The Department of Energy (DOE) requests public comment on the first complete application submitted in response to its June 10, 2010 Request for Proposals for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 in the Federal Register (75 FR 32940) (2010 RFP). In response to the 2010 RFP, Clean Line Energy Partners, LLC, submitted an application for its Plains & Eastern Clean Line project. The project would include an overhead <plus-minus>600-kilovolt (kV) high voltage, direct current electric transmission system and associated facilities with the capacity to deliver approximately 3,500 megawatts primarily from renewable energy generation facilities in the Oklahoma and Texas Panhandle regions to load-serving entities in the Mid-South and Southeast United States via an interconnection with the Tennessee Valley Authority electrical grid. DOE has concluded that Clean Line's application was responsive to the 2010 RFP and is making it available for public review.

Federal Register, Volume 80 Issue 81 (Tuesday, April 28, 2015)
[Federal Register Volume 80, Number 81 (Tuesday, April 28, 2015)]
[Notices]
[Pages 23520-23522]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-09941]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

[OE Docket No. TPF-01]


Application for Proposed Project for Clean Line Plains & Eastern 
Transmission Line

AGENCY: Office of Electricity Delivery and Energy Reliability, DOE.

ACTION: Notice of Application.

-----------------------------------------------------------------------

SUMMARY: The Department of Energy (DOE) requests public comment on the 
first complete application submitted in response to its June 10, 2010 
Request for Proposals for New or Upgraded Transmission Line Projects 
Under Section 1222 of the Energy Policy Act of 2005 in the Federal 
Register (75 FR 32940) (2010 RFP). In response to the 2010 RFP, Clean 
Line Energy Partners, LLC, submitted an application for its Plains & 
Eastern Clean Line project. The project would include an overhead 
600-kilovolt (kV) high voltage, direct current electric 
transmission system and associated facilities with the capacity to 
deliver approximately 3,500 megawatts

[[Page 23521]]

primarily from renewable energy generation facilities in the Oklahoma 
and Texas Panhandle regions to load-serving entities in the Mid-South 
and Southeast United States via an interconnection with the Tennessee 
Valley Authority electrical grid. DOE has concluded that Clean Line's 
application was responsive to the 2010 RFP and is making it available 
for public review.

DATES: Comments on the application must be submitted on or before June 
12, 2015.

ADDRESSES: Written comments should be addressed as follows: 1222 
Program, Office of Electricity Delivery and Energy Reliability (OE-20), 
U.S. Department of Energy, 1000 Independence Avenue SW., Washington, DC 
20585. Electronic comments can be emailed to 
[email protected].

FOR FURTHER INFORMATION CONTACT: Angela Colamaria at 202-287-5387 or 
via electronic mail at [email protected].

SUPPLEMENTARY INFORMATION: Pursuant to section 1222 of the Energy 
Policy Act of 2005 (EPAct) (42 U.S.C. 16421), the Secretary of Energy, 
acting through the Southwestern Power Administration (Southwestern) or 
the Western Area Power Administration (Western), has the authority to 
design, develop, construct, operate, maintain, or own, or participate 
with other entities in designing, developing, constructing, operating, 
maintaining, or owning two types of projects: (a) Electric power 
transmission facilities and related facilities needed to upgrade 
existing transmission facilities owned by Southwestern or Western (42 
U.S.C. 16421(a)), or (b) new electric power transmission facilities and 
related facilities located within any State in which Southwestern or 
Western operates (42 U.S.C. 16421(b)). In carrying out either type of 
section 1222 project (Project), the Secretary may accept and use funds 
contributed by another entity for the purpose of executing the Project 
(42 U.S.C. 16421(c)).
    In order to exercise the authority to engage in these activities 
under section 1222, the Secretary, in consultation with the applicable 
Power Marketing Administrator, must first determine that a proposed 
Project satisfies certain statutory criteria:
    i. The proposed Project must be either:
    (A) Located in an area designated under section 216(a) of the 
Federal Power Act (16 U.S.C. 824p(a)) and will reduce congestion of 
electric transmission in interstate commerce; or
    (B) Necessary to accommodate an actual or projected increase in 
demand for electric transmission capacity;
    ii. The proposed Project must be consistent with both:
    (A) Transmission needs identified, in a transmission expansion plan 
or otherwise, by the appropriate Transmission Organization (as defined 
in the Federal Power Act, 16 U.S.C. 791a et seq.) if any, or approved 
regional reliability organization; and
    (B) Efficient and reliable operation of the transmission grid;
    iii. The proposed Project will be operated in conformance with 
prudent utility practice;
    iv. The proposed Project will be operated by, or in conformance 
with the rules of, the appropriate Transmission Organization, if any; 
or if such an organization does not exist, regional reliability 
organization; and
    v. The proposed Project will not duplicate the functions of 
existing transmission facilities or proposed facilities which are the 
subject of ongoing or approved siting and related permitting 
proceedings.
    In June 2010, DOE issued Request for Proposals for New or Upgraded 
Transmission Line Projects Under Section 1222 of the Energy Policy Act 
of 2005 (75 FR 32940) (2010 RFP). To be responsive to the 2010 RFP, the 
application must demonstrate how the proposed Project meets all of the 
above statutory criteria, as well as several additional criteria, 
including, but not limited to, the following:
    1. Whether the Project is in the public interest;
    2. Whether the Project will facilitate the reliable delivery of 
power generated by renewable resources;
    3. The benefits and impacts of the Project in each state it 
traverses, including economic and environmental factors;
    4. The technical viability of the Project, considering engineering, 
electrical, and geographic factors; and
    5. The financial viability of the Project.
    In response to the 2010 RFP, Clean Line Energy Partners LLC of 
Houston, Texas, the parent company of Plains and Eastern Clean Line LLC 
and Plains and Eastern Clean Line Oklahoma LLC (collectively referred 
to with its subsidiaries as Clean Line or the Applicant) submitted a 
proposal to DOE in July 2010 for the Plains & Eastern Clean Line 
Project. In August 2011, Clean Line modified the proposal. In December 
2014, DOE requested additional information from the Applicant to 
supplement and update its original application. This ``Part II'' 
application and other documentation are now available for a 45-day 
public comment period.
    Clean Line proposes to construct an overhead 600-
kilovolt (kV), high voltage direct current (HVDC) electric transmission 
system and associated facilities with the capacity to deliver 
approximately 3,500 megawatts primarily from renewable energy 
generation facilities in the Oklahoma and Texas Panhandle regions to 
load-serving entities in the Mid-South and Southeast United States via 
an interconnection with the Tennessee Valley Authority electrical grid. 
Major associated facilities identified in the application consist of 
converter stations; an approximate 720-mile, 600kV HVDC 
transmission line; an alternating current (AC) collection system; and 
access roads. Clean Line requests that Southwestern participate in 
development of the facilities in Oklahoma and Arkansas. As part of 
their environmental review of the project pursuant to the National 
Environmental Policy Act (NEPA), DOE has identified and analyzed 
potential environmental impacts for several additional alternatives. 
These alternatives include an Arkansas converter station (capable of 
supplying an additional 500 megawatts of energy into the Arkansas 
electrical grid) and alternative routes for the HVDC transmission line.
    Procedural Matters: Prior to making a determination whether or not 
to participate in the proposed Project, DOE, in consultation with 
Southwestern, must evaluate the proposed Project for compliance with 
section 1222 of EPAct, the criteria in the 2010 RFP, and NEPA. On 
December 21, 2012, DOE issued a Notice of Intent to Draft an 
Environmental Impact Statement (EIS; 77 FR 75623) pursuant to NEPA. On 
December 17, 2014, DOE issued a Notice of Availability and announced 
public hearings for the Draft EIS (79 FR 75132). DOE made the Draft EIS 
available on DOE's Plains & Eastern EIS Web site 
(www.PlainsandEasternEIS.com) and the DOE NEPA Web site 
(www.energy.gov/nepa). The Draft EIS assesses the potential 
environmental effects of participating in the proposed Project. DOE 
hosted fifteen public hearings across the proposed Project area. The 
public comment period for the NEPA review is scheduled to end on April 
20, 2015. DOE will address the public comments in the Final EIS, which 
will inform the Department's determination.
    In addition to conducting a NEPA review, DOE is conducting due

[[Page 23522]]

diligence on other factors related to the statutory criteria identified 
above. DOE's review will include making all required statutory findings 
and will consider all criteria listed in section 1222 of EPAct, as well 
as all factors included in DOE's 2010 RFP. This due diligence is the 
reason for today's notice. DOE is requesting comments on whether the 
proposed Project meets the statutory criteria and the factors 
identified within the 2010 RFP.
    Any person may comment on the application by filing such comment at 
the address provided above. Copies of the application are available by 
accessing the program Web site at http://www.energy.gov/oe/services/electricity-policy-coordination-and-implementation/transmission-planning/section-1222-0.

