80_FR_32479 80 FR 32370 - Northern Indiana Public Service Company v. Midcontinent Independent System Operator, Inc. and PJM Interconnection, LLC; Supplemental Notice of Technical Conference

80 FR 32370 - Northern Indiana Public Service Company v. Midcontinent Independent System Operator, Inc. and PJM Interconnection, LLC; Supplemental Notice of Technical Conference

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 80, Issue 109 (June 8, 2015)

Page Range32370-32371
FR Document2015-13899

Federal Register, Volume 80 Issue 109 (Monday, June 8, 2015)
[Federal Register Volume 80, Number 109 (Monday, June 8, 2015)]
[Notices]
[Pages 32370-32371]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-13899]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. EL13-88-000]


Northern Indiana Public Service Company v. Midcontinent 
Independent System Operator, Inc. and PJM Interconnection, LLC; 
Supplemental Notice of Technical Conference

    As announced in the notice issued on May 5, 2015, the Federal 
Energy Regulatory Commission will hold a technical conference on June 
15, 2015 from 9:00 a.m. to 4:00 p.m. to explore issues raised in the 
complaint filed by Northern Indiana Public Service Company (NIPSCO) 
against Midcontinent Independent System Operator, Inc. (MISO) and PJM 
Interconnection, L.L.C. (PJM) related to the MISO-PJM Joint Operating 
Agreement (JOA) and the MISO-PJM seam. The conference will be held at 
the Commission's headquarters at 888 First Street NE., Washington, DC 
20426 in the Commission Meeting Room. An updated agenda identifying 
panelists for this conference is attached.
    The technical conference will not be transcribed. However, there 
will be a free webcast of the conference. The webcast will allow 
persons to listen to the technical conference, but not participate. 
Anyone with internet access who wants to listen to the conference can 
do so by navigating to the Calendar of Events at www.ferc.gov and 
locating the technical conference in the Calendar. The technical 
conference will contain a link to its webcast. The Capitol Connection 
provides technical support for the webcast and offers the option of 
listening to the meeting via phone-bridge for a fee. If you have any 
questions, visit www.CapitolConnection.org or call 703-993-3100.\1\
---------------------------------------------------------------------------

    \1\ The webcast will be available on the Calendar of Events on 
the Commission's Web site www.ferc.gov for three months after the 
conference.
---------------------------------------------------------------------------

    While the purpose of this conference is to discuss the matter 
pending before the Commission in Docket No. EL13-88 and is not for the 
purpose of discussing other specific cases, we note that the 
discussions at the conference may address matters at issue in the 
following Commission proceedings that are either pending or within 
their rehearing period:

 PJM Interconnection,       Docket No. ER13-1944
 L.L.C.
 Midcontinent Independent   Docket No. ER13-1943
 System Operator, Inc.
 PJM Interconnection,       Docket No. ER13-1924
 L.L.C.
 Midcontinent Independent   Docket No. ER13-1945
 System Operator, Inc.
 Entergy Services, Inc....  Docket No. ER13-1955
 Cleco Power LLC..........  Docket No. ER13-1956
 Southwest Power Pool, Inc  Docket No. ER14-1174
 Midcontinent Independent   Docket No. ER14-1736
 System Operator, Inc.
 Midcontinent Independent   Docket No. ER14-2445
 System Operator, Inc..
 Southwest Power Pool, Inc  Docket No. ER13-1864
 Southwest Power Pool,      Docket No. EL14-21
 Inc. v. Midcontinent Independent
 System Operator, Inc.
 Midcontinent Independent   Docket No. EL14-30
 System Operator, Inc. v.
 Southwest Power Pool, Inc.
 Midwest Independent        Docket No. EL11-34
 Transmission System Operator, Inc.
 Midwest Independent        Docket No. ER11-1844
 Transmission System Operator, Inc.
 

    Advance registration is strongly encouraged for all attendees. If 
you have not already done so, those who plan to attend may register in 
advance at the following Web page: https://www.ferc.gov/whats-new/registration/06-15-15-form.asp. Attendees should allow time to pass 
through building security procedures before the 9:00 a.m. (Eastern 
Time) start time of the technical conference. In addition, information 
on this event will be posted on the Calendar of Events on the 
Commission's Web site, www.ferc.gov, prior to the event.
    Commission conferences are accessible under section 508 of the 
Rehabilitation Act of 1973. For accessibility accommodations please 
send an email to [email protected] or call toll free 1-866-208-
3372 (voice) or 202-502-8659 (TTY); or send a fax to 202-208-2106 with 
the required accommodations.
    Following the technical conference, the Commission will consider 
post-technical conference comments submitted on or before July 15, 
2015. Reply comments are due on or before August 5, 2015. The written 
comments will be included in the formal record of the proceeding, 
which, together with the record developed to date, will form the basis 
for further Commission action.

[[Page 32371]]

    For more information about this technical conference, please 
contact Lina Naik, 202-502-8882, [email protected], regarding legal 
issues; or Jason Strong, 202-502-6124, [email protected], and Ben 
Foster, 202-502-6149, [email protected], regarding technical issues; 
or Sarah McKinley, 202-502-8368, [email protected], regarding 
logistical issues.

    Dated: June 2, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-13899 Filed 6-5-15; 8:45 am]
 BILLING CODE 6717-01-P



                                                  32370                                      Federal Register / Vol. 80, No. 109 / Monday, June 8, 2015 / Notices

                                                  Commission’s Rules of Practice and                                       dockets. This can reduce the amount of                                    the MISO–PJM Joint Operating
                                                  Procedures (18 CFR 385.214).1 Only                                       time you spend researching proceedings                                    Agreement (JOA) and the MISO–PJM
                                                  intervenors have the right to seek                                       by automatically providing you with                                       seam. The conference will be held at the
                                                  rehearing of the Commission’s decision.                                  notification of these filings, document                                   Commission’s headquarters at 888 First
                                                  The Commission grants affected                                           summaries, and direct links to the                                        Street NE., Washington, DC 20426 in the
                                                  landowners and others with                                               documents. Go to www.ferc.gov/docs-                                       Commission Meeting Room. An updated
                                                  environmental concerns intervenor                                        filing/esubscription.asp.                                                 agenda identifying panelists for this
                                                  status upon showing good cause by                                          Dated: June 2, 2015.                                                    conference is attached.
                                                  stating that they have a clear and direct                                                                                                             The technical conference will not be
                                                                                                                           Kimberly D. Bose,
                                                  interest in this proceeding which no                                                                                                               transcribed. However, there will be a
                                                                                                                           Secretary.
                                                  other party can adequately represent.                                                                                                              free webcast of the conference. The
                                                  Simply filing environmental comments                                     [FR Doc. 2015–13897 Filed 6–5–15; 8:45 am]
                                                                                                                                                                                                     webcast will allow persons to listen to
                                                  will not give you intervenor status, but                                 BILLING CODE 6717–17–P
                                                                                                                                                                                                     the technical conference, but not
                                                  you do not need intervenor status to                                                                                                               participate. Anyone with internet access
                                                  have your comments considered.                                                                                                                     who wants to listen to the conference
                                                     Additional information about the                                      DEPARTMENT OF ENERGY
                                                                                                                                                                                                     can do so by navigating to the Calendar
                                                  Project is available from the
                                                                                                                           Federal Energy Regulatory                                                 of Events at www.ferc.gov and locating
                                                  Commission’s Office of External Affairs,
                                                                                                                           Commission                                                                the technical conference in the
                                                  at (866) 208–FERC, or on the FERC Web
                                                                                                                                                                                                     Calendar. The technical conference will
                                                  site (www.ferc.gov) using the eLibrary                                   [Docket No. EL13–88–000]                                                  contain a link to its webcast. The
                                                  link. Click on the eLibrary link, click on
                                                                                                                                                                                                     Capitol Connection provides technical
                                                  ‘‘General Search,’’ and enter the docket                                 Northern Indiana Public Service                                           support for the webcast and offers the
                                                  number excluding the last three digits in                                Company v. Midcontinent Independent                                       option of listening to the meeting via
                                                  the Docket Number field (i.e., CP14–                                     System Operator, Inc. and PJM
                                                  555). Be sure you have selected an                                                                                                                 phone-bridge for a fee. If you have any
                                                                                                                           Interconnection, LLC; Supplemental                                        questions, visit
                                                  appropriate date range. For assistance,                                  Notice of Technical Conference
                                                  please contact FERC Online Support at                                                                                                              www.CapitolConnection.org or call 703–
                                                  FercOnlineSupport@ferc.gov or toll free                                     As announced in the notice issued on                                   993–3100.1
                                                  at (866) 208–3676, or for TTY, contact                                   May 5, 2015, the Federal Energy                                              While the purpose of this conference
                                                  (202) 502–8659. The eLibrary link also                                   Regulatory Commission will hold a                                         is to discuss the matter pending before
                                                  provides access to the texts of formal                                   technical conference on June 15, 2015                                     the Commission in Docket No. EL13–88
                                                  documents issued by the Commission,                                      from 9:00 a.m. to 4:00 p.m. to explore                                    and is not for the purpose of discussing
                                                  such as orders, notices, and                                             issues raised in the complaint filed by                                   other specific cases, we note that the
                                                  rulemakings.                                                             Northern Indiana Public Service                                           discussions at the conference may
                                                     In addition, the Commission offers a                                  Company (NIPSCO) against                                                  address matters at issue in the following
                                                  free service called eSubscription which                                  Midcontinent Independent System                                           Commission proceedings that are either
                                                  allows you to keep track of all formal                                   Operator, Inc. (MISO) and PJM                                             pending or within their rehearing
                                                  issuances and submittals in specific                                     Interconnection, L.L.C. (PJM) related to                                  period:

                                                  •   PJM Interconnection, L.L.C ............................................................................................................................................        Docket   No.   ER13–1944
                                                  •   Midcontinent Independent System Operator, Inc ........................................................................................................                         Docket   No.   ER13–1943
                                                  •   PJM Interconnection, L.L.C ............................................................................................................................................        Docket   No.   ER13–1924
                                                  •   Midcontinent Independent System Operator, Inc ........................................................................................................                         Docket   No.   ER13–1945
                                                  •   Entergy Services, Inc ......................................................................................................................................................   Docket   No.   ER13–1955
                                                  •   Cleco Power LLC ............................................................................................................................................................   Docket   No.   ER13–1956
                                                  •   Southwest Power Pool, Inc ............................................................................................................................................         Docket   No.   ER14–1174
                                                  •   Midcontinent Independent System Operator, Inc ........................................................................................................                         Docket   No.   ER14–1736
                                                  •   Midcontinent Independent System Operator, Inc. .......................................................................................................                         Docket   No.   ER14–2445
                                                  •   Southwest Power Pool, Inc ............................................................................................................................................         Docket   No.   ER13–1864
                                                  •   Southwest Power Pool, Inc. v. Midcontinent Independent System Operator, Inc ....................................................                                               Docket   No.   EL14–21
                                                  •   Midcontinent Independent System Operator, Inc. v. Southwest Power Pool, Inc ....................................................                                               Docket   No.   EL14–30
                                                  •   Midwest Independent Transmission System Operator, Inc ........................................................................................                                 Docket   No.   EL11–34
                                                  •   Midwest Independent Transmission System Operator, Inc ........................................................................................                                 Docket   No.   ER11–1844


                                                     Advance registration is strongly                                      information on this event will be posted                                  202–208–2106 with the required
                                                  encouraged for all attendees. If you have                                on the Calendar of Events on the                                          accommodations.
                                                  not already done so, those who plan to                                   Commission’s Web site, www.ferc.gov,                                        Following the technical conference,
                                                  attend may register in advance at the                                    prior to the event.                                                       the Commission will consider post-
                                                  following Web page: https://                                                                                                                       technical conference comments
                                                                                                                             Commission conferences are                                              submitted on or before July 15, 2015.
                                                  www.ferc.gov/whats-new/registration/                                     accessible under section 508 of the
                                                  06-15-15-form.asp. Attendees should                                                                                                                Reply comments are due on or before
                                                                                                                           Rehabilitation Act of 1973. For                                           August 5, 2015. The written comments
                                                  allow time to pass through building
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                                                                                           accessibility accommodations please                                       will be included in the formal record of
                                                  security procedures before the 9:00 a.m.                                 send an email to accessibility@ferc.gov                                   the proceeding, which, together with the
                                                  (Eastern Time) start time of the                                         or call toll free 1–866–208–3372 (voice)                                  record developed to date, will form the
                                                  technical conference. In addition,                                       or 202–502–8659 (TTY); or send a fax to                                   basis for further Commission action.

                                                     1 See the previous discussion on the methods for                        1 The webcast will be available on the Calendar

                                                  filing comments.                                                         of Events on the Commission’s Web site
                                                                                                                           www.ferc.gov for three months after the conference.


                                             VerDate Sep<11>2014         17:09 Jun 05, 2015        Jkt 235001      PO 00000       Frm 00033       Fmt 4703      Sfmt 4703      E:\FR\FM\08JNN1.SGM             08JNN1


                                                                                  Federal Register / Vol. 80, No. 109 / Monday, June 8, 2015 / Notices                                            32371

                                                     For more information about this                      capital or construction cost associated                DEPARTMENT OF ENERGY
                                                  technical conference, please contact                    with the project.
                                                  Lina Naik, 202–502–8882, lina.naik@                                                                            Federal Energy Regulatory
                                                                                                             Pursuant to section 157.9 of the
                                                  ferc.gov, regarding legal issues; or Jason                                                                     Commission
                                                                                                          Commission’s rules, 18 CFR 157.9,
                                                  Strong, 202–502–6124, jason.strong@                     within 90 days of this Notice the                      [Docket No. EL15–72–000]
                                                  ferc.gov, and Ben Foster, 202–502–6149,
                                                                                                          Commission staff will either: complete
                                                  ben.foster@ferc.gov, regarding technical                                                                       Southwestern Electric Cooperative,
                                                                                                          its environmental assessment (EA) and
                                                  issues; or Sarah McKinley, 202–502–                                                                            Inc. v. Midcontinent Independent
                                                  8368, sarah.mckinley@ferc.gov,                          place it into the Commission’s public
                                                                                                                                                                 System Operator, Inc., Dynegy, Inc.,
                                                  regarding logistical issues.                            record (eLibrary) for this proceeding; or
                                                                                                                                                                 and Sellers of Capacity into Zone 4 of
                                                                                                          issue a Notice of Schedule for                         the 2015–2016 MISO Planning
                                                    Dated: June 2, 2015.                                  Environmental Review. If a Notice of
                                                  Kimberly D. Bose,                                                                                              Resource Auction; Notice of Complaint
                                                                                                          Schedule for Environmental Review is
                                                  Secretary.                                              issued, it will indicate, among other                     Take notice that on May 29, 2015,
                                                  [FR Doc. 2015–13899 Filed 6–5–15; 8:45 am]              milestones, the anticipated date for the               pursuant to sections 206, 222 and 306
                                                  BILLING CODE 6717–01–P                                  Commission staff’s issuance of the final               of the Federal Power Act (FPA), 16
                                                                                                          environmental impact statement (FEIS)                  U.S.C. 824(e), 824(v), and 825(e) and
                                                                                                          or EA for this proposal. The filing of the             Rule 206 of the Federal Energy
                                                  DEPARTMENT OF ENERGY                                    EA in the Commission’s public record                   Regulatory Commission’s (Commission)
                                                                                                                                                                 Rules of Practice and Procedure, 18 CFR
                                                  Federal Energy Regulatory                               for this proceeding or the issuance of a
                                                                                                                                                                 385.206, Southwestern Electric
                                                  Commission                                              Notice of Schedule for Environmental
                                                                                                                                                                 Cooperative, Inc. (Complainant) filed a
                                                                                                          Review will serve to notify federal and                complaint against Midcontinent
                                                  [Docket No. CP15–496–000]                               state agencies of the timing for the                   Independent Transmission System
                                                                                                          completion of all necessary reviews, and               Operator, Inc. (‘‘MISO’’), Dynegy, Inc.
                                                  Equitrans, LP; Notice of Request
                                                  Under Blanket Authorization                             the subsequent need to complete all                    and Sellers of Capacity into Zone 4 of
                                                                                                          federal authorizations within 90 days of               the 2015–2016 MISO Planning Resource
                                                     Take notice that on May 21, 2015,                    the date of issuance of the Commission                 Auction asserting that the MISO 2015–
                                                  Equitrans, L.P. (Equitrans), 625 Liberty                staff’s FEIS or EA.                                    2016 Planning Resource Auction failed
                                                  Avenue, Suite 1700, Pittsburgh,                            Any person may, within 60 days after                to produce just and reasonable rates in
                                                  Pennsylvania 15222, filed in the above                                                                         Zone 4, in violation of the Federal
                                                                                                          the issuance of the instant notice by the
                                                  Docket, a prior notice request pursuant                                                                        Power Act, as more fully explained in
                                                                                                          Commission, file pursuant to Rule 214
                                                  to sections 157.205 and 157.208 of the                                                                         the complaint.
                                                                                                          of the Commission’s Procedural Rules
                                                  Commission’s regulations under the                                                                                Any person desiring to intervene or to
                                                  Natural Gas Act (NGA), and Equitrans’                   (18 CFR 385.214) a motion to intervene
                                                                                                                                                                 protest this filing must file in
                                                  authorization in Docket No. CP96–532–                   or notice of intervention. Any person
                                                                                                                                                                 accordance with Rules 211 and 214 of
                                                  000 for authorization to operate its                    filing to intervene or the Commission’s
                                                                                                                                                                 the Commission’s Rules of Practice and
                                                  existing Jefferson Compressor Station at                staff may, pursuant to section 157.205 of
                                                                                                                                                                 Procedure (18 CFR 385.211, 385.214).
                                                  a higher horsepower, all as more fully                  the Commission’s Regulations under the                 Protests will be considered by the
                                                  set forth in the application which is on                Natural Gas Act (NGA) (18 CFR 157.205)                 Commission in determining the
                                                  file with the Commission and open to                    file a protest to the request. If no protest           appropriate action to be taken, but will
                                                  public inspection. The filing may also                  is filed within the time allowed                       not serve to make protestants parties to
                                                  be viewed on the web at http://                         therefore, the proposed activity shall be              the proceeding. Any person wishing to
                                                  www.ferc.gov using the ‘‘eLibrary’’ link.               deemed to be authorized effective the                  become a party must file a notice of
                                                  Enter the docket number excluding the                   day after the time allowed for protest. If             intervention or motion to intervene, as
                                                  last three digits in the docket number                  a protest is filed and not withdrawn                   appropriate. The Respondent’s answer
                                                  field to access the document. For                       within 30 days after the time allowed                  and all interventions, or protests must
                                                  assistance, please contact FERC Online                  for filing a protest, the instant request              be filed on or before the comment date.
                                                  Support at FERCOnlineSupport@                           shall be treated as an application for                 The Respondent’s answer, motions to
                                                  ferc.gov or toll free at (866) 208–3676, or             authorization pursuant to section 7 of                 intervene, and protests must be served
                                                  TTY, contact (202) 502–8659.                            the NGA.                                               on the Complainants.
                                                     Any questions concerning this                                                                                  The Commission encourages
                                                  application may be directed Paul W.                        The Commission strongly encourages
                                                                                                                                                                 electronic submission of protests and
                                                  Diehl, Counsel-Midstream, EQT                           electronic filings of comments, protests,
                                                                                                                                                                 interventions in lieu of paper using the
                                                  Corporation, 625 Liberty Avenue, Suite                  and interventions via the internet in lieu             ‘‘eFiling’’ link at http://www.ferc.gov.
                                                  1700, Pittsburgh, PA 15222, at (412)                    of paper. See 18 CFR 385.2001(a)(1)(iii)               Persons unable to file electronically
                                                  395–5540.                                               and the instructions on the                            should submit an original and 5 copies
                                                     Specifically, Equitrans seeks                        Commission’s Web site (www.ferc.gov)                   of the protest or intervention to the
                                                  authorization to operate the newly                      under the ‘‘e-Filing’’ link.                           Federal Energy Regulatory Commission,
                                                  constructed natural gas turbine                           Dated: June 1, 2015.                                 888 First Street NE., Washington, DC
                                                  compressor at is fully rated capability of              Kimberly D. Bose,                                      20426.
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                  16,301 horsepower. No construction                                                                                This filing is accessible on-line at
                                                                                                          Secretary.
                                                  will be necessary for Equitrans to                                                                             http://www.ferc.gov, using the
                                                                                                          [FR Doc. 2015–13898 Filed 6–5–15; 8:45 am]
                                                  operate the compressor at its fully                                                                            ‘‘eLibrary’’ link and is available for
                                                  capability; rather, Equitrans will need                 BILLING CODE 6717–01–P                                 electronic review in the Commission’s
                                                  only to modify the software which                                                                              Public Reference Room in Washington,
                                                  currently limits the horsepower at the                                                                         DC. There is an ‘‘eSubscription’’ link on
                                                  newly constructed turbine compressor                                                                           the Web site that enables subscribers to
                                                  to 12,913 horsepower. There is no new                                                                          receive email notification when a


                                             VerDate Sep<11>2014   17:09 Jun 05, 2015   Jkt 235001   PO 00000   Frm 00034   Fmt 4703   Sfmt 4703   E:\FR\FM\08JNN1.SGM   08JNN1



Document Created: 2018-02-22 10:12:29
Document Modified: 2018-02-22 10:12:29
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation80 FR 32370 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR