The U.S. Nuclear Regulatory Commission (NRC) has issued a final director's decision with regard to a petition dated March 5, 2014, as supplemented on April 8, May 21, and September 3, 2014, filed by Mr. Michael Mulligan (the petitioner), requesting that the NRC take action with regard to Entergy Nuclear Operations, Inc. (ENO or the licensee) at Palisades Nuclear Plant (PNP). The petitioner's requests and the final director's decision are included in the SUPPLEMENTARY INFORMATION section of this document.

Federal Register, Volume 80 Issue 70 (Monday, April 13, 2015)
[Federal Register Volume 80, Number 70 (Monday, April 13, 2015)]
[Notices]
[Pages 19702-19703]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-08409]


-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[Docket No. 50-255; NRC-2014-0216]


Entergy Nuclear Operations, Inc.; Palisades Nuclear Plant

AGENCY: Nuclear Regulatory Commission.

ACTION: Director's decision under 10 CFR 2.206; issuance.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) has issued a 
final director's decision with regard to a petition dated March 5, 
2014, as supplemented on April 8, May 21, and September 3, 2014, filed 
by Mr. Michael Mulligan (the petitioner), requesting that the NRC take 
action with regard to Entergy Nuclear Operations, Inc. (ENO or the 
licensee) at Palisades Nuclear Plant (PNP). The petitioner's requests 
and the final director's decision are included in the SUPPLEMENTARY 
INFORMATION section of this document.

DATES: April 13, 2015.

ADDRESSES: Please refer to Docket ID NRC-2014-0216 when contacting the 
NRC about the availability of information regarding this document. You 
may obtain publicly-available information related to this document 
using any of the following methods:
     Federal Rulemaking Web site: Go to http://www.regulations.gov and search for Docket ID NRC-2014-0216. Address 
questions about NRC dockets to Carol Gallagher; telephone: 301-415-
3463; email: [email protected]. For technical questions, contact 
the individual listed in the FOR FURTHER INFORMATION CONTACT section of 
this document.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly-available documents online in the 
ADAMS Public Documents collection at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and 
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS, 
please contact the NRC's Public Document Room (PDR) reference staff at 
1-800-397-4209, 301-415-4737, or by email to [email protected]. The 
ADAMS accession number for each document referenced in this document 
(if that document is available in ADAMS) is provided the first time 
that a document is referenced.
     NRC's PDR: You may examine and purchase copies of public 
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 
Rockville Pike, Rockville, Maryland 20852.

FOR FURTHER INFORMATION CONTACT: Jennivine Rankin, Office of Nuclear 
Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC 
20555-0001; telephone: 301-415-1530, email: [email protected].

SUPPLEMENTARY INFORMATION: Notice is hereby given that the Deputy 
Director, Nuclear Reactor Regulation, has issued a final director's 
decision (ADAMS Accession No. ML15054A365), on a petition filed by the 
petitioner on March 5, 2014 (ADAMS Accession No. ML14071A006), as 
supplemented on April 8, May 21, and September 3, 2014 (ADAMS Accession 
Nos. ML14143A212, ML14142A101, and ML14259A135, respectively). The 
petitioner requested a number of actions be taken by the NRC and the 
licensee for equipment failures at PNP. As the basis for the request, 
the petitioner stated that there have been recent plant events and 
equipment failures at PNP, such as parts of the primary coolant pump 
(PCP) impeller breaking off and lodging in the reactor vessel (RV) and 
flaws in the control rod drive mechanisms (CRDMs). The petitioner 
requested immediate action to prevent the PNP from restarting due to a 
piece of PCP impeller that was lodged between the RV and the flow skirt 
and due to flawed CRDMs.
    By email dated March 19, 2014 (ADAMS Accession No. ML14083A680), 
the NRC staff denied the petitioner's request for immediate action to 
prevent PNP from restarting, based on the following factors:
    1. The NRC performed an in-depth independent review of the 
licensee's analysis and concluded that the impeller piece did not pose 
a threat to safe operation of the reactor and RV.
    2. The licensee replaced all of the CRDM housings prior to plant 
startup.
    By teleconference on April 8, 2014, and again on September 3, 2014, 
the petitioner addressed the Petition Review Board (PRB). The meetings 
provided the petitioner with an opportunity to provide additional 
information and to clarify issues cited in the petition. The 
transcripts of these meeting were treated as supplements to the 
petition and are available in ADAMS, as previously noted.
    In the agency's letter dated September 25, 2014 (ADAMS Accession 
No. ML14237A726), the NRC accepted the following specific issues of the 
petition for review under Section 2.206 of Title 10 of the Code of 
Federal Regulations (10 CFR):

    1. Request for PNP to open every PCP for inspection and clear up 
all flaws.
    2. Request for PNP to replace the PCPs with others designed for 
their intended duty.

[[Page 19703]]

    3. Request an Office of the Inspector General (OIG) inspection 
on why different NRC regions have different analysis criteria for 
similar PCP events.
    4. Request a $10 million fine over these events.
    5. Request for PNP to return to yellow or red status and for the 
NRC to intensify its monitoring of PNP.

    The NRC sent a copy of the proposed director's decision to the 
petitioner and the licensee for comment on January 23, 2015 (ADAMS 
Accession Nos. ML14338A435 and ML14338A431). The petitioner and the 
licensee were asked to provide comments within 15 days on any part of 
the proposed director's decision that was considered to be erroneous or 
any issues in the petition that were not addressed. Comments were 
received from the petitioner and are addressed in an attachment to the 
final director's decision.
    The Deputy Director of the Office of Nuclear Reactor Regulation 
denied the petitioner's requests for the following actions:

    1. Request for PNP to open every PCP for inspection and clear up 
all flaws.
    2. Request for PNP to replace the PCPs with others designed for 
their intended duty.
    3. Request a $10 million fine over these events.
    4. Request for PNP to return to yellow or red status and for the 
NRC to intensify its monitoring of PNP.

The reasons for this decision are explained in the final director's 
decision DD-15-03, under 10 CFR 2.206 of the Commission's regulations. 
The petitioner's request for an OIG inspection on why different NRC 
regions have different analysis criteria for similar PCP events has 
been forwarded to the OIG. The NRC found no basis for taking the 
requested enforcement-related actions against PNP; thus, the NRC denies 
the petition. NRC staff did not find that the continued operation of 
PNP would adversely affect public health and safety. The NRC determined 
that the licensee's actions to date are adequate and there is 
reasonable assurance that the operation of the PNP will not endanger 
the health and safety of the public. For the performance deficiencies 
and inspection findings that the NRC has identified at PNP, the agency 
will continue to monitor the progress of the licensee's completion of 
corrective actions through planned inspections consistent with the 
NRC's ongoing reactor oversight process.
    Consistent with 10 CFR 2.206(c), the NRC staff will file a copy of 
this final director's decision with the Secretary of the Commission for 
the Commission to review. As provided for in 10 CFR 2.206(c)(1), the 
final director's decision will constitute the Commission's final action 
within 25 days of the date of the decision unless the Commission, on 
its own motion, chooses to review the decision within that time.

    Dated at Rockville, Maryland this 6th day of April 2015.

    For the Nuclear Regulatory Commission.
Jennifer Uhle,
Deputy Director, Office of Nuclear Reactor Regulation.
[FR Doc. 2015-08409 Filed 4-10-15; 8:45 am]
 BILLING CODE 7590-01-P



                                                  19702                          Federal Register / Vol. 80, No. 70 / Monday, April 13, 2015 / Notices

                                                  person is not required to respond to, a                 NUCLEAR REGULATORY                                    FOR FURTHER INFORMATION CONTACT:
                                                  collection of information unless it                     COMMISSION                                            Jennivine Rankin, Office of Nuclear
                                                  displays a currently valid OMB control                                                                        Reactor Regulation, U.S. Nuclear
                                                  number.                                                 [Docket No. 50–255; NRC–2014–0216]                    Regulatory Commission, Washington,
                                                     The NRC published a Federal                                                                                DC 20555–0001; telephone: 301–415–
                                                                                                          Entergy Nuclear Operations, Inc.;                     1530, email: Jennivine.Rankin@nrc.gov.
                                                  Register notice with a 60-day comment                   Palisades Nuclear Plant
                                                  period on this information collection on                                                                      SUPPLEMENTARY INFORMATION: Notice is
                                                  November 19, 2014, 79 FR 68917.                         AGENCY: Nuclear Regulatory                            hereby given that the Deputy Director,
                                                                                                          Commission.                                           Nuclear Reactor Regulation, has issued
                                                     1. The title of the information                                                                            a final director’s decision (ADAMS
                                                                                                          ACTION: Director’s decision under 10
                                                  collection: 10 CFR part 31, ‘‘General                                                                         Accession No. ML15054A365), on a
                                                                                                          CFR 2.206; issuance.
                                                  Domestic Licenses for Byproduct                                                                               petition filed by the petitioner on March
                                                  Material.’’                                             SUMMARY:   The U.S. Nuclear Regulatory                5, 2014 (ADAMS Accession No.
                                                     2. OMB approval number: 3150–0016                    Commission (NRC) has issued a final                   ML14071A006), as supplemented on
                                                                                                          director’s decision with regard to a                  April 8, May 21, and September 3, 2014
                                                     3. Type of submission: Extension with                petition dated March 5, 2014, as                      (ADAMS Accession Nos.
                                                  burden revision                                         supplemented on April 8, May 21, and                  ML14143A212, ML14142A101, and
                                                     4. The form number if applicable: Not                September 3, 2014, filed by Mr. Michael               ML14259A135, respectively). The
                                                  applicable                                              Mulligan (the petitioner), requesting                 petitioner requested a number of actions
                                                     5. How often the collection is required              that the NRC take action with regard to               be taken by the NRC and the licensee for
                                                  or requested: Reports are submitted as                  Entergy Nuclear Operations, Inc. (ENO                 equipment failures at PNP. As the basis
                                                  events occur. General license                           or the licensee) at Palisades Nuclear                 for the request, the petitioner stated that
                                                  registration requests may be submitted                  Plant (PNP). The petitioner’s requests                there have been recent plant events and
                                                                                                          and the final director’s decision are                 equipment failures at PNP, such as parts
                                                  at any time. Changes to the information
                                                                                                          included in the SUPPLEMENTARY                         of the primary coolant pump (PCP)
                                                  on the registration may be submitted as
                                                                                                          INFORMATION section of this document.                 impeller breaking off and lodging in the
                                                  they occur.
                                                                                                          DATES: April 13, 2015.                                reactor vessel (RV) and flaws in the
                                                     6. Who will be required or asked to                  ADDRESSES: Please refer to Docket ID                  control rod drive mechanisms (CRDMs).
                                                  respond: Persons receiving, possessing,                 NRC–2014–0216 when contacting the                     The petitioner requested immediate
                                                  using, or transferring devices containing               NRC about the availability of                         action to prevent the PNP from
                                                  byproduct material.                                     information regarding this document.                  restarting due to a piece of PCP impeller
                                                     7. The estimated number of annual                    You may obtain publicly-available                     that was lodged between the RV and the
                                                  responses: 138,429 (10,929 responses +                  information related to this document                  flow skirt and due to flawed CRDMs.
                                                  127,500 recordkeepers).                                 using any of the following methods:                      By email dated March 19, 2014
                                                                                                             • Federal Rulemaking Web site: Go to               (ADAMS Accession No. ML14083A680),
                                                     8. The estimated number of annual                                                                          the NRC staff denied the petitioner’s
                                                                                                          http://www.regulations.gov and search
                                                  respondents: 10,929 (971 NRC licensee                                                                         request for immediate action to prevent
                                                                                                          for Docket ID NRC–2014–0216. Address
                                                  respondents + 9,958 Agreement State                     questions about NRC dockets to Carol                  PNP from restarting, based on the
                                                  licensee responses).                                    Gallagher; telephone: 301–415–3463;                   following factors:
                                                     9. An estimate of the total number of                email: Carol.Gallagher@nrc.gov. For                      1. The NRC performed an in-depth
                                                  hours needed annually to comply with                    technical questions, contact the                      independent review of the licensee’s
                                                  the information collection requirement                  individual listed in the FOR FURTHER                  analysis and concluded that the
                                                  or request: 36,186 hours (4,843 hours for               INFORMATION CONTACT section of this                   impeller piece did not pose a threat to
                                                  NRC licensees + 31,343 hours for                        document.                                             safe operation of the reactor and RV.
                                                  Agreement State licensees).                                • NRC’s Agencywide Documents                          2. The licensee replaced all of the
                                                                                                          Access and Management System                          CRDM housings prior to plant startup.
                                                     10. Abstract: Part 31 of Title 10 of the
                                                                                                          (ADAMS): You may obtain publicly-                        By teleconference on April 8, 2014,
                                                  Code of Federal Regulations (10 CFR),                                                                         and again on September 3, 2014, the
                                                                                                          available documents online in the
                                                  establishes general licenses for the                    ADAMS Public Documents collection at                  petitioner addressed the Petition Review
                                                  possession and use of byproduct                         http://www.nrc.gov/reading-rm/                        Board (PRB). The meetings provided the
                                                  material in certain devices. General                    adams.html. To begin the search, select               petitioner with an opportunity to
                                                  licensees are required to keep testing                  ‘‘ADAMS Public Documents’’ and then                   provide additional information and to
                                                  records and submit event reports                        select ‘‘Begin Web-based ADAMS                        clarify issues cited in the petition. The
                                                  identified in Part 31, which assist the                 Search.’’ For problems with ADAMS,                    transcripts of these meeting were treated
                                                  NRC in determining with reasonable                      please contact the NRC’s Public                       as supplements to the petition and are
                                                  assurance that devices are operated                     Document Room (PDR) reference staff at                available in ADAMS, as previously
                                                  safely and without radiological hazard                  1–800–397–4209, 301–415–4737, or by                   noted.
                                                  to users or the public.                                 email to pdr.resource@nrc.gov. The                       In the agency’s letter dated September
                                                    Dated at Rockville, Maryland, this 7th day            ADAMS accession number for each                       25, 2014 (ADAMS Accession No.
                                                  of April, 2015.                                         document referenced in this document                  ML14237A726), the NRC accepted the
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                                                                          (if that document is available in                     following specific issues of the petition
                                                    For the Nuclear Regulatory Commission.
                                                                                                          ADAMS) is provided the first time that                for review under Section 2.206 of Title
                                                  Tremaine Donnell,                                       a document is referenced.                             10 of the Code of Federal Regulations
                                                  NRC Clearance Officer, Office of Information               • NRC’s PDR: You may examine and                   (10 CFR):
                                                  Services.                                               purchase copies of public documents at                  1. Request for PNP to open every PCP for
                                                  [FR Doc. 2015–08381 Filed 4–10–15; 8:45 am]             the NRC’s PDR, Room O1–F21, One                       inspection and clear up all flaws.
                                                  BILLING CODE 7590–01–P                                  White Flint North, 11555 Rockville                      2. Request for PNP to replace the PCPs
                                                                                                          Pike, Rockville, Maryland 20852.                      with others designed for their intended duty.



                                             VerDate Sep<11>2014   18:02 Apr 10, 2015   Jkt 235001   PO 00000   Frm 00073   Fmt 4703   Sfmt 4703   E:\FR\FM\13APN1.SGM   13APN1


                                                                                 Federal Register / Vol. 80, No. 70 / Monday, April 13, 2015 / Notices                                           19703

                                                    3. Request an Office of the Inspector                 2.206(c)(1), the final director’s decision               • NRC’s Agencywide Documents
                                                  General (OIG) inspection on why different               will constitute the Commission’s final                Access and Management System
                                                  NRC regions have different analysis criteria            action within 25 days of the date of the              (ADAMS): You may obtain publicly-
                                                  for similar PCP events.                                 decision unless the Commission, on its                available documents online in the
                                                    4. Request a $10 million fine over these
                                                  events.
                                                                                                          own motion, chooses to review the                     ADAMS Public Documents collection at
                                                    5. Request for PNP to return to yellow or             decision within that time.                            http://www.nrc.gov/reading-rm/
                                                  red status and for the NRC to intensify its               Dated at Rockville, Maryland this 6th day           adams.html. To begin the search, select
                                                  monitoring of PNP.                                      of April 2015.                                        ‘‘ADAMS Public Documents’’ and then
                                                                                                            For the Nuclear Regulatory Commission.              select ‘‘Begin Web-based ADAMS
                                                     The NRC sent a copy of the proposed
                                                                                                                                                                Search.’’ For problems with ADAMS,
                                                  director’s decision to the petitioner and               Jennifer Uhle,
                                                                                                                                                                please contact the NRC’s Public
                                                  the licensee for comment on January 23,                 Deputy Director, Office of Nuclear Reactor            Document Room (PDR) reference staff at
                                                  2015 (ADAMS Accession Nos.                              Regulation.
                                                                                                                                                                1–800–397–4209, (301) 415–4737, or by
                                                  ML14338A435 and ML14338A431). The                       [FR Doc. 2015–08409 Filed 4–10–15; 8:45 am]
                                                                                                                                                                email to pdr.resource@nrc.gov. The
                                                  petitioner and the licensee were asked                  BILLING CODE 7590–01–P                                supporting statement is available in
                                                  to provide comments within 15 days on                                                                         ADAMS under Accession No.
                                                  any part of the proposed director’s                                                                           ML15036A316.
                                                  decision that was considered to be                      NUCLEAR REGULATORY                                       • NRC’s PDR: You may examine and
                                                  erroneous or any issues in the petition                 COMMISSION                                            purchase copies of public documents at
                                                  that were not addressed. Comments                       [NRC–2014–0245]                                       the NRC’s PDR, Room O1–F21, One
                                                  were received from the petitioner and                                                                         White Flint North, 11555 Rockville
                                                  are addressed in an attachment to the                   Information Collection: Standards for                 Pike, Rockville, Maryland 20852.
                                                  final director’s decision.                              Protection Against Radiation                             • NRC’s Clearance Officer: A copy of
                                                     The Deputy Director of the Office of                                                                       the collection of information and related
                                                  Nuclear Reactor Regulation denied the                   AGENCY:  Nuclear Regulatory
                                                                                                                                                                instructions may be obtained without
                                                  petitioner’s requests for the following                 Commission.
                                                                                                                                                                charge by contacting the NRC’s
                                                  actions:                                                ACTION: Notice of submission to the                   Clearance Officer, Tremaine Donnell,
                                                    1. Request for PNP to open every PCP for              Office of Management and Budget;                      Office of Information Services, U.S.
                                                  inspection and clear up all flaws.                      request for comment.                                  Nuclear Regulatory Commission,
                                                    2. Request for PNP to replace the PCPs                                                                      Washington, DC 20555–0001; telephone:
                                                  with others designed for their intended duty.           SUMMARY:   The U.S. Nuclear Regulatory
                                                                                                          Commission (NRC) has recently                         (301) 415–6258; email:
                                                    3. Request a $10 million fine over these                                                                    INFOCOLLECTS.Resource@NRC.GOV.
                                                  events.                                                 submitted a request for renewal of an
                                                    4. Request for PNP to return to yellow or             existing collection of information to the             B. Submitting Comments
                                                  red status and for the NRC to intensify its             Office of Management and Budget                         The NRC cautions you not to include
                                                  monitoring of PNP.                                      (OMB) for review. The information                     identifying or contact information in
                                                  The reasons for this decision are                       collection is entitled, ‘‘Standards for               comment submissions that you do not
                                                  explained in the final director’s decision              Protection Against Radiation.’’                       want to be publicly disclosed in your
                                                  DD–15–03, under 10 CFR 2.206 of the                     DATES: Submit comments by May 13,                     comment submission. All comment
                                                  Commission’s regulations. The                           2015.                                                 submissions are posted at http://
                                                  petitioner’s request for an OIG                         ADDRESSES:   Submit comments directly                 www.regulations.gov and entered into
                                                  inspection on why different NRC                         to the OMB reviewer at: Vlad Dorjets,                 ADAMS. Comment submissions are not
                                                  regions have different analysis criteria                Desk Officer, Office of Information and               routinely edited to remove identifying
                                                  for similar PCP events has been                         Regulatory Affairs (3150–0014), NEOB–                 or contact information.
                                                  forwarded to the OIG. The NRC found                     10202, Office of Management and                         If you are requesting or aggregating
                                                  no basis for taking the requested                       Budget, Washington, DC 20503;                         comments from other persons for
                                                  enforcement-related actions against                     telephone: 202–395–1741, email:                       submission to the OMB, then you
                                                  PNP; thus, the NRC denies the petition.                 Vladik_Dorjets@omb.eop.gov.                           should inform those persons not to
                                                  NRC staff did not find that the                                                                               include identifying or contact
                                                                                                          FOR FURTHER INFORMATION CONTACT:
                                                  continued operation of PNP would                                                                              information that they do not want to be
                                                                                                          Tremaine Donnell, NRC Clearance
                                                  adversely affect public health and                                                                            publicly disclosed in their comment
                                                                                                          Officer, U.S. Nuclear Regulatory
                                                  safety. The NRC determined that the                                                                           submission. Your request should state
                                                                                                          Commission, Washington, DC 20555–
                                                  licensee’s actions to date are adequate                                                                       that comment submissions are not
                                                                                                          0001; telephone: (301) 415–6258; email:
                                                  and there is reasonable assurance that                                                                        routinely edited to remove such
                                                                                                          INFOCOLLECTS.Resource@nrc.gov.
                                                  the operation of the PNP will not                                                                             information before making the comment
                                                  endanger the health and safety of the                   SUPPLEMENTARY INFORMATION:
                                                                                                                                                                submissions available to the public or
                                                  public. For the performance deficiencies                I. Obtaining Information and                          entering the comment into ADAMS.
                                                  and inspection findings that the NRC                    Submitting Comments
                                                  has identified at PNP, the agency will                                                                        II. Background
                                                  continue to monitor the progress of the                 A. Obtaining Information                                 Under the provisions of the
                                                  licensee’s completion of corrective                       Please refer to Docket ID NRC–2014–                 Paperwork Reduction Act of 1995 (44
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                  actions through planned inspections                     0245 when contacting the NRC about                    U.S.C. Chapter 35), the NRC recently
                                                  consistent with the NRC’s ongoing                       the availability of information for this              submitted a request for renewal of an
                                                  reactor oversight process.                              action. You may obtain publicly-                      existing collection of information to
                                                     Consistent with 10 CFR 2.206(c), the                 available information related to this                 OMB for review entitled, ‘‘Standards for
                                                  NRC staff will file a copy of this final                action by any of the following methods:               Protection Against Radiation.’’ The NRC
                                                  director’s decision with the Secretary of                 • Federal Rulemaking Web site: Go to                hereby informs potential respondents
                                                  the Commission for the Commission to                    http://www.regulations.gov and search                 that an agency may not conduct or
                                                  review. As provided for in 10 CFR                       for Docket ID NRC–2014–0245.                          sponsor, and that a person is not


                                             VerDate Sep<11>2014   18:02 Apr 10, 2015   Jkt 235001   PO 00000   Frm 00074   Fmt 4703   Sfmt 4703   E:\FR\FM\13APN1.SGM   13APN1



Document Created: 2015-12-18 11:22:26
Document Modified: 2015-12-18 11:22:26
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionDirector's decision under 10 CFR 2.206; issuance.
DatesApril 13, 2015.
ContactJennivine Rankin, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; telephone: 301-415-1530, email: [email protected]