80_FR_32527 80 FR 32418 - Northwest Medical Isotopes, LLC; Construction Permit Application

80 FR 32418 - Northwest Medical Isotopes, LLC; Construction Permit Application

NUCLEAR REGULATORY COMMISSION

Federal Register Volume 80, Issue 109 (June 8, 2015)

Page Range32418-32419
FR Document2015-13937

The U.S. Nuclear Regulatory Commission (NRC) staff has determined that the partial application for a construction permit, submitted by Northwest Medical Isotopes, LLC (NWMI) is acceptable for docketing. The NWMI proposes to build a medical radioisotope production facility located in Columbia, Missouri.

Federal Register, Volume 80 Issue 109 (Monday, June 8, 2015)
[Federal Register Volume 80, Number 109 (Monday, June 8, 2015)]
[Notices]
[Pages 32418-32419]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-13937]


-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[Docket No. 50-609; NRC-2013-0235]


Northwest Medical Isotopes, LLC; Construction Permit Application

AGENCY: Nuclear Regulatory Commission.

ACTION: Construction permit application; docketing.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) staff has 
determined that the partial application for a construction permit, 
submitted by Northwest Medical Isotopes, LLC (NWMI) is acceptable for 
docketing. The NWMI proposes to build a medical radioisotope production 
facility located in Columbia, Missouri.

DATES: June 8, 2015.

ADDRESSES: Please refer to Docket ID NRC-2013-0235 when contacting the 
NRC about the availability of information regarding this document. You 
may obtain publicly-available information related to this document 
using any of the following methods:
     Federal Rulemaking Web site: Go to http://www.regulations.gov and search for Docket ID NRC-2013-0235. Address 
questions about NRC dockets to Carol Gallagher; telephone: 301-415-
3463; email: [email protected]. For technical questions, contact 
the individual listed in the FOR FURTHER INFORMATION CONTACT section of 
this document.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly-available documents online in the 
ADAMS Public Documents collection at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and 
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS, 
please contact the NRC's Public Document Room (PDR) reference staff at 
1-800-397-4209, 301-415-4737, or by email to [email protected]. The 
ADAMS accession number for each document referenced in this document 
(if that document is available in ADAMS) is provided the first time 
that a document is referenced.
     NRC's PDR: You may examine and purchase copies of public 
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 
Rockville Pike, Rockville, Maryland 20852.

FOR FURTHER INFORMATION CONTACT: Michael Balazik, Office of Nuclear 
Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC 
20555-0001; telephone: 301-415-2856; email: [email protected].

SUPPLEMENTARY INFORMATION: On November 7, 2014, NWMI filed with the 
NRC, pursuant to Section 103 of the Atomic Energy Act of 1954, as 
amended, and part 50 of Title 10 of the Code of Federal Regulations (10 
CFR), a portion of an application for a construction permit for a 
medical radioisotope production facility in Columbia, Missouri. By 
letter dated February 5, 2015 (ADAMS Accession No. ML15086A262), NWMI 
withdrew and resubmitted this portion of its construction permit 
application (ADAMS Accession No. ML15086A261) to include a discussion 
of connected actions in its environmental report in response to a 
January 23, 2015, letter from the NRC (ADAMS Accession No. 
ML14349A501). A notice of receipt of this application was previously 
published in the Federal Register on April 21, 2015 (80 FR 22227).
    An exemption from certain requirements of 10 CFR 2.101(a)(5) 
granted by the Commission on October 7, 2013, and published in the 
Federal Register on October 24, 2013 (78 FR 63501), in response to a 
letter from NWMI dated August 9, 2013 (ADAMS Accession No. 
ML13227A295), allowed for NWMI to submit its construction permit 
application in two parts. Specifically, the exemption allowed NWMI to 
submit a portion of its application for a construction permit up to six 
months prior to the remainder of the application regardless of whether 
or not an environmental impact statement or a supplement to an 
environmental impact statement was prepared during the review of its 
application. On February 5, 2015, in accordance with 10 CFR 
2.101(a)(5), NWMI submitted the following in part one of the 
construction permit application (ADAMS Accession No. ML15086A261):
     The description and safety assessment of the site required 
by 10 CFR 50.34(a)(1),
     the environmental report required by 10 CFR 50.30(f),
     the filing fee information required by 10 CFR 50.30(e) and 
10 CFR 170.21,
     the general information required by 10 CFR 50.33; and
     the agreement limiting access to classified information 
required by 10 CFR 50.37.
    The NRC staff has determined that NWMI has submitted the 
information listed above in accordance with 10 CFR 2.101(a)(5) and that 
the partial application is acceptable for docketing. The docket number 
established for the NWMI facility is 50-609.
    The NRC staff will perform a detailed technical review of the 
partial construction permit application. Docketing of the partial 
construction permit application does not preclude the NRC from 
requesting additional information from the applicant as the review 
proceeds, nor does it predict whether the Commission will grant or deny 
the application. The NRC staff will also perform an acceptance review 
of the second and final part of the construction permit application 
when it is tendered. As stated in NWMI's February 5, 2015, letter, the 
second and final part of NWMI's application for a construction permit 
will contain the remainder of the preliminary safety analysis report 
required by 10 CFR 50.34(a) and will be submitted in accordance with 
the requirements of 10 CFR 2.101(a)(5). If, after completion of the 
acceptance review of the full construction permit application, the full 
construction permit application is found acceptable for docketing, the 
Commission or a designated Atomic Safety and Licensing Board will 
conduct a hearing in accordance with Subpart L, ``Simplified Hearing 
Procedures for NRC Adjudications,'' of 10 CFR part 2 and the Advisory 
Committee on Reactor Safeguards will prepare a report on the 
construction permit application consistent with 10 CFR 50.58, 
``Hearings and report of the Advisory Committee on Reactor 
Safeguards.'' The Commission will announce in a future Federal Register 
notice, the opportunity to petition for leave to intervene in the 
hearing required for this application by 10 CFR 50.58, as well as the 
time and place of the hearing. If the Commission finds that the full 
construction permit application meets the applicable standards of the 
Atomic Energy Act and

[[Page 32419]]

the Commission's regulations, and that required notifications to other 
agencies and bodies have been made, the Commission will issue a 
construction permit, in the form and containing conditions and 
limitations that the Commission finds appropriate and necessary.
    Pursuant to 10 CFR part 51, the NRC staff will conduct an 
environmental review of the construction permit before recommending 
Commission action on the application. The NRC staff will determine in 
accordance with 10 CFR 51.25, whether it will prepare an environmental 
impact statement or an environmental assessment to inform the decision 
on the construction permit application and will publish a Federal 
Register notice concerning its environmental review.

    Dated at Rockville, Maryland, this 29th day of May 2015.

    For the Nuclear Regulatory Commission.

Alexander Adams, Jr.,
 Chief, Research and Test Reactors Licensing Branch, Division of Policy 
and Rulemaking, Office of Nuclear Reactor Regulation.
[FR Doc. 2015-13937 Filed 6-5-15; 8:45 am]
 BILLING CODE 7590-01-P



                                                  32418                           Federal Register / Vol. 80, No. 109 / Monday, June 8, 2015 / Notices

                                                  White Flint North, 11555 Rockville                      http://www.nrc.gov/reading-rm/                         CFR 2.101(a)(5), NWMI submitted the
                                                  Pike, Room O–1 F21 (First Floor),                       adams.html. To begin the search, select                following in part one of the construction
                                                  Rockville, Maryland and accessible                      ‘‘ADAMS Public Documents’’ and then                    permit application (ADAMS Accession
                                                  electronically though the ADAMS                         select ‘‘Begin Web-based ADAMS                         No. ML15086A261):
                                                  Public Electronic Reading Room on the                   Search.’’ For problems with ADAMS,                        • The description and safety
                                                  Internet at the NRC Web site, http://                   please contact the NRC’s Public                        assessment of the site required by 10
                                                  www.nrc.gov/reading-rm/adams.html.                      Document Room (PDR) reference staff at                 CFR 50.34(a)(1),
                                                  Persons who do not have access to                       1–800–397–4209, 301–415–4737, or by                       • the environmental report required
                                                  ADAMS or who encounter problems in                      email to pdr.resource@nrc.gov. The                     by 10 CFR 50.30(f),
                                                  accessing the documents located in                      ADAMS accession number for each                           • the filing fee information required
                                                  ADAMS should contact the NRC PDR                        document referenced in this document                   by 10 CFR 50.30(e) and 10 CFR 170.21,
                                                  reference staff by telephone at 1–800–                  (if that document is available in                         • the general information required by
                                                  397–4209, 301–415–4737, or by email at                  ADAMS) is provided the first time that                 10 CFR 50.33; and
                                                                                                                                                                    • the agreement limiting access to
                                                  pdr.resource@nrc.gov.                                   a document is referenced.
                                                                                                             • NRC’s PDR: You may examine and                    classified information required by 10
                                                    Dated at Rockville, Maryland, this 29th day                                                                  CFR 50.37.
                                                  of May 2015.                                            purchase copies of public documents at
                                                                                                                                                                    The NRC staff has determined that
                                                    For The Nuclear Regulatory Commission.                the NRC’s PDR, Room O1–F21, One
                                                                                                                                                                 NWMI has submitted the information
                                                  William M. Dean,                                        White Flint North, 11555 Rockville                     listed above in accordance with 10 CFR
                                                  Director, Office of Nuclear Reactor                     Pike, Rockville, Maryland 20852.                       2.101(a)(5) and that the partial
                                                  Regulation.                                             FOR FURTHER INFORMATION CONTACT:                       application is acceptable for docketing.
                                                  [FR Doc. 2015–13939 Filed 6–5–15; 8:45 am]              Michael Balazik, Office of Nuclear                     The docket number established for the
                                                  BILLING CODE 7590–01–P
                                                                                                          Reactor Regulation, U.S. Nuclear                       NWMI facility is 50–609.
                                                                                                          Regulatory Commission, Washington,                        The NRC staff will perform a detailed
                                                                                                          DC 20555–0001; telephone: 301–415–                     technical review of the partial
                                                  NUCLEAR REGULATORY                                      2856; email: Michael.Balazik@nrc.gov.                  construction permit application.
                                                  COMMISSION                                              SUPPLEMENTARY INFORMATION: On                          Docketing of the partial construction
                                                                                                          November 7, 2014, NWMI filed with the                  permit application does not preclude
                                                  [Docket No. 50–609; NRC–2013–0235]
                                                                                                          NRC, pursuant to Section 103 of the                    the NRC from requesting additional
                                                  Northwest Medical Isotopes, LLC;                        Atomic Energy Act of 1954, as amended,                 information from the applicant as the
                                                  Construction Permit Application                         and part 50 of Title 10 of the Code of                 review proceeds, nor does it predict
                                                                                                          Federal Regulations (10 CFR), a portion                whether the Commission will grant or
                                                  AGENCY:  Nuclear Regulatory                             of an application for a construction                   deny the application. The NRC staff will
                                                  Commission.                                             permit for a medical radioisotope                      also perform an acceptance review of
                                                  ACTION: Construction permit                             production facility in Columbia,                       the second and final part of the
                                                  application; docketing.                                 Missouri. By letter dated February 5,                  construction permit application when it
                                                                                                          2015 (ADAMS Accession No.                              is tendered. As stated in NWMI’s
                                                  SUMMARY:   The U.S. Nuclear Regulatory                  ML15086A262), NWMI withdrew and                        February 5, 2015, letter, the second and
                                                  Commission (NRC) staff has determined                   resubmitted this portion of its                        final part of NWMI’s application for a
                                                  that the partial application for a                      construction permit application                        construction permit will contain the
                                                  construction permit, submitted by                       (ADAMS Accession No. ML15086A261)                      remainder of the preliminary safety
                                                  Northwest Medical Isotopes, LLC                         to include a discussion of connected                   analysis report required by 10 CFR
                                                  (NWMI) is acceptable for docketing. The                 actions in its environmental report in                 50.34(a) and will be submitted in
                                                  NWMI proposes to build a medical                        response to a January 23, 2015, letter                 accordance with the requirements of 10
                                                  radioisotope production facility located                from the NRC (ADAMS Accession No.                      CFR 2.101(a)(5). If, after completion of
                                                  in Columbia, Missouri.                                  ML14349A501). A notice of receipt of                   the acceptance review of the full
                                                  DATES: June 8, 2015.                                    this application was previously                        construction permit application, the full
                                                  ADDRESSES: Please refer to Docket ID                    published in the Federal Register on                   construction permit application is found
                                                  NRC–2013–0235 when contacting the                       April 21, 2015 (80 FR 22227).                          acceptable for docketing, the
                                                  NRC about the availability of                              An exemption from certain                           Commission or a designated Atomic
                                                  information regarding this document.                    requirements of 10 CFR 2.101(a)(5)                     Safety and Licensing Board will conduct
                                                  You may obtain publicly-available                       granted by the Commission on October                   a hearing in accordance with Subpart L,
                                                  information related to this document                    7, 2013, and published in the Federal                  ‘‘Simplified Hearing Procedures for NRC
                                                  using any of the following methods:                     Register on October 24, 2013 (78 FR                    Adjudications,’’ of 10 CFR part 2 and
                                                    • Federal Rulemaking Web site: Go to                  63501), in response to a letter from                   the Advisory Committee on Reactor
                                                  http://www.regulations.gov and search                   NWMI dated August 9, 2013 (ADAMS                       Safeguards will prepare a report on the
                                                  for Docket ID NRC–2013–0235. Address                    Accession No. ML13227A295), allowed                    construction permit application
                                                  questions about NRC dockets to Carol                    for NWMI to submit its construction                    consistent with 10 CFR 50.58, ‘‘Hearings
                                                  Gallagher; telephone: 301–415–3463;                     permit application in two parts.                       and report of the Advisory Committee
                                                  email: Carol.Gallagher@nrc.gov. For                     Specifically, the exemption allowed                    on Reactor Safeguards.’’ The
                                                  technical questions, contact the                        NWMI to submit a portion of its                        Commission will announce in a future
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                  individual listed in the FOR FURTHER                    application for a construction permit up               Federal Register notice, the opportunity
                                                  INFORMATION CONTACT section of this                     to six months prior to the remainder of                to petition for leave to intervene in the
                                                  document.                                               the application regardless of whether or               hearing required for this application by
                                                    • NRC’s Agencywide Documents                          not an environmental impact statement                  10 CFR 50.58, as well as the time and
                                                  Access and Management System                            or a supplement to an environmental                    place of the hearing. If the Commission
                                                  (ADAMS): You may obtain publicly-                       impact statement was prepared during                   finds that the full construction permit
                                                  available documents online in the                       the review of its application. On                      application meets the applicable
                                                  ADAMS Public Documents collection at                    February 5, 2015, in accordance with 10                standards of the Atomic Energy Act and


                                             VerDate Sep<11>2014   17:09 Jun 05, 2015   Jkt 235001   PO 00000   Frm 00081   Fmt 4703   Sfmt 4703   E:\FR\FM\08JNN1.SGM   08JNN1


                                                                                  Federal Register / Vol. 80, No. 109 / Monday, June 8, 2015 / Notices                                            32419

                                                  the Commission’s regulations, and that                  POSTAL SERVICE                                            The Council will advise on the
                                                  required notifications to other agencies                                                                       establishment of a new national center
                                                  and bodies have been made, the                          Product Change—Priority Mail                           (Presidio Institute) focused on service
                                                  Commission will issue a construction                    Negotiated Service Agreement                           and leadership development, with
                                                  permit, in the form and containing                      AGENCY:   Postal ServiceTM.                            specific emphasis on: (a) Assessing the
                                                  conditions and limitations that the                                                                            role and key opportunities of a national
                                                                                                          ACTION:   Notice.
                                                  Commission finds appropriate and                                                                               center dedicated to service and
                                                  necessary.                                              SUMMARY:    The Postal Service gives                   leadership at Fort Scott in the Presidio
                                                    Pursuant to 10 CFR part 51, the NRC                   notice of filing a request with the Postal             of San Francisco; (b) providing
                                                  staff will conduct an environmental                     Regulatory Commission to add a                         recommendations related to the Presidio
                                                  review of the construction permit before                domestic shipping services contract to                 Institute’s programmatic goals, target
                                                  recommending Commission action on                       the list of Negotiated Service                         audiences, content, implementation and
                                                  the application. The NRC staff will                     Agreements in the Mail Classification                  evaluation; (c) providing guidance on a
                                                  determine in accordance with 10 CFR                     Schedule’s Competitive Products List.                  phased development approach that
                                                  51.25, whether it will prepare an                       DATES: Effective date: June 8, 2015.                   leverages a combination of funding
                                                  environmental impact statement or an                    FOR FURTHER INFORMATION CONTACT:                       sources including philanthropy; and (d)
                                                  environmental assessment to inform the                  Elizabeth A. Reed, 202–268–3179.                       making recommendations on how to
                                                  decision on the construction permit                     SUPPLEMENTARY INFORMATION: The
                                                                                                                                                                 structure the Presidio Institute’s
                                                  application and will publish a Federal                  United States Postal Service® hereby                   business model to best achieve the
                                                  Register notice concerning its                          gives notice that, pursuant to 39 U.S.C.               Presidio Institute’s mission and ensure
                                                  environmental review.                                   3642 and 3632(b)(3), on May 29, 2015,                  long-term financial self-sufficiency.
                                                    Dated at Rockville, Maryland, this 29th day           it filed with the Postal Regulatory                       Meeting Agenda: This meeting of the
                                                  of May 2015.                                            Commission a Request of the United                     Council will feature a presentation by
                                                    For the Nuclear Regulatory Commission.                States Postal Service to Add Priority                  Fellows from the Presidio Institute
                                                                                                          Mail Contract 123 to Competitive                       Cross Sector Leaders Fellowship
                                                  Alexander Adams, Jr.,
                                                                                                          Product List. Documents are available at               program. Updates will be provided on
                                                  Chief, Research and Test Reactors Licensing                                                                    programs and input will be sought on
                                                  Branch, Division of Policy and Rulemaking,              www.prc.gov, Docket Nos. MC2015–52,
                                                                                                          CP2015–80.                                             potential audiences and program
                                                  Office of Nuclear Reactor Regulation.
                                                                                                                                                                 participants. The period from 11:30 a.m.
                                                  [FR Doc. 2015–13937 Filed 6–5–15; 8:45 am]              Stanley F. Mires,                                      to 12:00 p.m. will be reserved for public
                                                  BILLING CODE 7590–01–P                                  Attorney, Federal Compliance.                          comments.
                                                                                                          [FR Doc. 2015–13877 Filed 6–5–15; 8:45 am]                Public Comment: Individuals who
                                                                                                          BILLING CODE 7710–12–P                                 would like to offer comments are
                                                  POSTAL SERVICE                                                                                                 invited to sign-up at the meeting and
                                                                                                                                                                 speaking times will be assigned on a
                                                  Product Change—Priority Mail                            PRESIDIO TRUST                                         first-come, first-served basis. Written
                                                  Negotiated Service Agreement                                                                                   comments may be submitted on cards
                                                                                                          Notice of Public Meeting of Presidio                   that will be provided at the meeting, via
                                                  AGENCY: Postal ServiceTM.                               Institute Advisory Council                             mail to Aimee Vincent, Presidio
                                                  ACTION: Notice.                                         AGENCY:  The Presidio Trust.                           Institute, 1201 Ralston Avenue, San
                                                                                                          ACTION: Notice of public meeting of                    Francisco, CA 94129–0052, or via email
                                                  SUMMARY:    The Postal Service gives                    Presidio Institute Advisory Council.                   to institute@presidiotrust.gov. If
                                                  notice of filing a request with the Postal                                                                     individuals submitting written
                                                  Regulatory Commission to add a                          SUMMARY:   Pursuant to the Federal                     comments request that their address or
                                                  domestic shipping services contract to                  Advisory Committee Act, as amended (5                  other contact information be withheld
                                                  the list of Negotiated Service                          U.S.C. Appendix 2), notice is hereby                   from public disclosure, it will be
                                                  Agreements in the Mail Classification                   given that a public meeting of the                     honored to the extent allowable by law.
                                                  Schedule’s Competitive Products List.                   Presidio Institute Advisory Council                    Such requests must be stated
                                                                                                          (Council) will be held from 9:00 a.m. to               prominently at the beginning of the
                                                  DATES: Effective date: June 8, 2015.                    12:00 p.m. on Tuesday, June 30, 2015.                  comments. The Trust will make
                                                  FOR FURTHER INFORMATION CONTACT:                        The meeting is open to the public, and                 available for public inspection all
                                                  Elizabeth A. Reed, 202–268–3179.                        oral public comment will be received at                submissions from organizations or
                                                  SUPPLEMENTARY INFORMATION: The                          the meeting. The Council was formed to                 businesses and from persons identifying
                                                  United States Postal Service® hereby                    advise the Executive Director of the                   themselves as representatives or
                                                  gives notice that, pursuant to 39 U.S.C.                Presidio Trust (Trust) on matters                      officials of organizations and
                                                  3642 and 3632(b)(3), on May 29, 2015,                   pertaining to the rehabilitation and                   businesses.
                                                  it filed with the Postal Regulatory                     reuse of Fort Winfield Scott as a new                     Time: The meeting will be held from
                                                  Commission a Request of the United                      national center focused on service and                 9:00 a.m. to 12:00 p.m. on Tuesday, June
                                                  States Postal Service to Add Priority                   leadership development.                                30, 2015.
                                                  Mail Contract 124 to Competitive                        SUPPLEMENTARY INFORMATION: The
                                                                                                                                                                    Location: The meeting will be held at
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                  Product List. Documents are available at                Trust’s Executive Director, in                         the Presidio Institute, Building 1202
                                                  www.prc.gov, Docket Nos. MC2015–53,                     consultation with the Chair of the Board               Ralston Avenue, San Francisco, CA
                                                  CP2015–81.                                              of Directors, has determined that the                  94129.
                                                                                                          Council is in the public interest and
                                                  Stanley F. Mires,                                       supports the Trust in performing its                   FOR FURTHER INFORMATION CONTACT:
                                                  Attorney, Federal Compliance.                           duties and responsibilities under the                  Additional information is available
                                                  [FR Doc. 2015–13879 Filed 6–5–15; 8:45 am]              Presidio Trust Act, 16 U.S.C. 460bb                    online at http://www.presidio.gov/
                                                  BILLING CODE 7710–12–P                                  appendix.                                              explore/Pages/fort-scott-council.aspx.


                                             VerDate Sep<11>2014   17:09 Jun 05, 2015   Jkt 235001   PO 00000   Frm 00082   Fmt 4703   Sfmt 4703   E:\FR\FM\08JNN1.SGM   08JNN1



Document Created: 2018-02-22 10:12:48
Document Modified: 2018-02-22 10:12:48
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionConstruction permit application; docketing.
DatesJune 8, 2015.
ContactMichael Balazik, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; telephone: 301-415-2856; email: [email protected]
FR Citation80 FR 32418 