80_FR_23614 80 FR 23533 - Los Angeles County Public Works; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene

80 FR 23533 - Los Angeles County Public Works; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 80, Issue 81 (April 28, 2015)

Page Range23533-23534
FR Document2015-09745

Federal Register, Volume 80 Issue 81 (Tuesday, April 28, 2015)
[Federal Register Volume 80, Number 81 (Tuesday, April 28, 2015)]
[Notices]
[Pages 23533-23534]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-09745]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No., CD15-23-000]


Los Angeles County Public Works; Notice of Preliminary 
Determination of a Qualifying Conduit Hydropower Facility and 
Soliciting Comments and Motions To Intervene

    On April 14, 2015, Los Angeles County Public Works filed a notice 
of intent to construct a qualifying conduit hydropower facility, 
pursuant to section 30 of the Federal Power Act (FPA), as amended by 
section 4 of the Hydropower Regulatory Efficiency Act of 2013 (HREA). 
The proposed M7W Pressure Reducing Station Hydroelectric Project would 
have an installed capacity of 215 kilowatts (kW) and would be located 
at the Quartz Hill Water Treatment Plant, which treats water for 
municipal consumption. The project would be located near the Town of 
Palmdale in Los Angeles County, California.
    Applicant Contact: Paul Maselbas, Los Angeles County Public Works, 
Waterworks Division, 900 S. Freemont Ave., Alhambra, CA 91803, (626) 
300-3302.
    FERC Contact: Robert Bell, Phone No. (202) 502-6062, email: 
robert.bell@ferc.gov.
    Qualifying Conduit Hydropower Facility Description: The proposed 
project would consist of: (1) an existing 51-foot by 38-foot building, 
which will serve as the powerhouse; (2) an existing 30-inch-diameter 
pipe to the treatment plant; (3) one proposed turbine-generator unit 
with an installed capacity of 215 kW, which will replace pressure 
reducing valve CV5; (4) an existing 125-foot-long, 30-inch-diameter 
discharge pipe that delivers potable water to storage tanks for 
distribution to parts of the City of Palmdale, California and (5) 
appurtenant facilities. The proposed project would have an estimated 
annual generating capacity of 730 megawatt-hours.
    A qualifying conduit hydropower facility is one that is determined 
or deemed to meet all of the criteria shown in the table below.

                          Table 1--Criteria for Qualifying Conduit Hydropower Facility
----------------------------------------------------------------------------------------------------------------
              Statutory provision                                 Description                    Satisfies (Y/N)
----------------------------------------------------------------------------------------------------------------
FPA 30(a)(3)(A), as amended by HREA...........  The conduit the facility uses is a tunnel,                    Y
                                                 canal, pipeline, aqueduct, flume, ditch, or
                                                 similar manmade water conveyance that is
                                                 operated for the distribution of water for
                                                 agricultural, municipal, or industrial
                                                 consumption and not primarily for the
                                                 generation of electricity.
FPA 30(a)(3)(C)(i), as amended by HREA........  The facility is constructed, operated, or                     Y
                                                 maintained for the generation of electric
                                                 power and uses for such generation only the
                                                 hydroelectric potential of a non-federally
                                                 owned conduit.
FPA 30(a)(3)(C)(ii), as amended by HREA.......  The facility has an installed capacity that                   Y
                                                 does not exceed 5 megawatts.
FPA 30(a)(3)(C)(iii), as amended by HREA......  On or before August 9, 2013, the facility is                  Y
                                                 not licensed, or exempted from the licensing
                                                 requirements of Part I of the FPA.
----------------------------------------------------------------------------------------------------------------

    Preliminary Determination: Based upon the above criteria, 
Commission staff preliminarily determines that the proposal satisfies 
the requirements for a qualifying conduit hydropower facility, which is 
not required to be licensed or exempted from licensing.
    Comments and Motions to Intervene: Deadline for filing comments 
contesting whether the facility meets the qualifying criteria is 45 
days from the issuance date of this notice.
    Deadline for filing motions to intervene is 30 days from the 
issuance date of this notice.
    Anyone may submit comments or a motion to intervene in accordance 
with the requirements of Rules of Practice and Procedure, 18 CFR 
385.210 and 385.214. Any motions to intervene must be received on or 
before the specified deadline date for the particular proceeding.
    Filing and Service of Responsive Documents: All filings must (1) 
bear in all capital letters the ``COMMENTS CONTESTING QUALIFICATION FOR 
A CONDUIT HYDROPOWER FACILITY'' or ``MOTION TO INTERVENE,'' as 
applicable; (2) state in the heading the name of the applicant and the 
project number of the application to which the filing responds; (3) 
state the name, address, and telephone number of the person filing; and 
(4) otherwise comply with the requirements of sections 385.2001 through 
385.2005 of the Commission's regulations.\1\ All comments contesting 
Commission staff's preliminary determination that the facility meets 
the qualifying criteria must set forth their evidentiary basis.
---------------------------------------------------------------------------

    \1\ 18 CFR 385.2001-2005 (2014).
---------------------------------------------------------------------------

    The Commission strongly encourages electronic filing. Please file 
motions to intervene and comments using the Commission's eFiling system 
at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit 
brief comments up to 6,000 characters, without prior registration, 
using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the 
end of your comments. For assistance, please contact FERC Online 
Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or 
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper 
copy to: Secretary, Federal Energy Regulatory Commission, 888 First 
Street NE., Washington, DC 20426. A copy of all other filings in 
reference

[[Page 23534]]

to this application must be accompanied by proof of service on all 
persons listed in the service list prepared by the Commission in this 
proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
    Locations of Notice of Intent: Copies of the notice of intent can 
be obtained directly from the applicant or such copies can be viewed 
and reproduced at the Commission in its Public Reference Room, Room 2A, 
888 First Street NE., Washington, DC 20426. The filing may also be 
viewed on the web at http://www.ferc.gov/docs-filing/elibrary.asp using 
the ``eLibrary'' link. Enter the docket number (e.g., CD15-23000) in 
the docket number field to access the document. For assistance, call 
toll-free 1-866-208-3676 or email FERCOnlineSupport@ferc.gov. For TTY, 
call (202) 502-8659.

    Dated: April 16, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-09745 Filed 4-27-15; 8:45 am]
 BILLING CODE 6717-01-P



                                                                                   Federal Register / Vol. 80, No. 81 / Tuesday, April 28, 2015 / Notices                                                  23533

                                                    208–3676 (toll free), or (202) 502–8659                 DEPARTMENT OF ENERGY                                     Applicant Contact: Paul Maselbas,
                                                    (TTY). In lieu of electronic filing, please                                                                    Los Angeles County Public Works,
                                                    send a paper copy to: Kimberly D. Bose,                 Federal Energy Regulatory                              Waterworks Division, 900 S. Freemont
                                                    Secretary, Federal Energy Regulatory                    Commission                                             Ave., Alhambra, CA 91803, (626) 300–
                                                    Commission, 888 First Street NE.,                                                                              3302.
                                                    Washington, DC 20426. The first page of                 [Docket No., CD15–23–000]                                FERC Contact: Robert Bell, Phone No.
                                                    any filing should include docket                                                                               (202) 502–6062, email:
                                                    number P–14201–001.                                     Los Angeles County Public Works;                       robert.bell@ferc.gov.
                                                                                                            Notice of Preliminary Determination of                   Qualifying Conduit Hydropower
                                                       More information about this project,                                                                        Facility Description: The proposed
                                                                                                            a Qualifying Conduit Hydropower
                                                    including a copy of the application, can                Facility and Soliciting Comments and                   project would consist of: (1) an existing
                                                    be viewed or printed on the ‘‘eLibrary’’                Motions To Intervene                                   51-foot by 38-foot building, which will
                                                    link of Commission’s Web site at                                                                               serve as the powerhouse; (2) an existing
                                                    http://www.ferc.gov/docs-filing/                          On April 14, 2015, Los Angeles                       30-inch-diameter pipe to the treatment
                                                    elibrary.asp. Enter the docket number                   County Public Works filed a notice of                  plant; (3) one proposed turbine-
                                                    (P–14201) in the docket number field to                 intent to construct a qualifying conduit               generator unit with an installed capacity
                                                    access the document. For assistance,                    hydropower facility, pursuant to section               of 215 kW, which will replace pressure
                                                    contact FERC Online Support.                            30 of the Federal Power Act (FPA), as                  reducing valve CV5; (4) an existing 125-
                                                      Dated: April 14, 2015.                                amended by section 4 of the                            foot-long, 30-inch-diameter discharge
                                                                                                            Hydropower Regulatory Efficiency Act                   pipe that delivers potable water to
                                                    Kimberly D. Bose,
                                                                                                            of 2013 (HREA). The proposed M7W                       storage tanks for distribution to parts of
                                                    Secretary.                                              Pressure Reducing Station Hydroelectric                the City of Palmdale, California and (5)
                                                    [FR Doc. 2015–09840 Filed 4–27–15; 8:45 am]             Project would have an installed capacity               appurtenant facilities. The proposed
                                                    BILLING CODE 6717–01–P                                  of 215 kilowatts (kW) and would be                     project would have an estimated annual
                                                                                                            located at the Quartz Hill Water                       generating capacity of 730 megawatt-
                                                                                                            Treatment Plant, which treats water for                hours.
                                                                                                            municipal consumption. The project                       A qualifying conduit hydropower
                                                                                                            would be located near the Town of                      facility is one that is determined or
                                                                                                            Palmdale in Los Angeles County,                        deemed to meet all of the criteria shown
                                                                                                            California.                                            in the table below.

                                                                                      TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
                                                                                                                                                                                                        Satisfies
                                                           Statutory provision                                                            Description                                                    (Y/N)

                                                    FPA 30(a)(3)(A), as amended            The conduit the facility uses is a tunnel, canal, pipeline, aqueduct, flume, ditch, or similar                  Y
                                                      by HREA.                               manmade water conveyance that is operated for the distribution of water for agricultural,
                                                                                             municipal, or industrial consumption and not primarily for the generation of electricity.
                                                    FPA 30(a)(3)(C)(i), as amended         The facility is constructed, operated, or maintained for the generation of electric power and                   Y
                                                      by HREA.                               uses for such generation only the hydroelectric potential of a non-federally owned conduit.
                                                    FPA 30(a)(3)(C)(ii), as amend-         The facility has an installed capacity that does not exceed 5 megawatts ..................................      Y
                                                      ed by HREA.
                                                    FPA 30(a)(3)(C)(iii), as amend-        On or before August 9, 2013, the facility is not licensed, or exempted from the licensing re-                   Y
                                                      ed by HREA.                           quirements of Part I of the FPA.



                                                      Preliminary Determination: Based                      deadline date for the particular                       facility meets the qualifying criteria
                                                    upon the above criteria, Commission                     proceeding.                                            must set forth their evidentiary basis.
                                                    staff preliminarily determines that the                    Filing and Service of Responsive                       The Commission strongly encourages
                                                    proposal satisfies the requirements for a               Documents: All filings must (1) bear in                electronic filing. Please file motions to
                                                    qualifying conduit hydropower facility,                 all capital letters the ‘‘COMMENTS                     intervene and comments using the
                                                    which is not required to be licensed or                 CONTESTING QUALIFICATION FOR A                         Commission’s eFiling system at http://
                                                    exempted from licensing.                                CONDUIT HYDROPOWER FACILITY’’                          www.ferc.gov/docs-filing/efiling.asp.
                                                      Comments and Motions to Intervene:                    or ‘‘MOTION TO INTERVENE,’’ as                         Commenters can submit brief comments
                                                    Deadline for filing comments contesting                 applicable; (2) state in the heading the               up to 6,000 characters, without prior
                                                    whether the facility meets the qualifying               name of the applicant and the project                  registration, using the eComment system
                                                    criteria is 45 days from the issuance                   number of the application to which the                 at http://www.ferc.gov/docs-filing/
                                                    date of this notice.                                    filing responds; (3) state the name,                   ecomment.asp. You must include your
                                                                                                            address, and telephone number of the                   name and contact information at the end
                                                      Deadline for filing motions to
                                                                                                                                                                   of your comments. For assistance,
asabaliauskas on DSK5VPTVN1PROD with NOTICES




                                                    intervene is 30 days from the issuance                  person filing; and (4) otherwise comply
                                                                                                            with the requirements of sections                      please contact FERC Online Support at
                                                    date of this notice.
                                                                                                            385.2001 through 385.2005 of the                       FERCOnlineSupport@ferc.gov, (866)
                                                      Anyone may submit comments or a                                                                              208–3676 (toll free), or (202) 502–8659
                                                    motion to intervene in accordance with                  Commission’s regulations.1 All
                                                                                                                                                                   (TTY). In lieu of electronic filing, please
                                                    the requirements of Rules of Practice                   comments contesting Commission staff’s
                                                                                                                                                                   send a paper copy to: Secretary, Federal
                                                    and Procedure, 18 CFR 385.210 and                       preliminary determination that the
                                                                                                                                                                   Energy Regulatory Commission, 888
                                                    385.214. Any motions to intervene must                                                                         First Street NE., Washington, DC 20426.
                                                    be received on or before the specified                    1 18   CFR 385.2001–2005 (2014).                     A copy of all other filings in reference


                                               VerDate Sep<11>2014   18:18 Apr 27, 2015   Jkt 235001   PO 00000   Frm 00038   Fmt 4703   Sfmt 4703   E:\FR\FM\28APN1.SGM   28APN1


                                                    23534                          Federal Register / Vol. 80, No. 81 / Tuesday, April 28, 2015 / Notices

                                                    to this application must be accompanied                    h. FERC Contact: M. Joseph Fayyad,                 dated October 28, 2011, to the new
                                                    by proof of service on all persons listed               (202) 502–8759, mo.fayyad@ferc.gov.                   owner, Mr. Drone, the Commission
                                                    in the service list prepared by the                        i. Deadline for filing comments,                   requested the filing of documentation he
                                                    Commission in this proceeding, in                       motions to intervene and protests, is 30              has the rights to use or occupy the
                                                    accordance with 18 CFR 4.34(b) and                      days from the issuance date of this                   federal lands affected by the project, and
                                                    385.2010.                                               notice. The Commission strongly                       a plan and schedule for making the
                                                      Locations of Notice of Intent: Copies                 encourages electronic filing. All                     project operational. On March 6, 2012,
                                                    of the notice of intent can be obtained                 documents may be filed using the                      Mr. Drone filed a letter with the
                                                    directly from the applicant or such                     Commission’s eFiling system at http://                Commission stating he declined the
                                                    copies can be viewed and reproduced at                  www.ferc.gov/docs-filing/efiling.asp.                 exemption transfer until Mr. Reeves
                                                    the Commission in its Public Reference                  Commenters can submit brief comments                  resolves non-compliance and
                                                    Room, Room 2A, 888 First Street NE.,                    up to 6,000 characters, without prior                 outstanding debt liability issues.
                                                    Washington, DC 20426. The filing may                    registration, using the eComment system               Commission, BLM, and BOR staff has
                                                    also be viewed on the web at http://                    at http://www.ferc.gov/docs-filing/                   tried to contact both parties. The parties
                                                    www.ferc.gov/docs-filing/elibrary.asp                   ecomment.asp. You must include your                   have shown no movement towards
                                                    using the ‘‘eLibrary’’ link. Enter the                  name and contact information at the end               restoring project operation or removing
                                                    docket number (e.g., CD15–23000) in                     of your comments. For assistance,                     abandoned equipment, and no longer
                                                    the docket number field to access the                   please contact FERC Online Support at                 claim ownership of the project. Last
                                                    document. For assistance, call toll-free                FERCOnlineSupport@ferc.gov, (866)                     correspondence with Mr. Reeves was
                                                    1–866–208–3676 or email                                 208–3676 (toll free), or (202) 502–8659               returned with no forwarding address.
                                                    FERCOnlineSupport@ferc.gov. For TTY,                    (TTY). In lieu of electronic filing, please           The Commission is pursuing an implied
                                                    call (202) 502–8659.                                    send a paper copy to: Secretary, Federal              surrender of the exemption due to
                                                                                                            Energy Regulatory Commission, 888                     noncompliance with its Standard
                                                      Dated: April 16, 2015.                                First Street NE., Washington, DC 20426.               Article 1. Doing so will also facilitate
                                                    Kimberly D. Bose,                                       Please include the project number (P–                 the BLM and/or the BOR efforts to
                                                    Secretary.                                              6142–008) on any comments, motions to                 pursue legally the current and/or the
                                                    [FR Doc. 2015–09745 Filed 4–27–15; 8:45 am]             intervene, protests, or recommendations               previous owner of the project.
                                                    BILLING CODE 6717–01–P                                  filed.                                                   l. This notice is available for review
                                                                                                               j. Description of Project Facilities: (1)          and reproduction at the Commission in
                                                                                                            A 5-foot-high by 20-foot-long diversion               the Public Reference Room, Room 2A,
                                                    DEPARTMENT OF ENERGY                                    structure on Dardanelles Creek and a 2-               888 First Street NE., Washington, DC
                                                                                                            foot-high by 8-foot-long diversion                    20426. The filing may also be viewed on
                                                    Federal Energy Regulatory                               structure on Pond Creek; (2) a 8-inch-                the Commission’s Web site at http://
                                                    Commission                                              diameter, 4,000-foot-long conduit from                www.ferc.gov/docs-filing/elibrary.asp.
                                                    [Project No. 6142–008]                                  Dardanelles Creek, and a 2-foot-wide,                 Enter the Docket number (P–6142–008)
                                                                                                            2,700-foot-long ditch from Pond Creek;                excluding the last three digits in the
                                                    Bradley D. Reeves, Kevin Drone;                         (3) a settling basin, 60-foot-long, 30-foot-          docket number field to access the
                                                    Notice of Termination of Exemption by                   wide, and 8-foot-deep; (4) a 6-inch-                  notice. You may also register online at
                                                    Implied Surrender and Soliciting                        diameter, 1,660-foot-long penstock; (5) a             http://www.ferc.gov/docs-filing/
                                                    Comments, Protests, and Motions To                      powerhouse with a single Canyon                       esubscription.asp to be notified via
                                                    Intervene                                               turbine unit rated at 224 kilowatts (kW),             email of new filings and issuances
                                                                                                            and connected to a Toshiba induction                  related to this or other pending projects.
                                                       Take notice that the following                       generator rated at 240 kW; and (6)                    For assistance, call toll-free 1–866–208–
                                                    hydroelectric proceeding has been                       appurtenant facilities.                               3676 or email FERCOnlineSupport@
                                                    initiated by the Commission:                               k. Description of Proceeding: The                  ferc.gov. For TTY, call (202) 502–8659.
                                                       a. Type of Proceeding: Termination of                exemptee is in violation of Standard                     m. Individuals desiring to be included
                                                    exemption by implied surrender                          Article 1 of its exemption, which was                 on the Commission’s mailing list should
                                                       b. Project No.: 6142–008                             granted on October 8, 1982 (21 FERC                   so indicate by writing to the Secretary
                                                       c. Date Initiated: April 16, 2015                    ¶62,018). Article 1 provides, among                   of the Commission.
                                                       d. Exemptees: Bradley D. Reeves and                  other things, that the Commission may                    n. Comments and Protests—Anyone
                                                    Kevin Drone                                             terminate an exemption if any term or                 may submit comments, protests or a
                                                       e. Name and Location of Project: The                 condition of the exemption is violated.               motion to intervene in accordance with
                                                    Dardanelles Creek Hydroelectric Project                    Commission records show The                        the requirements of Rules of Practice
                                                    is located on the Dardanelles and Pond                  Dardanelles Creek Hydroelectric Project               and Procedure, 18 CFR 385.210 and
                                                    Creeks, in Placer County, California, on                has been non-operational since before                 385.211. In determining the appropriate
                                                    federal lands managed by the U.S.                       2009. The project is located on lands                 action to take, the Commission will
                                                    Department of the Interior’s Bureau of                  managed by the Bureau of Land                         consider all protests or other comments
                                                    Land Management (BLM) and Bureau of                     Management (BLM) and the Bureau of                    filed, but only those who file a motion
                                                    Reclamation (BOR).                                      Reclamation (BOR) and has ongoing                     to intervene in accordance with the
                                                       f. Issued Pursuant to: 18 CFR 4.106                  compliance issues with both agencies.                 Commission’s Rules may become a
                                                    (Standard Article 1 of the Exemption)                   By letter dated September 26, 2011,                   party to the proceeding. Any comments,
asabaliauskas on DSK5VPTVN1PROD with NOTICES




                                                       g. Exemptee Contact Information:                     BLM copied the Commission on a fully                  protests, or motions to intervene must
                                                    Bradley D. Reeves, 6335 Broken Bow                      executed duplicate original 5-year                    be received on or before the specified
                                                    Court Foresthill, CA 95631, (916) 887–                  license (permit to use federal lands) to              deadline date for the particular
                                                    1443, and Kevin Drone, 22234 Todd                       Mr. Bradley Reeves, exemptee for the                  proceeding.
                                                    Valley Road Foresthill, CA 95631, (530)                 project. On October 17, 2011, Mr.                        o. Filing and Service of Responsive
                                                    863–3643 Or c/o Sackheim Consulting,                    Reeves advised the Commission that he                 Documents—Any filing must (1) bear in
                                                    5096 Cocoa Palm Way, Fair Oaks, CA                      had sold the project to Mr. Kevin Drone               all capital letters the title ‘‘COMMENTS,
                                                    95628, (301) 401–5978.                                  as of September 15, 2011. By letter                   PROTEST, or MOTION TO INTERVE’’,


                                               VerDate Sep<11>2014   18:18 Apr 27, 2015   Jkt 235001   PO 00000   Frm 00039   Fmt 4703   Sfmt 4703   E:\FR\FM\28APN1.SGM   28APN1



Document Created: 2015-12-16 08:35:38
Document Modified: 2015-12-16 08:35:38
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation80 FR 23533 

2024 Federal Register | Disclaimer | Privacy Policy