80_FR_32662 80 FR 32552 - Notice of Filing of Self-Certification of Coal Capability Under the Powerplant and Industrial Fuel Use Act

80 FR 32552 - Notice of Filing of Self-Certification of Coal Capability Under the Powerplant and Industrial Fuel Use Act

DEPARTMENT OF ENERGY

Federal Register Volume 80, Issue 110 (June 9, 2015)

Page Range32552-32552
FR Document2015-14059

On April 30, 2015, Pio Pico Energy Center, LLC, as owner and operator of a new base load electric powerplant, submitted a coal capability self-certification to the Department of Energy (DOE) pursuant to Sec. 201(d) of the Powerplant and Industrial Fuel Use Act of 1978 (FUA), as amended, and DOE regulations. FUA and regulations thereunder require DOE to publish a notice of filing of self- certification in the Federal Register. 42 U.S.C. 8311(d) and 10 CFR 501.61(c).

Federal Register, Volume 80 Issue 110 (Tuesday, June 9, 2015)
[Federal Register Volume 80, Number 110 (Tuesday, June 9, 2015)]
[Notices]
[Page 32552]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-14059]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

[Certification Notice--235]


Notice of Filing of Self-Certification of Coal Capability Under 
the Powerplant and Industrial Fuel Use Act

AGENCY: Office of Electricity Delivery and Energy Reliability, DOE.

ACTION: Notice of filing.

-----------------------------------------------------------------------

SUMMARY: On April 30, 2015, Pio Pico Energy Center, LLC, as owner and 
operator of a new base load electric powerplant, submitted a coal 
capability self-certification to the Department of Energy (DOE) 
pursuant to Sec.  201(d) of the Powerplant and Industrial Fuel Use Act 
of 1978 (FUA), as amended, and DOE regulations. FUA and regulations 
thereunder require DOE to publish a notice of filing of self-
certification in the Federal Register. 42 U.S.C. 8311(d) and 10 CFR 
501.61(c).

ADDRESSES:  Copies of coal capability self-certification filings are 
available for public inspection, upon request, in the Office of 
Electricity Delivery and Energy Reliability, Mail Code OE-20, Room 8G-
024, Forrestal Building, 1000 Independence Avenue SW., Washington, DC 
20585.

FOR FURTHER INFORMATION CONTACT:  Christopher Lawrence at (202) 586-
5260.

SUPPLEMENTARY INFORMATION:  Title II of FUA, as amended (42 U.S.C. 8301 
et seq.), provides that no new base load electric powerplant may be 
constructed or operated without the capability to use coal or another 
alternate fuel as a primary energy source. Pursuant to FUA in order to 
meet the requirement of coal capability, the owner or operator of such 
a facility proposing to use natural gas or petroleum as its primary 
energy source shall certify to the Secretary of Energy (Secretary) 
prior to construction, or prior to operation as a base load electric 
powerplant, that such powerplant has the capability to use coal or 
another alternate fuel. Such certification establishes compliance with 
FUA section 201(a) as of the date it is filed with the Secretary. 42 
U.S.C. 8311.
    The following owner of a proposed new base load electric powerplant 
has filed a self-certification of coal-capability with DOE pursuant to 
FUA section 201(d) and in accordance with DOE regulations in 10 CFR 
501.60 and 501.61:

OWNER: Pio Pico Energy Center, LLC
CAPACITY: 313 megawatts (MW)
PLANT LOCATION: Pio Pico Energy Center, LLC, 7363 Calzada De La Fuente, 
San Diego, CA 92154
IN-SERVICE DATE: Approximately September 30, 2016


    Issued in Washington, DC, on June 3, 2015.
Brian Mills,
Director, Permitting and Siting, Office of Electricity Delivery and 
Energy Reliability.
[FR Doc. 2015-14059 Filed 6-8-15; 8:45 am]
 BILLING CODE 6450-01-P



                                              32552                                        Federal Register / Vol. 80, No. 110 / Tuesday, June 9, 2015 / Notices

                                                                                   INDEPENDENT STUDENTS WITH DEPENDENTS OTHER THAN A SPOUSE—Continued
                                                                                                                                                                                                                                  And they are
                                              If the age of the student is
                                                                                                                                                                                                                          Married                Single

                                                                                                                                                                                                                     Then the education savings and asset
                                                                                                                                                                                                                     protection allowance is


                                                          *                                 *                                 *                                 *                                *                            *                    *
                                              64 .................................................................................................................................................................                10,400                  5,700

                                                            *                                 *                                *                                *                                *                            *                    *



                                              [FR Doc. C1–2015–12803 Filed 6–8–15; 8:45 am]                                 powerplant, that such powerplant has                                          of the Commission’s Rules of Practice
                                              BILLING CODE 1505–01–D                                                        the capability to use coal or another                                         and Procedure (18 CFR 385.211 and
                                                                                                                            alternate fuel. Such certification                                            385.214). Anyone filing a motion to
                                                                                                                            establishes compliance with FUA                                               intervene or protest must serve a copy
                                              DEPARTMENT OF ENERGY                                                          section 201(a) as of the date it is filed                                     of that document on the Applicant.
                                                                                                                            with the Secretary. 42 U.S.C. 8311.                                              Notice is hereby given that the
                                              [Certification Notice—235]                                                       The following owner of a proposed                                          deadline for filing protests with regard
                                                                                                                            new base load electric powerplant has                                         to the applicant’s request for blanket
                                              Notice of Filing of Self-Certification of
                                                                                                                            filed a self-certification of coal-                                           authorization, under 18 CFR part 34, of
                                              Coal Capability Under the Powerplant
                                                                                                                            capability with DOE pursuant to FUA                                           future issuances of securities and
                                              and Industrial Fuel Use Act
                                                                                                                            section 201(d) and in accordance with                                         assumptions of liability, is June 22,
                                              AGENCY: Office of Electricity Delivery                                        DOE regulations in 10 CFR 501.60 and                                          2015.
                                              and Energy Reliability, DOE.                                                  501.61:                                                                          The Commission encourages
                                              ACTION: Notice of filing.                                                     OWNER: Pio Pico Energy Center, LLC                                            electronic submission of protests and
                                                                                                                            CAPACITY: 313 megawatts (MW)                                                  interventions in lieu of paper, using the
                                              SUMMARY:    On April 30, 2015, Pio Pico                                       PLANT LOCATION: Pio Pico Energy
                                              Energy Center, LLC, as owner and                                                                                                                            FERC Online links at http://
                                                                                                                               Center, LLC, 7363 Calzada De La                                            www.ferc.gov. To facilitate electronic
                                              operator of a new base load electric                                             Fuente, San Diego, CA 92154
                                              powerplant, submitted a coal capability                                                                                                                     service, persons with Internet access
                                                                                                                            IN-SERVICE DATE: Approximately                                                who will eFile a document and/or be
                                              self-certification to the Department of                                          September 30, 2016
                                              Energy (DOE) pursuant to § 201(d) of the                                                                                                                    listed as a contact for an intervenor
                                              Powerplant and Industrial Fuel Use Act                                          Issued in Washington, DC, on June 3, 2015.                                  must create and validate an
                                              of 1978 (FUA), as amended, and DOE                                            Brian Mills,                                                                  eRegistration account using the
                                              regulations. FUA and regulations                                                                                                                            eRegistration link. Select the eFiling
                                                                                                                            Director, Permitting and Siting, Office of
                                              thereunder require DOE to publish a                                           Electricity Delivery and Energy Reliability.                                  link to log on and submit the
                                              notice of filing of self-certification in the                                                                                                               intervention or protests.
                                                                                                                            [FR Doc. 2015–14059 Filed 6–8–15; 8:45 am]
                                              Federal Register. 42 U.S.C. 8311(d) and                                       BILLING CODE 6450–01–P
                                                                                                                                                                                                             Persons unable to file electronically
                                              10 CFR 501.61(c).                                                                                                                                           should submit an original and 5 copies
                                              ADDRESSES: Copies of coal capability
                                                                                                                                                                                                          of the intervention or protest to the
                                              self-certification filings are available for                                  DEPARTMENT OF ENERGY                                                          Federal Energy Regulatory Commission,
                                              public inspection, upon request, in the                                                                                                                     888 First Street NE., Washington, DC
                                              Office of Electricity Delivery and Energy                                     Federal Energy Regulatory                                                     20426.
                                              Reliability, Mail Code OE–20, Room                                            Commission                                                                       The filings in the above-referenced
                                              8G–024, Forrestal Building, 1000                                              [Docket No. ER15–1810–000]                                                    proceeding are accessible in the
                                              Independence Avenue SW.,                                                                                                                                    Commission’s eLibrary system by
                                              Washington, DC 20585.                                                         Dillon Power, LLC; Supplemental                                               clicking on the appropriate link in the
                                              FOR FURTHER INFORMATION CONTACT:                                              Notice that Initial Market-Based Rate                                         above list. They are also available for
                                              Christopher Lawrence at (202) 586–                                            Filing Includes Request for Blanket                                           electronic review in the Commission’s
                                              5260.                                                                         Section 204 Authorization                                                     Public Reference Room in Washington,
                                                                                                                                                                                                          DC. There is an eSubscription link on
                                              SUPPLEMENTARY INFORMATION: Title II of                                          This is a supplemental notice in the                                        the Web site that enables subscribers to
                                              FUA, as amended (42 U.S.C. 8301 et                                            above-referenced proceeding of Dillon                                         receive email notification when a
                                              seq.), provides that no new base load                                         Power, LLC’s application for market-                                          document is added to a subscribed
                                              electric powerplant may be constructed                                        based rate authority, with an                                                 docket(s). For assistance with any FERC
                                              or operated without the capability to use                                     accompanying rate tariff, noting that                                         Online service, please email
                                              coal or another alternate fuel as a                                           such application includes a request for                                       FERCOnlineSupport@ferc.gov. or call
                                              primary energy source. Pursuant to FUA                                        blanket authorization, under 18 CFR                                           (866) 208–3676 (toll free). For TTY, call
tkelley on DSK3SPTVN1PROD with NOTICES




                                              in order to meet the requirement of coal                                      part 34, of future issuances of securities                                    (202) 502–8659.
                                              capability, the owner or operator of such                                     and assumptions of liability.
                                              a facility proposing to use natural gas or                                      Any person desiring to intervene or to                                        Dated: June 2, 2015.
                                              petroleum as its primary energy source                                        protest should file with the Federal                                          Nathaniel J. Davis, Sr.,
                                              shall certify to the Secretary of Energy                                      Energy Regulatory Commission, 888                                             Deputy Secretary.
                                              (Secretary) prior to construction, or                                         First Street, NE., Washington, DC 20426,                                      [FR Doc. 2015–14017 Filed 6–8–15; 8:45 am]
                                              prior to operation as a base load electric                                    in accordance with Rules 211 and 214                                          BILLING CODE 6717–01–P




                                         VerDate Sep<11>2014          20:33 Jun 08, 2015          Jkt 235001       PO 00000        Frm 00029        Fmt 4703        Sfmt 4703      E:\FR\FM\09JNN1.SGM               09JNN1



Document Created: 2015-12-15 15:25:48
Document Modified: 2015-12-15 15:25:48
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice of filing.
DatesApproximately September 30, 2016
ContactChristopher Lawrence at (202) 586- 5260.
FR Citation80 FR 32552 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR