80_FR_32522 80 FR 32413 - Virgil C. Summer Nuclear Station, Units 2 and 3

80 FR 32413 - Virgil C. Summer Nuclear Station, Units 2 and 3

NUCLEAR REGULATORY COMMISSION

Federal Register Volume 80, Issue 109 (June 8, 2015)

Page Range32413-32416
FR Document2015-13940

The U.S. Nuclear Regulatory Commission (NRC) is considering issuance of an amendment to Combined Licenses (NPF-93 and NPF-94), issued to South Carolina Electric and Gas (SCE&G) and South Carolina Public Service Authority (Santee Cooper) (the licensee), for construction and operation of the Virgil C. Summer Nuclear Station (VCSNS), Units 2 and 3 located in Fairfield County, South Carolina. The proposed amendment departs from to Tier 2* and associated Tier 2 information in the VCSNS Units 2 and 3 Updated Final Safety Analysis Report (UFSAR) (which includes the plant specific Design Control Document Tier 2 information) to revise the application of welding codes.

Federal Register, Volume 80 Issue 109 (Monday, June 8, 2015)
[Federal Register Volume 80, Number 109 (Monday, June 8, 2015)]
[Notices]
[Pages 32413-32416]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-13940]


=======================================================================
-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[Docket Nos. 052-00027 and 052-00028; NRC-2008-0441]


Virgil C. Summer Nuclear Station, Units 2 and 3

AGENCY: Nuclear Regulatory Commission.

ACTION: License amendment application; opportunity to comment, request 
a hearing, and petition for leave to intervene.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is considering 
issuance of an amendment to Combined Licenses (NPF-93 and NPF-94), 
issued to South Carolina Electric and Gas (SCE&G) and South Carolina 
Public Service Authority (Santee Cooper) (the licensee), for 
construction and operation of the Virgil C. Summer Nuclear Station 
(VCSNS), Units 2 and 3 located in Fairfield County, South Carolina.
    The proposed amendment departs from to Tier 2* and associated Tier 
2 information in the VCSNS Units 2 and 3 Updated Final Safety Analysis 
Report (UFSAR) (which includes the plant specific Design Control 
Document Tier 2 information) to revise the application of welding 
codes.

DATES: Submit comments by July 8, 2015. Requests for a hearing or 
petition for leave to intervene must be filed by August 7, 2015.

ADDRESSES: You may submit comments by any of the following methods:
     Federal Rulemaking Web site: Go to http://www.regulations.gov and search for Docket ID NRC-2008-0441. Address 
questions about NRC dockets to Carol Gallagher; telephone: 301-415-
3463; email: [email protected]. For technical questions, contact 
the individual listed in the FOR FURTHER INFORMATION CONTACT section of 
this document.
     Mail comments to: Cindy Bladey, Office of Administration, 
Mail Stop: OWFN-12-H08, U.S. Nuclear Regulatory Commission, Washington, 
DC 20555-0001.
    For additional direction on obtaining information and submitting 
comments, see ``Obtaining Information and Submitting Comments'' in the 
SUPPLEMENTARY INFORMATION section of this document.

FOR FURTHER INFORMATION CONTACT: Denise McGovern, Office of New 
Reactors, U.S. Nuclear Regulatory Commission, Washington, DC 20555-000; 
telephone: 301-415-0681; email: [email protected].

SUPPLEMENTARY INFORMATION: 

I. Obtaining Information and Submitting Comments

A. Obtaining Information

    Please refer to Docket ID NRC-2008-0441 when contacting the NRC 
about the availability of information for this action. You may obtain 
publicly-available information related to this action by any of the 
following methods:
     Federal Rulemaking Web site: Go to http://www.regulations.gov and search for Docket ID NRC-2008-0441.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly-available documents online in the 
ADAMS Public Documents collection at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and 
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS, 
please contact the NRC's Public Document Room (PDR) reference staff at 
1-800-397-4209, 301-415-4737, or by email to [email protected]. The 
application for amendment, dated May 26, 2015, is available in ADAMS 
under Accession No. ML15146A455.
     NRC's PDR: You may examine and purchase copies of public 
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 
Rockville Pike, Rockville, Maryland 20852.

B. Submitting Comments

    Please include Docket ID NRC-2008-0441 in your comment submission.
    The NRC cautions you not to include identifying or contact 
information that you do not want to be publicly disclosed in your 
comment submission. The NRC posts all comment submissions at http://www.regulations.gov as well as entering the comment submissions into 
ADAMS. The NRC does not routinely edit comment submissions to remove 
identifying or contact information.
    If you are requesting or aggregating comments from other persons 
for submission to the NRC, then you should inform those persons not to 
include identifying or contact information that they do not want to be 
publicly disclosed in their comment submission. Your request should 
state that the NRC does not routinely edit comment submissions to 
remove such information before making the comment submissions available 
to the public or entering the comment submissions into ADAMS.

II. Introduction

    The NRC is considering issuance of an amendment to Facility 
Operating License Nos. NPF-93 and NPF-94, issued to SCE&G and Santee 
Cooper for operation of the Virgil C. Summer Nuclear Station Units 2 
and 3, located in Fairfield County, South Carolina.
    The proposed amendment departs from Tier 2* and associated Tier 2 
information in the VCSNS Units 2 and 3 UFSAR (which includes the plant 
specific Design Control Document Tier 2 information) to revise the 
application of American Institute for Steel Construction (AISC) N690-
1994, Specification for the Design, Fabrication and Erection of Steel 
Safety Related Structures for Nuclear Facilities, to allow use of 
American Welding Society (AWS) D1.1-2000, Structural Welding Code-
Steel, in lieu of the AWS D1.1-1992 edition identified in AISC N690-
1994.
    Before any issuance of the proposed license amendment, the NRC will 
need to make the findings required by the Atomic Energy Act of 1954, as 
amended (the Act), and NRC's regulations.
    The NRC has made a proposed determination that the license 
amendment request involves no significant hazards consideration. Under 
the NRC's regulations in Sec.  50.92 of Title 10 of the Code of Federal 
Regulations (10 CFR), this means that operation of the facility in 
accordance with the proposed amendment would not (1) involve a 
significant increase in the probability or consequences of an accident 
previously evaluated; or (2) create the possibility of a new or 
different kind of accident from any accident previously evaluated; or 
(3) involve a significant reduction in a margin of safety. As required 
by 10 CFR 50.91(a), the licensee has provided its analysis of the issue 
of no significant hazards consideration, which is presented below:

    1. Does the proposed change involve a significant increase in 
the probability or consequences of an accident previously evaluated?
    Response: No.

[[Page 32414]]

    The design functions of the nuclear island structures are to 
provide support, protection, and separation for the seismic Category 
I mechanical and electrical equipment located in the nuclear island. 
The nuclear island structures are structurally designed to meet 
seismic Category I requirements as defined in Regulatory Guide 1.29. 
The design functions of the seismic Category II portions of the 
annex building and turbine building are to provide integrity for 
non-seismic items located in the proximity of safety-related items, 
the failure of which during a safe shutdown earthquake could result 
in loss of function of safety-related items.
    The use of AWS D1.1-2000 provides criteria for the design, 
qualification, fabrication, and inspection of welds for nuclear 
island structures and seismic Category II portions of the annex 
building and turbine building. These structures continue to meet the 
applicable portions of ACI 349, the remaining applicable portions of 
AISC N690 not related to requirements for welding, including the 
supplemental requirements described in UFSAR Subsections 3.8.4.4.1 
and 3.8.4.5, and the supplemental requirements identified in the 
UFSAR Subsection 3.8.3 for structural modules. The use of AWS D1.1-
2000 does not have an adverse impact on the response of the nuclear 
island structures, or seismic Category II portions of the annex 
building and turbine building to safe shutdown earthquake ground 
motions or loads due to anticipated transients or postulated 
accident conditions. The change does not impact the support, design, 
or operation of mechanical and fluid systems. There is no change to 
plant systems or the response of systems to postulated accident 
conditions. There is no change to the predicted radioactive releases 
due to normal operation or postulated accident conditions. The plant 
response to previously evaluated accidents or external events is not 
adversely affected, nor does the change described create any new 
accident precursors.
    Therefore, the proposed amendment does not involve a significant 
increase in the probability or consequences of an accident 
previously evaluated.
    2. Does the proposed change create the possibility of a new or 
different kind of accident from any accident previously evaluated?
    Response: No.
    The proposed change includes the use of AWS D1.1-2000 to provide 
criteria for the design, qualification, fabrication, and inspection 
of welds for nuclear island structures and the seismic Category II 
portions of the annex building and turbine building. The proposed 
change provides a consistent set of requirements for welding of 
structures required to be designed to the requirements of ACI 349 
and AISC N690. The change to the details does not change the design 
function, support, design, or operation of mechanical and fluid 
systems. The change to the weld details does not result in a new 
failure mechanism for the pertinent structures or new accident 
precursors. As a result, the design function of the structures is 
not adversely affected by the proposed change.
    Therefore, the proposed amendment does not create the 
possibility of a new or different kind of accident from any accident 
previously evaluated.
    3. Does the proposed change involve a significant reduction in a 
margin of safety?
    Response: No.
    The AWS D1.1-2000 code is a consensus standard written, revised, 
and approved by industry experts experienced in welding and weld 
design. The proposed change adds AWS D1.1-2000 to the list of 
applicable codes and standards in the UFSAR. The 2000 edition 
includes criteria that consider directionality in the weld which 
allows for an increase factor on structural fillet weld strength 
relative to the angle of load direction. These changes are supported 
by tests that provide the justification for criteria that consider 
the directionality. These changes can be similarly applied to welds 
in the AP1000 to continue to provide the necessary safety margin.
    Therefore, the proposed amendment does not involve a significant 
reduction in a margin of safety.

    Therefore, the proposed changes do not involve a significant 
reduction in a margin of safety.
    The NRC staff has reviewed the licensee's analysis and, based on 
this review, it appears that the three standards of 10 CFR 50.92(c) are 
satisfied. Therefore, the NRC staff proposes to determine that the 
license amendment request involves a No Significant Hazards 
Consideration.
    The NRC is seeking public comments on this proposed determination 
that the license amendment request involves no significant hazards 
consideration. Any comments received within 30 days after the date of 
publication of this notice will be considered in making any final 
determination.
    Normally, the Commission will not issue the amendment until the 
expiration of 60 days after the date of publication of this notice. The 
Commission may issue the license amendment before expiration of the 60-
day notice period if the Commission concludes the amendment involves no 
significant hazards consideration. In addition, the Commission may 
issue the amendment prior to the expiration of the 30-day comment 
period should circumstances change during the 30-day comment period 
such that failure to act in a timely way would result, for example, in 
derating or shutdown of the facility. Should the Commission take action 
prior to the expiration of either the comment period or the notice 
period, it will publish in the Federal Register a notice of issuance. 
Should the Commission make a final No Significant Hazards Consideration 
Determination, any hearing will take place after issuance. The 
Commission expects that the need to take this action will occur very 
infrequently.

III. Opportunity To Request a Hearing and Petition for Leave To 
Intervene

    Within 60 days after the date of publication of this Federal 
Register notice, any person whose interest may be affected by this 
proceeding and who desires to participate as a party in the proceeding 
must file a written request for hearing or a petition for leave to 
intervene specifying the contentions which the person seeks to have 
litigated in the hearing with respect to the license amendment request. 
Requests for hearing and petitions for leave to intervene shall be 
filed in accordance with the NRC's ``Agency Rules of Practice and 
Procedure'' in 10 CFR part 2. Interested person(s) should consult a 
current copy of 10 CFR 2.309, which is available at the NRC's PDR. The 
NRC's regulations are accessible electronically from the NRC Library on 
the NRC's Web site at http://www.nrc.gov/reading-rm/doc-collections/cfr/.
    As required by 10 CFR 2.309, a request for hearing or petition for 
leave to intervene must set forth with particularity the interest of 
the petitioner in the proceeding and how that interest may be affected 
by the results of the proceeding. The hearing request or petition must 
specifically explain the reasons why intervention should be permitted, 
with particular reference to the following general requirements: (1) 
The name, address, and telephone number of the requestor or petitioner; 
(2) the nature of the requestor's/petitioner's right under the Act to 
be made a party to the proceeding; (3) the nature and extent of the 
requestor's/petitioner's property, financial, or other interest in the 
proceeding; and (4) the possible effect of any decision or order which 
may be entered in the proceeding on the requestor's/petitioner's 
interest. The hearing request or petition must also include the 
specific contentions that the requestor/petitioner seeks to have 
litigated at the proceeding.
    For each contention, the requestor/petitioner must provide a 
specific statement of the issue of law or fact to be raised or 
controverted, as well as a brief explanation of the basis for the 
contention. Additionally, the requestor/petitioner must demonstrate 
that the issue raised by each contention is within the scope of the 
proceeding and is material to the findings that the NRC must make to 
support the granting of a license amendment in response to the 
application. The hearing request or petition must also include a 
concise statement of the alleged facts or expert

[[Page 32415]]

opinion that support the contention and on which the requestor/
petitioner intends to rely at the hearing, together with references to 
those specific sources and documents. The hearing request or petition 
must provide sufficient information to show that a genuine dispute 
exists with the applicant on a material issue of law or fact, including 
references to specific portions of the application for amendment that 
the petitioner disputes and the supporting reasons for each dispute. If 
the requestor/petitioner believes that the application for amendment 
fails to contain information on a relevant matter as required by law, 
the requestor/petitioner must identify each failure and the supporting 
reasons for the requestor's/petitioner's belief. Each contention must 
be one which, if proven, would entitle the requestor/petitioner to 
relief. A requestor/petitioner who does not satisfy these requirements 
for at least one contention will not be permitted to participate as a 
party.
    Those permitted to intervene become parties to the proceeding, 
subject to any limitations in the order granting leave to intervene, 
and have the opportunity to participate fully in the conduct of the 
hearing with respect to resolution of that person's admitted 
contentions, including the opportunity to present evidence and to 
submit a cross-examination plan for cross-examination of witnesses, 
consistent with NRC regulations, policies, and procedures. The Atomic 
Safety and Licensing Board will set the time and place for any 
prehearing conferences and evidentiary hearings, and the appropriate 
notices will be provided.
    Hearing requests or petitions for leave to intervene must be filed 
no later than 60 days from the date of publication of this notice. 
Requests for hearing, petitions for leave to intervene, and motions for 
leave to file new or amended contentions that are filed after the 60-
day deadline will not be entertained absent a determination by the 
presiding officer that the filing demonstrates good cause by satisfying 
the three factors in 10 CFR 2.309(c)(1)(i)-(iii).
    If a hearing is requested, the Commission will make a final 
determination on the issue of no significant hazards consideration. The 
final determination will serve to decide when the hearing is held. If 
the final determination is that the amendment request involves no 
significant hazards consideration, the Commission may issue the 
amendment and make it immediately effective, notwithstanding the 
request for a hearing. Any hearing held would take place after issuance 
of the amendment. If the final determination is that the amendment 
request involves a significant hazards consideration, then any hearing 
held would take place before the issuance of any amendment unless the 
Commission finds an imminent danger to the health or safety of the 
public, in which case it will issue an appropriate order or rule under 
10 CFR part 2.

IV. Electronic Submissions (E-Filing)

    All documents filed in NRC adjudicatory proceedings, including a 
request for hearing, a petition for leave to intervene, any motion or 
other document filed in the proceeding prior to the submission of a 
request for hearing or petition to intervene, and documents filed by 
interested governmental entities participating under 10 CFR 2.315(c), 
must be filed in accordance with the NRC's E-Filing rule (72 FR 49139; 
August 28, 2007). The E-Filing process requires participants to submit 
and serve all adjudicatory documents over the internet, or in some 
cases to mail copies on electronic storage media. Participants may not 
submit paper copies of their filings unless they seek an exemption in 
accordance with the procedures described below.
    To comply with the procedural requirements of E-Filing, at least 
ten 10 days prior to the filing deadline, the participant should 
contact the Office of the Secretary by email at [email protected], 
or by telephone at 301-415-1677, to request (1) a digital 
identification (ID) certificate, which allows the participant (or its 
counsel or representative) to digitally sign documents and access the 
E-Submittal server for any proceeding in which it is participating; and 
(2) advise the Secretary that the participant will be submitting a 
request or petition for hearing (even in instances in which the 
participant, or its counsel or representative, already holds an NRC-
issued digital ID certificate). Based upon this information, the 
Secretary will establish an electronic docket for the hearing in this 
proceeding if the Secretary has not already established an electronic 
docket.
    Information about applying for a digital ID certificate is 
available on the NRC's public Web site at http://www.nrc.gov/site-help/e-submittals/getting-started.html. System requirements for accessing 
the E-Submittal server are detailed in the NRC's ``Guidance for 
Electronic Submission,'' which is available on the agency's public Web 
site at http://www.nrc.gov/site-help/e-submittals.html. Participants 
may attempt to use other software not listed on the Web site, but 
should note that the NRC's E-Filing system does not support unlisted 
software, and the NRC Meta System Help Desk will not be able to offer 
assistance in using unlisted software.
    If a participant is electronically submitting a document to the NRC 
in accordance with the E-Filing rule, the participant must file the 
document using the NRC's online, Web-based submission form. In order to 
serve documents through the Electronic Information Exchange System, 
users will be required to install a Web browser plug-in from the NRC's 
Web site. Further information on the Web-based submission form, 
including the installation of the Web browser plug-in, is available on 
the NRC's public Web site at http://www.nrc.gov/site-help/e-submittals.html.
    Once a participant has obtained a digital ID certificate and a 
docket has been created, the participant can then submit a request for 
hearing or petition for leave to intervene. Submissions should be in 
Portable Document Format (PDF) in accordance with NRC guidance 
available on the NRC's public Web site at http://www.nrc.gov/site-help/e-submittals.html A filing is considered complete at the time the 
documents are submitted through the NRC's E-Filing system. To be 
timely, an electronic filing must be submitted to the E-Filing system 
no later than 11:59 p.m. Eastern Time on the due date. Upon receipt of 
a transmission, the E-Filing system time-stamps the document and sends 
the submitter an email notice confirming receipt of the document. The 
E-Filing system also distributes an email notice that provides access 
to the document to the NRC's Office of the General Counsel and any 
others who have advised the Office of the Secretary that they wish to 
participate in the proceeding, so that the filer need not serve the 
documents on those participants separately. Therefore, applicants and 
other participants (or their counsel or representative) must apply for 
and receive a digital ID certificate before a hearing request/petition 
to intervene is filed so that they can obtain access to the document 
via the E-Filing system.
    A person filing electronically using the NRC's adjudicatory E-
Filing system may seek assistance by contacting the NRC Meta System 
Help Desk through the ``Contact Us'' link located on the NRC's public 
Web site at http://www.nrc.gov/site-help/e-submittals.html, by email to 
[email protected], or by a toll-

[[Page 32416]]

free call at 1-866-672-7640. The NRC Meta System Help Desk is available 
between 8 a.m. and 8 p.m., Eastern Time, Monday through Friday, 
excluding government holidays.
    Participants who believe that they have a good cause for not 
submitting documents electronically must file an exemption request, in 
accordance with 10 CFR 2.302(g), with their initial paper filing 
requesting authorization to continue to submit documents in paper 
format. Such filings must be submitted by: (1) First class mail 
addressed to the Office of the Secretary of the Commission, U.S. 
Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention: 
Rulemaking and Adjudications Staff; or (2) courier, express mail, or 
expedited delivery service to the Office of the Secretary, Sixteenth 
Floor, One White Flint North, 11555 Rockville Pike, Rockville, 
Maryland, 20852, Attention: Rulemaking and Adjudications Staff. 
Participants filing a document in this manner are responsible for 
serving the document on all other participants. Filing is considered 
complete by first-class mail as of the time of deposit in the mail, or 
by courier, express mail, or expedited delivery service upon depositing 
the document with the provider of the service. A presiding officer, 
having granted an exemption request from using E-Filing, may require a 
participant or party to use E-Filing if the presiding officer 
subsequently determines that the reason for granting the exemption from 
use of E-Filing no longer exists.
    Documents submitted in adjudicatory proceedings will appear in the 
NRC's electronic hearing docket which is available to the public at 
http://ehd1.nrc.gov/ehd/, unless excluded pursuant to an order of the 
Commission, or the presiding officer. Participants are requested not to 
include personal privacy information, such as social security numbers, 
home addresses, or home phone numbers in their filings, unless an NRC 
regulation or other law requires submission of such information. 
However, in some instances, a request to intervene will require 
including information on local residence in order to demonstrate a 
proximity assertion of interest in the proceeding. With respect to 
copyrighted works, except for limited excerpts that serve the purpose 
of the adjudicatory filings and would constitute a Fair Use 
application, participants are requested not to include copyrighted 
materials in their submission.
    For further details with respect to this action, see the 
application for license amendment dated May 26, 2015.
    Attorney for licensee: Ms. Kathryn M. Sutton, Morgan, Lewis & 
Bockius LLC, 1111 Pennsylvania Avenue NW., Washington, DC 20004-2514.
    NRC Branch Chief: Denise L. McGovern

    Dated at Rockville, Maryland, this 1st day of June 2015.

    For the Nuclear Regulatory Commission.
Denise L. McGovern,
 Acting Branch Chief, Licensing Branch 4, Division of New Reactor 
Licensing, Office of New Reactors.
[FR Doc. 2015-13940 Filed 6-5-15; 8:45 am]
 BILLING CODE 7590-01-P



                                                                                  Federal Register / Vol. 80, No. 109 / Monday, June 8, 2015 / Notices                                                 32413

                                                     This meeting will be held by                         OWFN–12–H08, U.S. Nuclear                              submission to the NRC, then you should
                                                  teleconference. Please refer to the                     Regulatory Commission, Washington,                     inform those persons not to include
                                                  National Science Board Web site for                     DC 20555–0001.                                         identifying or contact information that
                                                  additional information and schedule                       For additional direction on obtaining                they do not want to be publicly
                                                  updates (time, place, subject matter or                 information and submitting comments,                   disclosed in their comment submission.
                                                  status of meeting), which may be found                  see ‘‘Obtaining Information and                        Your request should state that the NRC
                                                  at http://www.nsf.gov/nsb/notices/.                     Submitting Comments’’ in the                           does not routinely edit comment
                                                  Point of contact for this meeting is                    SUPPLEMENTARY INFORMATION section of                   submissions to remove such information
                                                  Jacqueline Meszaros (jmeszaro@nsf.gov).                 this document.                                         before making the comment
                                                                                                          FOR FURTHER INFORMATION CONTACT:                       submissions available to the public or
                                                  Ann Bushmiller,
                                                                                                          Denise McGovern, Office of New                         entering the comment submissions into
                                                  Senior Counsel to the National Science Board.                                                                  ADAMS.
                                                                                                          Reactors, U.S. Nuclear Regulatory
                                                  [FR Doc. 2015–14008 Filed 6–4–15; 11:15 am]
                                                                                                          Commission, Washington, DC 20555–                      II. Introduction
                                                  BILLING CODE 7555–01–P                                  000; telephone: 301–415–0681; email:
                                                                                                          Denise.Mcgovern@nrc.gov.                                  The NRC is considering issuance of an
                                                                                                          SUPPLEMENTARY INFORMATION:                             amendment to Facility Operating
                                                  NUCLEAR REGULATORY                                                                                             License Nos. NPF–93 and NPF–94,
                                                  COMMISSION                                              I. Obtaining Information and                           issued to SCE&G and Santee Cooper for
                                                                                                          Submitting Comments                                    operation of the Virgil C. Summer
                                                  [Docket Nos. 052–00027 and 052–00028;
                                                                                                          A. Obtaining Information                               Nuclear Station Units 2 and 3, located
                                                  NRC–2008–0441]
                                                                                                                                                                 in Fairfield County, South Carolina.
                                                                                                             Please refer to Docket ID NRC–2008–
                                                  Virgil C. Summer Nuclear Station,                                                                                 The proposed amendment departs
                                                                                                          0441 when contacting the NRC about
                                                  Units 2 and 3                                                                                                  from Tier 2* and associated Tier 2
                                                                                                          the availability of information for this
                                                                                                                                                                 information in the VCSNS Units 2 and
                                                  AGENCY:  Nuclear Regulatory                             action. You may obtain publicly-
                                                                                                                                                                 3 UFSAR (which includes the plant
                                                  Commission.                                             available information related to this
                                                                                                                                                                 specific Design Control Document Tier
                                                                                                          action by any of the following methods:
                                                  ACTION: License amendment application;                                                                         2 information) to revise the application
                                                                                                             • Federal Rulemaking Web site: Go to
                                                  opportunity to comment, request a                                                                              of American Institute for Steel
                                                                                                          http://www.regulations.gov and search
                                                  hearing, and petition for leave to                                                                             Construction (AISC) N690–1994,
                                                                                                          for Docket ID NRC–2008–0441.
                                                  intervene.                                                 • NRC’s Agencywide Documents                        Specification for the Design, Fabrication
                                                                                                          Access and Management System                           and Erection of Steel Safety Related
                                                  SUMMARY:   The U.S. Nuclear Regulatory                                                                         Structures for Nuclear Facilities, to
                                                  Commission (NRC) is considering                         (ADAMS): You may obtain publicly-
                                                                                                          available documents online in the                      allow use of American Welding Society
                                                  issuance of an amendment to Combined                                                                           (AWS) D1.1–2000, Structural Welding
                                                  Licenses (NPF–93 and NPF–94), issued                    ADAMS Public Documents collection at
                                                                                                          http://www.nrc.gov/reading-rm/                         Code-Steel, in lieu of the AWS D1.1–
                                                  to South Carolina Electric and Gas                                                                             1992 edition identified in AISC N690–
                                                  (SCE&G) and South Carolina Public                       adams.html. To begin the search, select
                                                                                                          ‘‘ADAMS Public Documents’’ and then                    1994.
                                                  Service Authority (Santee Cooper) (the                                                                            Before any issuance of the proposed
                                                  licensee), for construction and operation               select ‘‘Begin Web-based ADAMS
                                                                                                          Search.’’ For problems with ADAMS,                     license amendment, the NRC will need
                                                  of the Virgil C. Summer Nuclear Station                                                                        to make the findings required by the
                                                  (VCSNS), Units 2 and 3 located in                       please contact the NRC’s Public
                                                                                                          Document Room (PDR) reference staff at                 Atomic Energy Act of 1954, as amended
                                                  Fairfield County, South Carolina.                                                                              (the Act), and NRC’s regulations.
                                                     The proposed amendment departs                       1–800–397–4209, 301–415–4737, or by
                                                                                                          email to pdr.resource@nrc.gov. The                        The NRC has made a proposed
                                                  from to Tier 2* and associated Tier 2
                                                                                                          application for amendment, dated May                   determination that the license
                                                  information in the VCSNS Units 2 and
                                                                                                          26, 2015, is available in ADAMS under                  amendment request involves no
                                                  3 Updated Final Safety Analysis Report
                                                                                                          Accession No. ML15146A455.                             significant hazards consideration. Under
                                                  (UFSAR) (which includes the plant
                                                  specific Design Control Document Tier                      • NRC’s PDR: You may examine and                    the NRC’s regulations in § 50.92 of Title
                                                                                                          purchase copies of public documents at                 10 of the Code of Federal Regulations
                                                  2 information) to revise the application
                                                                                                          the NRC’s PDR, Room O1–F21, One                        (10 CFR), this means that operation of
                                                  of welding codes.
                                                                                                          White Flint North, 11555 Rockville                     the facility in accordance with the
                                                  DATES: Submit comments by July 8,                                                                              proposed amendment would not (1)
                                                                                                          Pike, Rockville, Maryland 20852.
                                                  2015. Requests for a hearing or petition                                                                       involve a significant increase in the
                                                  for leave to intervene must be filed by                 B. Submitting Comments                                 probability or consequences of an
                                                  August 7, 2015.                                           Please include Docket ID NRC–2008–                   accident previously evaluated; or (2)
                                                  ADDRESSES: You may submit comments                      0441 in your comment submission.                       create the possibility of a new or
                                                  by any of the following methods:                          The NRC cautions you not to include                  different kind of accident from any
                                                     • Federal Rulemaking Web site: Go to                 identifying or contact information that                accident previously evaluated; or (3)
                                                  http://www.regulations.gov and search                   you do not want to be publicly                         involve a significant reduction in a
                                                  for Docket ID NRC–2008–0441. Address                    disclosed in your comment submission.                  margin of safety. As required by 10 CFR
                                                  questions about NRC dockets to Carol                    The NRC posts all comment                              50.91(a), the licensee has provided its
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                  Gallagher; telephone: 301–415–3463;                     submissions at http://                                 analysis of the issue of no significant
                                                  email: Carol.Gallagher@nrc.gov. For                     www.regulations.gov as well as entering                hazards consideration, which is
                                                  technical questions, contact the                        the comment submissions into ADAMS.                    presented below:
                                                  individual listed in the FOR FURTHER                    The NRC does not routinely edit                          1. Does the proposed change involve a
                                                  INFORMATION CONTACT section of this                     comment submissions to remove                          significant increase in the probability or
                                                  document.                                               identifying or contact information.                    consequences of an accident previously
                                                     • Mail comments to: Cindy Bladey,                      If you are requesting or aggregating                 evaluated?
                                                  Office of Administration, Mail Stop:                    comments from other persons for                          Response: No.



                                             VerDate Sep<11>2014   17:09 Jun 05, 2015   Jkt 235001   PO 00000   Frm 00076   Fmt 4703   Sfmt 4703   E:\FR\FM\08JNN1.SGM   08JNN1


                                                  32414                           Federal Register / Vol. 80, No. 109 / Monday, June 8, 2015 / Notices

                                                     The design functions of the nuclear island              Therefore, the proposed amendment does              the need to take this action will occur
                                                  structures are to provide support, protection,          not create the possibility of a new or different       very infrequently.
                                                  and separation for the seismic Category I               kind of accident from any accident
                                                  mechanical and electrical equipment located             previously evaluated.                                  III. Opportunity To Request a Hearing
                                                  in the nuclear island. The nuclear island                  3. Does the proposed change involve a               and Petition for Leave To Intervene
                                                  structures are structurally designed to meet            significant reduction in a margin of safety?              Within 60 days after the date of
                                                  seismic Category I requirements as defined in              Response: No.
                                                  Regulatory Guide 1.29. The design functions                The AWS D1.1–2000 code is a consensus
                                                                                                                                                                 publication of this Federal Register
                                                  of the seismic Category II portions of the              standard written, revised, and approved by             notice, any person whose interest may
                                                  annex building and turbine building are to              industry experts experienced in welding and            be affected by this proceeding and who
                                                  provide integrity for non-seismic items                 weld design. The proposed change adds                  desires to participate as a party in the
                                                  located in the proximity of safety-related              AWS D1.1–2000 to the list of applicable                proceeding must file a written request
                                                  items, the failure of which during a safe               codes and standards in the UFSAR. The 2000             for hearing or a petition for leave to
                                                  shutdown earthquake could result in loss of             edition includes criteria that consider                intervene specifying the contentions
                                                  function of safety-related items.                       directionality in the weld which allows for            which the person seeks to have litigated
                                                     The use of AWS D1.1–2000 provides                    an increase factor on structural fillet weld
                                                  criteria for the design, qualification,
                                                                                                                                                                 in the hearing with respect to the
                                                                                                          strength relative to the angle of load                 license amendment request. Requests
                                                  fabrication, and inspection of welds for                direction. These changes are supported by
                                                  nuclear island structures and seismic                   tests that provide the justification for criteria
                                                                                                                                                                 for hearing and petitions for leave to
                                                  Category II portions of the annex building              that consider the directionality. These                intervene shall be filed in accordance
                                                  and turbine building. These structures                  changes can be similarly applied to welds in           with the NRC’s ‘‘Agency Rules of
                                                  continue to meet the applicable portions of             the AP1000 to continue to provide the                  Practice and Procedure’’ in 10 CFR part
                                                  ACI 349, the remaining applicable portions of           necessary safety margin.                               2. Interested person(s) should consult a
                                                  AISC N690 not related to requirements for                  Therefore, the proposed amendment does              current copy of 10 CFR 2.309, which is
                                                  welding, including the supplemental                     not involve a significant reduction in a               available at the NRC’s PDR. The NRC’s
                                                  requirements described in UFSAR                         margin of safety.                                      regulations are accessible electronically
                                                  Subsections 3.8.4.4.1 and 3.8.4.5, and the
                                                  supplemental requirements identified in the                Therefore, the proposed changes do                  from the NRC Library on the NRC’s Web
                                                  UFSAR Subsection 3.8.3 for structural                   not involve a significant reduction in a               site at http://www.nrc.gov/reading-rm/
                                                  modules. The use of AWS D1.1–2000 does                  margin of safety.                                      doc-collections/cfr/.
                                                  not have an adverse impact on the response                                                                        As required by 10 CFR 2.309, a
                                                                                                             The NRC staff has reviewed the
                                                  of the nuclear island structures, or seismic                                                                   request for hearing or petition for leave
                                                                                                          licensee’s analysis and, based on this
                                                  Category II portions of the annex building                                                                     to intervene must set forth with
                                                                                                          review, it appears that the three
                                                  and turbine building to safe shutdown                                                                          particularity the interest of the
                                                  earthquake ground motions or loads due to               standards of 10 CFR 50.92(c) are                       petitioner in the proceeding and how
                                                  anticipated transients or postulated accident           satisfied. Therefore, the NRC staff                    that interest may be affected by the
                                                  conditions. The change does not impact the              proposes to determine that the license                 results of the proceeding. The hearing
                                                  support, design, or operation of mechanical             amendment request involves a No                        request or petition must specifically
                                                  and fluid systems. There is no change to                Significant Hazards Consideration.
                                                  plant systems or the response of systems to                                                                    explain the reasons why intervention
                                                                                                             The NRC is seeking public comments                  should be permitted, with particular
                                                  postulated accident conditions. There is no
                                                                                                          on this proposed determination that the                reference to the following general
                                                  change to the predicted radioactive releases
                                                  due to normal operation or postulated                   license amendment request involves no                  requirements: (1) The name, address,
                                                  accident conditions. The plant response to              significant hazards consideration. Any                 and telephone number of the requestor
                                                  previously evaluated accidents or external              comments received within 30 days after                 or petitioner; (2) the nature of the
                                                  events is not adversely affected, nor does the          the date of publication of this notice                 requestor’s/petitioner’s right under the
                                                  change described create any new accident                will be considered in making any final                 Act to be made a party to the
                                                  precursors.                                             determination.                                         proceeding; (3) the nature and extent of
                                                     Therefore, the proposed amendment does                  Normally, the Commission will not                   the requestor’s/petitioner’s property,
                                                  not involve a significant increase in the
                                                                                                          issue the amendment until the                          financial, or other interest in the
                                                  probability or consequences of an accident
                                                  previously evaluated.                                   expiration of 60 days after the date of                proceeding; and (4) the possible effect of
                                                     2. Does the proposed change create the               publication of this notice. The                        any decision or order which may be
                                                  possibility of a new or different kind of               Commission may issue the license                       entered in the proceeding on the
                                                  accident from any accident previously                   amendment before expiration of the 60-                 requestor’s/petitioner’s interest. The
                                                  evaluated?                                              day notice period if the Commission                    hearing request or petition must also
                                                     Response: No.                                        concludes the amendment involves no                    include the specific contentions that the
                                                     The proposed change includes the use of              significant hazards consideration. In                  requestor/petitioner seeks to have
                                                  AWS D1.1–2000 to provide criteria for the               addition, the Commission may issue the                 litigated at the proceeding.
                                                  design, qualification, fabrication, and
                                                                                                          amendment prior to the expiration of                      For each contention, the requestor/
                                                  inspection of welds for nuclear island
                                                  structures and the seismic Category II                  the 30-day comment period should                       petitioner must provide a specific
                                                  portions of the annex building and turbine              circumstances change during the 30-day                 statement of the issue of law or fact to
                                                  building. The proposed change provides a                comment period such that failure to act                be raised or controverted, as well as a
                                                  consistent set of requirements for welding of           in a timely way would result, for                      brief explanation of the basis for the
                                                  structures required to be designed to the               example, in derating or shutdown of the                contention. Additionally, the requestor/
                                                  requirements of ACI 349 and AISC N690. The              facility. Should the Commission take                   petitioner must demonstrate that the
                                                  change to the details does not change the
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                                                                          action prior to the expiration of either               issue raised by each contention is
                                                  design function, support, design, or operation          the comment period or the notice                       within the scope of the proceeding and
                                                  of mechanical and fluid systems. The change
                                                                                                          period, it will publish in the Federal                 is material to the findings that the NRC
                                                  to the weld details does not result in a new
                                                  failure mechanism for the pertinent                     Register a notice of issuance. Should the              must make to support the granting of a
                                                  structures or new accident precursors. As a             Commission make a final No Significant                 license amendment in response to the
                                                  result, the design function of the structures           Hazards Consideration Determination,                   application. The hearing request or
                                                  is not adversely affected by the proposed               any hearing will take place after                      petition must also include a concise
                                                  change.                                                 issuance. The Commission expects that                  statement of the alleged facts or expert


                                             VerDate Sep<11>2014   17:09 Jun 05, 2015   Jkt 235001   PO 00000   Frm 00077   Fmt 4703   Sfmt 4703   E:\FR\FM\08JNN1.SGM   08JNN1


                                                                                  Federal Register / Vol. 80, No. 109 / Monday, June 8, 2015 / Notices                                              32415

                                                  opinion that support the contention and                 held would take place after issuance of                submittals.html. Participants may
                                                  on which the requestor/petitioner                       the amendment. If the final                            attempt to use other software not listed
                                                  intends to rely at the hearing, together                determination is that the amendment                    on the Web site, but should note that the
                                                  with references to those specific sources               request involves a significant hazards                 NRC’s E-Filing system does not support
                                                  and documents. The hearing request or                   consideration, then any hearing held                   unlisted software, and the NRC Meta
                                                  petition must provide sufficient                        would take place before the issuance of                System Help Desk will not be able to
                                                  information to show that a genuine                      any amendment unless the Commission                    offer assistance in using unlisted
                                                  dispute exists with the applicant on a                  finds an imminent danger to the health                 software.
                                                  material issue of law or fact, including                or safety of the public, in which case it                 If a participant is electronically
                                                  references to specific portions of the                  will issue an appropriate order or rule                submitting a document to the NRC in
                                                  application for amendment that the                      under 10 CFR part 2.                                   accordance with the E-Filing rule, the
                                                  petitioner disputes and the supporting                                                                         participant must file the document
                                                                                                          IV. Electronic Submissions (E-Filing)                  using the NRC’s online, Web-based
                                                  reasons for each dispute. If the
                                                  requestor/petitioner believes that the                     All documents filed in NRC                          submission form. In order to serve
                                                  application for amendment fails to                      adjudicatory proceedings, including a                  documents through the Electronic
                                                  contain information on a relevant matter                request for hearing, a petition for leave              Information Exchange System, users
                                                  as required by law, the requestor/                      to intervene, any motion or other                      will be required to install a Web
                                                  petitioner must identify each failure and               document filed in the proceeding prior                 browser plug-in from the NRC’s Web
                                                  the supporting reasons for the                          to the submission of a request for                     site. Further information on the Web-
                                                  requestor’s/petitioner’s belief. Each                   hearing or petition to intervene, and                  based submission form, including the
                                                  contention must be one which, if                        documents filed by interested                          installation of the Web browser plug-in,
                                                  proven, would entitle the requestor/                    governmental entities participating                    is available on the NRC’s public Web
                                                  petitioner to relief. A requestor/                      under 10 CFR 2.315(c), must be filed in                site at http://www.nrc.gov/site-help/e-
                                                  petitioner who does not satisfy these                   accordance with the NRC’s E-Filing rule                submittals.html.
                                                  requirements for at least one contention                (72 FR 49139; August 28, 2007). The E-                    Once a participant has obtained a
                                                  will not be permitted to participate as a               Filing process requires participants to                digital ID certificate and a docket has
                                                  party.                                                  submit and serve all adjudicatory                      been created, the participant can then
                                                     Those permitted to intervene become                  documents over the internet, or in some                submit a request for hearing or petition
                                                  parties to the proceeding, subject to any               cases to mail copies on electronic                     for leave to intervene. Submissions
                                                  limitations in the order granting leave to              storage media. Participants may not                    should be in Portable Document Format
                                                  intervene, and have the opportunity to                  submit paper copies of their filings                   (PDF) in accordance with NRC guidance
                                                  participate fully in the conduct of the                 unless they seek an exemption in                       available on the NRC’s public Web site
                                                  hearing with respect to resolution of                   accordance with the procedures                         at http://www.nrc.gov/site-help/e-
                                                  that person’s admitted contentions,                     described below.                                       submittals.html A filing is considered
                                                  including the opportunity to present                       To comply with the procedural                       complete at the time the documents are
                                                  evidence and to submit a cross-                         requirements of E-Filing, at least ten 10              submitted through the NRC’s E-Filing
                                                  examination plan for cross-examination                  days prior to the filing deadline, the                 system. To be timely, an electronic
                                                  of witnesses, consistent with NRC                       participant should contact the Office of               filing must be submitted to the E-Filing
                                                  regulations, policies, and procedures.                  the Secretary by email at                              system no later than 11:59 p.m. Eastern
                                                  The Atomic Safety and Licensing Board                   hearing.docket@nrc.gov, or by telephone                Time on the due date. Upon receipt of
                                                  will set the time and place for any                     at 301–415–1677, to request (1) a digital              a transmission, the E-Filing system
                                                  prehearing conferences and evidentiary                  identification (ID) certificate, which                 time-stamps the document and sends
                                                  hearings, and the appropriate notices                   allows the participant (or its counsel or              the submitter an email notice
                                                  will be provided.                                       representative) to digitally sign                      confirming receipt of the document. The
                                                     Hearing requests or petitions for leave              documents and access the E-Submittal                   E-Filing system also distributes an email
                                                  to intervene must be filed no later than                server for any proceeding in which it is               notice that provides access to the
                                                  60 days from the date of publication of                 participating; and (2) advise the                      document to the NRC’s Office of the
                                                  this notice. Requests for hearing,                      Secretary that the participant will be                 General Counsel and any others who
                                                  petitions for leave to intervene, and                   submitting a request or petition for                   have advised the Office of the Secretary
                                                  motions for leave to file new or                        hearing (even in instances in which the                that they wish to participate in the
                                                  amended contentions that are filed after                participant, or its counsel or                         proceeding, so that the filer need not
                                                  the 60-day deadline will not be                         representative, already holds an NRC-                  serve the documents on those
                                                  entertained absent a determination by                   issued digital ID certificate). Based upon             participants separately. Therefore,
                                                  the presiding officer that the filing                   this information, the Secretary will                   applicants and other participants (or
                                                  demonstrates good cause by satisfying                   establish an electronic docket for the                 their counsel or representative) must
                                                  the three factors in 10 CFR                             hearing in this proceeding if the                      apply for and receive a digital ID
                                                  2.309(c)(1)(i)–(iii).                                   Secretary has not already established an               certificate before a hearing request/
                                                     If a hearing is requested, the                       electronic docket.                                     petition to intervene is filed so that they
                                                  Commission will make a final                               Information about applying for a                    can obtain access to the document via
                                                  determination on the issue of no                        digital ID certificate is available on the             the E-Filing system.
                                                  significant hazards consideration. The                  NRC’s public Web site at http://                          A person filing electronically using
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                  final determination will serve to decide                www.nrc.gov/site-help/e-submittals/                    the NRC’s adjudicatory E-Filing system
                                                  when the hearing is held. If the final                  getting-started.html. System                           may seek assistance by contacting the
                                                  determination is that the amendment                     requirements for accessing the E-                      NRC Meta System Help Desk through
                                                  request involves no significant hazards                 Submittal server are detailed in the                   the ‘‘Contact Us’’ link located on the
                                                  consideration, the Commission may                       NRC’s ‘‘Guidance for Electronic                        NRC’s public Web site at http://
                                                  issue the amendment and make it                         Submission,’’ which is available on the                www.nrc.gov/site-help/e-
                                                  immediately effective, notwithstanding                  agency’s public Web site at http://                    submittals.html, by email to
                                                  the request for a hearing. Any hearing                  www.nrc.gov/site-help/e-                               MSHD.Resource@nrc.gov, or by a toll-


                                             VerDate Sep<11>2014   17:09 Jun 05, 2015   Jkt 235001   PO 00000   Frm 00078   Fmt 4703   Sfmt 4703   E:\FR\FM\08JNN1.SGM   08JNN1


                                                  32416                           Federal Register / Vol. 80, No. 109 / Monday, June 8, 2015 / Notices

                                                  free call at 1–866–672–7640. The NRC                      Attorney for licensee: Ms. Kathryn M.                You may obtain publicly-available
                                                  Meta System Help Desk is available                      Sutton, Morgan, Lewis & Bockius LLC,                   information related to this document
                                                  between 8 a.m. and 8 p.m., Eastern                      1111 Pennsylvania Avenue NW.,                          using any of the following methods:
                                                  Time, Monday through Friday,                            Washington, DC 20004–2514.                                • Federal Rulemaking Web site: Go to
                                                  excluding government holidays.                            NRC Branch Chief: Denise L.                          http://www.regulations.gov and search
                                                     Participants who believe that they                   McGovern                                               for Docket ID NRC–2011–0024. Address
                                                  have a good cause for not submitting                      Dated at Rockville, Maryland, this 1st day           questions about NRC dockets to Carol
                                                  documents electronically must file an                   of June 2015.                                          Gallagher; telephone: 301–415–3463;
                                                  exemption request, in accordance with                     For the Nuclear Regulatory Commission.               email: Carol.Gallagher@nrc.gov. For
                                                  10 CFR 2.302(g), with their initial paper                                                                      technical questions, contact the
                                                                                                          Denise L. McGovern,
                                                  filing requesting authorization to                                                                             individual listed in the FOR FURTHER
                                                  continue to submit documents in paper                   Acting Branch Chief, Licensing Branch 4,
                                                                                                                                                                 INFORMATION CONTACT section of this
                                                                                                          Division of New Reactor Licensing, Office of
                                                  format. Such filings must be submitted                                                                         document.
                                                                                                          New Reactors.
                                                  by: (1) First class mail addressed to the                                                                         • NRC’s Agencywide Documents
                                                                                                          [FR Doc. 2015–13940 Filed 6–5–15; 8:45 am]
                                                  Office of the Secretary of the                                                                                 Access and Management System
                                                                                                          BILLING CODE 7590–01–P
                                                  Commission, U.S. Nuclear Regulatory                                                                            (ADAMS): You may obtain publicly
                                                  Commission, Washington, DC 20555–                                                                              available documents online in the
                                                  0001, Attention: Rulemaking and                                                                                ADAMS Public Documents collection at
                                                                                                          NUCLEAR REGULATORY
                                                  Adjudications Staff; or (2) courier,                                                                           http://www.nrc.gov/reading-rm/
                                                  express mail, or expedited delivery                     COMMISSION
                                                                                                                                                                 adams.html. To begin the search, select
                                                  service to the Office of the Secretary,                 [Docket No. 50–302; License No. DPR–72;                ‘‘ADAMS Public Documents’’ and then
                                                  Sixteenth Floor, One White Flint North,                 NRC–2011–0024]                                         select ‘‘Begin Web-based ADAMS
                                                  11555 Rockville Pike, Rockville,                                                                               Search.’’ For problems with ADAMS,
                                                  Maryland, 20852, Attention:                             In the Matter of Duke Energy Florida,                  please contact the NRC’s Public
                                                  Rulemaking and Adjudications Staff.                     Inc.; Crystal River Unit 3 Nuclear                     Document Room (PDR) reference staff at
                                                  Participants filing a document in this                  Generating Plant                                       1–800–397–4209, 301–415–4737, or by
                                                  manner are responsible for serving the                  AGENCY: Nuclear Regulatory                             email to pdr.resource@nrc.gov. The
                                                  document on all other participants.                     Commission.                                            ADAMS accession number for each
                                                  Filing is considered complete by first-                                                                        document referenced (if it available in
                                                                                                          ACTION: Direct transfer of license; order.
                                                  class mail as of the time of deposit in                                                                        ADAMS) is provided the first time that
                                                  the mail, or by courier, express mail, or               SUMMARY:    The U.S. Nuclear Regulatory                a document is referenced.
                                                  expedited delivery service upon                         Commission (NRC) is issuing an order to                   • NRC’s PDR: You may examine and
                                                  depositing the document with the                        Duke Energy Florida, Inc. (DEF),                       purchase copies of public documents at
                                                  provider of the service. A presiding                    approving the direct transfer of Facility              the NRC’s PDR, Room O1–F21, One
                                                  officer, having granted an exemption                    Operating License No. DPR–72 for                       White Flint North, 11555 Rockville
                                                  request from using E-Filing, may require                Crystal River Unit 3 Nuclear Generating                Pike, Rockville, Maryland 20852.
                                                  a participant or party to use E-Filing if               Plant (CR–3), to the extent held by eight              FOR FURTHER INFORMATION CONTACT:
                                                  the presiding officer subsequently                      minority co-owners to DEF. The eight                   Michael D. Orenak, Office of Nuclear
                                                  determines that the reason for granting                 minority co-owners, all municipalities                 Reactor Regulation, U.S. Nuclear
                                                  the exemption from use of E-Filing no                   or utilities in the State of Florida, are as           Regulatory Commission, Washington,
                                                  longer exists.                                          follows: The City of Alachua, City of                  DC 20555–0001; telephone: 301–415–
                                                     Documents submitted in adjudicatory                  Bushnell, City of Gainesville, City of                 3229; email: Michael.Orenak@nrc.gov.
                                                  proceedings will appear in the NRC’s                    Kissimmee, City of Leesburg, City of                   SUPPLEMENTARY INFORMATION: The text of
                                                  electronic hearing docket which is                      New Smyrna Beach and Utilities
                                                  available to the public at http://                                                                             the Order is attached.
                                                                                                          Commission/City of New Smyrna                            Dated at Rockville, Maryland this 29th day
                                                  ehd1.nrc.gov/ehd/, unless excluded                      Beach, City of Ocala, and Orlando
                                                  pursuant to an order of the Commission,                                                                        of May, 2015.
                                                                                                          Utilities Commission/City of Orlando                     For The Nuclear Regulatory Commission.
                                                  or the presiding officer. Participants are
                                                                                                          (the eight minority co-owners,
                                                  requested not to include personal                                                                              Meena K. Khanna,
                                                                                                          collectively). The direct license transfer
                                                  privacy information, such as social                                                                            Chief, Plant Licensing IV–2 and
                                                                                                          does not involve Seminole Electric
                                                  security numbers, home addresses, or                                                                           Decommissioning Transition Branch,
                                                                                                          Cooperative, Inc., the remaining co-
                                                  home phone numbers in their filings,                                                                           Division of Operating Reactor Licensing,
                                                                                                          owner of CR–3. A conforming license
                                                  unless an NRC regulation or other law                                                                          Office of Nuclear Reactor Regulation.
                                                                                                          amendment will remove reference to the
                                                  requires submission of such
                                                                                                          eight minority co-owners in the license.               Attachment—Order Approving
                                                  information. However, in some
                                                                                                          The CR–3 facility is permanently shut                  Transfer of License and Conforming
                                                  instances, a request to intervene will
                                                                                                          down and defueled and the application                  Amendment
                                                  require including information on local
                                                  residence in order to demonstrate a                     proposed no physical changes to the                    United States of America
                                                  proximity assertion of interest in the                  facility or operational changes. DEF and
                                                                                                          Seminole Electric Corporation, Inc., will              Nuclear Regulatory Commission
                                                  proceeding. With respect to copyrighted
                                                  works, except for limited excerpts that                 be joint owners of CR–3 and DEF will                     In the Matter of Duke Energy Florida, Inc.;
                                                                                                          be the operator of the facility. This                  Crystal River Unit 3 Nuclear Generating
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                  serve the purpose of the adjudicatory                                                                          Plant, Docket No. 50–302, License No. DPR–
                                                  filings and would constitute a Fair Use                 Order is effective upon issuance.
                                                                                                                                                                 72, Order Approving Transfer of License and
                                                  application, participants are requested                 DATES: The Order was issued on May                     Conforming Amendment.
                                                  not to include copyrighted materials in                 29, 2015, and is effective for one year.
                                                  their submission.                                       ADDRESSES: Please refer to Docket ID                   I.
                                                     For further details with respect to this             NRC–2011–0024 when contacting the                        Duke Energy Florida, Inc. (DEF or the
                                                  action, see the application for license                 NRC about the availability of                          applicant), City of Alachua, City of
                                                  amendment dated May 26, 2015.                           information regarding this document.                   Bushnell, City of Gainesville, City of


                                             VerDate Sep<11>2014   17:09 Jun 05, 2015   Jkt 235001   PO 00000   Frm 00079   Fmt 4703   Sfmt 4703   E:\FR\FM\08JNN1.SGM   08JNN1



Document Created: 2018-02-22 10:12:42
Document Modified: 2018-02-22 10:12:42
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionLicense amendment application; opportunity to comment, request a hearing, and petition for leave to intervene.
DatesSubmit comments by July 8, 2015. Requests for a hearing or petition for leave to intervene must be filed by August 7, 2015.
ContactDenise McGovern, Office of New Reactors, U.S. Nuclear Regulatory Commission, Washington, DC 20555-000; telephone: 301-415-0681; email: [email protected]
FR Citation80 FR 32413 