80_FR_29798 80 FR 29699 - Consolidated Edison Company of New York, Inc.; Notice of Filing

80 FR 29699 - Consolidated Edison Company of New York, Inc.; Notice of Filing

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 80, Issue 99 (May 22, 2015)

Page Range29699-29699
FR Document2015-12477

Federal Register, Volume 80 Issue 99 (Friday, May 22, 2015)
[Federal Register Volume 80, Number 99 (Friday, May 22, 2015)]
[Notices]
[Page 29699]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-12477]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. TX14-1-000]


Consolidated Edison Company of New York, Inc.; Notice of Filing

    Take notice that on May 11, 2015, Consolidated Edison Company of 
New York, Inc. (Con Edison) filed a joint offer of settlement to amend 
its March 18, 2014 filed application for an order directing Cogen 
Technologies Linden Venture, L.P. to modify the physical connection 
that currently exists between its transmission facilities and those of 
Con Edison.
    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be 
considered by the Commission in determining the appropriate action to 
be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a notice of 
intervention or motion to intervene, as appropriate. Such notices, 
motions, or protests must be filed on or before the comment date. On or 
before the comment date, it is not necessary to serve motions to 
intervene or protests on persons other than the Applicant.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at http://www.ferc.gov. Persons unable to file electronically should submit an 
original and 5 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street NE., Washington, DC 
20426.
    This filing is accessible on-line at http://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive email 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please email 
[email protected], or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.
    Comment Date: 5:00 p.m. Eastern Time on June 1, 2015.

    Dated: May 18, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-12477 Filed 5-21-15; 8:45 am]
BILLING CODE 6717-01-P



                                                                                     Federal Register / Vol. 80, No. 99 / Friday, May 22, 2015 / Notices                                                   29699

                                                    efiling.asp. Commenters can submit                      Market Regulation, Federal Energy                     Online service, please email
                                                    brief comments up to 6,000 characters,                  Regulatory Commission at (202) 502–                   FERCOnlineSupport@ferc.gov, or call
                                                    without prior registration, using the                   6169 or Michael.Cackoski@ferc.gov.                    (866) 208–3676 (toll free). For TTY, call
                                                    eComment system at http://                                Dated: May 18, 2015.                                (202) 502–8659.
                                                    www.ferc.gov/docs-filing/                               Nathaniel J. Davis, Sr.,                                Comment Date: 5:00 p.m. Eastern
                                                    ecomment.asp. You must include your
                                                                                                            Deputy Secretary.                                     Time on June 1, 2015.
                                                    name and contact information at the end
                                                                                                            [FR Doc. 2015–12437 Filed 5–21–15; 8:45 am]
                                                    of your comments. For assistance,                                                                               Dated: May 18, 2015.
                                                                                                            BILLING CODE 6717–01–P
                                                    please contact FERC Online Support. In                                                                        Kimberly D. Bose,
                                                    lieu of electronic filing, please send a                                                                      Secretary.
                                                    paper copy to: Kimberly D. Bose,                        DEPARTMENT OF ENERGY                                  [FR Doc. 2015–12477 Filed 5–21–15; 8:45 am]
                                                    Secretary, Federal Energy Regulatory
                                                                                                                                                                  BILLING CODE 6717–01–P
                                                    Commission, 888 First Street NE.,                       Federal Energy Regulatory
                                                    Washington, DC 20426.                                   Commission
                                                       For further information, contact                                                                           DEPARTMENT OF ENERGY
                                                    Steven Sachs by telephone at 202–502–                   [Docket No. TX14–1–000]
                                                    8666 or by email at Steven.Sachs@                                                                             Federal Energy Regulatory
                                                                                                            Consolidated Edison Company of New
                                                    ferc.gov.                                                                                                     Commission
                                                                                                            York, Inc.; Notice of Filing
                                                      Dated: May 18, 2015.
                                                    Kimberly D. Bose,                                          Take notice that on May 11, 2015,
                                                                                                            Consolidated Edison Company of New                    [Project No. 3181–004]
                                                    Secretary.
                                                                                                            York, Inc. (Con Edison) filed a joint offer
                                                    [FR Doc. 2015–12468 Filed 5–21–15; 8:45 am]                                                                   Hydro Development Group, Inc.; Hydro
                                                                                                            of settlement to amend its March 18,
                                                    BILLING CODE 6717–01–P                                  2014 filed application for an order                   Development Group Acquisition, LLC;
                                                                                                            directing Cogen Technologies Linden                   Notice of Transfer of Exemption
                                                                                                            Venture, L.P. to modify the physical
                                                    DEPARTMENT OF ENERGY                                                                                            1. By letter filed April 24, 2015,1
                                                                                                            connection that currently exists between
                                                                                                            its transmission facilities and those of              William B. Conway, Jr., Counsel for Enel
                                                    Federal Energy Regulatory                                                                                     Green Power North America, Inc.
                                                    Commission                                              Con Edison.
                                                                                                               Any person desiring to intervene or to             (EGPNA),2 informed the Commission
                                                    Notice of Commission Staff                              protest this filing must file in                      that the exemption from licensing for
                                                    Attendance                                              accordance with Rules 211 and 214 of                  the Number 6 Mill Project, FERC No.
                                                                                                            the Commission’s Rules of Practice and                3181, originally issued September 17,
                                                       The Federal Energy Regulatory                        Procedure (18 CFR 385.211, 385.214).                  1981,3 has been transferred to Hydro
                                                    Commission (Commission) hereby gives                    Protests will be considered by the                    Development Group Acquisition, LLC,
                                                    notice that members of the                              Commission in determining the                         an affiliate of Enel Green Power. The
                                                    Commission’s staff may attend the                       appropriate action to be taken, but will              project is located on the Oswegatchie
                                                    following meeting related to the                        not serve to make protestants parties to              River in Lawrence County, New York.
                                                    transmission planning activities of ISO                 the proceeding. Any person wishing to                 The transfer of an exemption does not
                                                    New England Inc.                                        become a party must file a notice of                  require Commission approval.
                                                       ISO New England Inc. Planning                        intervention or motion to intervene, as
                                                    Advisory Committee Meeting.                             appropriate. Such notices, motions, or                  2. Hydro Development Group
                                                       May 21, 2015, 9:30 a.m.–2:00 p.m.                    protests must be filed on or before the               Acquisition, LLC is now the exemptee
                                                    (Eastern Standard Time).                                comment date. On or before the                        of the Number 6 Mill Project, FERC No.
                                                       The above-referenced meeting will be                 comment date, it is not necessary to                  3181. All correspondence should be
                                                    held at: Doubletree Hotel, 5400                         serve motions to intervene or protests                forwarded to: Hydro Development
                                                    Computer Drive, Westborough, MA                         on persons other than the Applicant.                  Group Acquisition, LLC, c/o Enel Green
                                                    01581.                                                     The Commission encourages                          Power North America, Inc., Attn:
                                                       The above-referenced meeting is open                 electronic submission of protests and                 General Counsel, 1 Tech Drive, Suite
                                                    to stakeholders.                                        interventions in lieu of paper using the              220, Andover, MA 01810.
                                                       Further information may be found at:                 ‘‘eFiling’’ link at http://www.ferc.gov.                Dated: May 18, 2015.
                                                    http://www.iso-ne.com/committees/                       Persons unable to file electronically
                                                                                                                                                                  Kimberly D. Bose,
                                                    planning/planning-advisory.                             should submit an original and 5 copies
                                                                                                            of the protest or intervention to the                 Secretary.
                                                       The discussions at the meeting
                                                                                                            Federal Energy Regulatory Commission,                 [FR Doc. 2015–12469 Filed 5–21–15; 8:45 am]
                                                    described above may address matters at
                                                    issue in the following proceedings:                     888 First Street NE., Washington, DC                  BILLING CODE 6717–01–P
                                                                                                            20426.
                                                    Docket No. ER13–193, ISO New England                       This filing is accessible on-line at                  1 Seventeen other exempted projects which are to

                                                       Inc.                                                 http://www.ferc.gov, using the                        be transferred were included in the April 24, 2015
asabaliauskas on DSK5VPTVN1PROD with NOTICES




                                                    Docket No. ER13–196, ISO New England                    ‘‘eLibrary’’ link and is available for                letter. These exemptions will be handled under
                                                       Inc.                                                 review in the Commission’s Public
                                                                                                                                                                  separate proceedings.
                                                                                                                                                                     2 Enel Green Power North America, Inc. is a
                                                    Docket No. ER13–1957, ISO New                           Reference Room in Washington, DC.
                                                       England Inc. et al.                                                                                        wholly owned subsidiary of Enel Green Power. Enel
                                                                                                            There is an ‘‘eSubscription’’ link on the             Green Power is a well-capitalized publicly traded
                                                    Docket No. ER13–1960, ISO New                           Web site that enables subscribers to                  company.
                                                       England Inc. et al.                                  receive email notification when a                        3 16 FERC ¶ 62,453, Order Granting Exemption

                                                       For more information, contact                        document is added to a subscribed                     from Licensing of a Small Hydroelectric Project of
                                                    Michael Cackoski, Office of Energy                      docket(s). For assistance with any FERC               5 Megawatts or Less (1981).



                                               VerDate Sep<11>2014   19:32 May 21, 2015   Jkt 235001   PO 00000   Frm 00098   Fmt 4703   Sfmt 4703   E:\FR\FM\22MYN1.SGM   22MYN1



Document Created: 2015-12-15 15:46:00
Document Modified: 2015-12-15 15:46:00
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
Dates5:00 p.m. Eastern Time on June 1, 2015.
FR Citation80 FR 29699 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR