80_FR_23610 80 FR 23529 - Murphy Dam, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications

80 FR 23529 - Murphy Dam, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 80, Issue 81 (April 28, 2015)

Page Range23529-23530
FR Document2015-09754

Federal Register, Volume 80 Issue 81 (Tuesday, April 28, 2015)
[Federal Register Volume 80, Number 81 (Tuesday, April 28, 2015)]
[Notices]
[Pages 23529-23530]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-09754]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14670-000]


Murphy Dam, LLC; Notice of Preliminary Permit Application 
Accepted for Filing and Soliciting Comments, Motions To Intervene, and 
Competing Applications

    On March 20, 2015, Murphy Dam, LLC, filed an application for a 
preliminary permit, pursuant to section 4(f) of the Federal Power Act 
(FPA), proposing to study the feasibility of the Murphy Dam 
Hydroelectric Project (Murphy Dam Project) to be located on the 
Connecticut River, near Pittsburg, Coos County, New Hampshire. The sole 
purpose of a preliminary permit, if issued, is to grant the permit 
holder priority to file a license application during the permit term. A 
preliminary permit does not authorize the permit holder to perform any 
land-disturbing activities or otherwise enter upon lands or waters 
owned by others without the owners' express permission.
    The proposed project would consist of the following: (1) An 
existing 100-foot-high, 2,100-foot-long earthen embankment dam; (2) an 
adjacent 300-foot-long concrete spillway with a stoplog and flashboard 
crest elevation of 1,385 feet National Geodetic Vertical Datum (NGVD); 
(3) the existing 2,020-acre Lake Francis with a storage capacity of 
96,000 acre-feet; (4) a new 8-foot-diameter, 500-foot-long steel 
penstock connected to an existing 916-foot-long, steel-lined concrete 
outlet conduit and concrete intake structure; (5) a new 30-foot-wide, 
40-foot long, 20-foot high powerhouse containing one Kaplan turbine-
generator unit having a total installed capacity of 3.0 megawatts; (6) 
a new 30-foot-wide, 10-foot-deep, 100-foot-long, riprap-lined tailrace; 
(7) a new 1,600-foot-long, 12-kilovolt transmission line connecting the 
powerhouse to the Public Service of New Hampshire distribution system; 
and (8) appurtenant facilities. The estimated annual generation of the 
Murphy Dam Project would be about 12,400 megawatt-hours. The existing 
Murphy Dam and appurtenant works is owned by the New Hampshire 
Department of Environmental Services.
    Applicant Contact: Mr. Mark Boumansour, Murphy Dam LLC, c/o Gravity 
Renewables, Inc. 1401 Walnut Street, Suite 220, Boulder, CO 80302; 
phone: (303) 615-3101; email: [email protected].
    FERC Contact: Patrick Crile; phone: (202) 502-8042 or email: 
[email protected].
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 Days from the issuance of this notice. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR 4.36.
    The Commission strongly encourages electronic filing. Please file 
comments, motions to intervene, notices of intent, and competing 
applications using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief 
comments up to 6,000 characters, without prior registration, using the 
eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You 
must include your name and contact information at the end of your 
comments. For assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888

[[Page 23530]]

First Street NE., Washington, DC 20426. The first page of any filing 
should include docket number P-14670-000.
    More information about this project, including a copy of the 
application, can be viewed or printed on the ``eLibrary'' link of 
Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-14670) in the docket number field to access 
the document. For assistance, contact FERC Online Support.

    Dated: April 21, 2015.
 Kimberly D. Bose,
 Secretary.
[FR Doc. 2015-09754 Filed 4-27-15; 8:45 am]
 BILLING CODE 6717-01-P



                                                                                   Federal Register / Vol. 80, No. 81 / Tuesday, April 28, 2015 / Notices                                            23529

                                                    contractors, and other interested parties               Secretary, Federal Energy Regulatory                  or waters owned by others without the
                                                    with special expertise with respect to                  Commission, 888 First Street NE., Room                owners’ express permission.
                                                    historic and cultural resources                         1A, Washington, DC 20426.                                The proposed project would consist of
                                                    commonly associated with pipeline                          All of the information related to the              the following: (1) An existing 100-foot-
                                                    projects. Please note that this comment                 proposed updates to the Guidelines and                high, 2,100-foot-long earthen
                                                    period will close on July 20, 2015.                     submitted comments can be found on                    embankment dam; (2) an adjacent 300-
                                                       The Guidelines are referred to at 18                 the FERC Web site (www.ferc.gov) using                foot-long concrete spillway with a
                                                    Code of Federal Regulations (CFR)                       the eLibrary link. Click on the eLibrary              stoplog and flashboard crest elevation of
                                                    380.12(f). Full text of the current version             link, click on ‘‘General Search’’ and                 1,385 feet National Geodetic Vertical
                                                    of the Guidelines can be viewed on the                  enter the docket number, excluding the                Datum (NGVD); (3) the existing 2,020-
                                                    Federal Energy Regulatory Commission                    last three digits in the Docket Number                acre Lake Francis with a storage
                                                    (FERC or Commission) Web site at                        field (i.e., AD15–10). Be sure you have               capacity of 96,000 acre-feet; (4) a new 8-
                                                    http://www.ferc.gov/industries/gas/                     selected an appropriate date range. For               foot-diameter, 500-foot-long steel
                                                    enviro/guidelines.asp.                                  assistance, please contact FERC Online                penstock connected to an existing 916-
                                                       Based on the input received in                       Support at FercOnlineSupport@ferc.gov                 foot-long, steel-lined concrete outlet
                                                    response to this notice, OEP staff                      or toll free at (866) 208–3676, or for                conduit and concrete intake structure;
                                                    anticipates issuing draft changes to the                TTY, contact (202) 502–8258. The                      (5) a new 30-foot-wide, 40-foot long, 20-
                                                    Guidelines by fall 2015, and will make                  eLibrary link also provides access to the             foot high powerhouse containing one
                                                    them available for public comment. We                   texts of formal documents issued by the               Kaplan turbine-generator unit having a
                                                    will then consider all timely comments                  Commission, such as orders, notices,                  total installed capacity of 3.0 megawatts;
                                                    on the drafts before issuing the final                  and rulemakings.                                      (6) a new 30-foot-wide, 10-foot-deep,
                                                    version.                                                   In addition, the Commission now                    100-foot-long, riprap-lined tailrace; (7) a
                                                       Interested parties can help us                       offers a free service called eSubscription            new 1,600-foot-long, 12-kilovolt
                                                    determine the appropriate updates and                                                                         transmission line connecting the
                                                                                                            which allows you to keep track of all
                                                    improvements to make by providing us                                                                          powerhouse to the Public Service of
                                                                                                            formal issuances and submittals in
                                                    comments or suggestions that focus on                                                                         New Hampshire distribution system;
                                                                                                            specific dockets. This can reduce the
                                                    the specific sections requiring                                                                               and (8) appurtenant facilities. The
                                                                                                            amount of time you spend researching
                                                    clarification, updates to reflect current                                                                     estimated annual generation of the
                                                                                                            proceedings by automatically providing
                                                    laws and regulations, or improved                                                                             Murphy Dam Project would be about
                                                                                                            you with notification of these filings,
                                                    measures to avoid or minimize impacts                                                                         12,400 megawatt-hours. The existing
                                                                                                            document summaries, and direct links
                                                    on historic or cultural resources. The                                                                        Murphy Dam and appurtenant works is
                                                                                                            to the documents. Go to www.ferc.gov/
                                                    more specific your comments, the more                                                                         owned by the New Hampshire
                                                                                                            docs-filing/esubscription.asp.
                                                    useful they will be. A detailed                                                                               Department of Environmental Services.
                                                    explanation of your submissions and/or                    Dated: April 21, 2015.                                 Applicant Contact: Mr. Mark
                                                    any references of scientific studies                    Kimberly D. Bose,                                     Boumansour, Murphy Dam LLC, c/o
                                                    associated with your comments would                     Secretary.                                            Gravity Renewables, Inc. 1401 Walnut
                                                    greatly help us with this process.                      [FR Doc. 2015–09744 Filed 4–27–15; 8:45 am]           Street, Suite 220, Boulder, CO 80302;
                                                       For your convenience, there are three                BILLING CODE 6717–01–P                                phone: (303) 615–3101; email: info@
                                                    methods which you can use to submit                                                                           gravityrenewables.com.
                                                    your comments to the Commission. In                                                                              FERC Contact: Patrick Crile; phone:
                                                    all instances please reference the docket               DEPARTMENT OF ENERGY                                  (202) 502–8042 or email: Patrick.Crile@
                                                    number (AD15–10–000) with your                                                                                ferc.gov.
                                                    submission. The Commission                              Federal Energy Regulatory                                Deadline for filing comments, motions
                                                    encourages electronic filing of                         Commission                                            to intervene, competing applications
                                                    comments and has expert staff available                                                                       (without notices of intent), or notices of
                                                    to assist you at (202) 502–8258 or                      [Project No. 14670–000]                               intent to file competing applications: 60
                                                    efiling@ferc.gov.                                                                                             Days from the issuance of this notice.
                                                       (1) You can file your comments                       Murphy Dam, LLC; Notice of                            Competing applications and notices of
                                                    electronically using the eComment                       Preliminary Permit Application                        intent must meet the requirements of 18
                                                    feature on the Commission’s Web site                    Accepted for Filing and Soliciting                    CFR 4.36.
                                                    (www.ferc.gov) under the link to                        Comments, Motions To Intervene, and                      The Commission strongly encourages
                                                    Documents and Filings. This is an easy                  Competing Applications                                electronic filing. Please file comments,
                                                    method for interested persons to submit                                                                       motions to intervene, notices of intent,
                                                    brief, text-only comments;                                 On March 20, 2015, Murphy Dam,                     and competing applications using the
                                                       (2) You can file your comments                       LLC, filed an application for a                       Commission’s eFiling system at http://
                                                    electronically using the eFiling feature                preliminary permit, pursuant to section               www.ferc.gov/docs-filing/efiling.asp.
                                                    on the Commission’s Web site                            4(f) of the Federal Power Act (FPA),                  Commenters can submit brief comments
                                                    (www.ferc.gov) under the link to                        proposing to study the feasibility of the             up to 6,000 characters, without prior
                                                    Documents and Filings. With eFiling,                    Murphy Dam Hydroelectric Project                      registration, using the eComment system
                                                    you can provide comments in a variety                   (Murphy Dam Project) to be located on                 at http://www.ferc.gov/docs-filing/
                                                    of formats by attaching them as a file                  the Connecticut River, near Pittsburg,                ecomment.asp. You must include your
asabaliauskas on DSK5VPTVN1PROD with NOTICES




                                                    with your submission. New eFiling                       Coos County, New Hampshire. The sole                  name and contact information at the end
                                                    users must first create an account by                   purpose of a preliminary permit, if                   of your comments. For assistance,
                                                    clicking on ‘‘eRegister.’’ You must select              issued, is to grant the permit holder                 please contact FERC Online Support at
                                                    the type of filing you are making, select               priority to file a license application                FERCOnlineSupport@ferc.gov, (866)
                                                    ‘‘Comment on a Filing’’; or                             during the permit term. A preliminary                 208–3676 (toll free), or (202) 502–8659
                                                       (3) You can file a paper copy of your                permit does not authorize the permit                  (TTY). In lieu of electronic filing, please
                                                    comments by mailing them to the                         holder to perform any land-disturbing                 send a paper copy to: Secretary, Federal
                                                    following address: Kimberly D. Bose,                    activities or otherwise enter upon lands              Energy Regulatory Commission, 888


                                               VerDate Sep<11>2014   18:18 Apr 27, 2015   Jkt 235001   PO 00000   Frm 00034   Fmt 4703   Sfmt 4703   E:\FR\FM\28APN1.SGM   28APN1


                                                    23530                          Federal Register / Vol. 80, No. 81 / Tuesday, April 28, 2015 / Notices

                                                    First Street NE., Washington, DC 20426.                 the acquisition of an easement to                     Expansion Project (FERC Docket CP15–
                                                    The first page of any filing should                     construct, operate, and maintain the                  77–000) in Madison County, Kentucky;
                                                    include docket number P–14670–000.                      proposed facilities. The company would                   • Two compressor units at
                                                       More information about this project,                 seek to negotiate a mutually acceptable               Tennessee’s existing Compressor Station
                                                    including a copy of the application, can                agreement. However, if the Commission                 110 in Rowan County, Kentucky, adding
                                                    be viewed or printed on the ‘‘eLibrary’’                approves the project, that approval                   32,000 hp;
                                                    link of Commission’s Web site at                        conveys with it the right of eminent                     • Four new mid-point compressor
                                                    http://www.ferc.gov/docs-filing/                        domain. Therefore, if easement                        stations, (Compressor Stations 202.5,
                                                    elibrary.asp. Enter the docket number                   negotiations fail to produce an                       206.5, 211.5, and 216.5), on lines 200–
                                                    (P–14670) in the docket number field to                 agreement, the pipeline company could                 1, 200–2, and 200–4, adding a total of
                                                    access the document. For assistance,                    initiate condemnation proceedings                     82,000 hp in Jackson, Morgan,
                                                    contact FERC Online Support.                            where compensation would be                           Tuscarawas, and Mahoning counties,
                                                                                                            determined in accordance with state                   Ohio;
                                                      Dated: April 21, 2015.                                                                                         • A 7.6-mile-long new pipeline loop1
                                                    Kimberly D. Bose,                                       law.
                                                                                                               Tennessee provided landowners with                 in Carter and Lewis Counties, Kentucky
                                                    Secretary.                                                                                                    to continue Tennessee’s Line 100–7; and
                                                                                                            a fact sheet prepared by the FERC
                                                    [FR Doc. 2015–09754 Filed 4–27–15; 8:45 am]                                                                      • Removal of certain crossovers, taps,
                                                                                                            entitled ‘‘An Interstate Natural Gas
                                                    BILLING CODE 6717–01–P                                                                                        valves and miscellaneous pipe, and the
                                                                                                            Facility On My Land? What Do I Need
                                                                                                                                                                  relocation and/or installation of new
                                                                                                            To Know?’’ This fact sheet addresses a
                                                                                                                                                                  taps to complete the physical separation
                                                                                                            number of typically-asked questions,
                                                    DEPARTMENT OF ENERGY                                                                                          of the Abandoned Line from
                                                                                                            including the use of eminent domain
                                                                                                                                                                  Tennessee’s retained pipelines.
                                                    Federal Energy Regulatory                               and how to participate in the
                                                    Commission                                              Commission’s proceedings. It is also                  Land Requirements
                                                                                                            available for viewing on the FERC Web                    Project activities, including
                                                    [Docket No. CP15–88–000]                                site (www.ferc.gov).                                  abandonment, construction and
                                                    Tennessee Gas Pipeline Company,                         Summary of the Proposed Project                       modification of existing facilities, would
                                                    LLC; Notice of Intent To Prepare an                                                                           disturb about 463 acres of land.
                                                                                                               Tennessee proposes to abandon in                   Following abandonment and
                                                    Environmental Assessment for the                        place and remove from service
                                                    Proposed Abandonment and Capacity                                                                             construction activities, Tennessee
                                                                                                            approximately 964 miles of Tennessee’s                would maintain about 256.4 acres for
                                                    Restoration Project Request for                         existing pipelines that run from
                                                    Comments on Environmental Issues                                                                              permanent operation of the project’s
                                                                                                            Natchitoches Parish, LA, to Columbiana                facilities; the remaining acreage would
                                                      The staff of the Federal Energy                       County, Ohio. Tennessee currently                     be restored and revert to former uses.
                                                    Regulatory Commission (FERC or                          operates six parallel pipelines that                  About 105.3 acres of land would be
                                                    Commission) will prepare an                             transport natural gas from the Gulf of                disturbed by the construction of new
                                                    environmental assessment (EA) that will                 Mexico region to the Northeast markets.               compressor stations in Jackson, Morgan,
                                                    discuss the environmental impacts of                    The proposed Project would occur on                   Tuscarawas, and Mahoning counties,
                                                    the Abandonment and Capacity                            Tennessee’s existing 100 and 200 Lines.               Ohio (60.3 acres would be permanently
                                                    Restoration Project (Project) involving                 In order to replace capacity that would               maintained for operation). Construction
                                                    abandonment of facilities by Tennessee                  be lost due to the abandonment,                       of the 7.6-mile-long new pipeline would
                                                    Gas Pipeline Company, LLC                               Tennessee would modify and construct                  disturb about 163 acres of land in Carter
                                                    (Tennessee). The Commission will use                    certain facilities along the existing                 and Lewis Counties, Kentucky (46.3
                                                    this EA in its decision-making process                  pipelines not proposed for                            acres would be permanently maintained
                                                    to determine whether the project is in                  abandonment.                                          for operation). Land disturbed by
                                                    the public convenience and necessity.                      Tennessee would abandon in place                   modifications to existing compressor
                                                      This notice announces the opening of                  the following facilities:                             stations and removal, relocation and/or
                                                    the scoping process the Commission                         • 677 miles of Tennessee’s 24-inch-                installation of crossovers, taps, valves
                                                    will use to gather input from the public                diameter 100–1 Line from Compressor                   and miscellaneous pipe on Tennessee’s
                                                    and interested agencies on the project.                 Station 40 in Natchitoches Parish,                    existing pipeline would be mostly
                                                    Your input will help the Commission                     Louisiana, to Compressor Station 106 in               within Tennessee’s existing right-of-
                                                    staff determine what issues they need to                Powel County, Kentucky;                               way. The general location of the Project
                                                    evaluate in the EA. Please note that the                   • 77 miles of Tennessee’s 26-inch-                 is shown in appendix 1.2
                                                    scoping period will close on May 18,                    diameter 100–3 Line from Compressor
                                                    2015. You may submit comments in                        Station 106 to Compressor Station 200                 Future Use of the Abandoned Pipeline
                                                    written form. Further details on how to                 in Greenup County, Kentucky; and                      Facilities
                                                    submit written comments are in the                         • 210 miles of Tennessee’s 26-inch-                  Following the abandonment of
                                                    Public Participation section of this                    diameter 200–3 Line from Compressor                   Tennessee’s pipeline facilities, if the
                                                    notice.                                                 Station 200 to MLV 216 in Columbiana                  Commission approves the Project,
                                                      This notice is being sent to the                      County, Ohio, including disconnection
                                                    Commission’s current environmental                      of the 200–3 Line from an aerial                        1 A pipeline loop is a segment of pipe constructed
asabaliauskas on DSK5VPTVN1PROD with NOTICES




                                                    mailing list for this project. State and                crossing at either side of the Ohio River             parallel to an existing pipeline to increase capacity.
                                                                                                                                                                    2 The appendices referenced in this notice will
                                                    local government representatives should                 headers.
                                                                                                                                                                  not appear in the Federal Register. Copies of
                                                    notify their constituents of this                          Tennessee would construct and                      appendices were sent to all those receiving this
                                                    proposed project and encourage them to                  install the following facilities:                     notice in the mail and are available at www.ferc.gov
                                                    comment on their areas of concern.                         • An additional 10,771 horsepower                  using the link called ‘‘eLibrary’’ or from the
                                                                                                                                                                  Commission’s Public Reference Room, 888 First
                                                      If you are a landowner receiving this                 (hp) compressor unit at Compressor                    Street NE., Washington, DC 20426, or call (202)
                                                    notice, a pipeline company                              Station 875, to be constructed by                     502–8371. For instructions on connecting to
                                                    representative may contact you about                    Tennessee as part of the Broad Run                    eLibrary, refer to the last page of this notice.



                                               VerDate Sep<11>2014   18:18 Apr 27, 2015   Jkt 235001   PO 00000   Frm 00035   Fmt 4703   Sfmt 4703   E:\FR\FM\28APN1.SGM   28APN1



Document Created: 2015-12-16 08:35:28
Document Modified: 2015-12-16 08:35:28
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation80 FR 23529 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR