = $60,528




                                             VerDate Sep<11>2014        20:09 Apr 09, 2015         Jkt 235001       PO 00000        Frm 00075       Fmt 4703       Sfmt 4703       E:\FR\FM\10APN1.SGM               10APN1


                                                                                              Federal Register / Vol. 80, No. 69 / Friday, April 10, 2015 / Notices                                                                                         19351

                                                                                                                                       BURDEN TABLE—Continued
                                                                                                                                                                                                                Non-hour cost burdens
                                                    Citation 30 CFR 250
                                                    Subpart J and related                          Reporting & recordkeeping requirement *                                                                                                             Annual burden
                                                                                                                                                                                                                       Average no. of
                                                           NTL(s)                                                                                                                  Hour burden                                                             hours
                                                                                                                                                                                                                      annual responses                   (rounded)

                                                  1008(e) ...........................       Submit repair report ...............................................             4 .............................     132 reports .....................              528
                                                  1008(f) ............................      Submit report of pipeline failure analysis ...............                       1⁄2 ...........................     4 reports .........................              2
                                                  1008(g) ...........................       Submit plan of corrective action and report of any                               13 ...........................      19 plans/reports .............                 247
                                                                                              remedial action.
                                                  1008(h) ...........................       Submit the results and conclusions of pipe-to-                                   1 .............................     794 results .....................              794
                                                                                              electrolyte potential measurements.
                                                  1010(c) ...........................       Notify BSEE of any archaeological resource dis-                                  5 .............................     1 notices ........................                5
                                                                                              covery.

                                                  1010(d) ...........................       Notify BSEE of P/L ROW holder’s name and ad-                                         Not considered IC under 5 CFR 1320.3(h).                                          0
                                                                                             dress changes.

                                                        Subtotal ............................................................................................................................................    1,778 responses ............                  4,270

                                                                                                                                                                                                                        $60,528 non-hour cost burdens

                                                                                                                                                           General

                                                  1000(c)(2) .......................        Identify in writing P/L operator on ROW if different                                         Cover by applicable applications                                          0
                                                                                              from ROW grant holder.

                                                  1000(c)(3) .......................        Mark specific point on P/L where operating responsibility transfers to transporting operator or depict                                                                 0
                                                                                                transfer point on a schematic located on the facility. One-time requirement after final rule pub-
                                                                                                lished; now part of application or construction process involving no additional burdens.

                                                  1000(c)(4) .......................        Petition BSEE for exceptions to general oper-                                    5 .............................     1 petition ........................               5
                                                                                              ations transfer point description.
                                                  1000(c)(8) .......................        Request BSEE recognize valves landward of last                                   1 .............................     1 request ........................                1
                                                                                              production facility but still located on OCS as
                                                                                              point where BSEE regulatory authority begins
                                                                                              (none received to date).
                                                  1000(c)(12) .....................         Petition BSEE to continue to operate under DOT                                   40 ...........................      1 petition ........................             40
                                                                                              regulations upstream of last valve on last pro-
                                                                                              duction facility (one received to date).
                                                  1000(c)(13) .....................         Transporting P/L operator petition to DOT and                                    40 ...........................      1 petition ........................             40
                                                                                              BSEE to continue to operate under BSEE regu-
                                                                                              lations (none received to date).

                                                  1004(c) ...........................       Place sign on safety equipment identified as inef-                                                         See footnote 1                                              0
                                                                                              fective and removed from service.

                                                  1000–1019 .....................           General departure and alternative compliance re-                                 2 .............................     200 requests ..................                400
                                                                                             quests not specifically covered elsewhere in
                                                                                             subpart J regulations.

                                                        Subtotal ............................................................................................................................................    204 responses ...............                  486

                                                                                                                                                     Recordkeeping

                                                  1000–1008 .....................           Make available to BSEE design, construction, op-                                 5 .............................     128 lease-term P/L oper-                       640
                                                                                              eration, maintenance, testing, and repair                                                                            ators.
                                                                                              records on lease-term P/Ls.2
                                                  1005(a) ...........................       Inspect P/L routes for indication of leakage,1                                   2 per month = 24 ...                128 lease-term P/L oper-                      3,072
                                                                                              record results, maintain records 2 years.2                                                                           ators.
                                                  1010(g) ...........................       Make available to BSEE design, construction, op-                                 5 .............................     87 P/L ROW holders .....                       435
                                                                                              eration, maintenance, testing, and repair
                                                                                              records on P/L ROW area and improvements.2

                                                        Subtotal ............................................................................................................................................    343 responses ...............                 4,147

                                                        Total Hour Burdens ..........................................................................................................................            3,031 responses ............                 36,564
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                        Total Non-Hour Cost Burdens .........................................................................................................                         $1,508,968 non-hour cost burdens
                                                     1 These   activities are usual and customary practices for prudent operators.
                                                     2 Retaining  these records is usual and customary business practice; required burden is minimal to make available to BSEE.
                                                     * In the future, BSEE will be allowing the option of electronic reporting for certain requirements.




                                             VerDate Sep<11>2014        20:09 Apr 09, 2015         Jkt 235001       PO 00000        Frm 00076       Fmt 4703       Sfmt 4703       E:\FR\FM\10APN1.SGM              10APN1


                                                  19352                            Federal Register / Vol. 80, No. 69 / Friday, April 10, 2015 / Notices

                                                     Estimated Reporting and                              information on this burden, refer to 5                Department of the Interior; Bureau of
                                                  Recordkeeping Non-Hour Cost Burden:                     CFR 1320.3(b)(1) and (2), or contact the              Safety and Environmental Enforcement;
                                                  We have identified seven non-hour cost                  Bureau representative listed previously               Regulations and Standards Branch;
                                                  burdens, all of which are the cost                      in this notice.                                       ATTN: Cheryl Blundon, 45600
                                                  recovery fees required under 30 CFR                       We will summarize written responses                 Woodland Road, Sterling, VA 20166.
                                                  250, Subpart J. However, the actual fee                 to this notice and address them in our                Please reference ICR 1014–0008 in your
                                                  amounts are specified in 30 CFR                         submission for OMB approval. As a                     comment and include your name and
                                                  250.125, which provides a consolidated                  result of your comments, we will make                 return address.
                                                  table of all of the fees required under the             any necessary adjustments to the burden               FOR FURTHER INFORMATION CONTACT:
                                                  30 CFR 250 regulations. The total of the                in our submission to OMB.                             Cheryl Blundon, Regulations and
                                                  non-hour cost burden (cost recovery                       Public Comment Procedures: Before                   Standards Branch at (703) 787–1607 to
                                                  fees) in this IC request is an estimated                including your address, phone number,                 request additional information about
                                                  $1,508,968.                                             email address, or other personal                      this ICR.
                                                     The non-hour cost burdens required                   identifying information in your
                                                                                                                                                                SUPPLEMENTARY INFORMATION:
                                                  in 30 CFR 250, Subpart J (and respective                comment, you should be aware that
                                                                                                          your entire comment—including your                       Title: 30 CFR part 250, subpart O,
                                                  cost-recovery fee amount per
                                                                                                          personal identifying information—may                  Well Control and Production Safety
                                                  transaction) are required under:
                                                                                                          be made publicly available at any time.               Training.
                                                  § 250.1000(b)—New Pipeline
                                                                                                          While you can ask us in your comment                     OMB Control Number: 1014–0008.
                                                  Application (lease term)—$3,541,
                                                                                                          to withhold your personal identifying                    Abstract: The Outer Continental Shelf
                                                  § 250.1000(b)—Pipeline Application
                                                                                                          information from public review, we                    (OCS) Lands Act, as amended (43 U.S.C.
                                                  Modification (lease term)—$2,056,
                                                                                                          cannot guarantee that we will be able to              1331 et seq. and 43 U.S.C. 1801 et seq.),
                                                  § 250.1000(b)—Pipeline Application
                                                                                                          do so.                                                authorizes the Secretary of the Interior
                                                  Modification (ROW)—$4,169,
                                                                                                                                                                to prescribe rules and regulations
                                                  § 250.1008(e)—Pipeline Repair                           Douglas W. Morris,                                    necessary for the administration of the
                                                  Notification—$388, § 250.1015(a)—
                                                                                                          Chief, Office of Offshore Regulatory Programs.        leasing provisions of the Act related to
                                                  Pipeline ROW Grant Application—
                                                  $2,771, § 250.1015(a)—Pipeline                          [FR Doc. 2015–08264 Filed 4–9–15; 8:45 am]            mineral resources on the OCS. Such
                                                  Conversion from Lease Term to ROW—                      BILLING CODE 4310–VH–P                                rules and regulations will apply to all
                                                  $236, § 250.1018(b)—Pipeline ROW                                                                              operations conducted under a lease,
                                                  Assignment—$201.                                                                                              pipeline right-of-way, or a right-of-use
                                                     We have not identified any other non-                DEPARTMENT OF THE INTERIOR                            and easement. Operations on the OCS
                                                  hour cost burdens associated with this                                                                        must preserve, protect, and develop oil
                                                                                                          Bureau of Safety and Environmental                    and natural gas resources in a manner
                                                  collection of information.                              Enforcement
                                                     Public Disclosure Statement: The PRA                                                                       that is consistent with the need to make
                                                  (44 U.S.C. 3501, et seq.) provides that an              [Docket ID BSEE–2015–0004; OMB Control                such resources available to meet the
                                                  agency may not conduct or sponsor a                     Number 1014–0008; 15XE1700DX                          Nation’s energy needs as rapidly as
                                                  collection of information unless it                     EEEE500000 EX1SF0000.DAQ000]                          possible; to balance orderly energy
                                                  displays a currently valid OMB control                                                                        resource development with protection
                                                                                                          Information Collection Activities: Well               of human, marine, and coastal
                                                  number. Until OMB approves a
                                                                                                          Control and Production Safety                         environments; to ensure the public a fair
                                                  collection of information, you are not
                                                                                                          Training; Proposed Collection;                        and equitable return on the resources of
                                                  obligated to respond.
                                                     Comments: Before submitting an ICR                   Comment Request                                       the OCS; and to preserve and maintain
                                                  to OMB, PRA section 3506(c)(2)(A)                       ACTION:   60-day notice.                              free enterprise competition.
                                                  requires each agency ‘‘. . . to provide                                                                          In addition to the general rulemaking
                                                  notice . . . and otherwise consult with                 SUMMARY:   To comply with the                         authority of the OCSLA at 43 U.S.C.
                                                  members of the public and affected                      Paperwork Reduction Act of 1995                       1334, section 301(a) of the Federal Oil
                                                  agencies concerning each proposed                       (PRA), BSEE is inviting comments on a                 and Gas Royalty Management Act
                                                  collection of information . . .’’.                      collection of information that we will                (FOGRMA), 30 U.S.C. 1751(a), grants
                                                  Agencies must specifically solicit                      submit to the Office of Management and                authority to the Secretary to prescribe
                                                  comments to: (a) Evaluate whether the                   Budget (OMB) for review and approval.                 such rules and regulations as are
                                                  collection is necessary or useful; (b)                  The information collection request (ICR)              reasonably necessary to carry out
                                                  evaluate the accuracy of the burden of                  concerns a renewal to the paperwork                   FOGRMA’s provisions. While the
                                                  the proposed collection of information;                 requirements in the regulations under                 majority of FOGRMA is directed to
                                                  (c) enhance the quality, usefulness, and                Subpart O, Well Control and Production                royalty collection and enforcement,
                                                  clarity of the information to be                        Safety Training.                                      some provisions apply to offshore
                                                  collected; and (d) minimize the burden                  DATES: You must submit comments by                    operations. For example, section 108 of
                                                  on the respondents, including the use of                June 9, 2015.                                         FOGRMA, 30 U.S.C. 1718, grants the
                                                  technology.                                             ADDRESSES: You may submit comments                    Secretary broad authority to inspect
                                                     Agencies must also estimate the non-                 by either of the following methods listed             lease sites for the purpose of
                                                  hour paperwork cost burdens to                          below.                                                determining whether there is
                                                  respondents or recordkeepers resulting                    • Electronically go to http://                      compliance with the mineral leasing
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                  from the collection of information.                     www.regulations.gov. In the Search box,               laws. Section 109(c)(2) and (d)(1), 30
                                                  Therefore, if you have other than hour                  enter BSEE–2015–0004 then click                       U.S.C. 1719(c)(2) and (d)(1), impose
                                                  burden costs to generate, maintain, and                 search. Follow the instructions to                    substantial civil penalties for failure to
                                                  disclose this information, you should                   submit public comments and view all                   permit lawful inspections and for
                                                  comment and provide your total capital                  related materials. We will post all                   knowing or willful preparation or
                                                  and startup cost components or annual                   comments.                                             submission of false, inaccurate, or
                                                  operation, maintenance, and purchase                      • Email cheryl.blundon@bsee.gov.                    misleading reports, records, or other
                                                  of service components. For further                      Mail or hand-carry comments to the                    information. Because the Secretary has


                                             VerDate Sep<11>2014   20:09 Apr 09, 2015   Jkt 235001   PO 00000   Frm 00077   Fmt 4703   Sfmt 4703   E:\FR\FM\10APN1.SGM   10APN1



Document Created: 2018-02-21 10:08:19
Document Modified: 2018-02-21 10:08:19
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
Action60-day notice.
DatesYou must submit comments by June 9, 2015.
ContactCheryl Blundon, Regulations and Standards Branch at (703) 787-1607 to request additional information about this ICR.
FR Citation80 FR 19348 