    Issued in Washington, DC, on April 23, 2015.
Patricia A. Hoffman,
Principal Deputy Assistant Secretary, Office of Electricity Delivery 
and Energy Reliability.
[FR Doc. 2015-09941 Filed 4-27-15; 8:45 am]
BILLING CODE 6450-01-P



                                                    23520                          Federal Register / Vol. 80, No. 81 / Tuesday, April 28, 2015 / Notices

                                                    objectives, and compliance with grant                   that provides the most current                        VIII. Other Information
                                                    conditions. The Secretary may also                      performance and financial expenditure                    Accessible Format: Individuals with
                                                    consider whether the applicant failed to                information as directed by the Secretary              disabilities can obtain this document
                                                    submit a timely performance report or                   under 34 CFR 75.118. The Secretary                    and a copy of the application package in
                                                    submitted a report of unacceptable                      may also require more frequent                        an accessible format (e.g., braille, large
                                                    quality.                                                performance reports under 34 CFR                      print, audiotape, or compact disk) on
                                                       In addition, in making a competitive                 75.720(c). For specific requirements on               request to the program contact person
                                                    grant award, the Secretary also requires                reporting, please go to www.ed.gov/                   listed under FOR FURTHER INFORMATION
                                                    various assurances including those                      fund/grant/apply/appforms/                            CONTACT in section VII of this notice.
                                                    applicable to Federal civil rights laws                 appforms.html.                                           Electronic Access to This Document:
                                                    that prohibit discrimination in programs                   4. Performance Measures: Under the                 The official version of this document is
                                                    or activities receiving Federal financial               Government Performance and Results                    the document published in the Federal
                                                    assistance from the Department of                       Act of 1993 (GPRA), the Department has                Register. Free Internet access to the
                                                    Education (34 CFR 100.4, 104.5, 106.4,                  developed the following performance                   official edition of the Federal Register
                                                    108.8, and 110.23).                                     measures for measuring the overall                    and the Code of Federal Regulations is
                                                       3. Special Conditions: Under 2 CFR                   effectiveness of the Demonstration                    available via the Federal Digital System
                                                    3474.10, the Secretary may impose                       Grants for Indian Children program:                   at: www.gpo.gov/fdsys. At this site you
                                                    special conditions and, in appropriate                     (1) The percentage of the annual
                                                                                                                                                                  can view this document, as well as all
                                                    circumstances, high-risk conditions on a                measurable objectives, as described in
                                                                                                                                                                  other documents of this Department
                                                    grant if the applicant or grantee is not                the application, that are met by grantees;
                                                                                                                                                                  published in the Federal Register, in
                                                    financially stable; has a history of                    and
                                                                                                               (2) The percentage of grantees that                text or Adobe Portable Document
                                                    unsatisfactory performance; has a                                                                             Format (PDF). To use PDF you must
                                                    financial or other management system                    report a significant increase in
                                                                                                            community collaborative efforts that                  have Adobe Acrobat Reader, which is
                                                    that does not meet the standards in 2                                                                         available free at the site.
                                                    CFR part 200, subpart D; has not                        promote college and career readiness of
                                                                                                            Indian children.                                         You may also access documents of the
                                                    fulfilled the conditions of a prior grant;                                                                    Department published in the Federal
                                                    or is otherwise not responsible.                           These measures constitute the
                                                                                                            Department’s indicators of success for                Register by using the article search
                                                    VI. Award Administration Information                    this program. Consequently, we advise                 feature at: www.federalregister.gov.
                                                                                                            an applicant for a grant under this                   Specifically, through the advanced
                                                       1. Award Notices: If your application
                                                                                                            program to give careful consideration to              search feature at this site, you can limit
                                                    is successful, we notify your U.S.
                                                                                                            these measures in developing the                      your search to documents published by
                                                    Representative and U.S. Senators and
                                                                                                            proposed project and identifying the                  the Department.
                                                    send you a Grant Award Notification
                                                    (GAN); or we may send you an email                      method of evaluation. Each grantee will                 Dated: April 23, 2015.
                                                    containing a link to access an electronic               be required to provide, in its annual                 Deborah S. Delisle,
                                                    version of your GAN. We may notify                      performance and final reports, data                   Assistant Secretary for Elementary and
                                                    you informally, also.                                   about its progress in meeting these                   Secondary Education.
                                                       If your application is not evaluated or              measures.                                             [FR Doc. 2015–09832 Filed 4–27–15; 8:45 am]
                                                    not selected for funding, we notify you.                   5. Continuation Awards: In making a                BILLING CODE 4000–01–P
                                                       2. Administrative and National Policy                continuation award under 34 CFR
                                                    Requirements: We identify                               75.253, the Secretary considers, among
                                                    administrative and national policy                      other things: Whether a grantee has
                                                                                                                                                                  DEPARTMENT OF ENERGY
                                                    requirements in the application package                 made substantial progress in achieving
                                                    and reference these and other                           the goals and objectives of the project;              [OE Docket No. TPF–01]
                                                    requirements in the Applicable                          whether the grantee has expended funds
                                                                                                            in a manner that is consistent with its               Application for Proposed Project for
                                                    Regulations section of this notice.
                                                       We reference the regulations outlining               approved application and budget; and,                 Clean Line Plains & Eastern
                                                    the terms and conditions of an award in                 if the Secretary has established                      Transmission Line
                                                    the Applicable Regulations section of                   performance measurement                               AGENCY: Office of Electricity Delivery
                                                    this notice and include these and other                 requirements, the performance targets in              and Energy Reliability, DOE.
                                                    specific conditions in the GAN. The                     the grantee’s approved application. In                ACTION: Notice of Application.
                                                    GAN also incorporates your approved                     making a continuation grant, the
                                                    application as part of your binding                     Secretary also considers whether the                  SUMMARY:   The Department of Energy
                                                    commitments under the grant.                            grantee is operating in compliance with               (DOE) requests public comment on the
                                                       3. Reporting: (a) If you apply for a                 the assurances in its approved                        first complete application submitted in
                                                    grant under this competition, you must                  application, including those applicable               response to its June 10, 2010 Request for
                                                    ensure that you have in place the                       to Federal civil rights laws that prohibit            Proposals for New or Upgraded
                                                    necessary processes and systems to                      discrimination in programs or activities              Transmission Line Projects Under
                                                    comply with the reporting requirements                  receiving Federal financial assistance                Section 1222 of the Energy Policy Act of
                                                    in 2 CFR part 170 should you receive                    from the Department (34 CFR 100.4,                    2005 in the Federal Register (75 FR
                                                    funding under the competition. This                     104.5, 106.4, 108.8, and 110.23).                     32940) (2010 RFP). In response to the
asabaliauskas on DSK5VPTVN1PROD with NOTICES




                                                    does not apply if you have an exception                                                                       2010 RFP, Clean Line Energy Partners,
                                                                                                            VII. Agency Contact
                                                    under 2 CFR 170.110(b).                                                                                       LLC, submitted an application for its
                                                       (b) At the end of your project period,               FOR FURTHER INFORMATION CONTACT:                      Plains & Eastern Clean Line project. The
                                                    you must submit a final performance                     David E. Emenheiser, U.S. Department                  project would include an overhead
                                                    report, including financial information,                of Education, 400 Maryland Avenue                     ±600-kilovolt (kV) high voltage, direct
                                                    as directed by the Secretary. If you                    SW., Room 3W215, Washington, DC                       current electric transmission system and
                                                    receive a multi-year award, you must                    20202. Telephone: (202) 260–1488 or by                associated facilities with the capacity to
                                                    submit an annual performance report                     email: david.emenheiser@ed.gov.                       deliver approximately 3,500 megawatts


                                               VerDate Sep<11>2014   18:18 Apr 27, 2015   Jkt 235001   PO 00000   Frm 00025   Fmt 4703   Sfmt 4703   E:\FR\FM\28APN1.SGM   28APN1


                                                                                   Federal Register / Vol. 80, No. 81 / Tuesday, April 28, 2015 / Notices                                           23521

                                                    primarily from renewable energy                            (B) Necessary to accommodate an                    application and other documentation
                                                    generation facilities in the Oklahoma                   actual or projected increase in demand                are now available for a 45-day public
                                                    and Texas Panhandle regions to load-                    for electric transmission capacity;                   comment period.
                                                    serving entities in the Mid-South and                      ii. The proposed Project must be                      Clean Line proposes to construct an
                                                    Southeast United States via an                          consistent with both:                                 overhead ±600-kilovolt (kV), high
                                                    interconnection with the Tennessee                         (A) Transmission needs identified, in              voltage direct current (HVDC) electric
                                                    Valley Authority electrical grid. DOE                   a transmission expansion plan or                      transmission system and associated
                                                    has concluded that Clean Line’s                         otherwise, by the appropriate                         facilities with the capacity to deliver
                                                    application was responsive to the 2010                  Transmission Organization (as defined                 approximately 3,500 megawatts
                                                    RFP and is making it available for                      in the Federal Power Act, 16 U.S.C.                   primarily from renewable energy
                                                    public review.                                          791a et seq.) if any, or approved regional            generation facilities in the Oklahoma
                                                    DATES: Comments on the application                      reliability organization; and                         and Texas Panhandle regions to load-
                                                    must be submitted on or before June 12,                    (B) Efficient and reliable operation of            serving entities in the Mid-South and
                                                    2015.                                                   the transmission grid;                                Southeast United States via an
                                                                                                               iii. The proposed Project will be                  interconnection with the Tennessee
                                                    ADDRESSES: Written comments should
                                                                                                            operated in conformance with prudent                  Valley Authority electrical grid. Major
                                                    be addressed as follows: 1222 Program,
                                                                                                            utility practice;                                     associated facilities identified in the
                                                    Office of Electricity Delivery and Energy
                                                                                                               iv. The proposed Project will be                   application consist of converter stations;
                                                    Reliability (OE–20), U.S. Department of
                                                                                                            operated by, or in conformance with the               an approximate 720-mile, ±600kV
                                                    Energy, 1000 Independence Avenue
                                                                                                            rules of, the appropriate Transmission                HVDC transmission line; an alternating
                                                    SW., Washington, DC 20585. Electronic
                                                                                                            Organization, if any; or if such an                   current (AC) collection system; and
                                                    comments can be emailed to
                                                                                                            organization does not exist, regional                 access roads. Clean Line requests that
                                                    plainsandeastern@hq.doe.gov.
                                                                                                            reliability organization; and                         Southwestern participate in
                                                    FOR FURTHER INFORMATION CONTACT:                           v. The proposed Project will not                   development of the facilities in
                                                    Angela Colamaria at 202–287–5387 or                     duplicate the functions of existing                   Oklahoma and Arkansas. As part of
                                                    via electronic mail at                                  transmission facilities or proposed                   their environmental review of the
                                                    Angela.Colamaria@hq.doe.gov.                            facilities which are the subject of                   project pursuant to the National
                                                    SUPPLEMENTARY INFORMATION: Pursuant                     ongoing or approved siting and related                Environmental Policy Act (NEPA), DOE
                                                    to section 1222 of the Energy Policy Act                permitting proceedings.                               has identified and analyzed potential
                                                    of 2005 (EPAct) (42 U.S.C. 16421), the                     In June 2010, DOE issued Request for               environmental impacts for several
                                                    Secretary of Energy, acting through the                 Proposals for New or Upgraded                         additional alternatives. These
                                                    Southwestern Power Administration                       Transmission Line Projects Under                      alternatives include an Arkansas
                                                    (Southwestern) or the Western Area                      Section 1222 of the Energy Policy Act of              converter station (capable of supplying
                                                    Power Administration (Western), has                     2005 (75 FR 32940) (2010 RFP). To be                  an additional 500 megawatts of energy
                                                    the authority to design, develop,                       responsive to the 2010 RFP, the                       into the Arkansas electrical grid) and
                                                    construct, operate, maintain, or own, or                application must demonstrate how the                  alternative routes for the HVDC
                                                    participate with other entities in                      proposed Project meets all of the above               transmission line.
                                                    designing, developing, constructing,                    statutory criteria, as well as several                   Procedural Matters: Prior to making a
                                                    operating, maintaining, or owning two                   additional criteria, including, but not               determination whether or not to
                                                    types of projects: (a) Electric power                   limited to, the following:                            participate in the proposed Project,
                                                    transmission facilities and related                        1. Whether the Project is in the public            DOE, in consultation with
                                                    facilities needed to upgrade existing                   interest;                                             Southwestern, must evaluate the
                                                    transmission facilities owned by                           2. Whether the Project will facilitate             proposed Project for compliance with
                                                    Southwestern or Western (42 U.S.C.                      the reliable delivery of power generated              section 1222 of EPAct, the criteria in the
                                                    16421(a)), or (b) new electric power                    by renewable resources;                               2010 RFP, and NEPA. On December 21,
                                                    transmission facilities and related                        3. The benefits and impacts of the                 2012, DOE issued a Notice of Intent to
                                                    facilities located within any State in                  Project in each state it traverses,                   Draft an Environmental Impact
                                                    which Southwestern or Western                           including economic and environmental                  Statement (EIS; 77 FR 75623) pursuant
                                                    operates (42 U.S.C. 16421(b)). In                       factors;                                              to NEPA. On December 17, 2014, DOE
                                                    carrying out either type of section 1222                   4. The technical viability of the                  issued a Notice of Availability and
                                                    project (Project), the Secretary may                    Project, considering engineering,                     announced public hearings for the Draft
                                                    accept and use funds contributed by                     electrical, and geographic factors; and               EIS (79 FR 75132). DOE made the Draft
                                                    another entity for the purpose of                          5. The financial viability of the                  EIS available on DOE’s Plains & Eastern
                                                    executing the Project (42 U.S.C.                        Project.                                              EIS Web site
                                                    16421(c)).                                                 In response to the 2010 RFP, Clean                 (www.PlainsandEasternEIS.com) and
                                                       In order to exercise the authority to                Line Energy Partners LLC of Houston,                  the DOE NEPA Web site
                                                    engage in these activities under section                Texas, the parent company of Plains and               (www.energy.gov/nepa). The Draft EIS
                                                    1222, the Secretary, in consultation with               Eastern Clean Line LLC and Plains and                 assesses the potential environmental
                                                    the applicable Power Marketing                          Eastern Clean Line Oklahoma LLC                       effects of participating in the proposed
                                                    Administrator, must first determine that                (collectively referred to with its                    Project. DOE hosted fifteen public
                                                                                                            subsidiaries as Clean Line or the                     hearings across the proposed Project
asabaliauskas on DSK5VPTVN1PROD with NOTICES




                                                    a proposed Project satisfies certain
                                                    statutory criteria:                                     Applicant) submitted a proposal to DOE                area. The public comment period for the
                                                       i. The proposed Project must be                      in July 2010 for the Plains & Eastern                 NEPA review is scheduled to end on
                                                    either:                                                 Clean Line Project. In August 2011,                   April 20, 2015. DOE will address the
                                                       (A) Located in an area designated                    Clean Line modified the proposal. In                  public comments in the Final EIS,
                                                    under section 216(a) of the Federal                     December 2014, DOE requested                          which will inform the Department’s
                                                    Power Act (16 U.S.C. 824p(a)) and will                  additional information from the                       determination.
                                                    reduce congestion of electric                           Applicant to supplement and update its                   In addition to conducting a NEPA
                                                    transmission in interstate commerce; or                 original application. This ‘‘Part II’’                review, DOE is conducting due


                                               VerDate Sep<11>2014   18:18 Apr 27, 2015   Jkt 235001   PO 00000   Frm 00026   Fmt 4703   Sfmt 4703   E:\FR\FM\28APN1.SGM   28APN1


                                                    23522                          Federal Register / Vol. 80, No. 81 / Tuesday, April 28, 2015 / Notices

                                                    diligence on other factors related to the               Docket No. ER06–274, Southwestern                     Docket No. ER14–2570, Southwest
                                                    statutory criteria identified above.                      Public Service Company                                Power Pool, Inc.
                                                    DOE’s review will include making all                    Docket No. ER09–35, Tallgrass                         Docket No. ER14–2850, Southwest
                                                    required statutory findings and will                      Transmission, LLC                                     Power Pool, Inc.
                                                    consider all criteria listed in section                 Docket No. ER09–36, Prairie Wind
                                                    1222 of EPAct, as well as all factors                     Transmission, LLC                                   Docket No. ER14–2851, Southwest
                                                    included in DOE’s 2010 RFP. This due                    Docket No. ER09–548, ITC Great Plains,                  Power Pool, Inc.
                                                    diligence is the reason for today’s                       LLC                                                 Docket No. ER15–10, Southwest Power
                                                    notice. DOE is requesting comments on                   Docket No. EL11–34, Midcontinent                        Pool, Inc.
                                                    whether the proposed Project meets the                    Independent System Operator, Inc.                   Docket No. ER15–21, Southwest Power
                                                    statutory criteria and the factors                      Docket No. ER11–1844, Midcontinent                      Pool, Inc.
                                                    identified within the 2010 RFP.                           Independent System Operator, Inc.
                                                      Any person may comment on the                         Docket No. ER11–4105, Southwest                       Docket No. ER15–279, Southwest Power
                                                    application by filing such comment at                     Power Pool, Inc.                                      Pool, Inc.
                                                    the address provided above. Copies of                   Docket No. EL12–28, Xcel Energy                       Docket No. ER15–509, Southwest Power
                                                    the application are available by                          Services Inc., et al.                                 Pool, Inc.
                                                    accessing the program Web site at                       Docket No. EL12–59, Golden Spread                     Docket No. ER15–534, Southwest Power
                                                    http://www.energy.gov/oe/services/                        Electric Cooperative, Inc.                            Pool, Inc.
                                                    electricity-policy-coordination-and-                    Docket No. EL12–60, Southwest Power
                                                                                                              Pool, Inc., et al.                                  Docket No. ER15–763, Southwest Power
                                                    implementation/transmission-planning/                                                                           Pool, Inc.
                                                    section-1222-0.                                         Docket No. ER12–480, Midcontinent
                                                                                                              Independent System Operator, Inc.                   Docket No. ER15–879, Southwest Power
                                                       Issued in Washington, DC, on April 23,
                                                    2015.
                                                                                                            Docket No. ER12–959, Southwest Power                    Pool, Inc.
                                                                                                              Pool, Inc.                                          Docket No. ER15–929, Southwest Power
                                                    Patricia A. Hoffman,
                                                                                                            Docket No. ER12–1179, Southwest                         Pool, Inc.
                                                    Principal Deputy Assistant Secretary, Office              Power Pool, Inc.
                                                    of Electricity Delivery and Energy Reliability.
                                                                                                            Docket No. ER12–1586, Southwest                       Docket No. ER15–964, Southwest Power
                                                    [FR Doc. 2015–09941 Filed 4–27–15; 8:45 am]               Power Pool, Inc.                                      Pool, Inc.
                                                    BILLING CODE 6450–01–P                                  Docket No. ER13–366, Southwest Power                  Docket No. ER15–990, Southwest Power
                                                                                                              Pool, Inc.                                            Pool, Inc.
                                                                                                            Docket No. ER13–367, Southwest Power                  Docket No. ER15–1139, Southwest
                                                    DEPARTMENT OF ENERGY                                      Pool, Inc.                                            Power Pool, Inc.
                                                    Federal Energy Regulatory                               Docket No. ER13–1173, Southwest
                                                                                                              Power Pool, Inc.                                    Docket No. ER15–1140, Southwest
                                                    Commission                                                                                                      Power Pool, Inc.
                                                                                                            Docket No. ER13–1864, Southwest
                                                    Notice of Staff Attendance at                             Power Pool, Inc.                                    Docket No. ER15–1152, Southwest
                                                    Southwest Power Pool Regional Entity                    Docket No. ER13–1937, Southwest                         Power Pool, Inc.
                                                    Trustee, Regional State Committee,                        Power Pool, Inc.                                    Docket No. ER15–1163, Southwest
                                                    Members’ and Board of Directors’                        Docket No. ER13–1939, Southwest                         Power Pool, Inc.
                                                    Meetings                                                  Power Pool, Inc.
                                                                                                                                                                  Docket No. ER15–1228, Southwest
                                                                                                            Docket No. EL14–21, Southwest Power
                                                       The Federal Energy Regulatory                                                                                Power Pool, Inc.
                                                                                                              Pool, Inc.
                                                    Commission (Commission) hereby gives                    Docket No. EL14–30, Midcontinent                      Docket No. ER15–1293, Southwest
                                                    notice that members of its staff may                      Independent System Operator, Inc.                     Power Pool, Inc.
                                                    attend the meetings of the Southwest                    Docket No. EL14–93, Kansas                            Docket No. ER15–1304, Southwest
                                                    Power Pool, Inc. (SPP) Regional Entity                    Corporation Commission v. Westar                      Power Pool, Inc.
                                                    Trustee (RE), Regional State Committee                    Energy, Inc.
                                                    (RSC), SPP Members Committee and                                                                              Docket No. ER15–1340, Southwest
                                                                                                            Docket No. ER14–67, Southwest Power                     Power Pool, Inc.
                                                    Board of Directors, as noted below.                       Pool, Inc.
                                                    Their attendance is part of the                         Docket No. ER14–781, Southwest Power                  Docket No. ER15–1370, Southwest
                                                    Commission’s ongoing outreach efforts.                    Pool, Inc.                                            Power Pool, Inc.
                                                       All meetings will be held at the Tulsa               Docket No. ER14–1174, Southwest                       Docket No. ER15–1401, Southwest
                                                    Hyatt Regency Downtown, 100 East                          Power Pool, Inc.                                      Power Pool, Inc.
                                                    Second Street, Tulsa, OK 74103.                         Docket No. ER14–1713, Midcontinent                    Docket No. ER15–1414, Southwest
                                                    SPP RE                                                    Independent System Operator, Inc.                     Power Pool, Inc.
                                                                                                            Docket No. ER14–2022, Midcontinent
                                                    April 27, 2015 (8:00 a.m.–3:00 p.m.)                      Independent System Operator, Inc.                     These meetings are open to the
                                                    SPP RSC                                                 Docket No. ER14–2081, Southwest                       public.
                                                                                                              Power Pool, Inc.                                      For more information, contact Patrick
                                                    April 27, 2015 (1:00 p.m.–5:00 p.m.)
                                                                                                            Docket No. ER14–2107, Southwest                       Clarey, Office of Energy Market
                                                                                                              Power Pool, Inc.
asabaliauskas on DSK5VPTVN1PROD with NOTICES




                                                    SPP Members/Board of Directors                                                                                Regulation, Federal Energy Regulatory
                                                    April 28, 2015 (8:00 a.m.–3:00 p.m.)                    Docket No. ER14–2363, Southwestern                    Commission at (317) 249–5937 or
                                                                                                              Public Service Company                              patrick.clarey@ferc.gov.
                                                       The discussions may address matters                  Docket No. ER14–2399, Southwest
                                                    at issue in the following proceedings:                                                                          Dated: April 16, 2015.
                                                                                                              Power Pool, Inc.
                                                    Docket No. EL05–19, Southwestern                        Docket No. ER14–2445, Midcontinent                    Kimberly D. Bose,
                                                       Public Service Company                                 Independent System Operator, Inc.                   Secretary.
                                                    Docket No. ER05–168, Southwestern                       Docket No. ER14–2553, Southwest                       [FR Doc. 2015–09749 Filed 4–27–15; 8:45 am]
                                                       Public Service Company                                 Power Pool, Inc.                                    BILLING CODE 6717–01–P




                                               VerDate Sep<11>2014   18:18 Apr 27, 2015   Jkt 235001   PO 00000   Frm 00027   Fmt 4703   Sfmt 9990   E:\FR\FM\28APN1.SGM   28APN1



Document Created: 2015-12-16 08:35:50
Document Modified: 2015-12-16 08:35:50
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice of Application.
DatesComments on the application must be submitted on or before June 12, 2015.
ContactAngela Colamaria at 202-287-5387 or via electronic mail at [email protected]
FR Citation80 FR 23520 