80_FR_32224 80 FR 32116 - Proposed Information Collection Request; Comment Request; See Item Specific ICR Titles Provided in the Text; See the Item Specific Docket Numbers Provided in the Text

80 FR 32116 - Proposed Information Collection Request; Comment Request; See Item Specific ICR Titles Provided in the Text; See the Item Specific Docket Numbers Provided in the Text

ENVIRONMENTAL PROTECTION AGENCY

Federal Register Volume 80, Issue 108 (June 5, 2015)

Page Range32116-32125
FR Document2015-13808

The Environmental Protection Agency (EPA) is planning to submit the below listed information collection requests (ICR) (See item specific ICR title, EPA ICR Number and OMB Control Number provided in the text) to the Office of Management and Budget (OMB) for review and approval in accordance with the Paperwork Reduction Act (44 U.S.C. 3501 et seq.). Before doing so, EPA is soliciting public comments on specific aspects of the proposed information collection as described below. These are proposed extensions of the currently approved ICRs. An Agency may not conduct or sponsor and a person is not required to respond to a collection of information unless it displays a currently valid OMB control number.

Federal Register, Volume 80 Issue 108 (Friday, June 5, 2015)
[Federal Register Volume 80, Number 108 (Friday, June 5, 2015)]
[Notices]
[Pages 32116-32125]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-13808]


-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[FRL-9928-74-OECA]


Proposed Information Collection Request; Comment Request; See 
Item Specific ICR Titles Provided in the Text; See the Item Specific 
Docket Numbers Provided in the Text

AGENCY: Environmental Protection Agency (EPA).

ACTION: Notice.

-----------------------------------------------------------------------

SUMMARY: The Environmental Protection Agency (EPA) is planning to 
submit the below listed information collection requests (ICR) (See item 
specific ICR title, EPA ICR Number and OMB Control Number provided in 
the text) to the Office of Management and Budget (OMB) for review and 
approval in accordance with the Paperwork Reduction Act (44 U.S.C. 3501 
et seq.). Before doing so, EPA is soliciting public comments on 
specific aspects of the proposed information collection as described 
below. These are proposed extensions of the currently approved ICRs. An 
Agency may not conduct or sponsor and a person is not required to 
respond to a collection of information unless it displays a currently 
valid OMB control number.

DATES: Comments must be submitted on or before August 4, 2015.

ADDRESSES: Submit your comments, referencing the Docket ID numbers 
provided for each item in the text, online using www.regulations.gov 
(our preferred method), by email to [email protected], or by mail to: 
EPA Docket Center, Environmental Protection Agency, Mail Code 28221T, 
1200 Pennsylvania Ave. NW., Washington, DC 20460.
    EPA's policy is that all comments received will be included in the 
public docket without change including any personal information 
provided, unless the comment includes profanity, threats, information 
claimed to be Confidential Business Information (CBI) or other 
information whose disclosure is restricted by statute.

FOR FURTHER INFORMATION CONTACT: Patrick Yellin, Monitoring, 
Assistance, and Media Programs Division, Office of Compliance, Mail 
Code 2227A, Environmental Protection Agency, 1200 Pennsylvania Ave. 
NW., Washington, DC 20460; telephone number: (202) 564-2970; fax 
number: (202) 564-0050; email address: [email protected].

SUPPLEMENTARY INFORMATION: Supporting documents which explain in detail 
the information that the EPA will be collecting are available in the 
public docket for this ICR. The docket can be viewed online at 
www.regulations.gov or in person at the EPA Docket Center, EPA West, 
Room 3334, 1301 Constitution Ave. NW., Washington, DC. The telephone 
number for the Docket Center is 202-566-1744. For additional 
information about EPA's public docket, visit http://www.epa.gov/dockets.
    Pursuant to section 3506(c)(2)(A) of the PRA, EPA is soliciting 
comments and information to enable it to: (i) Evaluate whether the 
proposed collection of information is necessary for the proper 
performance of the functions of the Agency, including whether the 
information will have practical utility; (ii) evaluate the accuracy of 
the Agency's estimate of the burden of the proposed collection of 
information, including the validity of the methodology and assumptions 
used; (iii) enhance the quality, utility, and clarity of the 
information to be collected; and (iv) minimize the burden of the 
collection of information on those who are to respond, including 
through the use of appropriate automated electronic, mechanical, or 
other technological collection techniques or other forms of information 
technology, e.g., permitting electronic submission of responses. Burden 
is defined at 5 CFR 1320.03(b). EPA will consider the comments received 
and amend the ICR as appropriate. The final ICR package will then be 
submitted to OMB for review and approval. At that time, EPA will issue 
another Federal Register notice to announce the submission of the ICR 
to OMB and the opportunity to submit additional comments to OMB.
    General Abstract: For all the listed ICRs in this notice, owners 
and operators of affected facilities are required to comply with 
reporting and record keeping requirements for the general provisions of 
40 CFR part 60, subpart A or Part 63, Subpart A, as well as the 
applicable specific standards. This includes submitting initial 
notifications, performance tests and periodic reports and results, and 
maintaining records of the occurrence and duration of any startup, 
shutdown, or malfunction in the operation of an affected facility, or 
any period during which the monitoring system is inoperative. These 
reports are used by EPA to determine compliance with the standards.
    (1) Docket ID Number: EPA-HQ-OECA-2011-0271; Title: NESHAP for 
Integrated Iron and Steel Manufacturing (40 CFR part 63, subpart 
FFFFF); EPA ICR Number 2003.06, OMB Control Number 2060-0517; 
Expiration Date: October 31, 2015.
    Respondents: Integrated iron and steel plants.
    Respondent's obligation to respond: Mandatory (40 CFR part 63, 
subpart FFFFF).
    Estimated number of respondents: 18 (total).
    Frequency of response: Initially, occasionally and semiannually.
    Estimated annual burden: 18,421 hours.
    Estimated annual cost: $1,832,122, includes $67,002 annualized 
capital or operation & maintenance (O&M) costs.
    Changes in Estimates: There is no change in burden hours from the 
previous ICR.

[[Page 32117]]

    (2) Docket ID Number: EPA-HQ-OECA-2011-0256; Title: Emission 
Guidelines for Existing Other Solid Waste Incineration Units (40 CFR 
part 60, subpart FFFF); EPA ICR Number 2164.05, OMB Control Number 
2060-0562; Expiration Date: October 31, 2015.
    Additional information: The emission guidelines address existing 
OSWI units that commenced construction before proposal of the emission 
guidelines (December 9, 2004). The emission guidelines do not apply 
directly to existing OSWI unit owners and operators. The emission 
guidelines can be considered a model regulation that a State agency can 
use in developing plans to implement the emission guidelines. If a 
State does not develop, adopt, and submit an approvable State plan, the 
Federal government must develop a plan to implement the emission 
guidelines. This ICR includes the burden for an affected entity even if 
it is ultimately regulated under a State or Federal plan.
    Respondents: Owners or operators of other solid waste incineration 
units.
    Respondent's obligation to respond: Mandatory (40 CFR part 60, 
subpart FFFF).
    Estimated number of respondents: 99 (total).
    Frequency of response: Initially, semiannually and annually.
    Estimated annual burden: 70,132 hours.
    Estimated annual cost: $7,215,028, includes $495,000 annualized 
capital or O&M costs.
    Changes in Estimates: There is no change in burden hours from the 
previous ICR.
    (3) Docket ID Number: EPA-HQ-OECA-2011-0264; Title: NSPS for 
Stationary Compression Ignition Internal Combustion Engines (40 CFR 
part 60, subpart IIII); EPA ICR Number 2196.05, OMB Control Number 
2060-0590; Expiration Date: October 31, 2015.
    Respondents: Owners or operators of stationary compression ignition 
internal combustion engines.
    Respondent's obligation to respond: Mandatory (40 CFR part 60, 
subpart IIII).
    Estimated number of respondents: 206,410 (total).
    Frequency of response: Initially and occasionally.
    Estimated annual burden: 193,707 hours.
    Estimated annual cost: $18,803,009, includes $242,092 annualized 
capital or O&M costs.
    Changes in Estimates: There is an expected increase in hours in the 
total estimated respondent burden compared with the ICR currently 
approved by OMB. This increase is due to an increase in the number of 
estimated respondents.
    (4) Docket ID Number: EPA-HQ-OECA-2012-0529; Title: NESHAP for 
Mercury (40 CFR part 61, subpart E); EPA ICR Number 0113.12, OMB 
Control Number 2060-0097; Expiration Date: December 31, 2015.
    Respondents: Facilities that process mercury ore to recovery 
mercury, use mercury chlor-alkali cells to produce chlorine gas and 
alkali metal hydroxide, and incinerate or dry wastewater treatment 
plant sludge.
    Respondent's obligation to respond: Mandatory (40 CFR part 61, 
subpart E).
    Estimated number of respondents: 107 (total).
    Frequency of response: Initially, occasionally, semiannually and 
annually.
    Estimated annual burden: 20,490 hours.
    Estimated annual cost: $1,984,018, includes $0 annualized capital 
or O&M costs.
    Changes in Estimates: There is no change in burden hours from the 
previous ICR.
    (5) Docket ID Number: EPA-HQ-OECA-2012-0530; Title: NSPS for Metal 
Furniture Coating (40 CFR part 60, subpart EE); EPA ICR Number 0649.12, 
OMB Control Number 2060-0106; ICR Status: This ICR is scheduled to 
expire on December 31, 2015.
    Respondents: Metal furniture coating facilities.
    Respondent's obligation to respond: Mandatory (40 CFR part 60, 
subpart EE).
    Estimated number of respondents: 400 (total).
    Frequency of response: Initially, occasionally and semiannually.
    Estimated annual burden: 56,074 hours.
    Estimated annual cost: $6,269,572, includes $840,000 annualized 
capital or O&M costs.
    Changes in Estimates: There is no change in burden hours from the 
previous ICR.
    (6) Docket ID Number: EPA-HQ-OECA-2012-0531; Title: NSPS for 
Surface Coating of Large Appliances (40 CFR part 60, subpart SS); EPA 
ICR Number 0659.13, OMB Control Number 2060-0108; Expiration Date: 
December 31, 2015.
    Respondents: Large appliance coating facilities.
    Respondent's obligation to respond: Mandatory (40 CFR part 60, 
subpart SS).
    Estimated number of respondents: 72 (total).
    Frequency of response: Initially and semiannually.
    Estimated annual burden: 7,659 hours.
    Estimated annual cost: $750,011, includes $8,400 annualized capital 
or O&M costs.
    Changes in Estimates: There is no change in burden hours from the 
previous ICR.
    (7) Docket ID Number: EPA-HQ-OECA-2012-0532; Title: NSPS for 
Beverage Can Surface Coating (40 CFR part 60, subpart WW); EPA ICR 
Number 0663.12, OMB Control Number 2060-0001; Expiration Date: December 
31, 2015.
    Respondents: Beverage can surface coating facilities.
    Respondent's obligation to respond: Mandatory (40 CFR part 60, 
subpart WW).
    Estimated number of respondents: 48 (total).
    Frequency of response: Initially, occasionally and semiannually.
    Estimated annual burden: 5,134 hours.
    Estimated annual cost: $597,892, includes $100,800 annualized 
capital or O&M costs.
    Changes in Estimates: There is no change in burden hours from the 
previous ICR.
    (8) Docket ID Number: EPA-HQ-OECA-2012-0528; Title: NSPS for 
Synthetic Fiber Production Facilities (40 CFR part 60, subpart HHH); 
EPA ICR Number 1156.13, OMB Control Number 2060-0059; Expiration Date: 
December 31, 2015.
    Respondents: Synthetic fiber production facilities.
    Respondent's obligation to respond: Mandatory (40 CFR part 60, 
subpart HHH).
    Estimated number of respondents: 22 (total).
    Frequency of response: Initially, quarterly and semiannually.
    Estimated annual burden: 1,860 hours.
    Estimated annual cost: $345,060, includes $165,000 annualized 
capital or O&M costs.
    Changes in Estimates: There is no change in burden hours from the 
previous ICR.
    (9) Docket ID Number: EPA-HQ-OECA-2009-0422; Title: NESHAP for 
Chromium Emissions from Hard and Decorative Chromium Electroplating and 
Chromium Anodizing Tanks (40 CFR part 63, subpart N); EPA ICR Number 
1611.11, OMB Control Number 2060-0327; Expiration Date: December 31, 
2015.
    Respondents: Chromium electroplating and anodizing facilities.
    Respondent's obligation to respond: Mandatory (40 CFR part 63, 
subpart N).
    Estimated number of respondents: 1,343 (total).

[[Page 32118]]

    Frequency of response: Initially, quarterly, semiannually and 
annually.
    Estimated annual burden: 177,695 hours.
    Estimated annual cost: $32,515,541, includes $26,924,372 annualized 
capital or O&M costs.
    Changes in Estimates: There is a likely a decrease in burden hours 
from the previous ICR to reflect the cost of ongoing burden after the 
initial three-year compliance period of the rule amendment.
    (10) Docket ID Number: EPA-HQ-OECA-2012-0505; Title: NESHAP for 
Secondary Aluminum Production (40 CFR part 63, subpart RRR); EPA ICR 
Number 1894.08, OMB Control Number 2060-0433; Expiration Date: December 
31, 2015.
    Respondents: Secondary aluminum production facilities.
    Respondent's obligation to respond: Mandatory (40 CFR part 63, 
subpart RRR).
    Estimated number of respondents: 1,834 (total).
    Frequency of response: Initially, occasionally and semiannually.
    Estimated annual burden: 101,856 hours.
    Estimated annual cost: $10,088,531, includes $225,750 annualized 
capital or O&M costs.
    Changes in Estimates: There is an expected increase in burden hours 
due to an increase in the number of subject area sources.
    (11) Docket ID Number: EPA-HQ-OECA-2012-0518; Title: NESHAP for 
Metal Furniture Surface Coating (40 CFR part 63, subpart RRRR); EPA ICR 
Number 1952.06, OMB Control Number 2060-0518; Expiration Date: December 
31, 2015.
    Respondents: Metal furniture surface coating facilities.
    Respondent's obligation to respond: Mandatory (40 CFR part 63, 
subpart RRRR).
    Estimated number of respondents: 583 (total).
    Frequency of response: Initially, occasionally and semiannually.
    Estimated annual burden: 190,408 hours.
    Estimated annual cost: $22,472,732, includes $699,600 annualized 
capital or O&M costs.
    Changes in Estimates: There is no change in burden hours from the 
previous ICR.
    (12) Docket ID Number: EPA-HQ-OECA-2011-0275; Title: NESHAP for 
Hydrochloric Acid Production (40 CFR part 63, subpart NNNNN); EPA ICR 
Number 2032.08, OMB Control Number 2060-0529; Expiration Date: December 
31, 2015.
    Respondents: Hydrochloric acid production facilities.
    Respondent's obligation to respond: Mandatory (40 CFR part 63, 
subpart NNNNN).
    Estimated number of respondents: 81 (total).
    Frequency of response: Initially, occasionally and semiannually.
    Estimated annual burden: 105,033 hours.
    Estimated annual cost: $10,789,637, includes $703,561 annualized 
capital or O&M costs.
    Changes in Estimates: There is an expected increase in burden hours 
due to an increase in the respondent universe.
    (13) Docket ID Number: EPA-HQ-OECA-2011-0274; Title: NESHAP for the 
Wood Building Products Surface Coating Industry (40 CFR part 63, 
subpart QQQQ); EPA ICR Number 2034.06, OMB Control Number 2060-0510; 
Expiration Date: December 31, 2015.
    Respondents: Wood building products surface coating facilities.
    Respondent's obligation to respond: Mandatory (40 CFR part 63, 
subpart QQQQ).
    Estimated number of respondents: 232 (total).
    Frequency of response: Initially, occasionally and semiannually.
    Estimated annual burden: 75,771 hours.
    Estimated annual cost: $7,554,577, includes $278,400 annualized 
capital or O&M costs.
    Changes in Estimates: There is no change in burden hours from the 
previous ICR.
    (14) Docket ID Number: EPA-HQ-OECA-2011-0228; Title: NSPS for 
Petroleum Refineries for which Construction, Reconstruction, or 
Modification Commenced after May 14, 2007 (40 CFR part 60, subpart Ja); 
EPA ICR Number 2263.05, OMB Control Number 2060-0602; Expiration Date: 
December 31, 2015.
    Respondents: Petroleum refineries constructed, reconstructed, ore 
modified after May 14, 2007.
    Respondent's obligation to respond: Mandatory (40 CFR part 60, 
subpart Ja).
    Estimated number of respondents: 150 (total).
    Frequency of response: Initially and semiannually.
    Estimated annual burden: 54,572 hours.
    Estimated annual cost: $24,934,110, includes $20,016,000 annualized 
capital or O&M costs.
    Changes in Estimates: There is a likely decrease in burden hours 
from the previous ICR to reflect the ongoing rule burden subsequent to 
the initial compliance period.
    (15) Docket ID Number: EPA-HQ-OECA-2011-0526; Title: NESHAP for 
Aluminum, Copper, and Other Non-Ferrous Foundries (40 CFR part 63, 
subpart ZZZZZZ); EPA ICR Number 2332.04, OMB Control Number 2060-0630; 
Expiration Date: December 31, 2015.
    Respondents: Aluminum, copper, and other non-ferrous foundries.
    Respondent's obligation to respond: Mandatory (40 CFR part 63, 
subpart ZZZZZZ).
    Estimated number of respondents: 318 (total).
    Frequency of response: Initially, occasionally and semiannually.
    Estimated annual burden: 10,482 hours. Burden is defined at 5 CFR 
1320.03(b)
    Estimated annual cost: $1,015,005, includes $0 annualized capital 
or O&M costs.
    Changes in Estimates: There is no change in burden hours from the 
previous ICR.
    (16) Docket ID Number: EPA-HQ-OECA-2011-0208; Title: NESHAP for 
Pulp and Paper Production (40 CFR part 63, subpart S); EPA ICR Number 
2452.03, OMB Control Number 2060-0681; Expiration Date: December 31, 
2015.
    Respondents: Pulp and paper production facilities.
    Respondent's obligation to respond: Mandatory (40 CFR part 63, 
subpart S).
    Estimated number of respondents: 114 (total).
    Frequency of response: Initially, occasionally and semiannually.
    Estimated annual burden: 52,304 hours.
    Estimated annual cost: $5,780,270, includes $841,000 annualized 
capital or O&M costs.
    Changes in Estimates: There is likely a decrease in burden hours 
from the previous ICR to account for the ongoing burden after the 
initial compliance period.
    (17) Docket ID Number: EPA-HQ-OECA-2012-0533; Title: NSPS for the 
Phosphate Fertilizer Industry (40 CFR part 60, subparts T, U, V, W, and 
X); EPA ICR Number 1061.13, OMB Control Number 2060-0037; Expiration 
Date: January 31, 2016.
    Respondents: Phosphate fertilizer manufacturing facilities.
    Respondent's obligation to respond: Mandatory (40 CFR part 60, 
subparts T, U, V, W and X).
    Estimated number of respondents: 13 (total).
    Frequency of response: Initially and semiannually.

[[Page 32119]]

    Estimated annual burden: 1,373 hours.
    Estimated annual cost: $453,090, includes $320,190 annualized 
capital or O&M costs.
    Changes in Estimates: There is no change in burden hours from the 
previous ICR.
    (18) Docket ID Number: EPA-HQ-OECA-2012-0517; Title: NSPS for 
Emission Guidelines and Compliance Times for Small Municipal Waste 
Combustion Units Constructed on or before August 30, 1999 (40 CFR part 
60, subpart BBBB); EPA ICR Number 1901.06, OMB Control Number 2060-
0424; Expiration Date: January 31, 2016.
    Respondents: Small municipal waste combustion units.
    Respondent's obligation to respond: Mandatory (40 CFR part 60, 
subpart BBBB).
    Estimated number of respondents: 23 (total).
    Frequency of response: Initially, semiannually and annually.
    Estimated annual burden: 100,854 hours.
    Estimated annual cost: $10,802,579, includes $1,036,800 annualized 
capital or O&M costs.
    Changes in Estimates: There is no change in burden hours from the 
previous ICR.
    (19) Docket ID Number: EPA-HQ-OECA-2012-0525; Title: NESHAP for 
Chemical Manufacturing Area Sources (40 CFR part 63 Subpart VVVVVV); 
EPA ICR Number 2323.06, OMB Control Number 2060-0621; Expiration Date: 
January 31, 2016.
    Additional information: These standards apply to nine area source 
categories in the chemical manufacturing sector: Agricultural Chemicals 
and Pesticides Manufacturing, Cyclic Crude and Intermediate Production, 
Industrial Inorganic Chemical Manufacturing, Industrial Organic 
Chemical Manufacturing, Inorganic Pigments Manufacturing, Miscellaneous 
Organic Chemical Manufacturing, Plastic Materials and Resins 
Manufacturing, Pharmaceutical Production, and Synthetic Rubber 
Manufacturing. The requirements apply to process vents, storage tanks, 
equipment leaks, wastewater systems, transfer operations, and heat 
exchange systems at affected sources in each area source category and 
are combined in one subpart. The standards are based on EPA's 
determination of generally available control technology (GACT) or 
management practices for each area source category.
    Respondents: Chemical manufacturing area source facilities.
    Respondent's obligation to respond: Mandatory (40 CFR part 63, 
subpart VVVVVV).
    Estimated number of respondents: 452 (total).
    Frequency of response: Initially and semiannually.
    Estimated annual burden: 10,586 hours.
    Estimated annual cost: $905,135, includes $98,271 annualized 
capital or O&M costs.
    Changes in Estimates: There is likely an increase in burden hours 
from the previous ICR due to an increase in the number respondents.
    (20) Docket ID Number: EPA-HQ-OECA-2012-0534; Title: NSPS for 
Surface Coating of Plastic Parts for Business Machines (40 CFR part 60, 
subpart TTT); EPA ICR Number 1093.11, OMB Control Number 2060-0162; 
Expiration Date: February 29, 2016.
    Respondents: Facilities that perform industrial surface coating on 
plastic parts for business machines.
    Respondent's obligation to respond: Mandatory (40 CFR part 60, 
subpart TTT).
    Estimated number of respondents: 10 (total).
    Frequency of response: Initially, quarterly and semiannually.
    Estimated annual burden: 979 hours.
    Estimated annual cost: $94,725, includes $0 annualized capital or 
O&M costs.
    Changes in Estimates: There is no change in burden hours from the 
previous ICR.
    (21) Docket ID Number: EPA-HQ-OECA-2012-0535; Title: NSPS for 
Secondary Lead Smelters (40 CFR part 60, subpart L); EPA ICR Number 
1128.11, OMB Control Number 2060-0080; Expiration Date: February 29, 
2016.
    Respondents: Secondary lead smelting facilities.
    Respondent's obligation to respond: Mandatory (40 CFR part 60, 
subpart L).
    Estimated number of respondents: 25 (total).
    Frequency of response: Initially.
    Estimated annual burden: 37 hours.
    Estimated annual cost: $3,631, includes $0 annualized capital or 
O&M costs.
    Changes in Estimates: There is no change in burden hours from the 
previous ICR.
    (22) Docket ID Number: EPA-HQ-OECA-2011-0239; Title: NSPS for Grain 
Elevators (40 CFR part 60, subpart DD); EPA ICR Number 1130.11, OMB 
Control Number 2060-0082; Expiration Date: February 29, 2016.
    Respondents: Grain elevator operations.
    Respondent's obligation to respond: Mandatory (40 CFR part 60, 
subpart DD).
    Estimated number of respondents: 200 (total).
    Frequency of response: Initially and annually.
    Estimated annual burden: 2,070 hours.
    Estimated annual cost: $198,346, includes $0 annualized capital or 
O&M costs.
    Changes in Estimates: There is no change in burden hours from the 
previous ICR.
    (23) Docket ID Number: EPA-HQ-OECA-2011-0506; Title: NSPS for Small 
Municipal Waste Combustors (40 CFR part 60, subpart AAAA); EPA ICR 
Number 1900.06, OMB Control Number 2060-0423; Expiration Date: February 
29, 2016.
    Respondents: Small municipal waste combustors.
    Respondent's obligation to respond: Mandatory (40 CFR part 60, 
subpart AAAA).
    Estimated number of respondents: 3 (total).
    Frequency of response: Initially, semiannually and annually.
    Estimated annual burden: 12,351 hours.
    Estimated annual cost: $1,364,227, includes $168,336 annualized 
capital or O&M costs.
    Changes in Estimates: There is an expected increase in burden hours 
from the previous ICR due to an increase in one respondent being 
subject to the rule.
    (24) Docket ID Number: EPA-HQ-OECA-2012-0524; Title: NSPS for 
Stationary Combustion Turbines (40 CFR part 60, subpart KKKK); EPA ICR 
Number 2177.06, OMB Control Number 2060-0582; Expiration Date: February 
29, 2016.
    Respondents: New stationary combustion turbines.
    Respondent's obligation to respond: Mandatory (40 CFR part 60, 
subpart KKKK).
    Estimated number of respondents: 448 (total).
    Frequency of response: Initially and semiannually.
    Estimated annual burden: 44,394 hours.
    Estimated annual cost: $4,298,616, includes $0 annualized capital 
or O&M costs.
    Changes in Estimates: There is an expected increase in burden hours 
from the previous ICR due to a growth in the respondent universe.
    (25) Docket ID Number: EPA-HQ-OECA-2012-0497; Title: NSPS for 
Fossil Fuel Fired Steam Generating Units (40 CFR part 63, subpart D); 
EPA

[[Page 32120]]

ICR Number 1052.11, OMB Control Number 2060-0026; Expiration Date: 
March 31, 2016.
    Respondents: Fossil fuel fired steam generating units.
    Respondent's obligation to respond: Mandatory (40 CFR part 63, 
subpart D).
    Estimated number of respondents: 660 (total).
    Frequency of response: Semiannually.
    Estimated annual burden: 70,777 hours.
    Estimated annual cost: $16,753,220, includes $9,900,000 annualized 
capital or O&M costs.
    Changes in Estimates: There is no change in burden hours from the 
previous ICR.
    (26) Docket ID Number: EPA-HQ-OECA-2012-0498; Title: NSPS for Coal 
Preparation and Processing Plants (40 CFR part 60, subpart Y); EPA ICR 
Number 1062.14, OMB Control Number 2060-0122; Expiration Date: March 
31, 2016.
    Respondents: Coal preparation and processing facilities.
    Respondent's obligation to respond: Mandatory (40 CFR part 60, 
subpart Y).
    Estimated number of respondents: 1,037 (total).
    Frequency of response: Initially and semiannually.
    Estimated annual burden: 41,998 hours.
    Estimated annual cost: $4,414,741, includes $348,040 annualized 
capital or O&M costs.
    Changes in Estimates: There is an expected increase in burden hours 
from the previous ICR due to a growth in the respondent universe.
    (27) Docket ID Number: EPA-HQ-OECA-2012-0655; Title: NSPS for 
Ammonium Sulfate Manufacturing Plants (40 CFR part 60, subpart PP); EPA 
ICR Number 1066.08, OMB Control Number 2060-0032; Expiration Date: 
March 31, 2016.
    Respondents: Ammonium sulfate manufacturing plants.
    Respondent's obligation to respond: Mandatory (40 CFR part 60, 
subpart PP).
    Estimated number of respondents: 2 (total).
    Frequency of response: Semiannually.
    Estimated annual burden: 284 hours.
    Estimated annual cost: $27,449, includes $0 annualized capital or 
O&M costs.
    Changes in Estimates: There is no change in burden hours from the 
previous ICR.
    (28) Docket ID Number: EPA-HQ-OECA-2011-0234; Title: NESHAP for 
Petroleum Refineries (40 CFR part 63, subpart CC); EPA ICR Number 
1692.08, OMB Control Number 2060-0340; Expiration Date: March 31, 2016.
    Respondents: Petroleum refineries.
    Respondent's obligation to respond: Mandatory (40 CFR part 63, 
subpart CC).
    Estimated number of respondents: 148 (total).
    Frequency of response: Initially, occasionally, semiannually and 
annually.
    Estimated annual burden: 549,980 hours.
    Estimated annual cost: $66,661,569, includes $178,042 annualized 
capital or O&M costs.
    Changes in Estimates: There is no change in burden hours from the 
previous ICR.
    (29) Docket ID Number: EPA-HQ-OECA-2012-0502; Title: NSPS for 
Hospital/Medical/Infectious Waste Incinerators (40 CFR part 60, subpart 
Ec); EPA ICR Number 1730.10, OMB Control Number 2060-0363; Expiration 
Date: March 31, 2016.
    Respondents: Hospital/medical/infectious waste incinerators.
    Respondent's obligation to respond: Mandatory (40 CFR part 60, 
subpart Ec).
    Estimated number of respondents: 5 (total).
    Frequency of response: Initially, occasionally, semiannually and 
annually.
    Estimated annual burden: 3,912 hours.
    Estimated annual cost: $664,375, includes $285,549 annualized 
capital or O&M costs.
    Changes in Estimates: There is an expected increase in burden hours 
from the previous ICR due to an increase in the number of respondents.
    (30) Docket ID Number: EPA-HQ-OECA-2013-0337; Title: NESHAP for 
Portland Cement (40 CFR part 63, subpart LLL); EPA ICR Number 1801.12, 
OMB Control Number 2060-0416; Expiration Date: March 31, 2016.
    Respondents: Portland cement plants, except for kilns and in-line 
kiln/raw mills that burn hazardous waste and are subject to 40 CFR part 
63, subpart EEE.
    Respondent's obligation to respond: Mandatory (40 CFR part 63, 
subpart LLL).
    Estimated number of respondents: 87 (total).
    Frequency of response: Initially and semiannually.
    Estimated annual burden: 80,433 hours.
    Estimated annual cost: $69,897,805, includes $62,080,116 annualized 
capital or O&M costs.
    Changes in Estimates: There is likely a change in labor hours from 
the previous ICR to reflect the burden for ongoing rule compliance.
    (31) Docket ID Number: EPA-HQ-OECA-2012-0503; Title: Emission 
Guidelines for Large Municipal Waste Combustors Constructed on or 
Before September 20, 1994 (40 CFR part 60, subpart Cb); EPA ICR Number 
1847.07, OMB Control Number 2060-0390; Expiration Date: March 31, 2016.
    Respondents: Large municipal waste combustors.
    Respondent's obligation to respond: Mandatory (40 CFR part 60, 
subpart Cb).
    Estimated number of respondents: 81 (total).
    Frequency of response: Initially, occasionally, semiannually and 
annually.
    Estimated annual burden: 394,965 hours.
    Estimated annual cost: $52,760,002, includes $1,555,200 annualized 
capital or O&M costs.
    Changes in Estimates: There is no change in burden hours from the 
previous ICR.
    (32) Docket ID Number: EPA-HQ-OECA-2011-0272; Title: NSPS for 
Hospital/Medical/Infectious Waste Incinerators (40 CFR part 60, subpart 
Ce and 40 CFR part 62, subpart HHH); EPA ICR Number 1899.08, OMB 
Control Number 2060-0422; Expiration Date: March 31, 2016.
    Respondents: Hospital, medical, infectious waste incinerators.
    Respondent's obligation to respond: Mandatory (40 CFR part 60, 
subpart Ce and Part 62, Subpart HHH).
    Estimated number of respondents: 79 (total).
    Frequency of response: Initially, occasionally, semiannually and 
annually.
    Estimated annual burden: 60,080 hours.
    Estimated annual cost: $6,489,166, includes $742,817 annualized 
capital or O&M costs.
    Changes in Estimates: There is no change in burden hours from the 
previous ICR.
    (33) Docket ID Number: EPA-HQ-OECA-2015-0191; Title: NESHAP for 
Miscellaneous Organic Chemical Manufacturing (40 CFR part 63, subpart 
FFFF); EPA ICR Number 1969.06, OMB Control Number 2060-0533; Expiration 
Date: March 31, 2016.
    Respondents: Miscellaneous organic chemical manufacturing 
facilities.
    Respondent's obligation to respond: Mandatory (40 CFR part 63, 
subpart FFFF).
    Estimated number of respondents: 263 (total).
    Frequency of response: Initially and semiannually.
    Estimated annual burden: 426,474 hours.
    Estimated annual cost: $46,919,809, includes $5,624,883 annualized 
capital or O&M costs.

[[Page 32121]]

    Changes in Estimates: There is an expected increase in burden hours 
from the previous ICR due to growth in the respondent universe.
    (34) Docket ID Number: EPA-HQ-OECA-2012-0527; Title: NESHAP for 
Paints and Allied Products Manufacturing Area Source Category (40 CFR 
part 63, subpart CCCCCCC); EPA ICR Number 2348.04, OMB Control Number 
2060-0633; Expiration Date: March 31, 2016.
    Respondents: Paints and allied products manufacturing facilities.
    Respondent's obligation to respond: Mandatory (40 CFR part 63, 
subpart CCCCCCC).
    Estimated number of respondents: 2,190 (total).
    Frequency of response: Initially, occasionally and annually.
    Estimated annual burden: 4,533 hours.
    Estimated annual cost: $1,172,604, includes $0 annualized capital 
or O&M costs.
    Changes in Estimates: There is no change in burden hours from the 
previous ICR.
    (35) Docket ID Number: EPA-HQ-OECA-2012-0496; Title: NESHAP for 
Area Sources: Asphalt Processing and Asphalt Roofing Manufacturing (40 
CFR part 63, subpart AAAAAAA); EPA ICR Number 2352.04, OMB Control 
Number 2060-0634; Expiration Date: March 31, 2016.
    Respondents: Area source facilities that process asphalt or 
manufacture asphalt roofing products.
    Respondent's obligation to respond: Mandatory (40 CFR part 63, 
subpart AAAAAAA).
    Estimated number of respondents: 75 (total).
    Frequency of response: Initially and semiannually.
    Estimated annual burden: 2,846 hours.
    Estimated annual cost: $276,724, includes $1,125 annualized capital 
or O&M costs.
    Changes in Estimates: There is no change in burden hours from the 
previous ICR.
    (36) Docket ID Number: EPA-HQ-OECA-2012-0653; Title: NSPS for Steel 
Plants: Electric Arc Furnaces and Argon-Oxygen Decarburization Vessels 
(40 CFR part 60, subparts AA and AAa); EPA ICR Number 1060.17, OMB 
Control Number 2060-0038; Expiration Date: April 30, 2016.
    Respondents: Steel plants with electric arc furnaces, argon-oxygen 
decarburization vessels, and dust handling systems.
    Respondent's obligation to respond: Mandatory (40 CFR part 60, 
subparts AA and AAa).
    Estimated number of respondents: 98 (total).
    Frequency of response: Initially and semiannually.
    Estimated annual burden: 61,310 hours.
    Estimated annual cost: $6,137,827, includes $201,240 annualized 
capital or O&M costs.
    Changes in Estimates: There is an expected increase in burden hours 
from the previous ICR due to an increase of one respondent.
    (37) Docket ID Number: EPA-HQ-OECA-2012-0659; Title: NESHAP for 
Perchloroethylene Dry Cleaning Facilities (40 CFR part 63, subpart M); 
EPA ICR Number 1415.11, OMB Control Number 2060-0234; Expiration Date: 
April 30, 2016.
    Respondents: Dry cleaning facilities that use perchloroethylene.
    Respondent's obligation to respond: Mandatory (40 CFR part 63, 
subpart M).
    Estimated number of respondents: 28,012 (total).
    Frequency of response: Initially and occasionally.
    Estimated annual burden: 1,564,851 hours.
    Estimated annual cost: $157,229,928, includes $946,413 annualized 
capital or O&M costs.
    Changes in Estimates: There is no change in burden hours from the 
previous ICR.
    (38) Docket ID Number: EPA-HQ-OECA-2012-0666; Title: NESHAP for the 
Printing and Publishing Industry (40 CFR part 63, subpart KK); EPA ICR 
Number 1739.08, OMB Control Number 2060-0335; Expiration Date: April 
30, 2016.
    Respondents: Facilities in the printing and publishing industry.
    Respondent's obligation to respond: Mandatory (40 CFR part 63, 
subpart KK).
    Estimated number of respondents: 352 (total).
    Frequency of response: Initially, occasionally and semiannually.
    Estimated annual burden: 58,162 hours.
    Estimated annual cost: $6,045,789, includes $414,000 annualized 
capital or O&M costs.
    Changes in Estimates: There is no change in burden hours from the 
previous ICR.
    (39) Docket ID Number: EPA-HQ-OECA-2012-0677; Title: NSPS for 
Storage Vessels for Petroleum Liquids for Which Construction, 
Reconstruction, or Modification Commenced After June 11, 1973, and 
prior to May 19, 1978 (40 CFR part 60, subpart K); EPA ICR Number 
1797.07, OMB Control Number 2060-0442; Expiration Date: April 30, 2016.
    Respondents: Facilities that store petroleum liquids in storage 
vessels.
    Respondent's obligation to respond: Mandatory (40 CFR part 60, 
subpart K).
    Estimated number of respondents: 220 (total).
    Frequency of response: Initially and occasionally.
    Estimated annual burden: 769 hours.
    Estimated annual cost: $74,473, includes $0 annualized capital or 
O&M costs.
    Changes in Estimates: There is no change in burden hours from the 
previous ICR.
    (40) Docket ID Number: EPA-HQ-OECA-2012-0680; Title: Emission 
Guidelines and Compliance Times for Municipal Solid Waste Landfills (40 
CFR part 60, subpart Cc and 40 CFR part 62, subpart GGG); EPA ICR 
Number 1893.07, OMB Control Number 2060-0430; Expiration Date: April 
30, 2016.
    Respondents: Municipal solid waste landfills.
    Respondent's obligation to respond: Mandatory (40 CFR part 60, 
subpart Cc and part 62, subpart GGG).
    Estimated number of respondents: 511 (total).
    Frequency of response: Initially, occasionally and annually.
    Estimated annual burden: 42,277 hours.
    Estimated annual cost: $4,717,854, includes $663,600 annualized 
capital or O&M costs.
    Changes in Estimates: There is an expected decrease in burden hours 
from the previous ICR due to landfill closures.
    (41) Docket ID Number: EPA-HQ-OECA-2012-0691; Title: NESHAP for 
Mercury Cell Chlor-Alkali Plants (40 CFR part 63, subpart IIIII); EPA 
ICR Number 2046.08, OMB Control Number 2060-0542; Expiration Date: 
April 30, 2016.
    Respondents: Mercury cell chlor-alkali plants.
    Respondent's obligation to respond: Mandatory (40 CFR part 63, 
subpart IIIII).
    Estimated number of respondents: 2 (total).
    Frequency of response: Initially and semiannually.
    Estimated annual burden: 3,682 hours.
    Estimated annual cost: $372,952, includes $16,400 annualized 
capital or O&M costs.
    Changes in Estimates: There is no change in burden hours from the 
previous ICR.
    (42) Docket ID Number: EPA-HQ-OECA-2012-0693; Title: NESHAP for 
Taconite Iron Ore Processing (40 CFR part 63, subpart RRRRR); EPA ICR

[[Page 32122]]

Number 2050.06, OMB Control Number 2060-0538; Expiration Date: April 
30, 2016.
    Respondents: Taconite iron ore processing plants.
    Respondent's obligation to respond: Mandatory (40 CFR part 63, 
subpart RRRRR).
    Estimated number of respondents: 8 (total).
    Frequency of response: Initially and semiannually.
    Estimated annual burden: 614 hours.
    Estimated annual cost: $650,107, includes $257,600 annualized 
capital or O&M costs.
    Changes in Estimates: There is no change in burden hours from the 
previous ICR.
    (43) Docket ID Number: EPA-HQ-OECA-2012-0699; Title: NESHAP for 
Primary Magnesium Refining (40 CFR part 63, subpart TTTTT); EPA ICR 
Number 2098.07, OMB Control Number 2060-0536; Expiration Date: April 
30, 2016.
    Respondents: Primary magnesium refining facilities.
    Respondent's obligation to respond: Mandatory (40 CFR part 63, 
subpart TTTTT).
    Estimated number of respondents: 1 (total).
    Frequency of response: Initially, occasionally and semiannually.
    Estimated annual burden: 611 hours. Burden is defined at 5 CFR 
1320.03(b)
    Estimated annual cost: $60,410, includes $1,200 annualized capital 
or O&M costs.
    Changes in Estimates: There is no change in burden hours from the 
previous ICR.
    (44) Docket ID Number: EPA-HQ-OECA-2012-0702; Title: NESHAP for 
Area Sources: Polyvinyl Chloride and Copolymers Production, Primary 
Copper Smelting, Secondary Copper Smelting, and Primary Nonferrous 
Metals-Zinc, Cadmium, and Beryllium (40 CFR part 63, subparts DDDDDD, 
EEEEEE, FFFFFF, and GGGGGG); EPA ICR Number 2240.05, OMB Control Number 
2060-0596; Expiration Date: April 30, 2016.
    Respondents: PVC and copolymer, primary copper smelters, secondary 
copper smelters, and primary zinc production facilities.
    Respondent's obligation to respond: Mandatory (40 CFR part 63, 
subparts DDDDDD, EEEEEE, FFFFFF and GGGGGG).
    Estimated number of respondents: 5 (total).
    Frequency of response: Initially.
    Estimated annual burden: 46 hours.
    Estimated annual cost: $4,454, includes $0 annualized capital or 
O&M costs.
    Changes in Estimates: There is no change in burden hours from the 
previous ICR.
    (45) Docket ID Number: EPA-HQ-OECA-2012-0703; Title: NESHAP for 
Prepared Feeds Manufacturing (40 CFR part 63, subpart DDDDDDD); EPA ICR 
Number 2354.04, OMB Control Number 2060-0635; Expiration Date: April 
30, 2016.
    Respondents: Prepared feed manufacturing facilities.
    Respondent's obligation to respond: Mandatory (40 CFR part 63, 
subpart DDDDDDD).
    Estimated number of respondents: 1,800 (total).
    Frequency of response: Initially and annually.
    Estimated annual burden: 62,079 hours.
    Estimated annual cost: $6,048,294, includes $37,236 annualized 
capital or O&M costs.
    Changes in Estimates: There is no change in burden hours from the 
previous ICR.
    (46) Docket ID Number: EPA-HQ-OECA-2012-0642; Title: NESHAP for 
Chemical Preparations Industry (40 CFR part 63, subpart BBBBBBB); EPA 
ICR Number 2356.04, OMB Control Number 2060-0636; Expiration Date: 
April 30, 2016.
    Respondents: Chemical preparation facilities.
    Respondent's obligation to respond: Mandatory (40 CFR part 63, 
subpart BBBBBBB).
    Estimated number of respondents: 26 (total).
    Frequency of response: Initially and semiannually.
    Estimated annual burden: 2,093 hours.
    Estimated annual cost: $203,052, includes $390 annualized capital 
or O&M costs.
    Changes in Estimates: There is no change in burden hours from the 
previous ICR.
    (47) Docket ID Number: EPA-HQ-OECA-2012-0643; Title: NSPS for 
Pressure Sensitive Tape and Label Surface Coating (CFR part 60, subpart 
RR); EPA ICR Number 0658.12, OMB Control Number 2060-0004; Expiration 
Date: May 31, 2016.
    Respondents: Pressure sensitive tape and label surface coating 
facilities.
    Respondent's obligation to respond: Mandatory (40 CFR part 60, 
subpart RR).
    Estimated number of respondents: 39 (total).
    Frequency of response: Initially and semiannually.
    Estimated annual burden: 3,652 hours.
    Estimated annual cost: $427,962, includes $77,200 annualized 
capital or O&M costs.
    Changes in Estimates: There is an expected increase in burden hours 
from the previous ICR due to growth in the respondent universe.
    (48) Docket ID Number: EPA-HQ-OECA-2012-0688; Title: NESHAP for 
Plastic Parts and Products Surface Coating (40 CFR part 63, subpart 
PPPP); EPA ICR Number 2044.06, OMB Control Number 2060-0537; Expiration 
Date: May 31, 2016.
    Respondents: Facilities that perform surface coating of plastic 
parts and products.
    Respondent's obligation to respond: Mandatory (40 CFR part 63, 
subpart PPPP).
    Estimated number of respondents: 832 (total).
    Frequency of response: Initially, occasionally and semiannually.
    Estimated annual burden: 322,467 hours.
    Estimated annual cost: $31,489,594, includes $265,600 annualized 
capital or O&M costs.
    Changes in Estimates: There is an expected increase in burden hours 
from the previous ICR due to growth in the respondent universe.
    (49) Docket ID Number: EPA-HQ-OECA-2012-0695; Title: NESHAP for 
Site Remediation (40 CFR part 63, subpart GGGGG); EPA ICR Number 
2062.06, OMB Control Number 2060-0534; Expiration Date: May 31, 2016.
    Respondents: Facilities with site remediation activities.
    Respondent's obligation to respond: Mandatory (40 CFR part 63, 
subpart GGGGG).
    Estimated number of respondents: 286 (total).
    Frequency of response: Initially and semiannually.
    Estimated annual burden: 140,338 hours.
    Estimated annual cost: $14,302,488, includes $582,000 annualized 
capital or O&M costs.
    Changes in Estimates: There is no change in burden hours from the 
previous ICR.
    (50) Docket ID Number: EPA-HQ-OECA-2013-0355; Title: NESHAP for 
Clay Ceramics Manufacturing, Glass Manufacturing and Secondary 
Nonferrous Metals Processing Area Sources (40 CFR part 63, subparts 
RRRRRR, SSSSSS, and TTTTTT); EPA ICR Number 2274.05, OMB Control Number 
2060-0606; Expiration Date: May 31, 2016.
    Respondents: Clay ceramics manufacturing, glass manufacturing, and 
secondary nonferrous metals processing facilities.

[[Page 32123]]

    Respondent's obligation to respond: Mandatory (40 CFR part 63, 
subparts RRRRRR, SSSSSS and TTTTTT).
    Estimated number of respondents: 82 (total).
    Frequency of response: Initially.
    Estimated annual burden: 1,763 hours.
    Estimated annual cost: $182,301, includes $9,854 annualized capital 
or O&M costs.
    Changes in Estimates: There is no change in burden hours from the 
previous ICR.
    (51) Docket ID Number: EPA-HQ-OECA-2012-0657; Title: NSPS for 
Flexible Vinyl and Urethane Coating and Printing (40 CFR part 60, 
subpart FFF); EPA ICR Number 1157.11, OMB Control Number 2060-0073; 
Expiration Date: June 30, 2016.
    Respondents: Facilities that print or coat flexible vinyl or 
urethane products.
    Respondent's obligation to respond: Mandatory (40 CFR part 60, 
subpart FFF).
    Estimated number of respondents: 24 (total).
    Frequency of response: Initially and semiannually.
    Estimated annual burden: 775 hours.
    Estimated annual cost: $297,664, includes $222,600 annualized 
capital or O&M costs.
    Changes in Estimates: There is an expected increase in burden hours 
from the previous ICR due to an increase in one respondent.
    (52) Docket ID Number: EPA-HQ-OECA-2012-0658; Title: NSPS/NESHAP 
for Wool Fiberglass Insulation Manufacturing Plants (40 CFR part 60, 
subpart PPP and 40 CFR part 63, subpart NNN); EPA ICR Number 1160.13, 
OMB Control Number 2060-0114; Expiration Date: June 30, 2016.
    Respondents: Facilities with rotary spin wool fiberglass insulation 
manufacturing lines.
    Respondent's obligation to respond: Mandatory (40 CFR part 60, 
subpart PPP and part 63, subpart NNN).
    Estimated number of respondents: 61 (total).
    Frequency of response: Initially, occasionally and semiannually.
    Estimated annual burden: 18,559 hours.
    Estimated annual cost: $2,285,560, includes $488,500 annualized 
capital or O&M costs.
    Changes in Estimates: There is no change in burden hours from the 
previous ICR.
    (53) Docket ID Number: EPA-HQ-OECA-2015-0190; Title: NSPS for 
Nitric Acid Plants (40 CFR part 60, subpart G and Ga); EPA ICR Number 
1056.12, OMB Control Number 2060-0019; Expiration Date: July 31, 2016.
    Respondents: Nitric acid plants.
    Respondent's obligation to respond: Mandatory (40 CFR part 60, 
subparts G and Ga).
    Estimated number of respondents: 26 (total).
    Frequency of response: Initially, occasionally and semiannually.
    Estimated annual burden: 1,921 hours.
    Estimated annual cost: $2,805,032, includes $2,618,983 annualized 
capital or O&M costs.
    Changes in Estimates: There is an expected increase in burden hours 
from the previous ICR due to an increase in the number of respondents.
    (54) Docket ID Number: EPA-HQ-OECA-2012-0654; Title: NSPS for 
Automobile and Light Duty Truck Surface Coating Operations (40 CFR part 
60, subpart MM); EPA ICR Number 1064.18, OMB Control Number 2060-0034; 
Expiration Date: July 31, 2016.
    Respondents: Facilities that perform surface coating of automobile 
and light duty truck.
    Respondent's obligation to respond: Mandatory (40 CFR part 60, 
subpart MM).
    Estimated number of respondents: 58 (total).
    Frequency of response: Initially, quarterly and semiannually.
    Estimated annual burden: 175,195 hours.
    Estimated annual cost: $17,067,068, includes $103,200 annualized 
capital or O&M costs.
    Changes in Estimates: There is an expected increase in burden hours 
from the previous ICR due to an increase in the number of respondents.
    (55) Docket ID Number: EPA-HQ-OECA-2012-0656; Title: NSPS for Lead-
Acid Battery Manufacturing (40 CFR part 60, subpart KK); EPA ICR Number 
1072.11, OMB Control Number 2060-0081; Expiration Date: July 31, 2016.
    Respondents: Lead-acid battery manufacturing plants.
    Respondent's obligation to respond: Mandatory (40 CFR part 60, 
subpart KK).
    Estimated number of respondents: 52 (total).
    Frequency of response: Initially and semiannually.
    Estimated annual burden: 4,053 hours.
    Estimated annual cost: $404,122, includes $11,700 annualized 
capital or O&M costs.
    Changes in Estimates: There is no change in burden hours from the 
previous ICR.
    (56) Docket ID Number: EPA-HQ-OECA-2012-0499; Title: NSPS for 
Industrial-Commercial-Institutional Steam Generating Units (40 CFR part 
60, subpart Db); EPA ICR Number 1088.14, OMB Control Number 2060-0072; 
Expiration Date: July 31, 2016.
    Respondents: Industrial, commercial, and institutional steam 
generating units.
    Respondent's obligation to respond: Mandatory (40 CFR part 60, 
subpart Db).
    Estimated number of respondents: 1,727 (total).
    Frequency of response: Initially, quarterly and semiannually.
    Estimated annual burden: 1,607,368 hours.
    Estimated annual cost: $190,544,313, includes $34,905,000 
annualized capital or O&M costs.
    Changes in Estimates: There is an expected increase in burden hours 
from the previous ICR due to an increase in the estimated number of 
respondents.
    (57) Docket ID Number: EPA-HQ-OECA-2012-0660; Title: NESHAP for 
Halogenated Solvent Cleaners/Halogenated Hazardous Air Pollutants (40 
CFR part 63, subpart T); EPA ICR Number 1652.09, OMB Control Number 
2060-0273; Expiration Date: July 31, 2016.
    Respondents: Facilities with halogenated HAP solvent cleaning 
machines.
    Respondent's obligation to respond: Mandatory (40 CFR part 63, 
subpart T).
    Estimated number of respondents: 1,431 (total).
    Frequency of response: Initially, quarterly, semiannually and 
annually.
    Estimated annual burden: 45,242 hours.
    Estimated annual cost: $5,395,561, includes $1,014,800 annualized 
capital or O&M costs.
    Changes in Estimates: There is no change in burden hours from the 
previous ICR.
    (58) Docket ID Number: EPA-HQ-OECA-2012-0665; Title: NESHAP for 
Magnetic Tape Manufacturing Operations (40 CFR part 63, subpart EE); 
EPA ICR Number 1678.09, OMB Control Number 2060-0326; Expiration Date: 
July 31, 2016.
    Respondents: Magnetic tape manufacturing facilities.
    Respondent's obligation to respond: Mandatory (40 CFR part 63, 
subpart EE).
    Estimated number of respondents: 6 (total).
    Frequency of response: Initially and occasionally.
    Estimated annual burden: 3,905 hours.
    Estimated annual cost: $425,110, includes $47,000 annualized 
capital or O&M costs.
    Changes in Estimates: There is no change in burden hours from the 
previous ICR.

[[Page 32124]]

    (59) Docket ID Number: EPA-HQ-OECA-2012-0668; Title: NESHAP for 
Flexible Polyurethane Foam Production (40 CFR part 63, subpart III); 
EPA ICR Number 1783.07, OMB Control Number 2060-0357; Expiration Date: 
July 31, 2016.
    Respondents: Flexible polyurethane foam production facilities.
    Respondent's obligation to respond: Mandatory (40 CFR part 63, 
subpart III).
    Estimated number of respondents: 132 (total).
    Frequency of response: Initially, semiannually and annually.
    Estimated annual burden: 9,047 hours.
    Estimated annual cost: $874,812, includes $0 annualized capital or 
O&M costs.
    Changes in Estimates: There is no change in burden hours from the 
previous ICR.
    (60) Docket ID Number: EPA-HQ-OECA-2012-0669; Title: NESHAP for Oil 
and Natural Gas Production (40 CFR part 63, subpart HH); EPA ICR Number 
1788.11, OMB Control Number 2060-0417; Expiration Date: July 31, 2016.
    Respondents: Oil and natural gas production facilities.
    Respondent's obligation to respond: Mandatory (40 CFR part 63, 
subpart HH).
    Estimated number of respondents: 3,735 (total).
    Frequency of response: Initially, occasionally and semiannually.
    Estimated annual burden: 46,642 hours.
    Estimated annual cost: $5,431,638, includes $910,733 annualized 
capital or O&M costs.
    Changes in Estimates: There is an expected increase in burden hours 
from the previous ICR due to an increase in the estimated number of 
respondents.
    (61) Docket ID Number: EPA-HQ-OECA-2012-0676; Title: NESHAP for 
Phosphoric Acid Manufacturing and Phosphate Fertilizers Production (40 
CFR part 63, subparts AA and BB); EPA ICR Number 1790.07, OMB Control 
Number 2060-0361; Expiration Date: July 31, 2016.
    Respondents: Phosphoric acid manufacturing and phosphate fertilizer 
production facilities.
    Respondent's obligation to respond: Mandatory (40 CFR part 63, 
subparts AA and BB).
    Estimated number of respondents: 12 (total).
    Frequency of response: Initially, occasionally, quarterly, 
semiannually and annually.
    Estimated annual burden: 1,765 hours.
    Estimated annual cost: $181,581, includes $10,632 annualized 
capital or O&M costs.
    Changes in Estimates: There is no change in burden hours from the 
previous ICR.
    (62) Docket ID Number: EPA-HQ-OECA-2012-0678; Title: NESHAP for 
Mineral Wool Production (40 CFR part 63, subpart DDD); EPA ICR Number 
1799.09, OMB Control Number 2060-0362; Expiration Date: July 31, 2016.
    Respondents: Mineral wool production facilities.
    Respondent's obligation to respond: Mandatory (40 CFR part 63, 
subpart DDD).
    Estimated number of respondents: 6 (total).
    Frequency of response: Initially and semiannually.
    Estimated annual burden: 1,581 hours.
    Estimated annual cost: $157,566, includes $4,500 annualized capital 
or O&M costs.
    Changes in Estimates: There is no change in burden hours from the 
previous ICR.
    (63) Docket ID Number: EPA-HQ-OECA-2012-0701; Title: NESHAP for 
Miscellaneous Coating Manufacturing (40 CFR part 63, subpart HHHHH); 
EPA ICR Number 2115.05, OMB Control Number 2060-0535; Expiration Date: 
July 31, 2016.
    Respondents: Facilities that manufacture a miscellaneous coating.
    Respondent's obligation to respond: Mandatory (40 CFR part 63, 
subpart HHHHH).
    Estimated number of respondents: 135 (total).
    Frequency of response: Initially, occasionally and semiannually.
    Estimated annual burden: 171,406 hours.
    Estimated annual cost: $19,475,893, includes $2,878,500 annualized 
capital or O&M costs.
    Changes in Estimates: There is an expected increase in burden hours 
from the previous ICR due to an increase in the estimated number of 
respondents.
    (64) Docket ID Number: EPA-HQ-OECA-2012-0646; Title: NSPS for 
Incinerators (40 CFR part 60, subpart E); EPA ICR Number 1058.11, OMB 
Control Number 2060-0040; Expiration Date: August 31, 2016.
    Respondents: Incinerators constructed or modified after August 17, 
1971.
    Respondent's obligation to respond: Mandatory (40 CFR part 60, 
subpart E).
    Estimated number of respondents: 82 (total).
    Frequency of response: Initially and occasionally.
    Estimated annual burden: 8,393 hours.
    Estimated annual cost: $1,017,654, includes $205,000 annualized 
capital or O&M costs.
    Changes in Estimates: There is no change in burden hours from the 
previous ICR.
    (65) Docket ID Number: EPA-HQ-OECA-2012-0664; Title: NESHAP for 
Commercial Ethylene Oxide Sterilization and Fumigation Operations (40 
CFR part 63, subpart O); EPA ICR Number 1666.10, OMB Control Number 
2060-0283; Expiration Date: August 31, 2016.
    Respondents: Ethylene oxide sterilization and fumigation 
facilities.
    Respondent's obligation to respond: Mandatory (40 CFR part 63, 
subpart O).
    Estimated number of respondents: 122 (total).
    Frequency of response: Initially and occasionally.
    Estimated annual burden: 8,887 hours.
    Estimated annual cost: $1,524,913, includes $664,500 annualized 
capital or O&M costs.
    Changes in Estimates: There is an expected increase in burden hours 
from the previous ICR due to an increase in the estimated number of 
respondents.
    (66) Docket ID Number: EPA-HQ-OECA-2012-0681; Title: NSPS for 
Commercial and Industrial Solid Waste Incineration Units (40 CFR part 
60, subpart CCC); EPA ICR Number 1926.07, OMB Control Number 2060-0450; 
Expiration Date: August 31, 2016.
    Respondents: Commercial and industrial solid waste incineration 
units.
    Respondent's obligation to respond: Mandatory (40 CFR part 60, 
subpart CCC).
    Estimated number of respondents: 30 (total).
    Frequency of response: Initially, occasionally and annually.
    Estimated annual burden: 5,965 hours.
    Estimated annual cost: $959,788, includes $382,200 annualized 
capital or O&M costs.
    Changes in Estimates: There is no change in burden hours from the 
previous ICR.
    (67) Docket ID Number: EPA-HQ-OECA-2012-0685; Title: Emission 
Guidelines for Existing Commerce and Industrial Solid Waste 
Incineration Units (40 CFR part 60, subpart DDDD); EPA ICR Number 
1927.07, OMB Control Number 2060-0451; Expiration Date: August 31, 
2016.
    Respondents: Commercial and industrial solid waste incineration 
units.
    Respondent's obligation to respond: Mandatory (40 CFR part 60, 
subpart DDDD).

[[Page 32125]]

    Estimated number of respondents: 90 (total).
    Frequency of response: Initially, occasionally and annually.
    Estimated annual burden: 18,061 hours.
    Estimated annual cost: $2,892,789, includes $1,143,990 annualized 
capital or O&M costs.
    Changes in Estimates: There is no change in burden hours from the 
previous ICR.
    (68) Docket ID Number: EPA-HQ-OECA-2012-0686; Title: NESHAP for 
Organic Liquids Distribution (Non-Gasoline) Facilities (40 CFR part 63, 
subpart EEEE); EPA ICR Number 1963.06, OMB Control Number 2060-0539; 
Expiration Date: August 31, 2016.
    Respondents: Organic liquids distribution facilities.
    Respondent's obligation to respond: Mandatory (40 CFR part 63, 
subpart EEEE).
    Estimated number of respondents: 381 (total).
    Frequency of response: Initially and semiannually.
    Estimated annual burden: 114,667 hours.
    Estimated annual cost: $19,770,006, includes $8,559,164 annualized 
capital or O&M costs.
    Changes in Estimates: There is no change in burden hours from the 
previous ICR.
    (69) Docket ID Number: EPA-HQ-OECA-2012-0697; Title: NESHAP for 
Iron and Steel Foundries (40 CFR part 63, subpart EEEEE); EPA ICR 
Number 2096.06, OMB Control Number 2060-0543; Expiration Date: August 
31, 2016.
    Respondents: Iron and steel foundries.
    Respondent's obligation to respond: Mandatory (40 CFR part 63, 
subpart EEEEE).
    Estimated number of respondents: 98 (total).
    Frequency of response: Initially, occasionally and semiannually.
    Estimated annual burden: 29,747 hours.
    Estimated annual cost: $3,309,697, includes $400,060 annualized 
capital or O&M costs.
    Changes in Estimates: There is no change in burden hours from the 
previous ICR.
    (70) Docket ID Number: EPA-HQ-OECA-2012-0662; Title: NESHAP for 
Gasoline Distribution Facilities (40 CFR part 63, subpart R); EPA ICR 
Number 1659.09, OMB Control Number 2060-0325; Expiration Date: 
September 30, 2016.
    Respondents: Bulk gasoline terminals.
    Respondent's obligation to respond: Mandatory (40 CFR part 63, 
subpart R).
    Estimated number of respondents: 492 (total).
    Frequency of response: Initially and semiannually.
    Estimated annual burden: 15,823 hours.
    Estimated annual cost: $1,904,020, includes $357,000 annualized 
capital or O&M costs.
    Changes in Estimates: There is no change in burden hours from the 
previous ICR.
    (71) Docket ID Number: EPA-HQ-OECA-2012-0687; Title: NESHAP for 
Stationary Combustion Turbines (40 CFR part 63, subpart YYYY); EPA ICR 
Number 1967.06, OMB Control Number 2060-0540; Expiration Date: 
September 30, 2016.
    Respondents: Stationary combustion turbines constructed or 
reconstructed after January 14, 2003.
    Respondent's obligation to respond: Mandatory (40 CFR part 63, 
subpart YYYY).
    Estimated number of respondents: 96 (total).
    Frequency of response: Initially, semiannually and annually.
    Estimated annual burden: 1,338 hours.
    Estimated annual cost: $165,056, includes $10,750 annualized 
capital or O&M costs.
    Changes in Estimates: There is an expected increase in burden hours 
from the previous ICR due to an increase in the estimated number of 
respondents.
    (72) Docket ID Number: EPA-HQ-OECA-2012-0690; Title: NESHAP for 
Automobile and Light-duty Truck Surface Coating (40 CFR part 63, 
subpart IIII); EPA ICR Number 2045.06, OMB Control Number 2060-0550; 
Expiration Date: September 30, 2016.
    Respondents: Facilities that perform surface coating on automobiles 
and light-duty trucks.
    Respondent's obligation to respond: Mandatory (40 CFR part 63, 
subpart IIII).
    Estimated number of respondents: 65 (total).
    Frequency of response: Initially, occasionally and semiannually.
    Estimated annual burden: 26,685 hours.
    Estimated annual cost: $2,688,147, includes $78,000 annualized 
capital or O&M costs.
    Changes in Estimates: There is no change in burden hours from the 
previous ICR.

    Dated: May 27, 2015.
Edward J. Messina,
Director, Monitoring, Assistance and Media Programs Division.
[FR Doc. 2015-13808 Filed 6-4-15; 8:45 am]
 BILLING CODE 6560-50-P



                                                    32116                            Federal Register / Vol. 80, No. 108 / Friday, June 5, 2015 / Notices

                                                    Ambient Air Quality Surveillance. For                   title, EPA ICR Number and OMB                          practical utility; (ii) evaluate the
                                                    such purposes, the methods must be                      Control Number provided in the text) to                accuracy of the Agency’s estimate of the
                                                    used in strict accordance with the                      the Office of Management and Budget                    burden of the proposed collection of
                                                    operation or instruction manual                         (OMB) for review and approval in                       information, including the validity of
                                                    associated with the method and subject                  accordance with the Paperwork                          the methodology and assumptions used;
                                                    to any specifications and limitations                   Reduction Act (44 U.S.C. 3501 et seq.).                (iii) enhance the quality, utility, and
                                                    (e.g., configuration or operational                     Before doing so, EPA is soliciting public              clarity of the information to be
                                                    settings) specified in the applicable                   comments on specific aspects of the                    collected; and (iv) minimize the burden
                                                    designated method description (see the                  proposed information collection as                     of the collection of information on those
                                                    identification of the method above).                    described below. These are proposed                    who are to respond, including through
                                                       Use of the methods also should be in                 extensions of the currently approved                   the use of appropriate automated
                                                    general accordance with the guidance                    ICRs. An Agency may not conduct or                     electronic, mechanical, or other
                                                    and recommendations of applicable                       sponsor and a person is not required to                technological collection techniques or
                                                    sections of the ‘‘Quality Assurance                     respond to a collection of information                 other forms of information technology,
                                                    Handbook for Air Pollution                              unless it displays a currently valid OMB               e.g., permitting electronic submission of
                                                    Measurement Systems, Volume I,’’ EPA/                   control number.                                        responses. Burden is defined at 5 CFR
                                                    600/R–94/038a and ‘‘Quality Assurance                   DATES: Comments must be submitted on                   1320.03(b). EPA will consider the
                                                    Handbook for Air Pollution                              or before August 4, 2015.                              comments received and amend the ICR
                                                    Measurement Systems, Volume II,                         ADDRESSES: Submit your comments,                       as appropriate. The final ICR package
                                                    Ambient Air Quality Monitoring                          referencing the Docket ID numbers                      will then be submitted to OMB for
                                                    Program’’ EPA–454/B–08–003,                             provided for each item in the text,                    review and approval. At that time, EPA
                                                    December, 2008. Provisions concerning                   online using www.regulations.gov (our                  will issue another Federal Register
                                                    modification of such methods by users                   preferred method), by email to                         notice to announce the submission of
                                                    are specified under Section 2.8                         docket.oeca@epa.gov, or by mail to: EPA                the ICR to OMB and the opportunity to
                                                    (Modifications of Methods by Users) of                  Docket Center, Environmental                           submit additional comments to OMB.
                                                    Appendix C to 40 CFR part 58.                           Protection Agency, Mail Code 28221T,                      General Abstract: For all the listed
                                                       Consistent or repeated noncompliance                 1200 Pennsylvania Ave. NW.,                            ICRs in this notice, owners and
                                                    should be reported to: Director, Human                  Washington, DC 20460.                                  operators of affected facilities are
                                                    Exposure and Atmospheric Sciences                          EPA’s policy is that all comments                   required to comply with reporting and
                                                    Division (MD–E205–01), National                         received will be included in the public                record keeping requirements for the
                                                    Exposure Research Laboratory, U.S.                      docket without change including any                    general provisions of 40 CFR part 60,
                                                    Environmental Protection Agency,                        personal information provided, unless                  subpart A or Part 63, Subpart A, as well
                                                    Research Triangle Park, North Carolina                  the comment includes profanity, threats,               as the applicable specific standards.
                                                    27711.                                                  information claimed to be Confidential                 This includes submitting initial
                                                       Designation of these reference and                   Business Information (CBI) or other                    notifications, performance tests and
                                                    equivalent methods is intended to assist                information whose disclosure is                        periodic reports and results, and
                                                    the States in establishing and operating                restricted by statute.                                 maintaining records of the occurrence
                                                    their air quality surveillance systems                  FOR FURTHER INFORMATION CONTACT:                       and duration of any startup, shutdown,
                                                    under 40 CFR part 58. Questions                         Patrick Yellin, Monitoring, Assistance,                or malfunction in the operation of an
                                                    concerning the commercial availability                  and Media Programs Division, Office of                 affected facility, or any period during
                                                    or technical aspects of the method                      Compliance, Mail Code 2227A,                           which the monitoring system is
                                                    should be directed to the applicant.                    Environmental Protection Agency, 1200                  inoperative. These reports are used by
                                                      Dated: May 20, 2015.                                  Pennsylvania Ave. NW., Washington,                     EPA to determine compliance with the
                                                    Jennifer Orme-Zavaleta,                                 DC 20460; telephone number: (202)                      standards.
                                                    Director, National Exposure Research                    564–2970; fax number: (202) 564–0050;                     (1) Docket ID Number: EPA–HQ–
                                                    Laboratory.                                             email address: yellin.patrick@epa.gov.                 OECA–2011–0271; Title: NESHAP for
                                                    [FR Doc. 2015–13800 Filed 6–4–15; 8:45 am]              SUPPLEMENTARY INFORMATION:                             Integrated Iron and Steel Manufacturing
                                                                                                            Supporting documents which explain in                  (40 CFR part 63, subpart FFFFF); EPA
                                                    BILLING CODE 6560–50–P
                                                                                                            detail the information that the EPA will               ICR Number 2003.06, OMB Control
                                                                                                            be collecting are available in the public              Number 2060–0517; Expiration Date:
                                                    ENVIRONMENTAL PROTECTION                                docket for this ICR. The docket can be                 October 31, 2015.
                                                    AGENCY                                                  viewed online at www.regulations.gov                      Respondents: Integrated iron and steel
                                                                                                            or in person at the EPA Docket Center,                 plants.
                                                    [FRL–9928–74–OECA]                                                                                                Respondent’s obligation to respond:
                                                                                                            EPA West, Room 3334, 1301
                                                                                                            Constitution Ave. NW., Washington,                     Mandatory (40 CFR part 63, subpart
                                                    Proposed Information Collection                                                                                FFFFF).
                                                    Request; Comment Request; See Item                      DC. The telephone number for the
                                                                                                            Docket Center is 202–566–1744. For                        Estimated number of respondents: 18
                                                    Specific ICR Titles Provided in the                                                                            (total).
                                                    Text; See the Item Specific Docket                      additional information about EPA’s
                                                                                                            public docket, visit http://www.epa.gov/                  Frequency of response: Initially,
                                                    Numbers Provided in the Text
                                                                                                            dockets.                                               occasionally and semiannually.
asabaliauskas on DSK5VPTVN1PROD with NOTICES




                                                    AGENCY: Environmental Protection                           Pursuant to section 3506(c)(2)(A) of                   Estimated annual burden: 18,421
                                                    Agency (EPA).                                           the PRA, EPA is soliciting comments                    hours.
                                                    ACTION: Notice.                                         and information to enable it to: (i)                      Estimated annual cost: $1,832,122,
                                                                                                            Evaluate whether the proposed                          includes $67,002 annualized capital or
                                                    SUMMARY:   The Environmental Protection                 collection of information is necessary                 operation & maintenance (O&M) costs.
                                                    Agency (EPA) is planning to submit the                  for the proper performance of the                         Changes in Estimates: There is no
                                                    below listed information collection                     functions of the Agency, including                     change in burden hours from the
                                                    requests (ICR) (See item specific ICR                   whether the information will have                      previous ICR.


                                               VerDate Sep<11>2014   18:31 Jun 04, 2015   Jkt 235001   PO 00000   Frm 00035   Fmt 4703   Sfmt 4703   E:\FR\FM\05JNN1.SGM   05JNN1


                                                                                     Federal Register / Vol. 80, No. 108 / Friday, June 5, 2015 / Notices                                           32117

                                                       (2) Docket ID Number: EPA–HQ–                        increase in the number of estimated                       Estimated annual cost: $750,011,
                                                    OECA–2011–0256; Title: Emission                         respondents.                                           includes $8,400 annualized capital or
                                                    Guidelines for Existing Other Solid                        (4) Docket ID Number: EPA–HQ–                       O&M costs.
                                                    Waste Incineration Units (40 CFR part                   OECA–2012–0529; Title: NESHAP for                         Changes in Estimates: There is no
                                                    60, subpart FFFF); EPA ICR Number                       Mercury (40 CFR part 61, subpart E);                   change in burden hours from the
                                                    2164.05, OMB Control Number 2060–                       EPA ICR Number 0113.12, OMB Control                    previous ICR.
                                                    0562; Expiration Date: October 31, 2015.                Number 2060–0097; Expiration Date:                        (7) Docket ID Number: EPA–HQ–
                                                       Additional information: The emission                 December 31, 2015.                                     OECA–2012–0532; Title: NSPS for
                                                    guidelines address existing OSWI units                     Respondents: Facilities that process                Beverage Can Surface Coating (40 CFR
                                                    that commenced construction before                      mercury ore to recovery mercury, use                   part 60, subpart WW); EPA ICR Number
                                                    proposal of the emission guidelines                     mercury chlor-alkali cells to produce                  0663.12, OMB Control Number 2060–
                                                    (December 9, 2004). The emission                        chlorine gas and alkali metal hydroxide,               0001; Expiration Date: December 31,
                                                    guidelines do not apply directly to                     and incinerate or dry wastewater                       2015.
                                                    existing OSWI unit owners and                           treatment plant sludge.                                   Respondents: Beverage can surface
                                                    operators. The emission guidelines can                     Respondent’s obligation to respond:                 coating facilities.
                                                    be considered a model regulation that a                 Mandatory (40 CFR part 61, subpart E).                    Respondent’s obligation to respond:
                                                    State agency can use in developing                         Estimated number of respondents:                    Mandatory (40 CFR part 60, subpart
                                                    plans to implement the emission                         107 (total).                                           WW).
                                                    guidelines. If a State does not develop,                   Frequency of response: Initially,                      Estimated number of respondents: 48
                                                    adopt, and submit an approvable State                   occasionally, semiannually and                         (total).
                                                    plan, the Federal government must                       annually.                                                 Frequency of response: Initially,
                                                    develop a plan to implement the                            Estimated annual burden: 20,490                     occasionally and semiannually.
                                                    emission guidelines. This ICR includes                  hours.                                                    Estimated annual burden: 5,134
                                                    the burden for an affected entity even if                  Estimated annual cost: $1,984,018,                  hours.
                                                    it is ultimately regulated under a State                includes $0 annualized capital or O&M                     Estimated annual cost: $597,892,
                                                    or Federal plan.                                        costs.                                                 includes $100,800 annualized capital or
                                                       Respondents: Owners or operators of                     Changes in Estimates: There is no                   O&M costs.
                                                    other solid waste incineration units.                   change in burden hours from the                           Changes in Estimates: There is no
                                                       Respondent’s obligation to respond:                  previous ICR.                                          change in burden hours from the
                                                    Mandatory (40 CFR part 60, subpart                         (5) Docket ID Number: EPA–HQ–                       previous ICR.
                                                    FFFF).                                                  OECA–2012–0530; Title: NSPS for                           (8) Docket ID Number: EPA–HQ–
                                                       Estimated number of respondents: 99                  Metal Furniture Coating (40 CFR part                   OECA–2012–0528; Title: NSPS for
                                                    (total).                                                60, subpart EE); EPA ICR Number                        Synthetic Fiber Production Facilities (40
                                                       Frequency of response: Initially,                    0649.12, OMB Control Number 2060–                      CFR part 60, subpart HHH); EPA ICR
                                                    semiannually and annually.                              0106; ICR Status: This ICR is scheduled                Number 1156.13, OMB Control Number
                                                       Estimated annual burden: 70,132                      to expire on December 31, 2015.                        2060–0059; Expiration Date: December
                                                    hours.                                                     Respondents: Metal furniture coating                31, 2015.
                                                       Estimated annual cost: $7,215,028,                   facilities.                                               Respondents: Synthetic fiber
                                                    includes $495,000 annualized capital or                    Respondent’s obligation to respond:                 production facilities.
                                                    O&M costs.                                              Mandatory (40 CFR part 60, subpart EE).                   Respondent’s obligation to respond:
                                                       Changes in Estimates: There is no                       Estimated number of respondents:                    Mandatory (40 CFR part 60, subpart
                                                    change in burden hours from the                         400 (total).                                           HHH).
                                                    previous ICR.                                              Frequency of response: Initially,                      Estimated number of respondents: 22
                                                       (3) Docket ID Number: EPA–HQ–                        occasionally and semiannually.                         (total).
                                                    OECA–2011–0264; Title: NSPS for                            Estimated annual burden: 56,074                        Frequency of response: Initially,
                                                    Stationary Compression Ignition                         hours.                                                 quarterly and semiannually.
                                                    Internal Combustion Engines (40 CFR                        Estimated annual cost: $6,269,572,                     Estimated annual burden: 1,860
                                                    part 60, subpart IIII); EPA ICR Number                  includes $840,000 annualized capital or                hours.
                                                    2196.05, OMB Control Number 2060–                       O&M costs.                                                Estimated annual cost: $345,060,
                                                    0590; Expiration Date: October 31, 2015.                   Changes in Estimates: There is no                   includes $165,000 annualized capital or
                                                       Respondents: Owners or operators of                  change in burden hours from the                        O&M costs.
                                                    stationary compression ignition internal                previous ICR.                                             Changes in Estimates: There is no
                                                    combustion engines.                                        (6) Docket ID Number: EPA–HQ–                       change in burden hours from the
                                                       Respondent’s obligation to respond:                  OECA–2012–0531; Title: NSPS for                        previous ICR.
                                                    Mandatory (40 CFR part 60, subpart IIII).               Surface Coating of Large Appliances (40                   (9) Docket ID Number: EPA–HQ–
                                                       Estimated number of respondents:                     CFR part 60, subpart SS); EPA ICR                      OECA–2009–0422; Title: NESHAP for
                                                    206,410 (total).                                        Number 0659.13, OMB Control Number                     Chromium Emissions from Hard and
                                                       Frequency of response: Initially and                 2060–0108; Expiration Date: December                   Decorative Chromium Electroplating
                                                    occasionally.                                           31, 2015.                                              and Chromium Anodizing Tanks (40
                                                       Estimated annual burden: 193,707                        Respondents: Large appliance coating                CFR part 63, subpart N); EPA ICR
asabaliauskas on DSK5VPTVN1PROD with NOTICES




                                                    hours.                                                  facilities.                                            Number 1611.11, OMB Control Number
                                                       Estimated annual cost: $18,803,009,                     Respondent’s obligation to respond:                 2060–0327; Expiration Date: December
                                                    includes $242,092 annualized capital or                 Mandatory (40 CFR part 60, subpart SS).                31, 2015.
                                                    O&M costs.                                                 Estimated number of respondents: 72                    Respondents: Chromium
                                                       Changes in Estimates: There is an                    (total).                                               electroplating and anodizing facilities.
                                                    expected increase in hours in the total                    Frequency of response: Initially and                   Respondent’s obligation to respond:
                                                    estimated respondent burden compared                    semiannually.                                          Mandatory (40 CFR part 63, subpart N).
                                                    with the ICR currently approved by                         Estimated annual burden: 7,659                         Estimated number of respondents:
                                                    OMB. This increase is due to an                         hours.                                                 1,343 (total).


                                               VerDate Sep<11>2014   18:31 Jun 04, 2015   Jkt 235001   PO 00000   Frm 00036   Fmt 4703   Sfmt 4703   E:\FR\FM\05JNN1.SGM   05JNN1


                                                    32118                            Federal Register / Vol. 80, No. 108 / Friday, June 5, 2015 / Notices

                                                       Frequency of response: Initially,                       Respondents: Hydrochloric acid                      burden subsequent to the initial
                                                    quarterly, semiannually and annually.                   production facilities.                                 compliance period.
                                                       Estimated annual burden: 177,695                        Respondent’s obligation to respond:                    (15) Docket ID Number: EPA–HQ–
                                                    hours.                                                  Mandatory (40 CFR part 63, subpart                     OECA–2011–0526; Title: NESHAP for
                                                       Estimated annual cost: $32,515,541,                  NNNNN).                                                Aluminum, Copper, and Other Non-
                                                    includes $26,924,372 annualized capital                    Estimated number of respondents: 81                 Ferrous Foundries (40 CFR part 63,
                                                    or O&M costs.                                           (total).                                               subpart ZZZZZZ); EPA ICR Number
                                                       Changes in Estimates: There is a                        Frequency of response: Initially,                   2332.04, OMB Control Number 2060–
                                                    likely a decrease in burden hours from                  occasionally and semiannually.                         0630; Expiration Date: December 31,
                                                    the previous ICR to reflect the cost of                    Estimated annual burden: 105,033                    2015.
                                                    ongoing burden after the initial three-                 hours.                                                    Respondents: Aluminum, copper, and
                                                    year compliance period of the rule                         Estimated annual cost: $10,789,637,                 other non-ferrous foundries.
                                                    amendment.                                              includes $703,561 annualized capital or                   Respondent’s obligation to respond:
                                                       (10) Docket ID Number: EPA–HQ–                       O&M costs.                                             Mandatory (40 CFR part 63, subpart
                                                    OECA–2012–0505; Title: NESHAP for                          Changes in Estimates: There is an                   ZZZZZZ).
                                                    Secondary Aluminum Production (40                       expected increase in burden hours due                     Estimated number of respondents:
                                                    CFR part 63, subpart RRR); EPA ICR                      to an increase in the respondent                       318 (total).
                                                    Number 1894.08, OMB Control Number                      universe.                                                 Frequency of response: Initially,
                                                    2060–0433; Expiration Date: December                       (13) Docket ID Number: EPA–HQ–                      occasionally and semiannually.
                                                    31, 2015.                                               OECA–2011–0274; Title: NESHAP for                         Estimated annual burden: 10,482
                                                       Respondents: Secondary aluminum                      the Wood Building Products Surface                     hours. Burden is defined at 5 CFR
                                                    production facilities.                                  Coating Industry (40 CFR part 63,                      1320.03(b)
                                                       Respondent’s obligation to respond:                  subpart QQQQ); EPA ICR Number                             Estimated annual cost: $1,015,005,
                                                    Mandatory (40 CFR part 63, subpart                      2034.06, OMB Control Number 2060–                      includes $0 annualized capital or O&M
                                                    RRR).                                                   0510; Expiration Date: December 31,                    costs.
                                                       Estimated number of respondents:                     2015.                                                     Changes in Estimates: There is no
                                                    1,834 (total).                                             Respondents: Wood building products                 change in burden hours from the
                                                       Frequency of response: Initially,                    surface coating facilities.                            previous ICR.
                                                    occasionally and semiannually.                             Respondent’s obligation to respond:                    (16) Docket ID Number: EPA–HQ–
                                                       Estimated annual burden: 101,856                     Mandatory (40 CFR part 63, subpart                     OECA–2011–0208; Title: NESHAP for
                                                    hours.                                                  QQQQ).                                                 Pulp and Paper Production (40 CFR part
                                                       Estimated annual cost: $10,088,531,                     Estimated number of respondents:                    63, subpart S); EPA ICR Number
                                                    includes $225,750 annualized capital or                 232 (total).                                           2452.03, OMB Control Number 2060–
                                                    O&M costs.                                                 Frequency of response: Initially,                   0681; Expiration Date: December 31,
                                                       Changes in Estimates: There is an                    occasionally and semiannually.                         2015.
                                                    expected increase in burden hours due                      Estimated annual burden: 75,771                        Respondents: Pulp and paper
                                                    to an increase in the number of subject                 hours.                                                 production facilities.
                                                    area sources.                                              Estimated annual cost: $7,554,577,                     Respondent’s obligation to respond:
                                                       (11) Docket ID Number: EPA–HQ–                       includes $278,400 annualized capital or                Mandatory (40 CFR part 63, subpart S).
                                                    OECA–2012–0518; Title: NESHAP for                       O&M costs.                                                Estimated number of respondents:
                                                    Metal Furniture Surface Coating (40                        Changes in Estimates: There is no                   114 (total).
                                                    CFR part 63, subpart RRRR); EPA ICR                     change in burden hours from the                           Frequency of response: Initially,
                                                    Number 1952.06, OMB Control Number                      previous ICR.                                          occasionally and semiannually.
                                                    2060–0518; Expiration Date: December                       (14) Docket ID Number: EPA–HQ–                         Estimated annual burden: 52,304
                                                    31, 2015.                                               OECA–2011–0228; Title: NSPS for                        hours.
                                                       Respondents: Metal furniture surface                 Petroleum Refineries for which                            Estimated annual cost: $5,780,270,
                                                    coating facilities.                                     Construction, Reconstruction, or                       includes $841,000 annualized capital or
                                                       Respondent’s obligation to respond:                  Modification Commenced after May 14,                   O&M costs.
                                                    Mandatory (40 CFR part 63, subpart                      2007 (40 CFR part 60, subpart Ja); EPA                    Changes in Estimates: There is likely
                                                    RRRR).                                                  ICR Number 2263.05, OMB Control                        a decrease in burden hours from the
                                                       Estimated number of respondents:                     Number 2060–0602; Expiration Date:                     previous ICR to account for the ongoing
                                                    583 (total).                                            December 31, 2015.                                     burden after the initial compliance
                                                       Frequency of response: Initially,                       Respondents: Petroleum refineries                   period.
                                                    occasionally and semiannually.                          constructed, reconstructed, ore modified                  (17) Docket ID Number: EPA–HQ–
                                                       Estimated annual burden: 190,408                     after May 14, 2007.                                    OECA–2012–0533; Title: NSPS for the
                                                    hours.                                                     Respondent’s obligation to respond:                 Phosphate Fertilizer Industry (40 CFR
                                                       Estimated annual cost: $22,472,732,                  Mandatory (40 CFR part 60, subpart Ja).                part 60, subparts T, U, V, W, and X);
                                                    includes $699,600 annualized capital or                    Estimated number of respondents:                    EPA ICR Number 1061.13, OMB Control
                                                    O&M costs.                                              150 (total).                                           Number 2060–0037; Expiration Date:
                                                       Changes in Estimates: There is no                       Frequency of response: Initially and                January 31, 2016.
                                                    change in burden hours from the
asabaliauskas on DSK5VPTVN1PROD with NOTICES




                                                                                                            semiannually.                                             Respondents: Phosphate fertilizer
                                                    previous ICR.                                              Estimated annual burden: 54,572                     manufacturing facilities.
                                                       (12) Docket ID Number: EPA–HQ–                       hours.                                                    Respondent’s obligation to respond:
                                                    OECA–2011–0275; Title: NESHAP for                          Estimated annual cost: $24,934,110,                 Mandatory (40 CFR part 60, subparts T,
                                                    Hydrochloric Acid Production (40 CFR                    includes $20,016,000 annualized capital                U, V, W and X).
                                                    part 63, subpart NNNNN); EPA ICR                        or O&M costs.                                             Estimated number of respondents: 13
                                                    Number 2032.08, OMB Control Number                         Changes in Estimates: There is a                    (total).
                                                    2060–0529; Expiration Date: December                    likely decrease in burden hours from the                  Frequency of response: Initially and
                                                    31, 2015.                                               previous ICR to reflect the ongoing rule               semiannually.


                                               VerDate Sep<11>2014   18:31 Jun 04, 2015   Jkt 235001   PO 00000   Frm 00037   Fmt 4703   Sfmt 4703   E:\FR\FM\05JNN1.SGM   05JNN1


                                                                                     Federal Register / Vol. 80, No. 108 / Friday, June 5, 2015 / Notices                                           32119

                                                       Estimated annual burden: 1,373                          Respondent’s obligation to respond:                    Respondent’s obligation to respond:
                                                    hours.                                                  Mandatory (40 CFR part 63, subpart                     Mandatory (40 CFR part 60, subpart
                                                       Estimated annual cost: $453,090,                     VVVVVV).                                               DD).
                                                    includes $320,190 annualized capital or                    Estimated number of respondents:                       Estimated number of respondents:
                                                    O&M costs.                                              452 (total).                                           200 (total).
                                                       Changes in Estimates: There is no                       Frequency of response: Initially and                   Frequency of response: Initially and
                                                    change in burden hours from the                         semiannually.                                          annually.
                                                    previous ICR.                                              Estimated annual burden: 10,586                        Estimated annual burden: 2,070
                                                       (18) Docket ID Number: EPA–HQ–                       hours.                                                 hours.
                                                    OECA–2012–0517; Title: NSPS for                            Estimated annual cost: $905,135,                       Estimated annual cost: $198,346,
                                                    Emission Guidelines and Compliance                      includes $98,271 annualized capital or                 includes $0 annualized capital or O&M
                                                    Times for Small Municipal Waste                         O&M costs.                                             costs.
                                                    Combustion Units Constructed on or                         Changes in Estimates: There is likely                  Changes in Estimates: There is no
                                                    before August 30, 1999 (40 CFR part 60,                 an increase in burden hours from the                   change in burden hours from the
                                                    subpart BBBB); EPA ICR Number                           previous ICR due to an increase in the                 previous ICR.
                                                    1901.06, OMB Control Number 2060–                       number respondents.                                       (23) Docket ID Number: EPA–HQ–
                                                    0424; Expiration Date: January 31, 2016.                   (20) Docket ID Number: EPA–HQ–                      OECA–2011–0506; Title: NSPS for
                                                       Respondents: Small municipal waste                   OECA–2012–0534; Title: NSPS for                        Small Municipal Waste Combustors (40
                                                    combustion units.                                       Surface Coating of Plastic Parts for                   CFR part 60, subpart AAAA); EPA ICR
                                                       Respondent’s obligation to respond:                  Business Machines (40 CFR part 60,                     Number 1900.06, OMB Control Number
                                                    Mandatory (40 CFR part 60, subpart                      subpart TTT); EPA ICR Number                           2060–0423; Expiration Date: February
                                                    BBBB).                                                  1093.11, OMB Control Number 2060–                      29, 2016.
                                                       Estimated number of respondents: 23                  0162; Expiration Date: February 29,                       Respondents: Small municipal waste
                                                    (total).                                                2016.                                                  combustors.
                                                       Frequency of response: Initially,                       Respondents: Facilities that perform                   Respondent’s obligation to respond:
                                                    semiannually and annually.                              industrial surface coating on plastic                  Mandatory (40 CFR part 60, subpart
                                                       Estimated annual burden: 100,854                     parts for business machines.                           AAAA).
                                                    hours.                                                     Respondent’s obligation to respond:                    Estimated number of respondents: 3
                                                       Estimated annual cost: $10,802,579,                  Mandatory (40 CFR part 60, subpart                     (total).
                                                    includes $1,036,800 annualized capital                  TTT).                                                     Frequency of response: Initially,
                                                    or O&M costs.                                              Estimated number of respondents: 10                 semiannually and annually.
                                                       Changes in Estimates: There is no                    (total).                                                  Estimated annual burden: 12,351
                                                    change in burden hours from the                            Frequency of response: Initially,                   hours.
                                                    previous ICR.                                           quarterly and semiannually.                               Estimated annual cost: $1,364,227,
                                                       (19) Docket ID Number: EPA–HQ–                          Estimated annual burden: 979 hours.                 includes $168,336 annualized capital or
                                                    OECA–2012–0525; Title: NESHAP for                          Estimated annual cost: $94,725,
                                                                                                                                                                   O&M costs.
                                                    Chemical Manufacturing Area Sources                     includes $0 annualized capital or O&M                     Changes in Estimates: There is an
                                                    (40 CFR part 63 Subpart VVVVVV); EPA                    costs.                                                 expected increase in burden hours from
                                                    ICR Number 2323.06, OMB Control                            Changes in Estimates: There is no
                                                                                                                                                                   the previous ICR due to an increase in
                                                    Number 2060–0621; Expiration Date:                      change in burden hours from the
                                                                                                                                                                   one respondent being subject to the rule.
                                                    January 31, 2016.                                       previous ICR.
                                                                                                               (21) Docket ID Number: EPA–HQ–                         (24) Docket ID Number: EPA–HQ–
                                                       Additional information: These                                                                               OECA–2012–0524; Title: NSPS for
                                                    standards apply to nine area source                     OECA–2012–0535; Title: NSPS for
                                                                                                            Secondary Lead Smelters (40 CFR part                   Stationary Combustion Turbines (40
                                                    categories in the chemical                                                                                     CFR part 60, subpart KKKK); EPA ICR
                                                    manufacturing sector: Agricultural                      60, subpart L); EPA ICR Number
                                                                                                            1128.11, OMB Control Number 2060–                      Number 2177.06, OMB Control Number
                                                    Chemicals and Pesticides                                                                                       2060–0582; Expiration Date: February
                                                    Manufacturing, Cyclic Crude and                         0080; Expiration Date: February 29,
                                                                                                            2016.                                                  29, 2016.
                                                    Intermediate Production, Industrial                                                                               Respondents: New stationary
                                                                                                               Respondents: Secondary lead
                                                    Inorganic Chemical Manufacturing,                                                                              combustion turbines.
                                                                                                            smelting facilities.
                                                    Industrial Organic Chemical                                                                                       Respondent’s obligation to respond:
                                                                                                               Respondent’s obligation to respond:
                                                    Manufacturing, Inorganic Pigments                                                                              Mandatory (40 CFR part 60, subpart
                                                                                                            Mandatory (40 CFR part 60, subpart L).
                                                    Manufacturing, Miscellaneous Organic                       Estimated number of respondents: 25                 KKKK).
                                                    Chemical Manufacturing, Plastic                         (total).                                                  Estimated number of respondents:
                                                    Materials and Resins Manufacturing,                        Frequency of response: Initially.                   448 (total).
                                                    Pharmaceutical Production, and                             Estimated annual burden: 37 hours.                     Frequency of response: Initially and
                                                    Synthetic Rubber Manufacturing. The                        Estimated annual cost: $3,631,                      semiannually.
                                                    requirements apply to process vents,                    includes $0 annualized capital or O&M                     Estimated annual burden: 44,394
                                                    storage tanks, equipment leaks,                         costs.                                                 hours.
                                                    wastewater systems, transfer operations,                   Changes in Estimates: There is no                      Estimated annual cost: $4,298,616,
                                                    and heat exchange systems at affected                   change in burden hours from the                        includes $0 annualized capital or O&M
                                                    sources in each area source category and                                                                       costs.
asabaliauskas on DSK5VPTVN1PROD with NOTICES




                                                                                                            previous ICR.
                                                    are combined in one subpart. The                           (22) Docket ID Number: EPA–HQ–                         Changes in Estimates: There is an
                                                    standards are based on EPA’s                            OECA–2011–0239; Title: NSPS for Grain                  expected increase in burden hours from
                                                    determination of generally available                    Elevators (40 CFR part 60, subpart DD);                the previous ICR due to a growth in the
                                                    control technology (GACT) or                            EPA ICR Number 1130.11, OMB Control                    respondent universe.
                                                    management practices for each area                      Number 2060–0082; Expiration Date:                        (25) Docket ID Number: EPA–HQ–
                                                    source category.                                        February 29, 2016.                                     OECA–2012–0497; Title: NSPS for
                                                       Respondents: Chemical                                   Respondents: Grain elevator                         Fossil Fuel Fired Steam Generating
                                                    manufacturing area source facilities.                   operations.                                            Units (40 CFR part 63, subpart D); EPA


                                               VerDate Sep<11>2014   18:31 Jun 04, 2015   Jkt 235001   PO 00000   Frm 00038   Fmt 4703   Sfmt 4703   E:\FR\FM\05JNN1.SGM   05JNN1


                                                    32120                            Federal Register / Vol. 80, No. 108 / Friday, June 5, 2015 / Notices

                                                    ICR Number 1052.11, OMB Control                            Respondents: Petroleum refineries.                  Guidelines for Large Municipal Waste
                                                    Number 2060–0026; Expiration Date:                         Respondent’s obligation to respond:                 Combustors Constructed on or Before
                                                    March 31, 2016.                                         Mandatory (40 CFR part 63, subpart CC).                September 20, 1994 (40 CFR part 60,
                                                       Respondents: Fossil fuel fired steam                    Estimated number of respondents:                    subpart Cb); EPA ICR Number 1847.07,
                                                    generating units.                                       148 (total).                                           OMB Control Number 2060–0390;
                                                       Respondent’s obligation to respond:                     Frequency of response: Initially,                   Expiration Date: March 31, 2016.
                                                    Mandatory (40 CFR part 63, subpart D).                  occasionally, semiannually and                            Respondents: Large municipal waste
                                                       Estimated number of respondents:                     annually.                                              combustors.
                                                    660 (total).                                               Estimated annual burden: 549,980                       Respondent’s obligation to respond:
                                                       Frequency of response: Semiannually.                 hours.                                                 Mandatory (40 CFR part 60, subpart Cb).
                                                       Estimated annual burden: 70,777                         Estimated annual cost: $66,661,569,                    Estimated number of respondents: 81
                                                    hours.                                                  includes $178,042 annualized capital or                (total).
                                                       Estimated annual cost: $16,753,220,                  O&M costs.                                                Frequency of response: Initially,
                                                    includes $9,900,000 annualized capital                     Changes in Estimates: There is no                   occasionally, semiannually and
                                                    or O&M costs.                                           change in burden hours from the                        annually.
                                                       Changes in Estimates: There is no                    previous ICR.                                             Estimated annual burden: 394,965
                                                    change in burden hours from the                            (29) Docket ID Number: EPA–HQ–                      hours.
                                                    previous ICR.                                           OECA–2012–0502; Title: NSPS for                           Estimated annual cost: $52,760,002,
                                                       (26) Docket ID Number: EPA–HQ–                       Hospital/Medical/Infectious Waste                      includes $1,555,200 annualized capital
                                                    OECA–2012–0498; Title: NSPS for Coal                    Incinerators (40 CFR part 60, subpart                  or O&M costs.
                                                    Preparation and Processing Plants (40                   Ec); EPA ICR Number 1730.10, OMB                          Changes in Estimates: There is no
                                                    CFR part 60, subpart Y); EPA ICR                        Control Number 2060–0363; Expiration                   change in burden hours from the
                                                    Number 1062.14, OMB Control Number                      Date: March 31, 2016.                                  previous ICR.
                                                    2060–0122; Expiration Date: March 31,                      Respondents: Hospital/medical/                         (32) Docket ID Number: EPA–HQ–
                                                    2016.                                                   infectious waste incinerators.                         OECA–2011–0272; Title: NSPS for
                                                       Respondents: Coal preparation and                       Respondent’s obligation to respond:                 Hospital/Medical/Infectious Waste
                                                    processing facilities.                                  Mandatory (40 CFR part 60, subpart Ec).                Incinerators (40 CFR part 60, subpart Ce
                                                       Respondent’s obligation to respond:                     Estimated number of respondents: 5                  and 40 CFR part 62, subpart HHH); EPA
                                                    Mandatory (40 CFR part 60, subpart Y).                  (total).                                               ICR Number 1899.08, OMB Control
                                                       Estimated number of respondents:                        Frequency of response: Initially,                   Number 2060–0422; Expiration Date:
                                                    1,037 (total).                                          occasionally, semiannually and                         March 31, 2016.
                                                       Frequency of response: Initially and                 annually.                                                 Respondents: Hospital, medical,
                                                    semiannually.                                              Estimated annual burden: 3,912                      infectious waste incinerators.
                                                       Estimated annual burden: 41,998                      hours.                                                    Respondent’s obligation to respond:
                                                    hours.                                                     Estimated annual cost: $664,375,                    Mandatory (40 CFR part 60, subpart Ce
                                                       Estimated annual cost: $4,414,741,                   includes $285,549 annualized capital or                and Part 62, Subpart HHH).
                                                    includes $348,040 annualized capital or                 O&M costs.                                                Estimated number of respondents: 79
                                                    O&M costs.                                                 Changes in Estimates: There is an                   (total).
                                                                                                                                                                      Frequency of response: Initially,
                                                       Changes in Estimates: There is an                    expected increase in burden hours from
                                                                                                                                                                   occasionally, semiannually and
                                                    expected increase in burden hours from                  the previous ICR due to an increase in
                                                                                                                                                                   annually.
                                                    the previous ICR due to a growth in the                 the number of respondents.                                Estimated annual burden: 60,080
                                                    respondent universe.                                       (30) Docket ID Number: EPA–HQ–
                                                                                                                                                                   hours.
                                                       (27) Docket ID Number: EPA–HQ–                       OECA–2013–0337; Title: NESHAP for                         Estimated annual cost: $6,489,166,
                                                    OECA–2012–0655; Title: NSPS for                         Portland Cement (40 CFR part 63,                       includes $742,817 annualized capital or
                                                    Ammonium Sulfate Manufacturing                          subpart LLL); EPA ICR Number 1801.12,                  O&M costs.
                                                    Plants (40 CFR part 60, subpart PP); EPA                OMB Control Number 2060–0416;                             Changes in Estimates: There is no
                                                    ICR Number 1066.08, OMB Control                         Expiration Date: March 31, 2016.                       change in burden hours from the
                                                    Number 2060–0032; Expiration Date:                         Respondents: Portland cement plants,                previous ICR.
                                                    March 31, 2016.                                         except for kilns and in-line kiln/raw                     (33) Docket ID Number: EPA–HQ–
                                                       Respondents: Ammonium sulfate                        mills that burn hazardous waste and are                OECA–2015–0191; Title: NESHAP for
                                                    manufacturing plants.                                   subject to 40 CFR part 63, subpart EEE.                Miscellaneous Organic Chemical
                                                       Respondent’s obligation to respond:                     Respondent’s obligation to respond:                 Manufacturing (40 CFR part 63, subpart
                                                    Mandatory (40 CFR part 60, subpart PP).                 Mandatory (40 CFR part 63, subpart                     FFFF); EPA ICR Number 1969.06, OMB
                                                       Estimated number of respondents: 2                   LLL).                                                  Control Number 2060–0533; Expiration
                                                    (total).                                                   Estimated number of respondents: 87                 Date: March 31, 2016.
                                                       Frequency of response: Semiannually.                 (total).                                                  Respondents: Miscellaneous organic
                                                       Estimated annual burden: 284 hours.                     Frequency of response: Initially and                chemical manufacturing facilities.
                                                       Estimated annual cost: $27,449,                      semiannually.                                             Respondent’s obligation to respond:
                                                    includes $0 annualized capital or O&M                      Estimated annual burden: 80,433                     Mandatory (40 CFR part 63, subpart
                                                    costs.                                                  hours.                                                 FFFF).
                                                       Changes in Estimates: There is no                       Estimated annual cost: $69,897,805,
asabaliauskas on DSK5VPTVN1PROD with NOTICES




                                                                                                                                                                      Estimated number of respondents:
                                                    change in burden hours from the                         includes $62,080,116 annualized capital                263 (total).
                                                    previous ICR.                                           or O&M costs.                                             Frequency of response: Initially and
                                                       (28) Docket ID Number: EPA–HQ–                          Changes in Estimates: There is likely               semiannually.
                                                    OECA–2011–0234; Title: NESHAP for                       a change in labor hours from the                          Estimated annual burden: 426,474
                                                    Petroleum Refineries (40 CFR part 63,                   previous ICR to reflect the burden for                 hours.
                                                    subpart CC); EPA ICR Number 1692.08,                    ongoing rule compliance.                                  Estimated annual cost: $46,919,809,
                                                    OMB Control Number 2060–0340;                              (31) Docket ID Number: EPA–HQ–                      includes $5,624,883 annualized capital
                                                    Expiration Date: March 31, 2016.                        OECA–2012–0503; Title: Emission                        or O&M costs.


                                               VerDate Sep<11>2014   18:31 Jun 04, 2015   Jkt 235001   PO 00000   Frm 00039   Fmt 4703   Sfmt 4703   E:\FR\FM\05JNN1.SGM   05JNN1


                                                                                     Federal Register / Vol. 80, No. 108 / Friday, June 5, 2015 / Notices                                          32121

                                                       Changes in Estimates: There is an                       Estimated number of respondents: 98                    Respondents: Facilities that store
                                                    expected increase in burden hours from                  (total).                                               petroleum liquids in storage vessels.
                                                    the previous ICR due to growth in the                      Frequency of response: Initially and                   Respondent’s obligation to respond:
                                                    respondent universe.                                    semiannually.                                          Mandatory (40 CFR part 60, subpart K).
                                                       (34) Docket ID Number: EPA–HQ–                          Estimated annual burden: 61,310                        Estimated number of respondents:
                                                    OECA–2012–0527; Title: NESHAP for                       hours.                                                 220 (total).
                                                    Paints and Allied Products                                 Estimated annual cost: $6,137,827,                     Frequency of response: Initially and
                                                    Manufacturing Area Source Category (40                  includes $201,240 annualized capital or                occasionally.
                                                    CFR part 63, subpart CCCCCCC); EPA                      O&M costs.                                                Estimated annual burden: 769 hours.
                                                    ICR Number 2348.04, OMB Control                            Changes in Estimates: There is an                      Estimated annual cost: $74,473,
                                                    Number 2060–0633; Expiration Date:                      expected increase in burden hours from                 includes $0 annualized capital or O&M
                                                    March 31, 2016.                                         the previous ICR due to an increase of                 costs.
                                                       Respondents: Paints and allied                       one respondent.                                           Changes in Estimates: There is no
                                                    products manufacturing facilities.                         (37) Docket ID Number: EPA–HQ–                      change in burden hours from the
                                                       Respondent’s obligation to respond:                  OECA–2012–0659; Title: NESHAP for                      previous ICR.
                                                    Mandatory (40 CFR part 63, subpart                      Perchloroethylene Dry Cleaning                            (40) Docket ID Number: EPA–HQ–
                                                    CCCCCCC).                                               Facilities (40 CFR part 63, subpart M);                OECA–2012–0680; Title: Emission
                                                       Estimated number of respondents:                     EPA ICR Number 1415.11, OMB Control                    Guidelines and Compliance Times for
                                                    2,190 (total).                                          Number 2060–0234; Expiration Date:                     Municipal Solid Waste Landfills (40
                                                       Frequency of response: Initially,                    April 30, 2016.                                        CFR part 60, subpart Cc and 40 CFR part
                                                    occasionally and annually.                                 Respondents: Dry cleaning facilities                62, subpart GGG); EPA ICR Number
                                                       Estimated annual burden: 4,533                       that use perchloroethylene.                            1893.07, OMB Control Number 2060–
                                                    hours.                                                     Respondent’s obligation to respond:                 0430; Expiration Date: April 30, 2016.
                                                       Estimated annual cost: $1,172,604,                   Mandatory (40 CFR part 63, subpart M).                    Respondents: Municipal solid waste
                                                    includes $0 annualized capital or O&M                      Estimated number of respondents:                    landfills.
                                                    costs.                                                  28,012 (total).                                           Respondent’s obligation to respond:
                                                       Changes in Estimates: There is no                       Frequency of response: Initially and
                                                                                                                                                                   Mandatory (40 CFR part 60, subpart Cc
                                                    change in burden hours from the                         occasionally.
                                                                                                               Estimated annual burden: 1,564,851                  and part 62, subpart GGG).
                                                    previous ICR.                                                                                                     Estimated number of respondents:
                                                       (35) Docket ID Number: EPA–HQ–                       hours.
                                                                                                               Estimated annual cost: $157,229,928,                511 (total).
                                                    OECA–2012–0496; Title: NESHAP for
                                                                                                            includes $946,413 annualized capital or                   Frequency of response: Initially,
                                                    Area Sources: Asphalt Processing and
                                                                                                            O&M costs.                                             occasionally and annually.
                                                    Asphalt Roofing Manufacturing (40 CFR
                                                                                                               Changes in Estimates: There is no                      Estimated annual burden: 42,277
                                                    part 63, subpart AAAAAAA); EPA ICR
                                                                                                            change in burden hours from the                        hours.
                                                    Number 2352.04, OMB Control Number
                                                                                                            previous ICR.                                             Estimated annual cost: $4,717,854,
                                                    2060–0634; Expiration Date: March 31,
                                                                                                               (38) Docket ID Number: EPA–HQ–                      includes $663,600 annualized capital or
                                                    2016.
                                                       Respondents: Area source facilities                  OECA–2012–0666; Title: NESHAP for                      O&M costs.
                                                                                                            the Printing and Publishing Industry (40                  Changes in Estimates: There is an
                                                    that process asphalt or manufacture
                                                                                                            CFR part 63, subpart KK); EPA ICR                      expected decrease in burden hours from
                                                    asphalt roofing products.
                                                       Respondent’s obligation to respond:                  Number 1739.08, OMB Control Number                     the previous ICR due to landfill
                                                    Mandatory (40 CFR part 63, subpart                      2060–0335; Expiration Date: April 30,                  closures.
                                                    AAAAAAA).                                               2016.                                                     (41) Docket ID Number: EPA–HQ–
                                                       Estimated number of respondents: 75                     Respondents: Facilities in the printing             OECA–2012–0691; Title: NESHAP for
                                                    (total).                                                and publishing industry.                               Mercury Cell Chlor-Alkali Plants (40
                                                       Frequency of response: Initially and                    Respondent’s obligation to respond:                 CFR part 63, subpart IIIII); EPA ICR
                                                    semiannually.                                           Mandatory (40 CFR part 63, subpart                     Number 2046.08, OMB Control Number
                                                       Estimated annual burden: 2,846                       KK).                                                   2060–0542; Expiration Date: April 30,
                                                    hours.                                                     Estimated number of respondents:                    2016.
                                                       Estimated annual cost: $276,724,                     352 (total).                                              Respondents: Mercury cell chlor-
                                                    includes $1,125 annualized capital or                      Frequency of response: Initially,                   alkali plants.
                                                    O&M costs.                                              occasionally and semiannually.                            Respondent’s obligation to respond:
                                                       Changes in Estimates: There is no                       Estimated annual burden: 58,162                     Mandatory (40 CFR part 63, subpart
                                                    change in burden hours from the                         hours.                                                 IIIII).
                                                    previous ICR.                                              Estimated annual cost: $6,045,789,                     Estimated number of respondents: 2
                                                       (36) Docket ID Number: EPA–HQ–                       includes $414,000 annualized capital or                (total).
                                                    OECA–2012–0653; Title: NSPS for Steel                   O&M costs.                                                Frequency of response: Initially and
                                                    Plants: Electric Arc Furnaces and                          Changes in Estimates: There is no                   semiannually.
                                                    Argon-Oxygen Decarburization Vessels                    change in burden hours from the                           Estimated annual burden: 3,682
                                                    (40 CFR part 60, subparts AA and AAa);                  previous ICR.                                          hours.
                                                    EPA ICR Number 1060.17, OMB Control                        (39) Docket ID Number: EPA–HQ–                         Estimated annual cost: $372,952,
                                                                                                            OECA–2012–0677; Title: NSPS for                        includes $16,400 annualized capital or
asabaliauskas on DSK5VPTVN1PROD with NOTICES




                                                    Number 2060–0038; Expiration Date:
                                                    April 30, 2016.                                         Storage Vessels for Petroleum Liquids                  O&M costs.
                                                       Respondents: Steel plants with                       for Which Construction, Reconstruction,                   Changes in Estimates: There is no
                                                    electric arc furnaces, argon-oxygen                     or Modification Commenced After June                   change in burden hours from the
                                                    decarburization vessels, and dust                       11, 1973, and prior to May 19, 1978 (40                previous ICR.
                                                    handling systems.                                       CFR part 60, subpart K); EPA ICR                          (42) Docket ID Number: EPA–HQ–
                                                       Respondent’s obligation to respond:                  Number 1797.07, OMB Control Number                     OECA–2012–0693; Title: NESHAP for
                                                    Mandatory (40 CFR part 60, subparts                     2060–0442; Expiration Date: April 30,                  Taconite Iron Ore Processing (40 CFR
                                                    AA and AAa).                                            2016.                                                  part 63, subpart RRRRR); EPA ICR


                                               VerDate Sep<11>2014   18:31 Jun 04, 2015   Jkt 235001   PO 00000   Frm 00040   Fmt 4703   Sfmt 4703   E:\FR\FM\05JNN1.SGM   05JNN1


                                                    32122                            Federal Register / Vol. 80, No. 108 / Friday, June 5, 2015 / Notices

                                                    Number 2050.06, OMB Control Number                         Changes in Estimates: There is no                     Estimated annual cost: $427,962,
                                                    2060–0538; Expiration Date: April 30,                   change in burden hours from the                        includes $77,200 annualized capital or
                                                    2016.                                                   previous ICR.                                          O&M costs.
                                                       Respondents: Taconite iron ore                          (45) Docket ID Number: EPA–HQ–                        Changes in Estimates: There is an
                                                    processing plants.                                      OECA–2012–0703; Title: NESHAP for                      expected increase in burden hours from
                                                       Respondent’s obligation to respond:                  Prepared Feeds Manufacturing (40 CFR                   the previous ICR due to growth in the
                                                    Mandatory (40 CFR part 63, subpart                      part 63, subpart DDDDDDD); EPA ICR                     respondent universe.
                                                    RRRRR).                                                 Number 2354.04, OMB Control Number                       (48) Docket ID Number: EPA–HQ–
                                                       Estimated number of respondents: 8                   2060–0635; Expiration Date: April 30,                  OECA–2012–0688; Title: NESHAP for
                                                    (total).                                                2016.                                                  Plastic Parts and Products Surface
                                                       Frequency of response: Initially and                    Respondents: Prepared feed                          Coating (40 CFR part 63, subpart PPPP);
                                                    semiannually.                                           manufacturing facilities.                              EPA ICR Number 2044.06, OMB Control
                                                       Estimated annual burden: 614 hours.                                                                         Number 2060–0537; Expiration Date:
                                                                                                               Respondent’s obligation to respond:
                                                       Estimated annual cost: $650,107,                                                                            May 31, 2016.
                                                                                                            Mandatory (40 CFR part 63, subpart
                                                    includes $257,600 annualized capital or                                                                          Respondents: Facilities that perform
                                                                                                            DDDDDDD).
                                                    O&M costs.                                                                                                     surface coating of plastic parts and
                                                       Changes in Estimates: There is no                       Estimated number of respondents:
                                                                                                            1,800 (total).                                         products.
                                                    change in burden hours from the                                                                                  Respondent’s obligation to respond:
                                                    previous ICR.                                              Frequency of response: Initially and
                                                                                                                                                                   Mandatory (40 CFR part 63, subpart
                                                       (43) Docket ID Number: EPA–HQ–                       annually.
                                                                                                                                                                   PPPP).
                                                    OECA–2012–0699; Title: NESHAP for                          Estimated annual burden: 62,079                       Estimated number of respondents:
                                                    Primary Magnesium Refining (40 CFR                      hours.                                                 832 (total).
                                                    part 63, subpart TTTTT); EPA ICR                           Estimated annual cost: $6,048,294,                    Frequency of response: Initially,
                                                    Number 2098.07, OMB Control Number                      includes $37,236 annualized capital or                 occasionally and semiannually.
                                                    2060–0536; Expiration Date: April 30,                   O&M costs.                                               Estimated annual burden: 322,467
                                                    2016.                                                      Changes in Estimates: There is no                   hours.
                                                       Respondents: Primary magnesium                       change in burden hours from the                          Estimated annual cost: $31,489,594,
                                                    refining facilities.                                    previous ICR.                                          includes $265,600 annualized capital or
                                                       Respondent’s obligation to respond:                     (46) Docket ID Number: EPA–HQ–                      O&M costs.
                                                    Mandatory (40 CFR part 63, subpart                      OECA–2012–0642; Title: NESHAP for                        Changes in Estimates: There is an
                                                    TTTTT).                                                 Chemical Preparations Industry (40 CFR                 expected increase in burden hours from
                                                       Estimated number of respondents: 1                   part 63, subpart BBBBBBB); EPA ICR                     the previous ICR due to growth in the
                                                    (total).                                                Number 2356.04, OMB Control Number                     respondent universe.
                                                       Frequency of response: Initially,                    2060–0636; Expiration Date: April 30,                    (49) Docket ID Number: EPA–HQ–
                                                    occasionally and semiannually.                          2016.                                                  OECA–2012–0695; Title: NESHAP for
                                                       Estimated annual burden: 611 hours.                     Respondents: Chemical preparation                   Site Remediation (40 CFR part 63,
                                                    Burden is defined at 5 CFR 1320.03(b)                   facilities.                                            subpart GGGGG); EPA ICR Number
                                                       Estimated annual cost: $60,410,                         Respondent’s obligation to respond:                 2062.06, OMB Control Number 2060–
                                                    includes $1,200 annualized capital or                   Mandatory (40 CFR part 63, subpart                     0534; Expiration Date: May 31, 2016.
                                                    O&M costs.                                              BBBBBBB).                                                Respondents: Facilities with site
                                                       Changes in Estimates: There is no                       Estimated number of respondents: 26                 remediation activities.
                                                    change in burden hours from the                         (total).                                                 Respondent’s obligation to respond:
                                                    previous ICR.                                              Frequency of response: Initially and                Mandatory (40 CFR part 63, subpart
                                                       (44) Docket ID Number: EPA–HQ–                       semiannually.                                          GGGGG).
                                                    OECA–2012–0702; Title: NESHAP for                                                                                Estimated number of respondents:
                                                                                                               Estimated annual burden: 2,093
                                                    Area Sources: Polyvinyl Chloride and                                                                           286 (total).
                                                                                                            hours.
                                                    Copolymers Production, Primary                                                                                   Frequency of response: Initially and
                                                                                                               Estimated annual cost: $203,052,                    semiannually.
                                                    Copper Smelting, Secondary Copper
                                                                                                            includes $390 annualized capital or                      Estimated annual burden: 140,338
                                                    Smelting, and Primary Nonferrous
                                                                                                            O&M costs.                                             hours.
                                                    Metals-Zinc, Cadmium, and Beryllium
                                                                                                               Changes in Estimates: There is no                     Estimated annual cost: $14,302,488,
                                                    (40 CFR part 63, subparts DDDDDD,
                                                                                                            change in burden hours from the                        includes $582,000 annualized capital or
                                                    EEEEEE, FFFFFF, and GGGGGG); EPA
                                                                                                            previous ICR.                                          O&M costs.
                                                    ICR Number 2240.05, OMB Control
                                                                                                               (47) Docket ID Number: EPA–HQ–                        Changes in Estimates: There is no
                                                    Number 2060–0596; Expiration Date:
                                                                                                            OECA–2012–0643; Title: NSPS for                        change in burden hours from the
                                                    April 30, 2016.
                                                       Respondents: PVC and copolymer,                      Pressure Sensitive Tape and Label                      previous ICR.
                                                    primary copper smelters, secondary                      Surface Coating (CFR part 60, subpart                    (50) Docket ID Number: EPA–HQ–
                                                    copper smelters, and primary zinc                       RR); EPA ICR Number 0658.12, OMB                       OECA–2013–0355; Title: NESHAP for
                                                    production facilities.                                  Control Number 2060–0004; Expiration                   Clay Ceramics Manufacturing, Glass
                                                       Respondent’s obligation to respond:                  Date: May 31, 2016.                                    Manufacturing and Secondary
                                                    Mandatory (40 CFR part 63, subparts                        Respondents: Pressure sensitive tape                Nonferrous Metals Processing Area
                                                                                                            and label surface coating facilities.                  Sources (40 CFR part 63, subparts
asabaliauskas on DSK5VPTVN1PROD with NOTICES




                                                    DDDDDD, EEEEEE, FFFFFF and
                                                    GGGGGG).                                                   Respondent’s obligation to respond:                 RRRRRR, SSSSSS, and TTTTTT); EPA
                                                       Estimated number of respondents: 5                   Mandatory (40 CFR part 60, subpart RR).                ICR Number 2274.05, OMB Control
                                                    (total).                                                   Estimated number of respondents: 39                 Number 2060–0606; Expiration Date:
                                                       Frequency of response: Initially.                    (total).                                               May 31, 2016.
                                                       Estimated annual burden: 46 hours.                      Frequency of response: Initially and                  Respondents: Clay ceramics
                                                       Estimated annual cost: $4,454,                       semiannually.                                          manufacturing, glass manufacturing,
                                                    includes $0 annualized capital or O&M                      Estimated annual burden: 3,652                      and secondary nonferrous metals
                                                    costs.                                                  hours.                                                 processing facilities.


                                               VerDate Sep<11>2014   18:31 Jun 04, 2015   Jkt 235001   PO 00000   Frm 00041   Fmt 4703   Sfmt 4703   E:\FR\FM\05JNN1.SGM   05JNN1


                                                                                     Federal Register / Vol. 80, No. 108 / Friday, June 5, 2015 / Notices                                           32123

                                                       Respondent’s obligation to respond:                     Respondents: Nitric acid plants.                    Steam Generating Units (40 CFR part 60,
                                                    Mandatory (40 CFR part 63, subparts                        Respondent’s obligation to respond:                 subpart Db); EPA ICR Number 1088.14,
                                                    RRRRRR, SSSSSS and TTTTTT).                             Mandatory (40 CFR part 60, subparts G                  OMB Control Number 2060–0072;
                                                       Estimated number of respondents: 82                  and Ga).                                               Expiration Date: July 31, 2016.
                                                    (total).                                                   Estimated number of respondents: 26                    Respondents: Industrial, commercial,
                                                       Frequency of response: Initially.                    (total).                                               and institutional steam generating units.
                                                       Estimated annual burden: 1,763                          Frequency of response: Initially,                      Respondent’s obligation to respond:
                                                    hours.                                                  occasionally and semiannually.                         Mandatory (40 CFR part 60, subpart Db).
                                                       Estimated annual cost: $182,301,                        Estimated annual burden: 1,921                         Estimated number of respondents:
                                                    includes $9,854 annualized capital or                   hours.                                                 1,727 (total).
                                                    O&M costs.                                                 Estimated annual cost: $2,805,032,                     Frequency of response: Initially,
                                                       Changes in Estimates: There is no                    includes $2,618,983 annualized capital                 quarterly and semiannually.
                                                    change in burden hours from the                         or O&M costs.                                             Estimated annual burden: 1,607,368
                                                    previous ICR.                                              Changes in Estimates: There is an                   hours.
                                                       (51) Docket ID Number: EPA–HQ–                       expected increase in burden hours from                    Estimated annual cost: $190,544,313,
                                                    OECA–2012–0657; Title: NSPS for                         the previous ICR due to an increase in                 includes $34,905,000 annualized capital
                                                    Flexible Vinyl and Urethane Coating                     the number of respondents.                             or O&M costs.
                                                    and Printing (40 CFR part 60, subpart                      (54) Docket ID Number: EPA–HQ–                         Changes in Estimates: There is an
                                                    FFF); EPA ICR Number 1157.11, OMB                       OECA–2012–0654; Title: NSPS for                        expected increase in burden hours from
                                                    Control Number 2060–0073; Expiration                    Automobile and Light Duty Truck                        the previous ICR due to an increase in
                                                    Date: June 30, 2016.                                    Surface Coating Operations (40 CFR part                the estimated number of respondents.
                                                       Respondents: Facilities that print or                60, subpart MM); EPA ICR Number                           (57) Docket ID Number: EPA–HQ–
                                                    coat flexible vinyl or urethane products.               1064.18, OMB Control Number 2060–                      OECA–2012–0660; Title: NESHAP for
                                                       Respondent’s obligation to respond:                  0034; Expiration Date: July 31, 2016.                  Halogenated Solvent Cleaners/
                                                    Mandatory (40 CFR part 60, subpart                         Respondents: Facilities that perform                Halogenated Hazardous Air Pollutants
                                                    FFF).                                                   surface coating of automobile and light                (40 CFR part 63, subpart T); EPA ICR
                                                       Estimated number of respondents: 24                  duty truck.                                            Number 1652.09, OMB Control Number
                                                    (total).                                                   Respondent’s obligation to respond:                 2060–0273; Expiration Date: July 31,
                                                       Frequency of response: Initially and
                                                                                                            Mandatory (40 CFR part 60, subpart                     2016.
                                                    semiannually.
                                                       Estimated annual burden: 775 hours.                  MM).                                                      Respondents: Facilities with
                                                       Estimated annual cost: $297,664,                        Estimated number of respondents: 58                 halogenated HAP solvent cleaning
                                                    includes $222,600 annualized capital or                 (total).                                               machines.
                                                    O&M costs.                                                 Frequency of response: Initially,                      Respondent’s obligation to respond:
                                                       Changes in Estimates: There is an                    quarterly and semiannually.                            Mandatory (40 CFR part 63, subpart T).
                                                    expected increase in burden hours from                     Estimated annual burden: 175,195                       Estimated number of respondents:
                                                    the previous ICR due to an increase in                  hours.                                                 1,431 (total).
                                                    one respondent.                                            Estimated annual cost: $17,067,068,                    Frequency of response: Initially,
                                                       (52) Docket ID Number: EPA–HQ–                       includes $103,200 annualized capital or                quarterly, semiannually and annually.
                                                    OECA–2012–0658; Title: NSPS/                            O&M costs.                                                Estimated annual burden: 45,242
                                                    NESHAP for Wool Fiberglass Insulation                      Changes in Estimates: There is an                   hours.
                                                    Manufacturing Plants (40 CFR part 60,                   expected increase in burden hours from                    Estimated annual cost: $5,395,561,
                                                    subpart PPP and 40 CFR part 63, subpart                 the previous ICR due to an increase in                 includes $1,014,800 annualized capital
                                                    NNN); EPA ICR Number 1160.13, OMB                       the number of respondents.                             or O&M costs.
                                                    Control Number 2060–0114; Expiration                       (55) Docket ID Number: EPA–HQ–                         Changes in Estimates: There is no
                                                    Date: June 30, 2016.                                    OECA–2012–0656; Title: NSPS for Lead-                  change in burden hours from the
                                                       Respondents: Facilities with rotary                  Acid Battery Manufacturing (40 CFR                     previous ICR.
                                                    spin wool fiberglass insulation                         part 60, subpart KK); EPA ICR Number                      (58) Docket ID Number: EPA–HQ–
                                                    manufacturing lines.                                    1072.11, OMB Control Number 2060–                      OECA–2012–0665; Title: NESHAP for
                                                       Respondent’s obligation to respond:                  0081; Expiration Date: July 31, 2016.                  Magnetic Tape Manufacturing
                                                    Mandatory (40 CFR part 60, subpart PPP                     Respondents: Lead-acid battery                      Operations (40 CFR part 63, subpart EE);
                                                    and part 63, subpart NNN).                              manufacturing plants.                                  EPA ICR Number 1678.09, OMB Control
                                                       Estimated number of respondents: 61                     Respondent’s obligation to respond:                 Number 2060–0326; Expiration Date:
                                                    (total).                                                Mandatory (40 CFR part 60, subpart                     July 31, 2016.
                                                       Frequency of response: Initially,                    KK).                                                      Respondents: Magnetic tape
                                                    occasionally and semiannually.                             Estimated number of respondents: 52                 manufacturing facilities.
                                                       Estimated annual burden: 18,559                      (total).                                                  Respondent’s obligation to respond:
                                                    hours.                                                     Frequency of response: Initially and                Mandatory (40 CFR part 63, subpart EE).
                                                       Estimated annual cost: $2,285,560,                   semiannually.                                             Estimated number of respondents: 6
                                                    includes $488,500 annualized capital or                    Estimated annual burden: 4,053                      (total).
                                                    O&M costs.                                              hours.                                                    Frequency of response: Initially and
                                                       Changes in Estimates: There is no                       Estimated annual cost: $404,122,
asabaliauskas on DSK5VPTVN1PROD with NOTICES




                                                                                                                                                                   occasionally.
                                                    change in burden hours from the                         includes $11,700 annualized capital or                    Estimated annual burden: 3,905
                                                    previous ICR.                                           O&M costs.                                             hours.
                                                       (53) Docket ID Number: EPA–HQ–                          Changes in Estimates: There is no                      Estimated annual cost: $425,110,
                                                    OECA–2015–0190; Title: NSPS for                         change in burden hours from the                        includes $47,000 annualized capital or
                                                    Nitric Acid Plants (40 CFR part 60,                     previous ICR.                                          O&M costs.
                                                    subpart G and Ga); EPA ICR Number                          (56) Docket ID Number: EPA–HQ–                         Changes in Estimates: There is no
                                                    1056.12, OMB Control Number 2060–                       OECA–2012–0499; Title: NSPS for                        change in burden hours from the
                                                    0019; Expiration Date: July 31, 2016.                   Industrial-Commercial-Institutional                    previous ICR.


                                               VerDate Sep<11>2014   18:31 Jun 04, 2015   Jkt 235001   PO 00000   Frm 00042   Fmt 4703   Sfmt 4703   E:\FR\FM\05JNN1.SGM   05JNN1


                                                    32124                            Federal Register / Vol. 80, No. 108 / Friday, June 5, 2015 / Notices

                                                       (59) Docket ID Number: EPA–HQ–                          Estimated annual cost: $181,581,                       Estimated annual cost: $1,017,654,
                                                    OECA–2012–0668; Title: NESHAP for                       includes $10,632 annualized capital or                 includes $205,000 annualized capital or
                                                    Flexible Polyurethane Foam Production                   O&M costs.                                             O&M costs.
                                                    (40 CFR part 63, subpart III); EPA ICR                     Changes in Estimates: There is no                      Changes in Estimates: There is no
                                                    Number 1783.07, OMB Control Number                      change in burden hours from the                        change in burden hours from the
                                                    2060–0357; Expiration Date: July 31,                    previous ICR.                                          previous ICR.
                                                    2016.                                                      (62) Docket ID Number: EPA–HQ–                         (65) Docket ID Number: EPA–HQ–
                                                       Respondents: Flexible polyurethane                   OECA–2012–0678; Title: NESHAP for                      OECA–2012–0664; Title: NESHAP for
                                                    foam production facilities.                             Mineral Wool Production (40 CFR part                   Commercial Ethylene Oxide
                                                       Respondent’s obligation to respond:                  63, subpart DDD); EPA ICR Number                       Sterilization and Fumigation Operations
                                                    Mandatory (40 CFR part 63, subpart III).                1799.09, OMB Control Number 2060–                      (40 CFR part 63, subpart O); EPA ICR
                                                       Estimated number of respondents:                     0362; Expiration Date: July 31, 2016.                  Number 1666.10, OMB Control Number
                                                    132 (total).                                               Respondents: Mineral wool                           2060–0283; Expiration Date: August 31,
                                                       Frequency of response: Initially,                    production facilities.                                 2016.
                                                    semiannually and annually.                                 Respondent’s obligation to respond:                    Respondents: Ethylene oxide
                                                       Estimated annual burden: 9,047                       Mandatory (40 CFR part 63, subpart                     sterilization and fumigation facilities.
                                                                                                            DDD).                                                     Respondent’s obligation to respond:
                                                    hours.
                                                                                                               Estimated number of respondents: 6                  Mandatory (40 CFR part 63, subpart O).
                                                       Estimated annual cost: $874,812,                                                                               Estimated number of respondents:
                                                                                                            (total).
                                                    includes $0 annualized capital or O&M                                                                          122 (total).
                                                                                                               Frequency of response: Initially and
                                                    costs.                                                                                                            Frequency of response: Initially and
                                                                                                            semiannually.
                                                       Changes in Estimates: There is no                       Estimated annual burden: 1,581                      occasionally.
                                                    change in burden hours from the                         hours.                                                    Estimated annual burden: 8,887
                                                    previous ICR.                                              Estimated annual cost: $157,566,                    hours.
                                                       (60) Docket ID Number: EPA–HQ–                       includes $4,500 annualized capital or                     Estimated annual cost: $1,524,913,
                                                    OECA–2012–0669; Title: NESHAP for                       O&M costs.                                             includes $664,500 annualized capital or
                                                    Oil and Natural Gas Production (40 CFR                     Changes in Estimates: There is no                   O&M costs.
                                                    part 63, subpart HH); EPA ICR Number                    change in burden hours from the                           Changes in Estimates: There is an
                                                    1788.11, OMB Control Number 2060–                       previous ICR.                                          expected increase in burden hours from
                                                    0417; Expiration Date: July 31, 2016.                      (63) Docket ID Number: EPA–HQ–                      the previous ICR due to an increase in
                                                       Respondents: Oil and natural gas                     OECA–2012–0701; Title: NESHAP for                      the estimated number of respondents.
                                                    production facilities.                                  Miscellaneous Coating Manufacturing                       (66) Docket ID Number: EPA–HQ–
                                                       Respondent’s obligation to respond:                  (40 CFR part 63, subpart HHHHH); EPA                   OECA–2012–0681; Title: NSPS for
                                                    Mandatory (40 CFR part 63, subpart                      ICR Number 2115.05, OMB Control                        Commercial and Industrial Solid Waste
                                                    HH).                                                    Number 2060–0535; Expiration Date:                     Incineration Units (40 CFR part 60,
                                                       Estimated number of respondents:                     July 31, 2016.                                         subpart CCC); EPA ICR Number
                                                    3,735 (total).                                             Respondents: Facilities that                        1926.07, OMB Control Number 2060–
                                                       Frequency of response: Initially,                    manufacture a miscellaneous coating.                   0450; Expiration Date: August 31, 2016.
                                                    occasionally and semiannually.                             Respondent’s obligation to respond:                    Respondents: Commercial and
                                                       Estimated annual burden: 46,642                      Mandatory (40 CFR part 63, subpart                     industrial solid waste incineration
                                                    hours.                                                  HHHHH).                                                units.
                                                       Estimated annual cost: $5,431,638,                      Estimated number of respondents:                       Respondent’s obligation to respond:
                                                    includes $910,733 annualized capital or                 135 (total).                                           Mandatory (40 CFR part 60, subpart
                                                    O&M costs.                                                 Frequency of response: Initially,                   CCC).
                                                       Changes in Estimates: There is an                    occasionally and semiannually.                            Estimated number of respondents: 30
                                                    expected increase in burden hours from                     Estimated annual burden: 171,406                    (total).
                                                                                                            hours.                                                    Frequency of response: Initially,
                                                    the previous ICR due to an increase in
                                                                                                               Estimated annual cost: $19,475,893,                 occasionally and annually.
                                                    the estimated number of respondents.                                                                              Estimated annual burden: 5,965
                                                       (61) Docket ID Number: EPA–HQ–                       includes $2,878,500 annualized capital
                                                                                                            or O&M costs.                                          hours.
                                                    OECA–2012–0676; Title: NESHAP for                                                                                 Estimated annual cost: $959,788,
                                                                                                               Changes in Estimates: There is an
                                                    Phosphoric Acid Manufacturing and                                                                              includes $382,200 annualized capital or
                                                                                                            expected increase in burden hours from
                                                    Phosphate Fertilizers Production (40                                                                           O&M costs.
                                                                                                            the previous ICR due to an increase in
                                                    CFR part 63, subparts AA and BB); EPA                                                                             Changes in Estimates: There is no
                                                                                                            the estimated number of respondents.
                                                    ICR Number 1790.07, OMB Control                            (64) Docket ID Number: EPA–HQ–                      change in burden hours from the
                                                    Number 2060–0361; Expiration Date:                      OECA–2012–0646; Title: NSPS for                        previous ICR.
                                                    July 31, 2016.                                          Incinerators (40 CFR part 60, subpart E);                 (67) Docket ID Number: EPA–HQ–
                                                       Respondents: Phosphoric acid                         EPA ICR Number 1058.11, OMB Control                    OECA–2012–0685; Title: Emission
                                                    manufacturing and phosphate fertilizer                  Number 2060–0040; Expiration Date:                     Guidelines for Existing Commerce and
                                                    production facilities.                                  August 31, 2016.                                       Industrial Solid Waste Incineration
                                                       Respondent’s obligation to respond:                     Respondents: Incinerators constructed               Units (40 CFR part 60, subpart DDDD);
                                                    Mandatory (40 CFR part 63, subparts
asabaliauskas on DSK5VPTVN1PROD with NOTICES




                                                                                                            or modified after August 17, 1971.                     EPA ICR Number 1927.07, OMB Control
                                                    AA and BB).                                                Respondent’s obligation to respond:                 Number 2060–0451; Expiration Date:
                                                       Estimated number of respondents: 12                  Mandatory (40 CFR part 60, subpart E).                 August 31, 2016.
                                                    (total).                                                   Estimated number of respondents: 82                    Respondents: Commercial and
                                                       Frequency of response: Initially,                    (total).                                               industrial solid waste incineration
                                                    occasionally, quarterly, semiannually                      Frequency of response: Initially and                units.
                                                    and annually.                                           occasionally.                                             Respondent’s obligation to respond:
                                                       Estimated annual burden: 1,765                          Estimated annual burden: 8,393                      Mandatory (40 CFR part 60, subpart
                                                    hours.                                                  hours.                                                 DDDD).


                                               VerDate Sep<11>2014   18:31 Jun 04, 2015   Jkt 235001   PO 00000   Frm 00043   Fmt 4703   Sfmt 4703   E:\FR\FM\05JNN1.SGM   05JNN1


                                                                                     Federal Register / Vol. 80, No. 108 / Friday, June 5, 2015 / Notices                                            32125

                                                       Estimated number of respondents: 90                     Frequency of response: Initially and                FARM CREDIT ADMINISTRATION
                                                    (total).                                                semiannually.
                                                       Frequency of response: Initially,                       Estimated annual burden: 15,823                     Farm Credit Administration Board;
                                                    occasionally and annually.                              hours.                                                 Sunshine Act; Regular Meeting
                                                       Estimated annual burden: 18,061                         Estimated annual cost: $1,904,020,
                                                    hours.                                                  includes $357,000 annualized capital or                AGENCY:   Farm Credit Administration.
                                                       Estimated annual cost: $2,892,789,                   O&M costs.
                                                    includes $1,143,990 annualized capital                                                                         SUMMARY:  Notice is hereby given,
                                                                                                               Changes in Estimates: There is no                   pursuant to the Government in the
                                                    or O&M costs.
                                                       Changes in Estimates: There is no                    change in burden hours from the                        Sunshine Act, of the regular meeting of
                                                    change in burden hours from the                         previous ICR.                                          the Farm Credit Administration Board
                                                    previous ICR.                                              (71) Docket ID Number: EPA–HQ–                      (Board).
                                                       (68) Docket ID Number: EPA–HQ–                       OECA–2012–0687; Title: NESHAP for
                                                    OECA–2012–0686; Title: NESHAP for                       Stationary Combustion Turbines (40                     DATES:  Date and Time: The regular
                                                    Organic Liquids Distribution (Non-                      CFR part 63, subpart YYYY); EPA ICR                    meeting of the Board will be held at the
                                                    Gasoline) Facilities (40 CFR part 63,                   Number 1967.06, OMB Control Number                     offices of the Farm Credit
                                                    subpart EEEE); EPA ICR Number                           2060–0540; Expiration Date: September                  Administration in McLean, Virginia, on
                                                    1963.06, OMB Control Number 2060–                       30, 2016.                                              June 11, 2015, from 9 a.m. until such
                                                    0539; Expiration Date: August 31, 2016.                    Respondents: Stationary combustion                  time as the Board concludes its
                                                       Respondents: Organic liquids                         turbines constructed or reconstructed                  business.
                                                    distribution facilities.                                after January 14, 2003.
                                                       Respondent’s obligation to respond:                     Respondent’s obligation to respond:                 ADDRESSES:  Farm Credit
                                                    Mandatory (40 CFR part 63, subpart                      Mandatory (40 CFR part 63, subpart                     Administration, 1501 Farm Credit Drive,
                                                    EEEE).                                                  YYYY).                                                 McLean, Virginia 22102–5090. Submit
                                                       Estimated number of respondents:                        Estimated number of respondents: 96                 attendance requests via email to
                                                    381 (total).                                            (total).                                               VisitorRequest@FCA.gov. See
                                                       Frequency of response: Initially and                    Frequency of response: Initially,                   SUPPLEMENTARY INFORMATION for further
                                                    semiannually.                                           semiannually and annually.                             information about attendance requests.
                                                       Estimated annual burden: 114,667
                                                    hours.                                                     Estimated annual burden: 1,338                      FOR FURTHER INFORMATION CONTACT:   Dale
                                                       Estimated annual cost: $19,770,006,                  hours.                                                 L. Aultman, Secretary to the Farm
                                                    includes $8,559,164 annualized capital                     Estimated annual cost: $165,056,                    Credit Administration Board, (703) 883–
                                                    or O&M costs.                                           includes $10,750 annualized capital or                 4009, TTY (703) 883–4056.
                                                       Changes in Estimates: There is no                    O&M costs.
                                                                                                               Changes in Estimates: There is an                   SUPPLEMENTARY INFORMATION:       Parts of
                                                    change in burden hours from the
                                                                                                            expected increase in burden hours from                 this meeting of the Board will be open
                                                    previous ICR.
                                                       (69) Docket ID Number: EPA–HQ–                       the previous ICR due to an increase in                 to the public (limited space available),
                                                    OECA–2012–0697; Title: NESHAP for                       the estimated number of respondents.                   and parts will be closed to the public.
                                                    Iron and Steel Foundries (40 CFR part                      (72) Docket ID Number: EPA–HQ–                      Please send an email to VisitorRequest@
                                                    63, subpart EEEEE); EPA ICR Number                      OECA–2012–0690; Title: NESHAP for                      FCA.gov at least 24 hours before the
                                                    2096.06, OMB Control Number 2060–                       Automobile and Light-duty Truck                        meeting. In your email include: Name,
                                                    0543; Expiration Date: August 31, 2016.                 Surface Coating (40 CFR part 63, subpart               postal address, entity you are
                                                       Respondents: Iron and steel foundries.               IIII); EPA ICR Number 2045.06, OMB                     representing (if applicable), and
                                                       Respondent’s obligation to respond:                  Control Number 2060–0550; Expiration                   telephone number. You will receive an
                                                    Mandatory (40 CFR part 63, subpart                      Date: September 30, 2016.                              email confirmation from us. Please be
                                                    EEEEE).                                                    Respondents: Facilities that perform                prepared to show a photo identification
                                                       Estimated number of respondents: 98                  surface coating on automobiles and                     when you arrive. If you need assistance
                                                    (total).                                                light-duty trucks.                                     for accessibility reasons, or if you have
                                                       Frequency of response: Initially,                                                                           any questions, contact Dale L. Aultman,
                                                                                                               Respondent’s obligation to respond:
                                                    occasionally and semiannually.                                                                                 Secretary to the Farm Credit
                                                       Estimated annual burden: 29,747                      Mandatory (40 CFR part 63, subpart IIII).
                                                                                                               Estimated number of respondents: 65                 Administration Board, at (703) 883–
                                                    hours.                                                                                                         4009. The matters to be considered at
                                                       Estimated annual cost: $3,309,697,                   (total).
                                                                                                               Frequency of response: Initially,                   the meeting are:
                                                    includes $400,060 annualized capital or
                                                    O&M costs.                                              occasionally and semiannually.                         Open Session
                                                       Changes in Estimates: There is no                       Estimated annual burden: 26,685
                                                    change in burden hours from the                         hours.                                                 A. Approval of Minutes
                                                    previous ICR.                                              Estimated annual cost: $2,688,147,                  • May 14, 2015
                                                       (70) Docket ID Number: EPA–HQ–                       includes $78,000 annualized capital or
                                                    OECA–2012–0662; Title: NESHAP for                       O&M costs.                                             B. Reports
                                                    Gasoline Distribution Facilities (40 CFR                   Changes in Estimates: There is no
                                                                                                                                                                   • Annual Report on the Farm Credit
asabaliauskas on DSK5VPTVN1PROD with NOTICES




                                                    part 63, subpart R); EPA ICR Number                     change in burden hours from the
                                                    1659.09, OMB Control Number 2060–                       previous ICR.                                            System’s Young, Beginning, and
                                                    0325; Expiration Date: September 30,                                                                             Small Farmer Mission Performance:
                                                                                                              Dated: May 27, 2015.
                                                    2016.                                                                                                            2014 Results
                                                       Respondents: Bulk gasoline terminals.                Edward J. Messina,
                                                                                                                                                                   • Quarterly Report on Economic
                                                       Respondent’s obligation to respond:                  Director, Monitoring, Assistance and Media
                                                                                                            Programs Division.                                       Conditions and FCS Conditions
                                                    Mandatory (40 CFR part 63, subpart R).
                                                       Estimated number of respondents:                     [FR Doc. 2015–13808 Filed 6–4–15; 8:45 am]             • Semi-Annual Report on Office of
                                                    492 (total).                                            BILLING CODE 6560–50–P                                   Examination Operations


                                               VerDate Sep<11>2014   18:31 Jun 04, 2015   Jkt 235001   PO 00000   Frm 00044   Fmt 4703   Sfmt 4703   E:\FR\FM\05JNN1.SGM   05JNN1



Document Created: 2015-12-15 15:20:28
Document Modified: 2015-12-15 15:20:28
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice.
DatesComments must be submitted on or before August 4, 2015.
ContactPatrick Yellin, Monitoring, Assistance, and Media Programs Division, Office of Compliance, Mail Code 2227A, Environmental Protection Agency, 1200 Pennsylvania Ave. NW., Washington, DC 20460; telephone number: (202) 564-2970; fax
FR Citation80 FR 32116 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR