80_FR_23619 80 FR 23538 - Interconnection of the Grande Prairie Wind Farm, Holt County, Nebraska (DOE/EIS-0485)

80 FR 23538 - Interconnection of the Grande Prairie Wind Farm, Holt County, Nebraska (DOE/EIS-0485)

DEPARTMENT OF ENERGY
Western Area Power Administration

Federal Register Volume 80, Issue 81 (April 28, 2015)

Page Range23538-23540
FR Document2015-09938

Western Area Power Administration (Western) received a request from Grande Prairie Wind, LLC (Grande Prairie Wind), a subsidiary of Geronimo Wind Energy, LLC d.b.a. Geronimo Energy, LLC to interconnect their proposed Grande Prairie Wind Farm (Project) to Western's power transmission system. The proposed interconnection point would be on Western's existing Fort Thompson to Grand Island 345-kilovolt (kV) transmission line, approximately seven miles east of the town of O'Neill in Holt County, Nebraska. The Project would be built on private and State cropland and pasture. On January 16, 2015, the Notice of Availability (NOA) of the Final Environmental Impact Statement (EIS) for the Interconnection of the Grande Prairie Wind Farm, Holt County, Nebraska (DOE/EIS-0485) was published in the Federal Register (80 FR 2414). After considering the environmental impacts, Western has decided to execute an interconnection agreement with Grande Prairie Wind to interconnect the proposed Project to Western's transmission system and to construct, own, and operate a new switchyard adjacent to its Fort Thompson to Grand Island 345-kV transmission line to accommodate that interconnection.

Federal Register, Volume 80 Issue 81 (Tuesday, April 28, 2015)
[Federal Register Volume 80, Number 81 (Tuesday, April 28, 2015)]
[Notices]
[Pages 23538-23540]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-09938]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Western Area Power Administration


Interconnection of the Grande Prairie Wind Farm, Holt County, 
Nebraska (DOE/EIS-0485)

AGENCY: Western Area Power Administration, Department of Energy.

ACTION: Record of Decision.

-----------------------------------------------------------------------

SUMMARY: Western Area Power Administration (Western) received a request 
from Grande Prairie Wind, LLC (Grande Prairie Wind), a subsidiary of 
Geronimo Wind Energy, LLC d.b.a. Geronimo Energy, LLC to interconnect 
their proposed Grande Prairie Wind Farm (Project) to Western's power 
transmission system. The proposed interconnection point would be on 
Western's existing Fort Thompson to Grand Island 345-kilovolt (kV) 
transmission line, approximately seven miles east of the town of 
O'Neill in Holt County, Nebraska. The Project would be built on private 
and State cropland and pasture.

[[Page 23539]]

    On January 16, 2015, the Notice of Availability (NOA) of the Final 
Environmental Impact Statement (EIS) for the Interconnection of the 
Grande Prairie Wind Farm, Holt County, Nebraska (DOE/EIS-0485) was 
published in the Federal Register (80 FR 2414). After considering the 
environmental impacts, Western has decided to execute an 
interconnection agreement with Grande Prairie Wind to interconnect the 
proposed Project to Western's transmission system and to construct, 
own, and operate a new switchyard adjacent to its Fort Thompson to 
Grand Island 345-kV transmission line to accommodate that 
interconnection.

FOR FURTHER INFORMATION CONTACT: For further information, please 
contact Mr. Rod O'Sullivan, Western Area Power Administration, P.O. Box 
281213, Lakewood, CO 80228-8213, telephone (720) 962-7260, fax (720) 
962-7263, or email: [email protected]. For general information on 
DOE's National Environmental Policy Act (NEPA) review process, please 
contact Carol M. Borgstrom, Director, Office of NEPA Policy and 
Compliance, GC-54, U.S. Department of Energy, Washington, DC 20585, 
telephone (202) 586-4600 or (800) 472-2756, or email: 
[email protected].

SUPPLEMENTARY INFORMATION: Western is a Federal agency under the U.S. 
Department of Energy (DOE) that markets and transmits wholesale 
electrical power through an integrated 17,000-circuit mile, high-
voltage transmission system across 15 central and western states. 
Western's Open Access Transmission Service Tariff (Tariff) provides 
open access to its electric transmission system. Considering the 
requester's objectives, Western provides transmission services if there 
is sufficient available capacity and the reliability of the 
transmission system is maintained.

Proposed Federal Action

    Western's Proposed Federal Action is to execute an interconnection 
agreement with Grande Prairie Wind to interconnect the proposed Project 
to Western's transmission system and to construct, own, and operate a 
new switchyard adjacent to its Fort Thompson to Grand Island 345-kV 
transmission line to accommodate that interconnection.

Grande Prairie Wind's Proposed Project

    Grande Prairie Wind proposes to construct and operate a 400-
megawatt (MW) wind energy generation facility in Holt County in 
northern Nebraska. The proposed Project would interconnect to Western's 
345-kV Fort Thompson to Grand Island transmission line at a new 
switchyard constructed, owned and operated by Western. The Project area 
would occupy approximately 54,250 acres in portions of Willowdale, 
Antelope, Grattan, Iowa, Scott, and Steel Creek Townships. Grande 
Prairie Wind proposes to build up to 266 wind turbines, up to 85 miles 
of access roads, an underground electrical power collection system, 
collector substations, a step-up substation, a 14-mile overhead 
transmission line, meteorological towers, maintenance buildings, and 
other associated ancillary facilities. Grande Prairie Wind proposes to 
begin construction as early as spring 2015. The life of the Project is 
anticipated to be a minimum of 20 years.

Description of Alternatives

    Under its Proposed Action Alternative, Western would execute an 
interconnection agreement with Grande Prairie Wind to interconnect 
their proposed Project to Western's transmission system and to 
construct, own, and operate a new switchyard adjacent to its Fort 
Thompson to Grand Island 345-kV transmission line to accommodate that 
interconnection. Grande Prairie Wind would construct and operate the 
400-MW Project northeast of O'Neill in Holt County, Nebraska.
    Under the No Action Alternative, Western would not enter into an 
interconnection agreement and would not construct a switchyard for the 
proposed Project interconnection. Although Grande Prairie Wind could 
still construct and operate their Project, the wind farm would need to 
rely on different means of power transmission. For purposes of the NEPA 
analysis, the No Action Alternative assumed the proposed Project would 
not be built. Western has identified the No Action alternative as its 
environmentally preferred alternative as there would likely be no new 
impacts. Grande Prairie Wind's objectives relating to renewable energy 
development would not be met.

Public Involvement

    The public and interested parties were notified of the proposed 
Project and public comment opportunity through a Notice of Intent 
published in the Federal Register on April 16, 2012 (77 FR 22569). The 
U.S. Environmental Protection Agency (EPA) published a NOA of the Draft 
EIS in the Federal Register on June 20, 2014 (79 FR 35346). The public 
comment period closed on August, 4, 2014. On January 16, 2015, the EPA 
published a NOA of the Final EIS for the Project in the Federal 
Register (80 FR 2414).\1\
---------------------------------------------------------------------------

    \1\ The Final EIS can be found on Western's Web site at: http://www.wapa.gov/ugp/Environment/documents/FEIS_GrandePrairie_2014-12-29.pdf.
---------------------------------------------------------------------------

    Each official notification published in the Federal Register was 
accompanied concurrently by direct mailings of notices to State and 
Federal agencies, Tribal governments, landholders and interested 
parties, and widely distributed local notices and advertisements.

Mitigation

    The design features, best management practices (BMPs), and 
avoidance and minimization measures are considered an integral part of 
the proposed Project to be implemented by Grande Prairie Wind as 
requirements of their agreements with their construction contractors. 
These design features, BMPs, and avoidance and minimization measures 
described in detail in the Final EIS reflect all practicable means to 
avoid or minimize environmental harm from Grande Prairie Wind's Project 
and Western's proposed action.
    Each resource section in the Final EIS provides specific mitigation 
measures to address potential impacts of the proposed Project on that 
resource and can be reviewed in detail in chapter 4 of the Final EIS. 
Western's decision to execute an interconnection agreement considers 
Grande Prairie Wind's commitments to implement these design features, 
BMPs, and avoidance and minimization measures, along with the attendant 
reduction in environmental impacts that would result from their 
implementation. A Mitigation Action Plan is not required for Western's 
proposed action.

Endangered Species Act

    Section 7(a)(2) of the Endangered Species Act of 1973, as amended 
(16 United States Code [U.S.C.] 1531 et seq.) requires Federal agencies 
to consult with the U.S. Fish and Wildlife Service (USFWS) on their 
Federal actions and how they may affect federally listed threatened or 
endangered species. Western requested concurrence with their Biological 
Assessment, Formal Conferencing on the Project's effects on Northern 
Long Eared Bat, and Formal Consultation on the Project's effects on the 
American Burying Beetle by letter on October 1, 2014. Subsequently, the 
USFWS issued its Biological Opinion on March 24, 2015, and a separate 
Conferencing Opinion on March 30, 2015.

