The Department of Energy (DOE), Office of Electricity Delivery and Energy Reliability (OE), is seeking comments and information from interested parties to inform its policy development related to the possible establishment of a national reserve of power transformers that support the bulk power grid. The focus of the RFI is on the design and implementation of a National Power Transformer Reserve Program.

Federal Register, Volume 80 Issue 131 (Thursday, July 9, 2015)
[Federal Register Volume 80, Number 131 (Thursday, July 9, 2015)]
[Notices]
[Pages 39422-39423]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-16784]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF ENERGY


National Power Transformer Reserve

AGENCY: Office of Electricity Delivery and Energy Reliability, 
Department of Energy.

ACTION: Request for information (RFI).

-----------------------------------------------------------------------

SUMMARY: The Department of Energy (DOE), Office of Electricity Delivery 
and Energy Reliability (OE), is seeking comments and information from 
interested parties to inform its policy development related to the 
possible establishment of a national reserve of power transformers that 
support the bulk power grid. The focus of the RFI is on the design and 
implementation of a National Power Transformer Reserve Program.

DATES: Comments must be received on or before August 24, 2015.

ADDRESSES: Comments can be submitted by any of the following methods 
and must be identified as ``Transformer Reserve.'' By the Federal 
eRulemaking Portal: www.regulations.gov. Follow the instructions for 
submitting comments. By email: LPT.RFI.2015@hq.doe.gov, and include 
``Transformer Reserve'' in the subject line of the message. By mail: 
Alice Lippert, Office of Electricity Delivery and Energy Reliability, 
U.S. Department of Energy, Forrestal Building, Room 1E-078, 1000 
Independence Avenue SW., Washington, DC 20585. Note: Delivery of the 
U.S. Postal Service mail to DOE may be delayed by several weeks due to 
security screening. DOE, therefore, encourages those wishing to comment 
to submit comments electronically by email.

FOR FURTHER INFORMATION CONTACT: Requests for additional information 
should be directed to Alice Lippert, Office of Electricity Delivery and 
Energy Reliability, U.S. Department of Energy, 1000 Independence Avenue 
SW., Washington, DC 20585 at Alice.Lippert@hq.doe.gov, 202-586-9600.

SUPPLEMENTARY INFORMATION:

I. Background

    The U.S. electricity sector operates a complex and highly reliable 
electric power system, upon which the Nation's economy and security 
depend. The North American Bulk Power System (BPS) is extensive, 
consisting of various infrastructure components, including 
transformers, switches, transmission towers and lines, control centers, 
and computer controls. Of the BPS' physical infrastructure, large power 
transformers (LPTs) are critical components, because the reliable 
operation of the BPS depends heavily on the safe and efficient 
operation of a network of interconnected LPTs.
    LPTs have long been a concern for the U.S. electricity sector 
because the failure of a single unit can interrupt electricity service 
to a large number of customers and lead to collateral damage, and it 
could be difficult to quickly replace it. LPTs are large, custom-
designed pieces of equipment that entail a significant capital 
expenditure and a long lead-time to manufacture and ship. LPTs are not 
usually interchangeable. System owners often own and maintain spare 
LPTs at a number sufficient to mitigate risks from premature failure. 
The limited availability of spare LPTs, and the long lead times to 
procure replacements, could pose a potential threat to the availability 
and reliability of the Nation's bulk power system in the event of an 
emergency where a relatively large number of existing LPTs are damaged 
or destroyed.
    Large-scale disruptions to the U.S. BPS are rare; however, it faces 
a wide variety of evolving threats, including but not limited to: Cyber 
and physical security intrusions, weather-related

[[Page 39423]]

incidents; geomagnetic disturbances (GMD); and electromagnetic pulse 
(EMP) effects. The electricity sector serves one of the four lifeline 
functions as identified by the Department of Homeland Security, which 
means that its reliable operation is so critical that a disruption or 
loss of electricity will directly affect the security and resilience of 
other critical infrastructure and the Nation.
    The recently released ``Quadrennial Energy Review, Energy 
Transmission, Storage and Distribution Infrastructure Report, April 
2015,'' recommends that ``DOE should coordinate with the Department of 
Homeland Security and other Federal agencies, States, and industry--an 
initiative to mitigate the risks associated with the loss of 
transformers (p. 2-42).'' This request for comment is an initial step 
in executing that recommendation. Part of the national strategy to 
reduce risk from large power transformers, which has been under 
development by the DOE, includes assessing the need for a reserve of 
LPTs.

II. Request for Information

    For the reasons stated above, DOE is exploring possible National 
strategies to mitigate risk to the reliability of the bulk power system 
arising from the loss of LPTs. This RFI provides the public, and 
industry stakeholders, the opportunity to provide their view on the 
development and structure of a National program to establish and 
maintain large power transformer reserves in the United States. The 
intent of this RFI is to solicit information pertinent to the need and 
viability--regulatory, economic, and technical--of such a program. The 
information obtained is meant to be used by DOE for program design and 
strategy development purposes. In your comments, please reference the 
question(s) to which you are responding. Please also provide supporting 
information if noted, including studies, reports, data, and examples 
relevant to mitigating the risks associated with the loss of LPTs.

1. Program Need

    Is there a need for a National Power Transformer Reserve? How would 
such a reserve affect the reliability and resiliency of the North 
American bulk power system? Are there alternatives to a power 
transformer reserve program that can help ensure the reliability, 
resiliency, and recovery of the bulk power system? Is there a need for 
a nationally-maintained inventory of large power transformers?

2. Power Transformer Criteria

    What types and sizes of power transformers should be considered for 
inclusion in a transformer reserve program versus operational spare 
capacity? What are the design considerations for replacement 
transformers to support the bulk power system?

3. Ownership and Economics

    What would be an appropriate structure for procuring and 
inventorying power transformers? How, and by whom, should a program of 
this type be administered? How would a transformer reserve be funded?

4. Technical Considerations

    Is it technically feasible to develop a reserve of large power 
transformers when most are custom engineered? Is additional research 
and development (R&D) necessary to develop suitable replacement 
transformers that can be rapidly deployed from inventory in the event 
of an emergency?

5. Procurement and Management

    How should procurement, maintenance and management of the reserve 
power transformers be conducted? For example, should manufacturers be 
pre-qualified, and if so, according to what criteria?

6. Supply Chain

    What are the critical supply chain components for the manufacture 
and delivery of large power transformers (e.g., electrical steel, 
copper, silicone, high voltage bushings, etc.)? Are there shortages or 
other considerations that could necessitate using the Defense 
Production Act Priority Ratings to ensure sufficient parts are 
available in a time of need? Are there related skilled workforce 
issues?

7. Manufacturing

    Is there adequate manufacturing capacity to support a transformer 
reserve program? What is the lead time for engineering, manufacture, 
and delivery of large power transformers? Are there approaches that 
could help to speed manufacture and delivery of large power 
transformers?

8. Transport and Deployment

    What specialized transport infrastructure would be necessary to 
ship large power transformers from manufacturing site to storage 
locations, and from storage locations to field site in the event of an 
emergency? What should be the number and location of transformer 
storage sites? What are feasible delivery times for LPTs that reside in 
a reserve to an affected site?

9. Field Engineering and Installation

    Are there adequate domestic engineering and installation resources 
available throughout the United States to install multiple bulk power 
transformers simultaneously? What additional resources would be 
necessary?

10. Criteria for Deploying Transformers

    What criteria should be used for activating and deploying 
transformers from the reserve? How would deployment be funded?

11. Additional Comments

    Are there additional concerns regarding a National Power 
Transformer Reserve Program that need to be considered?

    Issued at Washington, DC, on July 2, 2015.
Patricia A. Hoffman,
Assistant Secretary, U.S. Department of Energy, Office of Electricity 
Delivery and Energy Reliability.
[FR Doc. 2015-16784 Filed 7-8-15; 8:45 am]
 BILLING CODE 6450-01-P



                                                39422                           Federal Register / Vol. 80, No. 131 / Thursday, July 9, 2015 / Notices

                                                information. This helps the Department                   areas and freely associated states                    and include ‘‘Transformer Reserve’’ in
                                                assess the impact of its information                     (American Samoa, Federated States of                  the subject line of the message. By mail:
                                                collection requirements and minimize                     Micronesia, Guam, Marshall Islands,                   Alice Lippert, Office of Electricity
                                                the public’s reporting burden. It also                   Commonwealth of the Northern Mariana                  Delivery and Energy Reliability, U.S.
                                                helps the public understand the                          Islands, Republic of Palau, and the U.S.              Department of Energy, Forrestal
                                                Department’s information collection                      Virgin Islands), the Department of                    Building, Room 1E–078, 1000
                                                requirements and provide the requested                   Defense Education Activity (DoDEA),                   Independence Avenue SW.,
                                                data in the desired format. ED is                        and the Bureau of Indian Education                    Washington, DC 20585. Note: Delivery
                                                soliciting comments on the proposed                      (BIE). NCES seeks authorization from                  of the U.S. Postal Service mail to DOE
                                                information collection request (ICR) that                OMB to continue its EDFacts data                      may be delayed by several weeks due to
                                                is described below. The Department of                    collection and is requesting a new                    security screening. DOE, therefore,
                                                Education is especially interested in                    clearance for the 2016–17, 2017–18, and               encourages those wishing to comment to
                                                public comment addressing the                            2018–19 school years in order to                      submit comments electronically by
                                                following issues: (1) Is this collection                 continue to provide EDFacts data to                   email.
                                                necessary to the proper functions of the                 Department of Education program                       FOR FURTHER INFORMATION CONTACT:
                                                Department; (2) will this information be                 offices, as well as SEAs, LEAs, and                   Requests for additional information
                                                processed and used in a timely manner;                   schools. This collection package will be              should be directed to Alice Lippert,
                                                (3) is the estimate of burden accurate;                  available for public comment during                   Office of Electricity Delivery and Energy
                                                (4) how might the Department enhance                     two open periods, a 60 day and a 30                   Reliability, U.S. Department of Energy,
                                                the quality, utility, and clarity of the                 day, and revisions will be made                       1000 Independence Avenue SW.,
                                                information to be collected; and (5) how                 accordingly. This submission includes a               Washington, DC 20585 at Alice.Lippert@
                                                might the Department minimize the                        few proposed changes to the EDFacts
                                                burden of this collection on the                                                                               hq.doe.gov, 202–586–9600.
                                                                                                         data collection. In addition to reviewing
                                                respondents, including through the use                                                                         SUPPLEMENTARY INFORMATION:
                                                                                                         the proposed changes (detailed in
                                                of information technology. Please note                   Attachment C and the B Attachments),                  I. Background
                                                that written comments received in                        ED requests that SEAs and other
                                                response to this notice will be                                                                                   The U.S. electricity sector operates a
                                                                                                         stakeholders respond to the directed                  complex and highly reliable electric
                                                considered public records.                               questions found in Attachment D.
                                                   Title of Collection: EDFacts Data                                                                           power system, upon which the Nation’s
                                                Collection School Years 2016–17, 2017–                     Dated: July 6, 2015.                                economy and security depend. The
                                                18, and 2018–19.                                         Kate Mullan,                                          North American Bulk Power System
                                                   OMB Control Number: 1850—NEW                          Acting Director, Information Collection               (BPS) is extensive, consisting of various
                                                (previously 1875–0240).                                  Clearance Division, Privacy, Information and          infrastructure components, including
                                                   Type of Review: A revised information                 Records Management Services, Office of                transformers, switches, transmission
                                                collection.                                              Management.                                           towers and lines, control centers, and
                                                   Respondents/Affected Public: State,                   [FR Doc. 2015–16798 Filed 7–8–15; 8:45 am]            computer controls. Of the BPS’ physical
                                                Local or Tribal Government.                              BILLING CODE 4000–01–P                                infrastructure, large power transformers
                                                   Total Estimated Number of Annual                                                                            (LPTs) are critical components, because
                                                Responses: 61.                                                                                                 the reliable operation of the BPS
                                                   Total Estimated Number of Annual                      DEPARTMENT OF ENERGY                                  depends heavily on the safe and
                                                Burden Hours: 126,880.                                                                                         efficient operation of a network of
                                                   Abstract: EDFacts is a U.S.                           National Power Transformer Reserve                    interconnected LPTs.
                                                Department of Education (ED) initiative                                                                           LPTs have long been a concern for the
                                                to collect, analyze, report on and                       AGENCY:  Office of Electricity Delivery               U.S. electricity sector because the
                                                promote the use of high-quality, pre-                    and Energy Reliability, Department of                 failure of a single unit can interrupt
                                                kindergarten through grade 12 (pre-K–                    Energy.                                               electricity service to a large number of
                                                12) performance data for use in                          ACTION: Request for information (RFI).                customers and lead to collateral damage,
                                                education planning, policymaking, and                                                                          and it could be difficult to quickly
                                                                                                         SUMMARY:   The Department of Energy
                                                management and budget decision                                                                                 replace it. LPTs are large, custom-
                                                                                                         (DOE), Office of Electricity Delivery and
                                                making to improve outcomes for                                                                                 designed pieces of equipment that entail
                                                                                                         Energy Reliability (OE), is seeking
                                                students. EDFacts enables the National                                                                         a significant capital expenditure and a
                                                                                                         comments and information from
                                                Center for Education Statistics (NCES)                                                                         long lead-time to manufacture and ship.
                                                                                                         interested parties to inform its policy
                                                to report on students, schools, staff,                                                                         LPTs are not usually interchangeable.
                                                                                                         development related to the possible
                                                services, and education outcomes at the                                                                        System owners often own and maintain
                                                                                                         establishment of a national reserve of
                                                state, district, and school levels, by                                                                         spare LPTs at a number sufficient to
                                                                                                         power transformers that support the
                                                centralizing data provided by state                                                                            mitigate risks from premature failure.
                                                                                                         bulk power grid. The focus of the RFI
                                                education agencies, local education                                                                            The limited availability of spare LPTs,
                                                                                                         is on the design and implementation of
                                                agencies, and schools. This centralized                                                                        and the long lead times to procure
                                                                                                         a National Power Transformer Reserve
                                                approach provides ED users with the                                                                            replacements, could pose a potential
                                                                                                         Program.
                                                ability to efficiently analyze and report                                                                      threat to the availability and reliability
                                                on submitted data and has reduced the                    DATES:  Comments must be received on                  of the Nation’s bulk power system in the
                                                reporting burden for state and local data                or before August 24, 2015.                            event of an emergency where a
srobinson on DSK5SPTVN1PROD with NOTICES




                                                producers through the use of                             ADDRESSES: Comments can be submitted                  relatively large number of existing LPTs
                                                streamlined data collection, analysis,                   by any of the following methods and                   are damaged or destroyed.
                                                and reporting tools. EDFacts collects                    must be identified as ‘‘Transformer                      Large-scale disruptions to the U.S.
                                                information on behalf of ED grant and                    Reserve.’’ By the Federal eRulemaking                 BPS are rare; however, it faces a wide
                                                program offices for approximately 180                    Portal: www.regulations.gov. Follow the               variety of evolving threats, including
                                                data groups for all 50 states, Washington                instructions for submitting comments.                 but not limited to: Cyber and physical
                                                DC, Puerto Rico, and seven outlying                      By email: LPT.RFI.2015@hq.doe.gov,                    security intrusions, weather-related


                                           VerDate Sep<11>2014   17:10 Jul 08, 2015   Jkt 235001   PO 00000   Frm 00016   Fmt 4703   Sfmt 4703   E:\FR\FM\09JYN1.SGM   09JYN1


                                                                                Federal Register / Vol. 80, No. 131 / Thursday, July 9, 2015 / Notices                                                 39423

                                                incidents; geomagnetic disturbances                      2. Power Transformer Criteria                         feasible delivery times for LPTs that
                                                (GMD); and electromagnetic pulse                                                                               reside in a reserve to an affected site?
                                                                                                            What types and sizes of power
                                                (EMP) effects. The electricity sector                    transformers should be considered for                 9. Field Engineering and Installation
                                                serves one of the four lifeline functions                inclusion in a transformer reserve
                                                as identified by the Department of                                                                                Are there adequate domestic
                                                                                                         program versus operational spare                      engineering and installation resources
                                                Homeland Security, which means that                      capacity? What are the design
                                                its reliable operation is so critical that                                                                     available throughout the United States
                                                                                                         considerations for replacement                        to install multiple bulk power
                                                a disruption or loss of electricity will                 transformers to support the bulk power
                                                directly affect the security and                                                                               transformers simultaneously? What
                                                                                                         system?                                               additional resources would be
                                                resilience of other critical infrastructure
                                                and the Nation.                                          3. Ownership and Economics                            necessary?
                                                   The recently released ‘‘Quadrennial                      What would be an appropriate                       10. Criteria for Deploying Transformers
                                                Energy Review, Energy Transmission,                      structure for procuring and inventorying                 What criteria should be used for
                                                Storage and Distribution Infrastructure                  power transformers? How, and by                       activating and deploying transformers
                                                Report, April 2015,’’ recommends that                    whom, should a program of this type be                from the reserve? How would
                                                ‘‘DOE should coordinate with the                         administered? How would a transformer                 deployment be funded?
                                                Department of Homeland Security and                      reserve be funded?
                                                other Federal agencies, States, and                                                                            11. Additional Comments
                                                                                                         4. Technical Considerations
                                                industry—an initiative to mitigate the                                                                           Are there additional concerns
                                                risks associated with the loss of                          Is it technically feasible to develop a             regarding a National Power Transformer
                                                transformers (p. 2–42).’’ This request for               reserve of large power transformers                   Reserve Program that need to be
                                                comment is an initial step in executing                  when most are custom engineered? Is                   considered?
                                                that recommendation. Part of the                         additional research and development                     Issued at Washington, DC, on July 2, 2015.
                                                national strategy to reduce risk from                    (R&D) necessary to develop suitable                   Patricia A. Hoffman,
                                                large power transformers, which has                      replacement transformers that can be
                                                                                                                                                               Assistant Secretary, U.S. Department of
                                                been under development by the DOE,                       rapidly deployed from inventory in the                Energy, Office of Electricity Delivery and
                                                includes assessing the need for a reserve                event of an emergency?                                Energy Reliability.
                                                of LPTs.                                                 5. Procurement and Management                         [FR Doc. 2015–16784 Filed 7–8–15; 8:45 am]
                                                                                                                                                               BILLING CODE 6450–01–P
                                                II. Request for Information                                How should procurement,
                                                                                                         maintenance and management of the
                                                  For the reasons stated above, DOE is
                                                                                                         reserve power transformers be                         DEPARTMENT OF ENERGY
                                                exploring possible National strategies to                conducted? For example, should
                                                mitigate risk to the reliability of the bulk             manufacturers be pre-qualified, and if
                                                power system arising from the loss of                                                                          Office of Energy Efficiency and
                                                                                                         so, according to what criteria?                       Renewable Energy
                                                LPTs. This RFI provides the public, and
                                                industry stakeholders, the opportunity                   6. Supply Chain                                       Bioproducts To Enable Biofuels
                                                to provide their view on the                                What are the critical supply chain                 Workshop
                                                development and structure of a National                  components for the manufacture and
                                                program to establish and maintain large                                                                        AGENCY: Office of Energy Efficiency and
                                                                                                         delivery of large power transformers
                                                power transformer reserves in the                                                                              Renewable Energy, Department of
                                                                                                         (e.g., electrical steel, copper, silicone,
                                                United States. The intent of this RFI is                                                                       Energy.
                                                                                                         high voltage bushings, etc.)? Are there
                                                to solicit information pertinent to the                                                                        ACTION: Notice of public workshop.
                                                                                                         shortages or other considerations that
                                                need and viability—regulatory,                           could necessitate using the Defense                   SUMMARY: The Department of Energy
                                                economic, and technical—of such a                        Production Act Priority Ratings to
                                                program. The information obtained is                                                                           (DOE) is announcing a public workshop
                                                                                                         ensure sufficient parts are available in a            entitled, ‘‘Bioproducts to Enable
                                                meant to be used by DOE for program                      time of need? Are there related skilled
                                                design and strategy development                                                                                Biofuels Workshop’’. The Bioenergy
                                                                                                         workforce issues?                                     Technologies Office (BETO) is seeking
                                                purposes. In your comments, please
                                                reference the question(s) to which you                   7. Manufacturing                                      to collect information from key
                                                are responding. Please also provide                                                                            industry, university, national laboratory,
                                                                                                           Is there adequate manufacturing                     and other stakeholders regarding
                                                supporting information if noted,                         capacity to support a transformer
                                                including studies, reports, data, and                                                                          challenges associated with the
                                                                                                         reserve program? What is the lead time                coproduction of biomass derived
                                                examples relevant to mitigating the risks                for engineering, manufacture, and
                                                associated with the loss of LPTs.                                                                              chemicals, products, and biofuels.
                                                                                                         delivery of large power transformers?                 DATES: The public workshop will be
                                                1. Program Need                                          Are there approaches that could help to               held on July 16, 2015, from 8:00 a.m. to
                                                                                                         speed manufacture and delivery of large               5:30 p.m. MDT in Westminster,
                                                   Is there a need for a National Power                  power transformers?                                   Colorado.
                                                Transformer Reserve? How would such
                                                                                                         8. Transport and Deployment                           ADDRESSES: The meeting will be held at
                                                a reserve affect the reliability and
                                                resiliency of the North American bulk                       What specialized transport                         The Westin Westminster, 10600
srobinson on DSK5SPTVN1PROD with NOTICES




                                                power system? Are there alternatives to                  infrastructure would be necessary to                  Westminster Blvd., Westminster,
                                                a power transformer reserve program                      ship large power transformers from                    Colorado 80020.
                                                that can help ensure the reliability,                    manufacturing site to storage locations,              FOR FURTHER INFORMATION CONTACT:
                                                resiliency, and recovery of the bulk                     and from storage locations to field site              Questions may be directed to Andrea
                                                power system? Is there a need for a                      in the event of an emergency? What                    Bailey at 303–425–6800 ext. 460 or by
                                                nationally-maintained inventory of large                 should be the number and location of                  email at andrea.bailey@ee.doe.gov.
                                                power transformers?                                      transformer storage sites? What are                   SUPPLEMENTARY INFORMATION:



                                           VerDate Sep<11>2014   17:10 Jul 08, 2015   Jkt 235001   PO 00000   Frm 00017   Fmt 4703   Sfmt 4703   E:\FR\FM\09JYN1.SGM   09JYN1



Document Created: 2018-02-23 09:14:10
Document Modified: 2018-02-23 09:14:10
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionRequest for information (RFI).
DatesComments must be received on or before August 24, 2015.
ContactRequests for additional information should be directed to Alice Lippert, Office of Electricity Delivery and Energy Reliability, U.S. Department of Energy, 1000 Independence Avenue SW., Washington, DC 20585 at [email protected], 202-586-9600.
FR Citation80 FR 39422 