80_FR_36921 80 FR 36798 - Sabal Trail Transmission, LLC; Supplemental Notice of Intent To Prepare an Environmental Impact Statement for the Proposed Southeast Market Pipelines Project and Request for Comments on Environmental Issues Related to the Newly Proposed Albany Compressor Station Location

80 FR 36798 - Sabal Trail Transmission, LLC; Supplemental Notice of Intent To Prepare an Environmental Impact Statement for the Proposed Southeast Market Pipelines Project and Request for Comments on Environmental Issues Related to the Newly Proposed Albany Compressor Station Location

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 80, Issue 123 (June 26, 2015)

Page Range36798-36799
FR Document2015-15649

Federal Register, Volume 80 Issue 123 (Friday, June 26, 2015)
[Federal Register Volume 80, Number 123 (Friday, June 26, 2015)]
[Notices]
[Pages 36798-36799]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-15649]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP15-17-000]


Sabal Trail Transmission, LLC; Supplemental Notice of Intent To 
Prepare an Environmental Impact Statement for the Proposed Southeast 
Market Pipelines Project and Request for Comments on Environmental 
Issues Related to the Newly Proposed Albany Compressor Station Location

    In a June 10, 2015, filing with the Federal Energy Regulatory 
Commission (FERC or Commission), Sabal Trail Transmission, LLC (Sabal 
Trail) proposed a new location for the Albany Compressor Station, a 
component of the Sabal Trail Project (Project) in Dougherty County, 
Georgia. This new site, which is described below, would affect new 
landowners; therefore, the Commission is issuing this supplemental 
notice (Notice) to provide landowners and other interested parties an 
opportunity to comment on the new compressor station location. As 
previously noticed on February 18, 2014, and as supplemented on October 
15, 2014, and supplemented herein, the FERC is the lead federal agency 
responsible for conducting the environmental review of the Project, and 
is preparing an environmental impact statement (EIS) that discusses the 
environmental impacts of the Project. This EIS will be used in-part by 
the Commission to determine whether the Project is in the public 
convenience and necessity.
    You have been identified as a landowner or an interested party 
residing within 0.5-mile of the newly proposed compressor station 
location. Information in this Notice was prepared to familiarize you 
with the new site and instruct you on how to submit comments. This 
Notice is also being sent to federal, state, and local government 
agencies; elected officials; Native American tribes; and local 
libraries and newspapers. We encourage elected officials and government 
representatives to notify their constituents about the Project and 
inform them on how they can comment on their areas of concern. Please 
note that comments on this Notice should be filed with the Commission 
by July 20, 2015.
    To help potentially affected landowners and other interested 
parties better understand the Commission and its environmental review 
process, the ``For Citizens'' section of the FERC Web site 
(www.ferc.gov) provides information about getting involved in FERC 
jurisdictional projects, and a citizens' guide entitled ``An Interstate 
Natural Gas Facility On My Land? What Do I Need to Know?'' This guide 
addresses a number of frequently asked questions, including the use of 
eminent domain and how to participate in the Commission's proceedings.

Public Participation

    You can make a difference by providing us with your specific 
comments about the Project. Your comments should focus on the potential 
environmental effects, reasonable alternatives, and measures to avoid 
or lessen environmental impacts. The more specific your comments, the 
more useful they will be. To ensure that your comments are considered 
in a timely manner and properly recorded, please send your comments so 
that the Commission receives them in Washington, DC on or before July 
20, 2015.
    For your convenience, there are three methods you can use to submit 
your comments to the Commission. In all instances, please reference the 
Project docket number (CP15-17-000) with your submission. The 
Commission encourages electronic filing of comments and has expert 
staff available to assist you at (202) 502-8258 or [email protected].
    (1) You can file your comments electronically using the eComment 
feature located on the Commission's Web site (www.ferc.gov) under the 
link to Documents and Filings. This is an easy method for interested 
persons to submit brief, text-only comments on a project;
    (2) You can file your comments electronically using the eFiling 
feature located on the Commission's Web site (www.ferc.gov) under the 
link to Documents and Filings. With eFiling, you can provide comments 
in a variety of formats by attaching them as a file with your 
submission. New eFiling users must first create an account by clicking 
on ``eRegister.'' You must select the type of filing you are making. If 
you are filing a comment on a particular project, please select 
``Comment on a Filing;'' or
    (3) You can file a paper copy of your comments by mailing them to 
the following address: Kimberly D. Bose, Secretary, Federal Energy 
Regulatory Commission, 888 First Street NE., Room 1A, Washington, DC 
20426.

Project Summary and Background

    The Project is being reviewed concurrently along with the Florida 
Southeast Connection Project and the Hillabee Expansion Project. These 
combined projects would involve the construction and operation of over 
650 miles of interstate natural gas transmission pipeline and 
associated facilities in Alabama, Georgia, and Florida (referred to as 
the Southeast Market Pipelines Project). The Project would connect with 
the Hillabee Expansion Project in Alabama, and the Florida Southeast 
Connection Project in Florida.
    On October 16, 2013, the FERC environmental staff approved Sabal 
Trail's request to use the Commission's Pre-Filing Process under docket 
number PF14-1-000. The purpose of the Pre-Filing Process is to 
encourage the early involvement of interested stakeholders to identify 
and resolve project-related issues before an application is filed with 
the Commission. During the course of the Pre-Filing Process, numerous 
concerns were expressed about the potential environmental impacts of 
the Albany Compressor Station and numerous alternative locations were 
identified and evaluated. On November 21, 2014, Sabal Trail filed its 
formal application with the Commission which was accepted for 
processing under docket CP15-17-000. Since that time, we requested 
additional information from Sabal Trail in three separate data 
requests. Sabal Trail responded to each of those requests and provided 
additional information in nine supplemental filings, including the June 
10, 2015 filing in which it informed the Commission of the new, 
proposed location for the Albany Compressor Station.

Newly Proposed Albany Compressor Station Location

    In its November 2014 application, Sabal Trail proposed to locate 
the Albany Compressor Station along Newton Road just southwest of the 
City of Albany in Dougherty County (the Newton Road Site). Upon further 
evaluation, Sabal Trail now proposes to locate the Albany Compressor 
Station on a 98-acre parcel along West Oakridge

[[Page 36799]]

Drive (the West Oakridge Drive Site). The West Oakridge Drive Site is 
located to the west of Albany, approximately 3 miles northwest from the 
Newton Road Site. A map depicting the newly proposed West Oakridge 
Drive Site is provided in Appendix 1.
    Sabal Trail would locate the compressor station within a 34-acre 
fenced area on the southern end of the site, approximately 2,000 feet 
south of West Oakridge Drive. The site is largely wooded with mature, 
planted pine, and Sabal Trail would retain at least a 100-foot-wide 
tree buffer around the entire station. Access to the station would be 
from West Oakridge Drive via an existing road on the site. Sabal Trail 
would also slightly modify the proposed pipeline alignment on the site 
to retain a 100-foot-wide tree buffer between the pipeline right-of-way 
and the western boundary of the site.

The EIS Process

    The National Environmental Policy Act (NEPA) requires the 
Commission to take into account the environmental impacts that could 
result from an action whenever it considers the issuance of a 
Certificate of Public Convenience and Necessity. NEPA also requires us 
to discover and address concerns the public may have about proposals. 
This process is referred to as scoping. The main goal of the scoping 
process is to focus the analysis in the EIS on the important 
environmental issues. By this Notice, the Commission requests public 
comments on the West Oakridge Drive Site for the Albany Compressor 
Station. We will consider all filed comments that are suggested during 
the preparation of the EIS.
    Our independent analysis of the issues will be presented in a draft 
EIS that will be placed in the public record, published, and 
distributed to the public for comments. We will also hold public 
comment meetings in the Project area and will address comments on the 
draft EIS in a final EIS. The final EIS will also be placed in the 
public record, published, and distributed to the public. To ensure your 
comments are considered, please carefully follow the instructions in 
the Public Participation section, beginning on page 2.

Consultations Under Section 106 of the National Historic Preservation 
Act

    In accordance with the Advisory Council on Historic Preservation's 
implementing regulations for section 106 of the National Historic 
Preservation Act, we are using this supplemental Notice to inform the 
Georgia State Historic Preservation Office (SHPO) of the proposed new 
site, and to solicit its view and those of other government agencies, 
interested Indian tribes, and the public on the Project's potential 
effects on historic properties.\1\ We will define the project-specific 
Area of Potential Effects (APE) in consultation with the SHPO as the 
Project develops. On natural gas facility projects, the APE at a 
minimum encompasses all areas subject to ground disturbance (examples 
include construction right-of-way, contractor/pipe storage yards, 
compressor stations, meter stations, and access roads). Our EIS for the 
Project will document our findings on the impacts on historic 
properties and summarize the status of consultations under section 106.
---------------------------------------------------------------------------

    \1\ The Advisory Council on Historic Preservation regulations 
are at Title 36, Code of Federal Regulations, part 800. Those 
regulations define historic properties as any prehistoric or 
historic district, site, building, structure, or object included in 
or eligible for inclusion in the National Register of Historic 
Places.
---------------------------------------------------------------------------

Environmental Mailing List

    Copies of the draft EIS will be sent to the environmental mailing 
list for public review and comment. The environmental mailing list 
includes federal, state, and local government representatives and 
agencies; elected officials; environmental and public interest groups; 
Native American Tribes; other interested parties; and local libraries 
and newspapers. This list also includes all affected landowners (as 
defined in the Commission's regulations) who are potential right-of-way 
grantors, whose property may be used temporarily for Project purposes, 
or who own homes within certain distances of aboveground facilities, 
and anyone who submits comments on the Project. We will update the 
environmental mailing list as the analysis proceeds to ensure that we 
send the information related to this environmental review to all 
individuals, organizations, and government entities interested in and/
or potentially affected by the proposed Project.
    If you would prefer to receive a paper copy of the draft EIS 
instead of the CD version or would like to remove your name from the 
mailing list, please return the attached Information Request (Appendix 
2).

Becoming an Intervenor

    You may want to become an ``intervenor'' which is an official party 
to the Commission's proceeding. Intervenors play a more formal role in 
the process and are able to file briefs, appear at hearings, and be 
heard by the courts if they choose to appeal the Commission's final 
ruling. An intervenor formally participates in the proceeding by filing 
a request to intervene. Instructions for becoming an intervenor are in 
the User's Guide under the ``e-filing'' link on the Commission's Web 
site.

Additional Information

    Additional information about the Project is available from the 
Commission's Office of External Affairs, at (866) 208-FERC, or on the 
FERC Web site (www.ferc.gov) using the eLibrary link. Click on the 
eLibrary link, click on ``General Search,'' and enter the docket 
number, excluding the last three digits (i.e., CP15-17). Be sure you 
have selected an appropriate date range. For assistance, please contact 
FERC Online Support at [email protected] or toll free at (866) 
208-3676, or for TTY, contact (202) 502-8659. The eLibrary link also 
provides access to the texts of formal documents issued by the 
Commission, such as orders, notices, and rulemakings.
    In addition, the Commission offers a free service called 
eSubscription which allows you to keep track of all formal issuances 
and submittals in specific dockets. This can reduce the amount of time 
you spend researching proceedings by automatically providing you with 
notification of these filings, document summaries, and direct links to 
the documents. Go to www.ferc.gov/docs-filing/esubscription.asp.
    Finally, public meetings or site visits will be posted on the 
Commission's calendar located at www.ferc.gov/EventCalendar/EventsList.aspx along with other related information.

    Dated: June 19, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-15649 Filed 6-25-15; 8:45 am]
 BILLING CODE 6717-01-P



                                              36798                           Federal Register / Vol. 80, No. 123 / Friday, June 26, 2015 / Notices

                                              dockets. This can reduce the amount of                  libraries and newspapers. We encourage                 the type of filing you are making. If you
                                              time you spend researching proceedings                  elected officials and government                       are filing a comment on a particular
                                              by automatically providing you with                     representatives to notify their                        project, please select ‘‘Comment on a
                                              notification of these filings, document                 constituents about the Project and                     Filing;’’ or
                                              summaries, and direct links to the                      inform them on how they can comment                      (3) You can file a paper copy of your
                                              documents. Go to www.ferc.gov/docs-                     on their areas of concern. Please note                 comments by mailing them to the
                                              filing/esubscription.asp.                               that comments on this Notice should be                 following address: Kimberly D. Bose,
                                                Dated: June 19, 2015.                                 filed with the Commission by July 20,                  Secretary, Federal Energy Regulatory
                                                                                                      2015.                                                  Commission, 888 First Street NE., Room
                                              Kimberly D. Bose,
                                                                                                         To help potentially affected                        1A, Washington, DC 20426.
                                              Secretary.                                              landowners and other interested parties
                                              [FR Doc. 2015–15651 Filed 6–25–15; 8:45 am]                                                                    Project Summary and Background
                                                                                                      better understand the Commission and
                                              BILLING CODE 6717–01–P                                  its environmental review process, the                     The Project is being reviewed
                                                                                                      ‘‘For Citizens’’ section of the FERC Web               concurrently along with the Florida
                                                                                                      site (www.ferc.gov) provides information               Southeast Connection Project and the
                                              DEPARTMENT OF ENERGY                                    about getting involved in FERC                         Hillabee Expansion Project. These
                                                                                                      jurisdictional projects, and a citizens’               combined projects would involve the
                                              Federal Energy Regulatory                               guide entitled ‘‘An Interstate Natural                 construction and operation of over 650
                                              Commission                                              Gas Facility On My Land? What Do I                     miles of interstate natural gas
                                              [Docket No. CP15–17–000]                                Need to Know?’’ This guide addresses a                 transmission pipeline and associated
                                                                                                      number of frequently asked questions,                  facilities in Alabama, Georgia, and
                                              Sabal Trail Transmission, LLC;                          including the use of eminent domain                    Florida (referred to as the Southeast
                                              Supplemental Notice of Intent To                        and how to participate in the                          Market Pipelines Project). The Project
                                              Prepare an Environmental Impact                         Commission’s proceedings.                              would connect with the Hillabee
                                              Statement for the Proposed Southeast                                                                           Expansion Project in Alabama, and the
                                              Market Pipelines Project and Request                    Public Participation                                   Florida Southeast Connection Project in
                                              for Comments on Environmental                              You can make a difference by                        Florida.
                                              Issues Related to the Newly Proposed                    providing us with your specific                           On October 16, 2013, the FERC
                                              Albany Compressor Station Location                      comments about the Project. Your                       environmental staff approved Sabal
                                                                                                      comments should focus on the potential                 Trail’s request to use the Commission’s
                                                 In a June 10, 2015, filing with the                  environmental effects, reasonable                      Pre-Filing Process under docket number
                                              Federal Energy Regulatory Commission                    alternatives, and measures to avoid or                 PF14–1–000. The purpose of the Pre-
                                              (FERC or Commission), Sabal Trail                       lessen environmental impacts. The more                 Filing Process is to encourage the early
                                              Transmission, LLC (Sabal Trail)                         specific your comments, the more useful                involvement of interested stakeholders
                                              proposed a new location for the Albany                  they will be. To ensure that your                      to identify and resolve project-related
                                              Compressor Station, a component of the                  comments are considered in a timely                    issues before an application is filed with
                                              Sabal Trail Project (Project) in                        manner and properly recorded, please                   the Commission. During the course of
                                              Dougherty County, Georgia. This new                     send your comments so that the                         the Pre-Filing Process, numerous
                                              site, which is described below, would                   Commission receives them in                            concerns were expressed about the
                                              affect new landowners; therefore, the                   Washington, DC on or before July 20,                   potential environmental impacts of the
                                              Commission is issuing this                              2015.                                                  Albany Compressor Station and
                                              supplemental notice (Notice) to provide                    For your convenience, there are three               numerous alternative locations were
                                              landowners and other interested parties                 methods you can use to submit your                     identified and evaluated. On November
                                              an opportunity to comment on the new                    comments to the Commission. In all                     21, 2014, Sabal Trail filed its formal
                                              compressor station location. As                         instances, please reference the Project                application with the Commission which
                                              previously noticed on February 18,                      docket number (CP15–17–000) with                       was accepted for processing under
                                              2014, and as supplemented on October                    your submission. The Commission                        docket CP15–17–000. Since that time,
                                              15, 2014, and supplemented herein, the                  encourages electronic filing of                        we requested additional information
                                              FERC is the lead federal agency                         comments and has expert staff available                from Sabal Trail in three separate data
                                              responsible for conducting the                          to assist you at (202) 502–8258 or                     requests. Sabal Trail responded to each
                                              environmental review of the Project,                    efiling@ferc.gov.                                      of those requests and provided
                                              and is preparing an environmental                          (1) You can file your comments                      additional information in nine
                                              impact statement (EIS) that discusses                   electronically using the eComment                      supplemental filings, including the June
                                              the environmental impacts of the                        feature located on the Commission’s                    10, 2015 filing in which it informed the
                                              Project. This EIS will be used in-part by               Web site (www.ferc.gov) under the link                 Commission of the new, proposed
                                              the Commission to determine whether                     to Documents and Filings. This is an                   location for the Albany Compressor
                                              the Project is in the public convenience                easy method for interested persons to                  Station.
                                              and necessity.                                          submit brief, text-only comments on a
                                                 You have been identified as a                        project;                                               Newly Proposed Albany Compressor
                                              landowner or an interested party                           (2) You can file your comments                      Station Location
                                              residing within 0.5-mile of the newly                   electronically using the eFiling feature                 In its November 2014 application,
                                              proposed compressor station location.                   located on the Commission’s Web site                   Sabal Trail proposed to locate the
tkelley on DSK3SPTVN1PROD with NOTICES




                                              Information in this Notice was prepared                 (www.ferc.gov) under the link to                       Albany Compressor Station along
                                              to familiarize you with the new site and                Documents and Filings. With eFiling,                   Newton Road just southwest of the City
                                              instruct you on how to submit                           you can provide comments in a variety                  of Albany in Dougherty County (the
                                              comments. This Notice is also being                     of formats by attaching them as a file                 Newton Road Site). Upon further
                                              sent to federal, state, and local                       with your submission. New eFiling                      evaluation, Sabal Trail now proposes to
                                              government agencies; elected officials;                 users must first create an account by                  locate the Albany Compressor Station
                                              Native American tribes; and local                       clicking on ‘‘eRegister.’’ You must select             on a 98-acre parcel along West Oakridge


                                         VerDate Sep<11>2014   18:15 Jun 25, 2015   Jkt 235001   PO 00000   Frm 00042   Fmt 4703   Sfmt 4703   E:\FR\FM\26JNN1.SGM   26JNN1


                                                                              Federal Register / Vol. 80, No. 123 / Friday, June 26, 2015 / Notices                                                     36799

                                              Drive (the West Oakridge Drive Site).                   and to solicit its view and those of other                intervenor formally participates in the
                                              The West Oakridge Drive Site is located                 government agencies, interested Indian                    proceeding by filing a request to
                                              to the west of Albany, approximately 3                  tribes, and the public on the Project’s                   intervene. Instructions for becoming an
                                              miles northwest from the Newton Road                    potential effects on historic properties.1                intervenor are in the User’s Guide under
                                              Site. A map depicting the newly                         We will define the project-specific Area                  the ‘‘e-filing’’ link on the Commission’s
                                              proposed West Oakridge Drive Site is                    of Potential Effects (APE) in                             Web site.
                                              provided in Appendix 1.                                 consultation with the SHPO as the
                                                 Sabal Trail would locate the                         Project develops. On natural gas facility                 Additional Information
                                              compressor station within a 34-acre                     projects, the APE at a minimum                               Additional information about the
                                              fenced area on the southern end of the                  encompasses all areas subject to ground                   Project is available from the
                                              site, approximately 2,000 feet south of                 disturbance (examples include                             Commission’s Office of External Affairs,
                                              West Oakridge Drive. The site is largely                construction right-of-way, contractor/                    at (866) 208–FERC, or on the FERC Web
                                              wooded with mature, planted pine, and                   pipe storage yards, compressor stations,                  site (www.ferc.gov) using the eLibrary
                                              Sabal Trail would retain at least a 100-                meter stations, and access roads). Our                    link. Click on the eLibrary link, click on
                                              foot-wide tree buffer around the entire                 EIS for the Project will document our                     ‘‘General Search,’’ and enter the docket
                                              station. Access to the station would be                 findings on the impacts on historic                       number, excluding the last three digits
                                              from West Oakridge Drive via an                         properties and summarize the status of                    (i.e., CP15–17). Be sure you have
                                              existing road on the site. Sabal Trail                  consultations under section 106.                          selected an appropriate date range. For
                                              would also slightly modify the proposed                                                                           assistance, please contact FERC Online
                                              pipeline alignment on the site to retain                Environmental Mailing List
                                                                                                                                                                Support at FercOnlineSupport@ferc.gov
                                              a 100-foot-wide tree buffer between the                    Copies of the draft EIS will be sent to                or toll free at (866) 208–3676, or for
                                              pipeline right-of-way and the western                   the environmental mailing list for                        TTY, contact (202) 502–8659. The
                                              boundary of the site.                                   public review and comment. The                            eLibrary link also provides access to the
                                                                                                      environmental mailing list includes                       texts of formal documents issued by the
                                              The EIS Process
                                                                                                      federal, state, and local government                      Commission, such as orders, notices,
                                                 The National Environmental Policy                    representatives and agencies; elected                     and rulemakings.
                                              Act (NEPA) requires the Commission to                   officials; environmental and public
                                              take into account the environmental                                                                                  In addition, the Commission offers a
                                                                                                      interest groups; Native American Tribes;                  free service called eSubscription which
                                              impacts that could result from an action                other interested parties; and local
                                              whenever it considers the issuance of a                                                                           allows you to keep track of all formal
                                                                                                      libraries and newspapers. This list also                  issuances and submittals in specific
                                              Certificate of Public Convenience and                   includes all affected landowners (as
                                              Necessity. NEPA also requires us to                                                                               dockets. This can reduce the amount of
                                                                                                      defined in the Commission’s                               time you spend researching proceedings
                                              discover and address concerns the                       regulations) who are potential right-of-
                                              public may have about proposals. This                                                                             by automatically providing you with
                                                                                                      way grantors, whose property may be                       notification of these filings, document
                                              process is referred to as scoping. The                  used temporarily for Project purposes,
                                              main goal of the scoping process is to                                                                            summaries, and direct links to the
                                                                                                      or who own homes within certain                           documents. Go to www.ferc.gov/docs-
                                              focus the analysis in the EIS on the                    distances of aboveground facilities, and
                                              important environmental issues. By this                                                                           filing/esubscription.asp.
                                                                                                      anyone who submits comments on the
                                              Notice, the Commission requests public                  Project. We will update the                                  Finally, public meetings or site visits
                                              comments on the West Oakridge Drive                     environmental mailing list as the                         will be posted on the Commission’s
                                              Site for the Albany Compressor Station.                 analysis proceeds to ensure that we                       calendar located at www.ferc.gov/
                                              We will consider all filed comments                     send the information related to this                      EventCalendar/EventsList.aspx along
                                              that are suggested during the                           environmental review to all individuals,                  with other related information.
                                              preparation of the EIS.                                 organizations, and government entities                      Dated: June 19, 2015.
                                                 Our independent analysis of the                      interested in and/or potentially affected                 Kimberly D. Bose,
                                              issues will be presented in a draft EIS                 by the proposed Project.                                  Secretary.
                                              that will be placed in the public record,                  If you would prefer to receive a paper                 [FR Doc. 2015–15649 Filed 6–25–15; 8:45 am]
                                              published, and distributed to the public                copy of the draft EIS instead of the CD                   BILLING CODE 6717–01–P
                                              for comments. We will also hold public                  version or would like to remove your
                                              comment meetings in the Project area                    name from the mailing list, please
                                              and will address comments on the draft                  return the attached Information Request                   DEPARTMENT OF ENERGY
                                              EIS in a final EIS. The final EIS will also             (Appendix 2).
                                              be placed in the public record,                                                                                   Federal Energy Regulatory
                                              published, and distributed to the public.               Becoming an Intervenor
                                                                                                                                                                Commission
                                              To ensure your comments are                                You may want to become an
                                              considered, please carefully follow the                 ‘‘intervenor’’ which is an official party                 [Project No. 13704–002; Project No. 13701–
                                              instructions in the Public Participation                to the Commission’s proceeding.                           002; Project No. 13703–002; Project No.
                                              section, beginning on page 2.                           Intervenors play a more formal role in                    13702–002]
                                              Consultations Under Section 106 of the                  the process and are able to file briefs,
                                              National Historic Preservation Act                      appear at hearings, and be heard by the                   FFP Missouri 2, LLC; Notice of
                                                                                                      courts if they choose to appeal the                       Technical Meeting
                                                In accordance with the Advisory                       Commission’s final ruling. An
tkelley on DSK3SPTVN1PROD with NOTICES




                                              Council on Historic Preservation’s                                                                                  a. Project Names and Numbers: From
                                              implementing regulations for section                      1 The  Advisory Council on Historic Preservation        upstream to downstream, Arkabutla
                                              106 of the National Historic                            regulations are at Title 36, Code of Federal              Lake Hydroelectric Project No. 13704,
                                              Preservation Act, we are using this                     Regulations, part 800. Those regulations define           Sardis Lake Hydroelectric Project No.
                                                                                                      historic properties as any prehistoric or historic
                                              supplemental Notice to inform the                       district, site, building, structure, or object included
                                                                                                                                                                13701, Enid Lake Hydroelectric Project
                                              Georgia State Historic Preservation                     in or eligible for inclusion in the National Register     No. 13703, and Grenada Lake
                                              Office (SHPO) of the proposed new site,                 of Historic Places.                                       Hydroelectric Project No. 13702.


                                         VerDate Sep<11>2014   18:15 Jun 25, 2015   Jkt 235001   PO 00000   Frm 00043   Fmt 4703   Sfmt 4703    E:\FR\FM\26JNN1.SGM    26JNN1



Document Created: 2015-12-15 14:14:54
Document Modified: 2015-12-15 14:14:54
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation80 FR 36798 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR