80_FR_23606 80 FR 23525 - McMahan Hydroelectric L.L.C.; Notice of Application Tendered for Filing With the Commission and Soliciting Additional Study Requests and Establishing Procedural Schedule for Relicensing and a Deadline for Submission of Final Amendments

80 FR 23525 - McMahan Hydroelectric L.L.C.; Notice of Application Tendered for Filing With the Commission and Soliciting Additional Study Requests and Establishing Procedural Schedule for Relicensing and a Deadline for Submission of Final Amendments

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 80, Issue 81 (April 28, 2015)

Page Range23525-23526
FR Document2015-09839

Federal Register, Volume 80 Issue 81 (Tuesday, April 28, 2015)
[Federal Register Volume 80, Number 81 (Tuesday, April 28, 2015)]
[Notices]
[Pages 23525-23526]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-09839]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 4093-035]


McMahan Hydroelectric L.L.C.; Notice of Application Tendered for 
Filing With the Commission and Soliciting Additional Study Requests and 
Establishing Procedural Schedule for Relicensing and a Deadline for 
Submission of Final Amendments

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: Subsequent license.
    b. Project No.: P-4093-035.
    c. Date filed: March 30, 2015.
    d. Applicant: McMahan Hydroelectric L.L.C.
    e. Name of Project: Bynum Hydroelectric Project.
    f. Location: On the Haw River, in Chatham County, North Carolina. 
No federal lands are occupied by the project works or located within 
the project boundary.
    g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: Andrew J. McMahan, President, McMahan 
Hydroelectric L.L.C., 105 Durham Eubanks Road, Pittsboro, NC 27312l; 
(336) 509-2148; [email protected].
    i. FERC Contact: Sean Murphy at (202) 502-6145; or email at 
[email protected].

[[Page 23526]]

    j. Cooperating agencies: Federal, state, local, and tribal agencies 
with jurisdiction and/or special expertise with respect to 
environmental issues that wish to cooperate in the preparation of the 
environmental document should follow the instructions for filing such 
requests described in item l below. Cooperating agencies should note 
the Commission's policy that agencies that cooperate in the preparation 
of the environmental document cannot also intervene. See, 94 FERC ] 
61,076 (2001).
    k. Pursuant to section 4.32(b)(7) of 18 CFR of the Commission's 
regulations, if any resource agency, Indian Tribe, or person believes 
that an additional scientific study should be conducted in order to 
form an adequate factual basis for a complete analysis of the 
application on its merit, the resource agency, Indian Tribe, or person 
must file a request for a study with the Commission not later than 60 
days from the date of filing of the application, and serve a copy of 
the request on the applicant.
    l. Deadline for filing additional study requests and requests for 
cooperating agency status: June 14, 2015.
    The Commission strongly encourages electronic filing. Please file 
additional study requests and requests for cooperating agency status 
using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. For assistance, please contact FERC Online Support 
at [email protected], (866) 208-3676 (toll free), or (202) 
502-8659 (TTY). In lieu of electronic filing, please send a paper copy 
to: Secretary, Federal Energy Regulatory Commission, 888 First Street 
NE., Washington, DC 20426. The first page of any filing should include 
docket number P-4093-035.
    m. The application is not ready for environmental analysis at this 
time.
    n. The 600-kilowatt (kW) Bynum project is located on the Haw River, 
in Chatham County, North Carolina. No federal lands are affected. The 
principal project works consist of: (1) A 750-foot-long, 10-foot-high 
stone masonry dam with an uncontrolled spillway and a 150-foot-long 
non-overflow section; (2) a 2000-foot-long canal, between 25 and 40 
feet wide; (3) a powerhouse separate from the dam containing a 600-kW 
generating unit; (4) a reservoir with a surface area of 20 acres at 
normal pool elevation of 315 feet mean sea level and a gross storage 
capacity of 100 acre-feet; and (5) appurtenant facilities. The project 
operates run-of-river and generates and estimated average of 2,461,000 
kW hours a year.
    o. A copy of the application is available for review at the 
Commission in the Public Reference Room or may be viewed on the 
Commission's Web site at http://www.ferc.gov using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. For assistance, contact 
FERC Online Support. A copy is also available for inspection and 
reproduction at the address in item h above.
    You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    p. With this notice, we are designating McMahan Hydroelectric 
L.L.C. as the Commission's non-federal representative for carrying out 
informal consultation pursuant to section 7 of the Endangered Species 
Act and section 305(b) of the Magnuson-Stevens Fishery Conservation and 
Management Act; and consultation pursuant to section 106 of the 
National Historic Preservation Act.
    q. Procedural schedule and final amendments: The application will 
be processed according to the following preliminary Hydro Licensing 
Schedule. Revisions to the schedule will be made as appropriate.

------------------------------------------------------------------------
 
------------------------------------------------------------------------
Issue Notice of Acceptance................  June 2015.
Issue Scoping Document 1 for comments.....  July 2015.
Comments on Scoping Document 1 due........  September 2015.
Issue Scoping Document 2..................  September 2015.
Issue notice of ready for environmental     September 2015.
 analysis.
Commission issues EA......................  March 2016.
Comments on EA due........................  April 2016.
Commission issues final EA................  June 2016.
------------------------------------------------------------------------

    Final amendments to the application must be filed with the 
Commission no later than 30 days from the issuance date of the notice 
of ready for environmental analysis.

    Dated: April 14, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-09839 Filed 4-27-15; 8:45 am]
BILLING CODE 6717-01-P



                                                                                   Federal Register / Vol. 80, No. 81 / Tuesday, April 28, 2015 / Notices                                                 23525

                                                    document, was mailed to the                             Meeting Procedures                                    of the protest or intervention to the
                                                    individuals and entities on the                           The meetings will be recorded by a                  Federal Energy Regulatory Commission,
                                                    Commission’s mailing list. Copies of                    stenographer. The transcripts will be                 888 First Street NE., Washington, DC
                                                    SD1 will be available at the scoping                    placed in the public record for the                   20426.
                                                    meetings, or may be viewed on the web                   project.                                                 This filing is accessible on-line at
                                                    at http://www.ferc.gov, using the                                                                             http://www.ferc.gov, using the
                                                                                                              Dated: April 17, 2015.                              ‘‘eLibrary’’ link and is available for
                                                    ‘‘eLibrary’’ link. Follow the directions
                                                                                                            Kimberly D. Bose,                                     review in the Commission’s Public
                                                    for accessing information in paragraph
                                                    n. Based on all oral and written                        Secretary.                                            Reference Room in Washington, DC.
                                                    comments, a Scoping Document 2 (SD2)                    [FR Doc. 2015–09747 Filed 4–27–15; 8:45 am]           There is an ‘‘eSubscription’’ link on the
                                                                                                            BILLING CODE 6717–01–P                                Web site that enables subscribers to
                                                    may be issued. SD2 may include a
                                                                                                                                                                  receive email notification when a
                                                    revised process plan and schedule, as
                                                                                                                                                                  document is added to a subscribed
                                                    well as a list of issues, identified                    DEPARTMENT OF ENERGY                                  docket(s). For assistance with any FERC
                                                    through the scoping process.
                                                                                                                                                                  Online service, please email
                                                    Environmental Site Review                               Federal Energy Regulatory                             FERCOnlineSupport@ferc.gov, or call
                                                                                                            Commission                                            (866) 208–3676 (toll free). For TTY, call
                                                       The potential applicant and                          [Docket No. EL15–61–000]                              (202) 502–8659.
                                                    Commission staff will conduct an                                                                                 Comment Date: 5:00 p.m. Eastern
                                                    Environmental Site Review of the                        Benjamin Riggs v. Rhode Island Public                 Time on May 12, 2015.
                                                    project on Tuesday, May 19, 2015,                       Utilities Commission Notice of Petition                 Dated: April 22, 2015.
                                                    starting at 9:00 a.m. All participants                  For Enforcement                                       Nathaniel J. Davis, Sr.,
                                                    should meet at Georgia Power’s Old                                                                            Deputy Secretary.
                                                    Salem Park, located at 1530 Old Salem                      Take notice that on April 21, 2015,
                                                                                                            Benjamin Riggs (Petitioner) filed a                   [FR Doc. 2015–09809 Filed 4–27–15; 8:45 am]
                                                    Road, Greensboro, Georgia 30642.
                                                                                                            Petition for Enforcement, pursuant to                 BILLING CODE 6717–01–P
                                                    Anyone with questions about the site
                                                                                                            section 210(h)(2) of the Public Utility
                                                    visit should contact Ms. Courtenay
                                                                                                            Regulatory Policies Act of 1978
                                                    O’Mara, Southern Company Generation,                                                                          DEPARTMENT OF ENERGY
                                                                                                            (PURPA), requesting the Federal Energy
                                                    at (404) 506–7219, or at g2oconeerel@
                                                                                                            Regulatory Commission (Commission)
                                                    southernco.com, on or before May 5,                     to exercise its authority and initiate                Federal Energy Regulatory
                                                    2015. Participants of the tour must                     enforcement action against the Rhode                  Commission
                                                    provide identification, sign a liability                Island Public Utilities Commission to                 [Project No. 4093–035]
                                                    waiver, and wear appropriate clothing                   ensure that PURPA regulations are
                                                    and closed toed shoes. If any participant               properly and lawfully implemented.                    McMahan Hydroelectric L.L.C.; Notice
                                                    attending any part of the site visit is                 Petitioner alleges that the Rhode Island              of Application Tendered for Filing With
                                                    disabled or has special needs, please                   Public Utility Commission on August                   the Commission and Soliciting
                                                    send an email to Oconee Relicensing at                  16, 2010, as directed by the Rhode                    Additional Study Requests and
                                                    g2oconeerel@southernco.com.                             Island General Assembly, approved a                   Establishing Procedural Schedule for
                                                                                                            20-year Purchase Power Agreement                      Relicensing and a Deadline for
                                                    Meeting Objectives
                                                                                                            between Deepwater Wind Block Island,                  Submission of Final Amendments
                                                       At the scoping meetings, Commission                  LLC and National Grid that appears to
                                                                                                            constitute a violation of the Federal                    Take notice that the following
                                                    staff will: (1) Initiate scoping of the
                                                                                                            Power Act, to include 16 U.S.C. 791 et                hydroelectric application has been filed
                                                    issues; (2) review and discuss existing
                                                                                                            seq., 16 U.S.C. 824, and the Supremacy                with the Commission and is available
                                                    conditions and resource management
                                                                                                            Clause of the U.S. Constitution.                      for public inspection.
                                                    objectives; (3) review and discuss                                                                               a. Type of Application: Subsequent
                                                    existing information and identify                          Any person desiring to intervene or to
                                                                                                            protest this filing must file in                      license.
                                                    preliminary information and study                                                                                b. Project No.: P–4093–035.
                                                    needs; (4) review and discuss the                       accordance with Rules 211 and 214 of                     c. Date filed: March 30, 2015.
                                                    process plan and schedule for pre-filing                the Commission’s Rules of Practice and                   d. Applicant: McMahan Hydroelectric
                                                    activities that incorporates the time                   Procedure (18 CFR 385.211, 385.214).                  L.L.C.
                                                    frames provided for in Part 5 of the                    Protests will be considered by the                       e. Name of Project: Bynum
                                                    Commission’s regulations and, to the                    Commission in determining the                         Hydroelectric Project.
                                                    extent possible, maximizes coordination                 appropriate action to be taken, but will                 f. Location: On the Haw River, in
                                                    of federal, state, and tribal permitting                not serve to make protestants parties to              Chatham County, North Carolina. No
                                                    and certification processes; and (5)                    the proceeding. Any person wishing to                 federal lands are occupied by the project
                                                    discuss the appropriateness of any                      become a party must file a notice of                  works or located within the project
                                                    federal or state agency or Indian tribe                 intervention or motion to intervene, as               boundary.
                                                    acting as a cooperating agency for                      appropriate. Such notices, motions, or                   g. Filed Pursuant to: Federal Power
                                                    development of an environmental                         protests must be filed on or before the               Act 16 U.S.C. 791(a)–825(r).
                                                                                                            comment date. Anyone filing a motion                     h. Applicant Contact: Andrew J.
asabaliauskas on DSK5VPTVN1PROD with NOTICES




                                                    document.
                                                                                                            to intervene or protest must serve a copy             McMahan, President, McMahan
                                                       Meeting participants should come                     of that document on the Petitioner.                   Hydroelectric L.L.C., 105 Durham
                                                    prepared to discuss their issues and/or                    The Commission encourages                          Eubanks Road, Pittsboro, NC 27312l;
                                                    concerns. Please review the PAD in                      electronic submission of protests and                 (336) 509–2148; email—
                                                    preparation for the scoping meetings.                   interventions in lieu of paper using the              mcmahanhydro@gmail.com.
                                                    Directions on how to obtain a copy of                   ‘‘eFiling’’ link at http://www.ferc.gov.                 i. FERC Contact: Sean Murphy at
                                                    the PAD and SD1 are included in item                    Persons unable to file electronically                 (202) 502–6145; or email at
                                                    n. of this document.                                    should submit an original and 5 copies                sean.murphy@ferc.gov.


                                               VerDate Sep<11>2014   18:18 Apr 27, 2015   Jkt 235001   PO 00000   Frm 00030   Fmt 4703   Sfmt 4703   E:\FR\FM\28APN1.SGM   28APN1


                                                    23526                          Federal Register / Vol. 80, No. 81 / Tuesday, April 28, 2015 / Notices

                                                       j. Cooperating agencies: Federal, state,                o. A copy of the application is                    DEPARTMENT OF ENERGY
                                                    local, and tribal agencies with                         available for review at the Commission
                                                    jurisdiction and/or special expertise                   in the Public Reference Room or may be                Federal Energy Regulatory
                                                    with respect to environmental issues                    viewed on the Commission’s Web site at                Commission
                                                    that wish to cooperate in the                           http://www.ferc.gov using the                         [Project No. 7518–018]
                                                    preparation of the environmental                        ‘‘eLibrary’’ link. Enter the docket
                                                    document should follow the                              number excluding the last three digits in             Erie Boulevard Hydropower, L.P. and
                                                    instructions for filing such requests                   the docket number field to access the                 Saint Regis Mohawk Tribe; Notice of
                                                    described in item l below. Cooperating                  document. For assistance, contact FERC                Application Accepted for Filing,
                                                    agencies should note the Commission’s                   Online Support. A copy is also available              Soliciting Comments, Motions To
                                                    policy that agencies that cooperate in                  for inspection and reproduction at the                Intervene, and Protests
                                                    the preparation of the environmental                    address in item h above.
                                                    document cannot also intervene. See, 94                                                                          Take notice that the following
                                                    FERC ¶ 61,076 (2001).                                      You may also register online at                    hydroelectric application has been filed
                                                       k. Pursuant to section 4.32(b)(7) of 18              http://www.ferc.gov/docs-filing/                      with the Commission and is available
                                                    CFR of the Commission’s regulations, if                 esubscription.asp to be notified via                  for public inspection:
                                                    any resource agency, Indian Tribe, or                   email of new filings and issuances                       a. Types of Application: Surrender of
                                                    person believes that an additional                      related to this or other pending projects.            License.
                                                    scientific study should be conducted in                 For assistance, contact FERC Online                      b. Project No.: 7518–018.
                                                                                                                                                                     c. Date Filed: January 21, 2015.
                                                    order to form an adequate factual basis                 Support.
                                                                                                                                                                     d. Applicants: Erie Boulevard
                                                    for a complete analysis of the                             p. With this notice, we are designating            Hydropower, L.P. (Erie) and Saint Regis
                                                    application on its merit, the resource                  McMahan Hydroelectric L.L.C. as the                   Mohawk Tribe (Tribe).
                                                    agency, Indian Tribe, or person must file               Commission’s non-federal                                 e. Name of Projects: Hogansburg
                                                    a request for a study with the                          representative for carrying out informal              Hydroelectric Project.
                                                    Commission not later than 60 days from                  consultation pursuant to section 7 of the                f. Location: On the St. Regis River in
                                                    the date of filing of the application, and                                                                    Franklin County, New York. The project
                                                                                                            Endangered Species Act and section
                                                    serve a copy of the request on the                                                                            does not occupy any federal lands.
                                                                                                            305(b) of the Magnuson-Stevens Fishery
                                                    applicant.                                                                                                       g. Filed Pursuant to: Federal Power
                                                                                                            Conservation and Management Act; and
                                                       l. Deadline for filing additional study                                                                    Act, 16 U.S.C. 791a–825r.
                                                    requests and requests for cooperating                   consultation pursuant to section 106 of
                                                                                                            the National Historic Preservation Act.                  h. Applicant Contact: For Erie, Mr.
                                                    agency status: June 14, 2015.                                                                                 John A. Whittaker, IV, Winston &
                                                       The Commission strongly encourages                      q. Procedural schedule and final                   Strawn LLP, 1700 K Street NW.,
                                                    electronic filing. Please file additional               amendments: The application will be                   Washington, DC 20006, Phone: 202–
                                                    study requests and requests for                         processed according to the following                  282–5766, Email: jwhittker@
                                                    cooperating agency status using the                     preliminary Hydro Licensing Schedule.                 winston.com. For Tribe: Mr. John J.
                                                    Commission’s eFiling system at http://                  Revisions to the schedule will be made                Privitera, McNamee, Lochner, Titus &
                                                    www.ferc.gov/docs-filing/efiling.asp. For               as appropriate.                                       Williams, P.C., 677 Broadway, Albany,
                                                    assistance, please contact FERC Online                                                                        NY 12207, Phone: 518–447–3200,
                                                    Support at FERCOnlineSupport@                           Issue Notice of Acceptance ..        June 2015.       Email: privitera@mltw.com.
                                                    ferc.gov, (866) 208–3676 (toll free), or                Issue Scoping Document 1             July 2015.          i. FERC Contact: M. Joseph Fayyad at
                                                    (202) 502–8659 (TTY). In lieu of                          for comments.                                       (202) 502–8759, or email at mo.fayyad@
                                                    electronic filing, please send a paper                  Comments on Scoping Docu-            September        ferc.gov.
                                                    copy to: Secretary, Federal Energy                        ment 1 due.                          2015.             j. Deadline for filing comments,
                                                    Regulatory Commission, 888 First Street                 Issue Scoping Document 2 ...         September        motions to intervene and protests, is 30
                                                    NE., Washington, DC 20426. The first                                                           2015.          days from the issuance date of this
                                                    page of any filing should include docket                Issue notice of ready for en-        September        notice. The Commission strongly
                                                    number P–4093–035.                                        vironmental analysis.                2015.
                                                                                                                                                                  encourages electronic filing. All
                                                       m. The application is not ready for                  Commission issues EA .........       March 2016.
                                                                                                                                                                  documents may be filed using the
                                                                                                            Comments on EA due ...........       April 2016.
                                                    environmental analysis at this time.                                                                          Commission’s eFiling system at http://
                                                                                                            Commission issues final EA           June 2016.
                                                       n. The 600-kilowatt (kW) Bynum                                                                             www.ferc.gov/docs-filing/efiling.asp.
                                                    project is located on the Haw River, in                                                                       Commenters can submit brief comments
                                                    Chatham County, North Carolina. No                         Final amendments to the application                up to 6,000 characters, without prior
                                                    federal lands are affected. The principal               must be filed with the Commission no                  registration, using the eComment system
                                                    project works consist of: (1) A 750-foot-               later than 30 days from the issuance                  at http://www.ferc.gov/docs-filing/
                                                    long, 10-foot-high stone masonry dam                    date of the notice of ready for                       ecomment.asp. You must include your
                                                    with an uncontrolled spillway and a                     environmental analysis.                               name and contact information at the end
                                                    150-foot-long non-overflow section; (2) a                 Dated: April 14, 2015.                              of your comments. For assistance,
                                                    2000-foot-long canal, between 25 and 40                                                                       please contact FERC Online Support at
                                                                                                            Kimberly D. Bose,
                                                    feet wide; (3) a powerhouse separate                                                                          FERCOnlineSupport@ferc.gov, (866)
                                                    from the dam containing a 600-kW                        Secretary.                                            208–3676 (toll free), or (202) 502–8659
asabaliauskas on DSK5VPTVN1PROD with NOTICES




                                                    generating unit; (4) a reservoir with a                 [FR Doc. 2015–09839 Filed 4–27–15; 8:45 am]           (TTY). In lieu of electronic filing, please
                                                    surface area of 20 acres at normal pool                 BILLING CODE 6717–01–P                                send a paper copy to: Secretary, Federal
                                                    elevation of 315 feet mean sea level and                                                                      Energy Regulatory Commission, 888
                                                    a gross storage capacity of 100 acre-feet;                                                                    First Street NE., Washington, DC 20426.
                                                    and (5) appurtenant facilities. The                                                                           Please include the project number (P–
                                                    project operates run-of-river and                                                                             7518–018) on any comments, motions to
                                                    generates and estimated average of                                                                            intervene, protests, or recommendations
                                                    2,461,000 kW hours a year.                                                                                    filed.


                                               VerDate Sep<11>2014   18:18 Apr 27, 2015   Jkt 235001   PO 00000   Frm 00031   Fmt 4703   Sfmt 4703   E:\FR\FM\28APN1.SGM   28APN1



Document Created: 2015-12-16 08:35:53
Document Modified: 2015-12-16 08:35:53
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation80 FR 23525 