[[Page 23540]]

National Historic Preservation Act

    Final cultural resource reports and effects determination were sent 
to the Nebraska State Historical Preservation Officer (SHPO) and were 
subsequently approved. A Memorandum of Agreement addressing effects to 
properties on or eligible for listing on the National Register of 
Historic Places for the preservation of eligible properties was signed 
by Grand Prairie Wind, the SHPO, and Western on March 25, 2015, in 
compliance with the National Historic Preservation Act.

Comments on the Final EIS

    One comment was received by the U.S. Environmental Protection 
Agency (EPA). In their February 17, 2015, letter, EPA recommended 
additional alternatives be considered in Western's future NEPA 
documents.

Decision

    Western's decision is to execute an interconnection agreement with 
Grande Prairie Wind to interconnect their proposed Project to Western's 
transmission system and to construct, own, and operate a new switchyard 
adjacent to its Fort Thompson to Grand Island 345-kV transmission line 
to accommodate that interconnection.\2\ Western's decision to grant 
this interconnection request satisfies the agency's statutory mission 
and Grande Prairie Wind's objectives while minimizing harm to the 
environment. Full implementation of this decision is contingent upon 
Grande Prairie Wind's obtaining all other applicable permits and 
approvals as well as executing an interconnection agreement in 
accordance with Western's Tariff. This decision is based on the 
information contained in the Interconnection of the Grande Prairie Wind 
Farm Final EIS. This ROD was prepared pursuant to the requirements of 
the Council on Environmental Quality Regulations for Implementing the 
Procedural Provisions of the NEPA (40 CFR parts 1500-1508) and DOE's 
NEPA Implementing Procedures (10 CFR part 1021).
---------------------------------------------------------------------------

    \2\ On November 16, 2011, DOE's Acting General Counsel restated 
the delegations to Western's Administrator of all the authorities of 
the General Counsel respecting Environmental Impact Statements.

    Dated: April 20, 2015.
Mark A. Gabriel,
Administrator.
[FR Doc. 2015-09938 Filed 4-27-15; 8:45 am]
BILLING CODE 6450-01-P



                                                    23538                          Federal Register / Vol. 80, No. 81 / Tuesday, April 28, 2015 / Notices

                                                    dockets. This can reduce the amount of                  within 90 days of this Notice, the                    project should submit an original and
                                                    time you spend researching proceedings                  Commission staff will either: complete                two copies of their comments to the
                                                    by automatically providing you with                     its environmental assessment (EA) and                 Secretary of the Commission.
                                                    notification of these filings, document                 place it into the Commission’s public                 Environmental commentors will be
                                                    summaries, and direct links to the                      record (eLibrary) for this proceeding; or             placed on the Commission’s
                                                    documents. Go to www.ferc.gov/docs-                     issue a Notice of Schedule for                        environmental mailing list, will receive
                                                    filing/esubscription.asp.                               Environmental Review. If a Notice of                  copies of the environmental documents,
                                                       Finally, public meetings or site visits              Schedule for Environmental Review is                  and will be notified of meetings
                                                    will be posted on the Commission’s                      issued, it will indicate, among other                 associated with the Commission’s
                                                    calendar located at www.ferc.gov/                       milestones, the anticipated date for the              environmental review process.
                                                    EventCalendar/EventsList.aspx along                     Commission staff’s issuance of the final              Environmental commentors will not be
                                                    with other related information.                         environmental impact statement (FEIS)                 required to serve copies of filed
                                                      Dated: April 17, 2015.                                or EA for this proposal. The filing of the            documents on all other parties.
                                                                                                            EA in the Commission’s public record                  However, the non-party commentors
                                                    Kimberly D. Bose,
                                                                                                            for this proceeding or the issuance of a              will not receive copies of all documents
                                                    Secretary.                                              Notice of Schedule for Environmental                  filed by other parties or issued by the
                                                    [FR Doc. 2015–09748 Filed 4–27–15; 8:45 am]             Review will serve to notify federal and               Commission (except for the mailing of
                                                    BILLING CODE 6717–01–P                                  state agencies of the timing for the                  environmental documents issued by the
                                                                                                            completion of all necessary reviews, and              Commission) and will not have the right
                                                                                                            the subsequent need to complete all                   to seek court review of the
                                                    DEPARTMENT OF ENERGY                                    federal authorizations within 90 days of              Commission’s final order.
                                                                                                            the date of issuance of the Commission                   The Commission strongly encourages
                                                    Federal Energy Regulatory
                                                                                                            staff’s FEIS or EA.                                   electronic filings of comments, protests
                                                    Commission                                                 There are two ways to become                       and interventions in lieu of paper using
                                                    [Docket Nos. CP15–169–000]                              involved in the Commission’s review of                the ‘‘eFiling’’ link at http://
                                                                                                            this project. First, any person wishing to            www.ferc.gov. Persons unable to file
                                                    Transcontinental Gas Pipe Line                          obtain legal status by becoming a party
                                                    Company, LLC; Notice of Application                                                                           electronically should submit an original
                                                                                                            to the proceedings for this project                   and 5 copies of the protest or
                                                                                                            should, on or before the comment date
                                                       Take notice that on April 13, 2015,                                                                        intervention to the Federal Energy
                                                                                                            stated below file with the Federal
                                                    Transcontinental Gas Pipe Line                                                                                regulatory Commission, 888 First Street
                                                                                                            Energy Regulatory Commission, 888
                                                    Company LLC (Transco), 2800 Post Oak                                                                          NE., Washington, DC 20426.
                                                                                                            First Street NE., Washington, DC 20426,
                                                    Boulevard, Houston, Texas 77056, filed                  a motion to intervene in accordance                      Comment Date: April 24, 2015.
                                                    in the above referenced docket an                       with the requirements of the                            Dated: April 14, 2015.
                                                    application pursuant to section 7(c) of                 Commission’s Rules of Practice and                    Kimberly D. Bose,
                                                    the Natural Gas Act (NGA), to amend                     Procedure (18 CFR 385.214 or 385.211)                 Secretary.
                                                    the certificate of public convenience                   and the Regulations under the NGA (18                 [FR Doc. 2015–09838 Filed 4–27–15; 8:45 am]
                                                    and necessity granted by the                            CFR 157.10). A person obtaining party                 BILLING CODE 6717–01–P
                                                    Commission by order issued on March                     status will be placed on the service list
                                                    19, 2015 in the reference proceeding,                   maintained by the Secretary of the
                                                    which order authorized Transco’s Rock                   Commission and will receive copies of                 DEPARTMENT OF ENERGY
                                                    Spring Expansion Project (Project). The                 all documents filed by the applicant and
                                                    amendment seeks authorization to                        by all other parties. A party must submit             Western Area Power Administration
                                                    amend the Project’s certificate to                      five copies of filings made in the
                                                    incorporate a minor route modification                  proceeding with the Commission and                    Interconnection of the Grande Prairie
                                                    of approximately 0.69 miles in                          must mail a copy to the applicant and                 Wind Farm, Holt County, Nebraska
                                                    Lancaster County, Pennsylvania, all as                  to every other party. Only parties to the             (DOE/EIS–0485)
                                                    more fully set forth in the application                 proceeding can ask for court review of
                                                    which is on file with the Commission                    Commission orders in the proceeding.                  AGENCY:  Western Area Power
                                                    and open to public inspection. The                         However, a person does not have to                 Administration, Department of Energy.
                                                    filing is available for review at the                   intervene in order to have comments                   ACTION: Record of Decision.
                                                    Commission in the Public Reference                      considered. The second way to
                                                    Room or may be viewed on the                            participate is by filing with the                     SUMMARY:   Western Area Power
                                                    Commission’s Web site web at http://                    Secretary of the Commission, as soon as               Administration (Western) received a
                                                    www.ferc.gov using the ‘‘eLibrary’’ link.               possible, an original and two copies of               request from Grande Prairie Wind, LLC
                                                    Enter the docket number excluding the                   comments in support of or in opposition               (Grande Prairie Wind), a subsidiary of
                                                    last three digits in the docket number                  to this project. The Commission will                  Geronimo Wind Energy, LLC d.b.a.
                                                    field to access the document. For                       consider these comments in                            Geronimo Energy, LLC to interconnect
                                                    assistance, contact FERC at                             determining the appropriate action to be              their proposed Grande Prairie Wind
                                                    FERCOnlineSupport@ferc.gov or call                      taken, but the filing of a comment alone              Farm (Project) to Western’s power
                                                    toll-free, (886) 208–3676 or TYY, (202)                 will not serve to make the filer a party              transmission system. The proposed
asabaliauskas on DSK5VPTVN1PROD with NOTICES




                                                    502–8659.                                               to the proceeding. The Commission’s                   interconnection point would be on
                                                       Any questions concerning this                        rules require that persons filing                     Western’s existing Fort Thompson to
                                                    application may be directed to Bill                     comments in opposition to the project                 Grand Island 345-kilovolt (kV)
                                                    Hammons, P.O. Box 1396, Houston,                        provide copies of their protests only to              transmission line, approximately seven
                                                    Texas 77251, by telephone at (713) 215–                 the party or parties directly involved in             miles east of the town of O’Neill in Holt
                                                    2130.                                                   the protest.                                          County, Nebraska. The Project would be
                                                       Pursuant to section 157.9 of the                        Persons who wish to comment only                   built on private and State cropland and
                                                    Commission’s rules (18 CFR 157.9),                      on the environmental review of this                   pasture.


                                               VerDate Sep<11>2014   18:18 Apr 27, 2015   Jkt 235001   PO 00000   Frm 00043   Fmt 4703   Sfmt 4703   E:\FR\FM\28APN1.SGM   28APN1


                                                                                   Federal Register / Vol. 80, No. 81 / Tuesday, April 28, 2015 / Notices                                                  23539

                                                       On January 16, 2015, the Notice of                   proposed Project would interconnect to                the EPA published a NOA of the Final
                                                    Availability (NOA) of the Final                         Western’s 345-kV Fort Thompson to                     EIS for the Project in the Federal
                                                    Environmental Impact Statement (EIS)                    Grand Island transmission line at a new               Register (80 FR 2414).1
                                                    for the Interconnection of the Grande                   switchyard constructed, owned and                       Each official notification published in
                                                    Prairie Wind Farm, Holt County,                         operated by Western. The Project area                 the Federal Register was accompanied
                                                    Nebraska (DOE/EIS–0485) was                             would occupy approximately 54,250                     concurrently by direct mailings of
                                                    published in the Federal Register (80                   acres in portions of Willowdale,                      notices to State and Federal agencies,
                                                    FR 2414). After considering the                         Antelope, Grattan, Iowa, Scott, and Steel             Tribal governments, landholders and
                                                    environmental impacts, Western has                      Creek Townships. Grande Prairie Wind                  interested parties, and widely
                                                    decided to execute an interconnection                   proposes to build up to 266 wind                      distributed local notices and
                                                    agreement with Grande Prairie Wind to                   turbines, up to 85 miles of access roads,             advertisements.
                                                    interconnect the proposed Project to                    an underground electrical power
                                                    Western’s transmission system and to                    collection system, collector substations,             Mitigation
                                                    construct, own, and operate a new                       a step-up substation, a 14-mile overhead                 The design features, best management
                                                    switchyard adjacent to its Fort                         transmission line, meteorological                     practices (BMPs), and avoidance and
                                                    Thompson to Grand Island 345-kV                         towers, maintenance buildings, and                    minimization measures are considered
                                                    transmission line to accommodate that                   other associated ancillary facilities.                an integral part of the proposed Project
                                                    interconnection.                                        Grande Prairie Wind proposes to begin                 to be implemented by Grande Prairie
                                                                                                            construction as early as spring 2015.                 Wind as requirements of their
                                                    FOR FURTHER INFORMATION CONTACT: For
                                                                                                            The life of the Project is anticipated to
                                                    further information, please contact Mr.                                                                       agreements with their construction
                                                                                                            be a minimum of 20 years.
                                                    Rod O’Sullivan, Western Area Power                                                                            contractors. These design features,
                                                    Administration, P.O. Box 281213,                        Description of Alternatives                           BMPs, and avoidance and minimization
                                                    Lakewood, CO 80228–8213, telephone                         Under its Proposed Action                          measures described in detail in the
                                                    (720) 962–7260, fax (720) 962–7263, or                  Alternative, Western would execute an                 Final EIS reflect all practicable means to
                                                    email: osullivan@wapa.gov. For general                  interconnection agreement with Grande                 avoid or minimize environmental harm
                                                    information on DOE’s National                           Prairie Wind to interconnect their                    from Grande Prairie Wind’s Project and
                                                    Environmental Policy Act (NEPA)                         proposed Project to Western’s                         Western’s proposed action.
                                                    review process, please contact Carol M.                 transmission system and to construct,                    Each resource section in the Final EIS
                                                    Borgstrom, Director, Office of NEPA                     own, and operate a new switchyard                     provides specific mitigation measures to
                                                    Policy and Compliance, GC–54, U.S.                      adjacent to its Fort Thompson to Grand                address potential impacts of the
                                                    Department of Energy, Washington, DC                    Island 345-kV transmission line to                    proposed Project on that resource and
                                                    20585, telephone (202) 586–4600 or                      accommodate that interconnection.                     can be reviewed in detail in chapter 4
                                                    (800) 472–2756, or email: askNEPA@                      Grande Prairie Wind would construct                   of the Final EIS. Western’s decision to
                                                    hq.doe.gov.                                             and operate the 400–MW Project                        execute an interconnection agreement
                                                    SUPPLEMENTARY INFORMATION: Western is                   northeast of O’Neill in Holt County,                  considers Grande Prairie Wind’s
                                                    a Federal agency under the U.S.                         Nebraska.                                             commitments to implement these design
                                                    Department of Energy (DOE) that                            Under the No Action Alternative,                   features, BMPs, and avoidance and
                                                    markets and transmits wholesale                         Western would not enter into an                       minimization measures, along with the
                                                    electrical power through an integrated                  interconnection agreement and would                   attendant reduction in environmental
                                                    17,000-circuit mile, high-voltage                       not construct a switchyard for the                    impacts that would result from their
                                                    transmission system across 15 central                   proposed Project interconnection.                     implementation. A Mitigation Action
                                                    and western states. Western’s Open                      Although Grande Prairie Wind could                    Plan is not required for Western’s
                                                    Access Transmission Service Tariff                      still construct and operate their Project,            proposed action.
                                                    (Tariff) provides open access to its                    the wind farm would need to rely on
                                                                                                                                                                  Endangered Species Act
                                                    electric transmission system.                           different means of power transmission.
                                                    Considering the requester’s objectives,                 For purposes of the NEPA analysis, the                  Section 7(a)(2) of the Endangered
                                                    Western provides transmission services                  No Action Alternative assumed the                     Species Act of 1973, as amended (16
                                                    if there is sufficient available capacity               proposed Project would not be built.                  United States Code [U.S.C.] 1531 et seq.)
                                                    and the reliability of the transmission                 Western has identified the No Action                  requires Federal agencies to consult
                                                    system is maintained.                                   alternative as its environmentally                    with the U.S. Fish and Wildlife Service
                                                                                                            preferred alternative as there would                  (USFWS) on their Federal actions and
                                                    Proposed Federal Action                                 likely be no new impacts. Grande                      how they may affect federally listed
                                                       Western’s Proposed Federal Action is                 Prairie Wind’s objectives relating to                 threatened or endangered species.
                                                    to execute an interconnection agreement                 renewable energy development would                    Western requested concurrence with
                                                    with Grande Prairie Wind to                             not be met.                                           their Biological Assessment, Formal
                                                    interconnect the proposed Project to                                                                          Conferencing on the Project’s effects on
                                                                                                            Public Involvement
                                                    Western’s transmission system and to                                                                          Northern Long Eared Bat, and Formal
                                                    construct, own, and operate a new                         The public and interested parties                   Consultation on the Project’s effects on
                                                    switchyard adjacent to its Fort                         were notified of the proposed Project                 the American Burying Beetle by letter
                                                                                                            and public comment opportunity
asabaliauskas on DSK5VPTVN1PROD with NOTICES




                                                    Thompson to Grand Island 345-kV                                                                               on October 1, 2014. Subsequently, the
                                                    transmission line to accommodate that                   through a Notice of Intent published in               USFWS issued its Biological Opinion on
                                                    interconnection.                                        the Federal Register on April 16, 2012                March 24, 2015, and a separate
                                                                                                            (77 FR 22569). The U.S. Environmental                 Conferencing Opinion on March 30,
                                                    Grande Prairie Wind’s Proposed Project                  Protection Agency (EPA) published a                   2015.
                                                      Grande Prairie Wind proposes to                       NOA of the Draft EIS in the Federal
                                                    construct and operate a 400-megawatt                    Register on June 20, 2014 (79 FR 35346).                 1 The Final EIS can be found on Western’s Web
                                                    (MW) wind energy generation facility in                 The public comment period closed on                   site at: http://www.wapa.gov/ugp/Environment/
                                                    Holt County in northern Nebraska. The                   August, 4, 2014. On January 16, 2015,                 documents/FEIS_GrandePrairie_2014-12-29.pdf.



                                               VerDate Sep<11>2014   18:18 Apr 27, 2015   Jkt 235001   PO 00000   Frm 00044   Fmt 4703   Sfmt 4703   E:\FR\FM\28APN1.SGM   28APN1


                                                    23540                           Federal Register / Vol. 80, No. 81 / Tuesday, April 28, 2015 / Notices

                                                    National Historic Preservation Act                      ENVIRONMENTAL PROTECTION                              7408–M, Environmental Protection
                                                                                                            AGENCY                                                Agency, 1200 Pennsylvania Ave. NW.,
                                                       Final cultural resource reports and                                                                        Washington, DC 20460; telephone
                                                    effects determination were sent to the                  [EPA–HQ–OPPT–2013–0811; FRL 9926–56–
                                                                                                            OEI]
                                                                                                                                                                  number: 202–554–1404; fax number:
                                                    Nebraska State Historical Preservation                                                                        202–564–8251; email address: TSCA-
                                                    Officer (SHPO) and were subsequently                    Information Collection Request                        Hotline@epa.gov.
                                                    approved. A Memorandum of                               Submitted to OMB for Review and                       SUPPLEMENTARY INFORMATION:
                                                    Agreement addressing effects to                         Approval; Comment Request;                               Docket: Supporting documents,
                                                    properties on or eligible for listing on                Residential Lead-Based Paint Hazard                   including the ICR that explains in detail
                                                    the National Register of Historic Places                Disclosure Requirements (Renewal)                     the information collection activities and
                                                    for the preservation of eligible                                                                              the related burden and cost estimates
                                                    properties was signed by Grand Prairie                  AGENCY: Environmental Protection                      that are summarized in this document,
                                                    Wind, the SHPO, and Western on March                    Agency (EPA).                                         are available in the docket for this ICR.
                                                    25, 2015, in compliance with the                        ACTION: Notice.                                       The docket can be viewed online at
                                                    National Historic Preservation Act.                                                                           http://www.regulations.gov or in person
                                                                                                            SUMMARY:   EPA has submitted the
                                                                                                                                                                  at the EPA Docket Center, West William
                                                    Comments on the Final EIS                               following information collection request
                                                                                                                                                                  Jefferson Clinton Bldg., Rm. 3334, 1301
                                                                                                            (ICR) to the Office of Management and
                                                       One comment was received by the                                                                            Constitution Ave. NW., Washington,
                                                                                                            Budget (OMB) for review and approval
                                                    U.S. Environmental Protection Agency                                                                          DC. The telephone number for the
                                                                                                            in accordance with the Paperwork
                                                    (EPA). In their February 17, 2015, letter,                                                                    Docket Center is (202) 566–1744. For
                                                                                                            Reduction Act (PRA): ‘‘Residential
                                                    EPA recommended additional                                                                                    additional information about EPA’s
                                                                                                            Lead-Based Paint Hazard Disclosure
                                                                                                                                                                  public docket, visit http://www.epa.gov/
                                                    alternatives be considered in Western’s                 Requirements (Renewal),’’ identified by
                                                                                                                                                                  dockets.
                                                    future NEPA documents.                                  EPA ICR No. 1710.07 and OMB Control
                                                                                                                                                                     ICR status: This ICR is currently
                                                                                                            No. 2070–0151. The ICR, which is
                                                    Decision                                                                                                      scheduled to expire on April 30, 2015.
                                                                                                            available in the docket along with other
                                                                                                                                                                  Under OMB regulations, the Agency
                                                       Western’s decision is to execute an                  related materials, provides a detailed
                                                                                                                                                                  may continue to conduct or sponsor the
                                                    interconnection agreement with Grande                   explanation of the collection activities
                                                                                                                                                                  collection of information while this
                                                    Prairie Wind to interconnect their                      and the burden estimate that is briefly
                                                                                                                                                                  submission is pending at OMB.
                                                    proposed Project to Western’s                           summarized in this document. EPA did
                                                                                                                                                                     Under PRA, 44 U.S.C. 3501 et seq., an
                                                    transmission system and to construct,                   not receive any comments in response
                                                                                                                                                                  agency may not conduct or sponsor, and
                                                                                                            to the previously provided public
                                                    own, and operate a new switchyard                                                                             a person is not required to respond to,
                                                                                                            review opportunity issued in the
                                                    adjacent to its Fort Thompson to Grand                                                                        a collection of information, unless it
                                                                                                            Federal Register on July 24, 2014 (79 FR
                                                    Island 345-kV transmission line to                                                                            displays a currently valid OMB control
                                                                                                            71603). With this submission, EPA is
                                                    accommodate that interconnection.2                                                                            number. The OMB control numbers are
                                                                                                            providing an additional 30 days for
                                                    Western’s decision to grant this                                                                              displayed either by publication in the
                                                                                                            public review.
                                                    interconnection request satisfies the                                                                         Federal Register or by other appropriate
                                                                                                            DATES: Comments must be received on                   means, such as on the related collection
                                                    agency’s statutory mission and Grande
                                                                                                            or before May 28, 2015.                               instrument or form, if applicable. The
                                                    Prairie Wind’s objectives while
                                                    minimizing harm to the environment.                     ADDRESSES: Submit your comments,                      display of OMB control numbers for
                                                    Full implementation of this decision is                 identified by docket identification (ID)              certain EPA regulations is consolidated
                                                    contingent upon Grande Prairie Wind’s                   number EPA–HQ–OPPT–2013–0811, to                      in 40 CFR part 9.
                                                    obtaining all other applicable permits                  both EPA and OMB as follows:                             Abstract: Section 1018 of the
                                                                                                               • To EPA online using http://www.                  Residential Lead Based Paint Hazard
                                                    and approvals as well as executing an
                                                                                                            regulations.gov (our preferred method)                Reduction Act (42 U.S.C. 4852d)
                                                    interconnection agreement in
                                                                                                            or by mail to: EPA Docket Center,                     requires that sellers and lessors of most
                                                    accordance with Western’s Tariff. This
                                                                                                            Environmental Protection Agency, Mail                 residential housing built before 1978
                                                    decision is based on the information                    Code 28221T, 1200 Pennsylvania Ave.
                                                    contained in the Interconnection of the                                                                       disclose known information on the
                                                                                                            NW., Washington, DC 20460.                            presence of lead based paint and lead
                                                    Grande Prairie Wind Farm Final EIS.                        • To OMB via email to oira_                        based paint hazards, and provide an
                                                    This ROD was prepared pursuant to the                   submission@omb.eop.gov. Address                       EPA approved pamphlet to purchasers
                                                    requirements of the Council on                          comments to OMB Desk Officer for EPA.                 and renters before selling or leasing the
                                                    Environmental Quality Regulations for                      EPA’s policy is that all comments                  housing. Sellers of pre-1978 housing are
                                                    Implementing the Procedural Provisions                  received will be included in the docket               also required to provide prospective
                                                    of the NEPA (40 CFR parts 1500–1508)                    without change, including any personal                purchasers with ten days to conduct an
                                                    and DOE’s NEPA Implementing                             information provided, unless the                      inspection or risk assessment for lead
                                                    Procedures (10 CFR part 1021).                          comment includes profanity, threats,                  based paint hazards before obligating
                                                     Dated: April 20, 2015.                                 information claimed to be Confidential                purchasers under contracts to purchase
                                                    Mark A. Gabriel,
                                                                                                            Business Information (CBI), or other                  the property. The rule does not apply to
                                                                                                            information whose disclosure is                       rental housing that has been found to be
asabaliauskas on DSK5VPTVN1PROD with NOTICES




                                                    Administrator.                                          restricted by statute. Do not submit                  free of lead-based paint, zero-bedroom
                                                    [FR Doc. 2015–09938 Filed 4–27–15; 8:45 am]             electronically any information you                    dwellings, housing for the elderly,
                                                    BILLING CODE 6450–01–P                                  consider to be CBI or other information               housing for the handicapped, or short
                                                                                                            whose disclosure is restricted by statute.            term leases.
                                                      2 On November 16, 2011, DOE’s Acting General
                                                                                                            FOR FURTHER INFORMATION CONTACT:                         Responses to the collection of
                                                    Counsel restated the delegations to Western’s
                                                    Administrator of all the authorities of the General
                                                                                                            Colby Lintner, Environmental                          information are mandatory (see 40 CFR
                                                    Counsel respecting Environmental Impact                 Assistance Division, Office of Pollution              part 745, subpart F, and 24 CFR part 35,
                                                    Statements.                                             Prevention and Toxics, Mail code:                     subpart H). Respondents may claim all


                                               VerDate Sep<11>2014   18:18 Apr 27, 2015   Jkt 235001   PO 00000   Frm 00045   Fmt 4703   Sfmt 4703   E:\FR\FM\28APN1.SGM   28APN1



Document Created: 2015-12-16 08:36:00
Document Modified: 2015-12-16 08:36:00
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionRecord of Decision.
ContactFor further information, please contact Mr. Rod O'Sullivan, Western Area Power Administration, P.O. Box 281213, Lakewood, CO 80228-8213, telephone (720) 962-7260, fax (720) 962-7263, or email: [email protected] For general information on DOE's National Environmental Policy Act (NEPA) review process, please contact Carol M. Borgstrom, Director, Office of NEPA Policy and Compliance, GC-54, U.S. Department of Energy, Washington, DC 20585, telephone (202) 586-4600 or (800) 472-2756, or email: [email protected]
FR Citation80 FR 23538 