80_FR_30168 80 FR 30068 - Grand Coulee Project Hydroelectric Authority; Notice of Surrender of Preliminary Permit

80 FR 30068 - Grand Coulee Project Hydroelectric Authority; Notice of Surrender of Preliminary Permit

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 80, Issue 100 (May 26, 2015)

Page Range30068-30068
FR Document2015-12617

Federal Register, Volume 80 Issue 100 (Tuesday, May 26, 2015)
[Federal Register Volume 80, Number 100 (Tuesday, May 26, 2015)]
[Notices]
[Page 30068]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-12617]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14372-001]


Grand Coulee Project Hydroelectric Authority; Notice of Surrender 
of Preliminary Permit

    Take notice that Grand Coulee Project Hydroelectric Authority, 
permittee for the proposed Rocky Coulee Wasteway Hydroelectric Project, 
has requested that its preliminary permit be terminated. The permit was 
issued on July 11, 2012, and would have expired on June 30, 2015.\1\ 
The project would have been located on the Rocky Coulee Wasteway near 
Moses Lake in Grant County, Washington.
---------------------------------------------------------------------------

    \1\ 140 FERC ] 62,036 122 (2012).
---------------------------------------------------------------------------

    The preliminary permit for Project No. 14372 will remain in effect 
until the close of business, June 18, 2015. But, if the Commission is 
closed on this day, then the permit remains in effect until the close 
of business on the next day in which the Commission is open.\2\ New 
applications for this site may not be submitted until after the permit 
surrender is effective.
---------------------------------------------------------------------------

    \2\ 18 CFR Sec.  385.2007(a)(2) (2014).

    Dated: May 19, 2015.
 Kimberly D. Bose,
 Secretary.
[FR Doc. 2015-12617 Filed 5-22-15; 8:45 am]
 BILLING CODE 6717-01-P



                                                  30068                          Federal Register / Vol. 80, No. 100 / Tuesday, May 26, 2015 / Notices

                                                  conjunction with the proposed variance,                 all capital letters the title                          near Moses Lake in Grant County,
                                                  the licensee proposes to provide no                     ‘‘COMMENTS’’, ‘‘PROTEST’’, or                          Washington.
                                                  more than 50 cfs to the Potter Valley                   ‘‘MOTION TO INTERVENE’’ as                               The preliminary permit for Project
                                                  Irrigation District (PVID) through the                  applicable; (2) set forth in the heading               No. 14372 will remain in effect until the
                                                  East Branch Russian River.                              the name of the applicant and the                      close of business, June 18, 2015. But, if
                                                     The licensee also proposes to                        project number of the application to                   the Commission is closed on this day,
                                                  establish a Potter Valley Drought                       which the filing responds; (3) furnish                 then the permit remains in effect until
                                                  Working Group, comprised of the                         the name, address, and telephone                       the close of business on the next day in
                                                  resource agencies and stakeholders,                     number of the person protesting or                     which the Commission is open.2 New
                                                  which would meet twice monthly                          intervening; and (4) otherwise comply                  applications for this site may not be
                                                  during the variance to determine                        with the requirements of 18 CFR                        submitted until after the permit
                                                  appropriate release levels within the                   385.2001 through 385.2005. All                         surrender is effective.
                                                  framework of the proposed variance.                     comments, motions to intervene, or
                                                  The licensee requests that once a flow                  protests must set forth their evidentiary                Dated: May 19, 2015.
                                                  is established, that a 24-hour average                  basis and otherwise comply with the                    Kimberly D. Bose,
                                                  flow be used as the compliance criteria                 requirements of 18 CFR 4.34(b). All                    Secretary.
                                                  for the corresponding compliance point.                 comments, motions to intervene, or                     [FR Doc. 2015–12617 Filed 5–22–15; 8:45 am]
                                                  Finally, the licensee proposes to file                  protests should relate to project works                BILLING CODE 6717–01–P
                                                  monthly compliance reports with the                     which are the subject of proposed
                                                  Commission, resource agencies and                       action. Agencies may obtain copies of
                                                  stakeholders, and to provide bi-monthly                 the application directly from the                      DEPARTMENT OF ENERGY
                                                  email reports to the resource agencies                  applicant. A copy of any protest or
                                                  and stakeholders.                                       motion to intervene must be served                     Federal Energy Regulatory
                                                     l. Locations of the Application: A                   upon each representative of the                        Commission
                                                  copy of the application is available for                applicant specified in the particular
                                                  inspection and reproduction at the                      application. If an intervener files                    [Project No. 9070–002]
                                                  Commission’s Public Reference Room,                     comments or documents with the
                                                  located at 888 First Street NE., Room                   Commission relating to the merits of an                Bypass Limited; Bypass Limited, LLC;
                                                  2A, Washington, DC 20426, or by calling                 issue that may affect the responsibilities             Notice of Transfer of Exemption
                                                  (202) 502–8371. This filing may also be                 of a particular resource agency, they
                                                  viewed on the Commission’s Web site at                  must also serve a copy of the document                    1. By letter filed April 24, 2015,1
                                                  http://www.ferc.gov/docs-filing/                        on that resource agency. A copy of all                 William B. Conway, Jr., Counsel for Enel
                                                  elibrary.asp. Enter the docket number                                                                          Green Power North America, Inc.
                                                                                                          other filings in reference to this
                                                  excluding the last three digits in the                                                                         (EGPNA),2 informed the Commission
                                                                                                          application must be accompanied by
                                                  docket number field to access the                                                                              that the exemption from licensing for
                                                                                                          proof of service on all persons listed in
                                                  document. You may also register online                                                                         the Bypass Project, FERC No. 9070,
                                                                                                          the service list prepared by the
                                                  at http://www.ferc.gov/docs-filing/                                                                            originally issued September 26, 1985,3
                                                                                                          Commission in this proceeding, in
                                                  esubscription.asp to be notified via                                                                           has been transferred to Bypass Limited,
                                                                                                          accordance with 18 CFR 4.34(b) and
                                                  email of new filings and issuances                                                                             LLC, an affiliate of Enel Green Power.
                                                                                                          385.2010.
                                                  related to this or other pending projects.                                                                     The project is located on the Main Canal
                                                  For assistance, call 1–866–208–3676 or                    Dated: May 18, 2015.
                                                                                                                                                                 at its intersection with the Bypass Canal
                                                  email FERCOnlineSupport@ferc.gov, for                   Kimberly D. Bose,
                                                                                                                                                                 in Jerome County, Idaho. The transfer of
                                                  TTY, call (202) 502–8659. A copy is also                Secretary.                                             an exemption does not require
                                                  available for inspection and                            [FR Doc. 2015–12597 Filed 5–22–15; 8:45 am]            Commission approval.
                                                  reproduction at the address in item (h)                 BILLING CODE 6717–01–P
                                                  above.                                                                                                            2. Bypass Limited, LLC is now the
                                                     m. Individuals desiring to be included                                                                      exemptee of the Bypass Project, FERC
                                                  on the Commission’s mailing list should                 DEPARTMENT OF ENERGY                                   No. 9070. All correspondence should be
                                                  so indicate by writing to the Secretary                                                                        forwarded to: Bypass Limited, LLC, c/o
                                                  of the Commission.                                      Federal Energy Regulatory                              Enel Green Power North America, Inc.,
                                                     n. Comments, Protests, or Motions to                 Commission                                             Attn: General Counsel, 1 Tech Drive,
                                                  Intervene: Anyone may submit                                                                                   Suite 220, Andover, MA 01810.
                                                  comments, a protest, or a motion to                     [Project No. 14372–001]                                  Dated: May 19, 2015.
                                                  intervene in accordance with the                                                                               Kimberly D. Bose,
                                                  requirements of Rules of Practice and                   Grand Coulee Project Hydroelectric                     Secretary.
                                                  Procedure, 18 CFR 385.210, .211, .214.                  Authority; Notice of Surrender of
                                                                                                                                                                 [FR Doc. 2015–12611 Filed 5–22–15; 8:45 am]
                                                  In determining the appropriate action to                Preliminary Permit
                                                  take, the Commission will consider all                                                                         BILLING CODE 6717–01P

                                                  protests or other comments filed, but                      Take notice that Grand Coulee Project
                                                  only those who file a motion to                         Hydroelectric Authority, permittee for                   2 18  CFR § 385.2007(a)(2) (2014).
                                                  intervene in accordance with the                        the proposed Rocky Coulee Wasteway                       1 Seventeen  other exempted projects which are to
                                                                                                          Hydroelectric Project, has requested that              be transferred were included in the April 24, 2015
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                  Commission’s Rules may become a                                                                                letter. These exemptions will be handled under
                                                  party to the proceeding. Any comments,                  its preliminary permit be terminated.                  separate proceedings.
                                                  protests, or motions to intervene must                  The permit was issued on July 11, 2012,                   2 Enel Green Power North America, Inc. is a

                                                  be received on or before the specified                  and would have expired on June 30,                     wholly owned subsidiary of Enel Green Power. Enel
                                                                                                          2015.1 The project would have been                     Green Power is a well-capitalized publicly traded
                                                  comment date for the particular                                                                                company.
                                                  application.                                            located on the Rocky Coulee Wasteway                      3 32 FERC ¶ 62,661, Order Granting Exemption
                                                     o. Filing and Service of Responsive                                                                         From Licensing for a Conduit Hydroelectric Project
                                                  Documents: Any filing must (1) bear in                    1 140   FERC ¶ 62,036 122 (2012).                    (1985).



                                             VerDate Sep<11>2014   17:50 May 22, 2015   Jkt 235001   PO 00000   Frm 00032    Fmt 4703   Sfmt 9990   E:\FR\FM\26MYN1.SGM   26MYN1



Document Created: 2018-02-21 10:31:17
Document Modified: 2018-02-21 10:31:17
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation80 FR 30068 

2024 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR