[Federal Register Volume 80, Number 139 (Tuesday, July 21, 2015)]
[Notices]
[Pages 43073-43074]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-17790]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14675-000]


Siting Renewables, LLC; Notice of Preliminary Permit Application 
Accepted for Filing and Soliciting Comments, Motions To Intervene, and 
Competing Applications

    On April 9, 2015, Siting Renewables, LLC, filed an application for 
a preliminary permit, pursuant to section 4(f) of the Federal Power Act 
(FPA), proposing to study the feasibility of a hydropower project to be 
located at the existing Chain Dam on the Lehigh River,

[[Page 43074]]

near the City of Easton, Northampton County, Pennsylvania. The sole 
purpose of a preliminary permit, if issued, is to grant the permit 
holder priority to file a license application during the permit term. A 
preliminary permit does not authorize the permit holder to perform any 
land-disturbing activities or otherwise enter upon lands or waters 
owned by others without the owners' express permission.
    The proposed Chain Dam Hydroelectric Project would consist of the 
following: (1) An existing 20-foot-high concrete gravity dam with a 
690-foot-long spillway; (2) an existing impoundment having a surface 
area of approximately 300 acres and a storage capacity of 1,200 acre-
feet at an elevation of 190 feet mean sea level (msl); (2) three 
channels, each with a very low head (VLH) 500-kilowatt (kW) turbine-
generator unit, with a maximum generating capacity of 1,500 kW, with a 
maximum hydraulic capacity of 2,300 cubic feet per second under a net 
head of 13.5 feet, (3) three new, heavy flotsam racks; (4) a crest-
mounted walkway carrying hydraulic and electrical conduits from the VLH 
turbines to a new powerhouse; and (5) a 280-foot-long 12.42/7.2 
kilovolt primary transmission line. The estimated annual generation of 
the proposed project would be 7,880,000 kilowatt-hours.
    Applicant Contact: Mr. Ralph J. Jones, Siting Renewables, LLC, 1800 
Rt. 34, Suite 101, Wall, NJ 07719; phone: (855) 946-7652.
    FERC Contact: Monir Chowdhury; phone: (202) 502-6736.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR 4.36.
    The Commission strongly encourages electronic filing. Please file 
comments, motions to intervene, notices of intent, and competing 
applications using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief 
comments up to 6,000 characters, without prior registration, using the 
eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You 
must include your name and contact information at the end of your 
comments. For assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE., 
Washington, DC 20426. The first page of any filing should include 
docket number P-14675-000.
    More information about this project, including a copy of the 
application, can be viewed or printed on the ``eLibrary'' link of the 
Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-14675) in the docket number field to access 
the document. For assistance, contact FERC Online Support.

    Dated: July 14, 2015.
Kimberly D. Bose,
 Secretary.
[FR Doc. 2015-17790 Filed 7-20-15; 8:45 am]
 BILLING CODE 6717-01-P



                                                                                    Federal Register / Vol. 80, No. 139 / Tuesday, July 21, 2015 / Notices                                                 43073

                                                    ACTION:   Notice.                                        respondents, including through the use                   Notice is hereby given that the
                                                                                                             of information technology. Please note                deadline for filing protests with regard
                                                    SUMMARY:    In accordance with the                       that written comments received in                     to the applicant’s request for blanket
                                                    Paperwork Reduction Act of 1995 (44                      response to this notice will be                       authorization, under 18 CFR part 34, of
                                                    U.S.C. chapter 3501 et seq.), ED is                      considered public records.                            future issuances of securities and
                                                    proposing a revision of an existing                        Title of Collection: Federal Perkins                assumptions of liability, is August 3,
                                                    information collection.                                  Loan Program Master Promissory Note.                  2015.
                                                    DATES: Interested persons are invited to                   OMB Control Number: 1845–0074.                         The Commission encourages
                                                    submit comments on or before August                        Type of Review: A revision of an                    electronic submission of protests and
                                                    20, 2015.                                                existing information collection.                      interventions in lieu of paper, using the
                                                    ADDRESSES: To access and review all the                    Respondents/Affected Public:                        FERC Online links at http://
                                                    documents related to the information                     Individuals or Households.                            www.ferc.gov. To facilitate electronic
                                                    collection listed in this notice, please                   Total Estimated Number of Annual                    service, persons with Internet access
                                                    use http://wwww.regulations.gov by                       Responses: 276, 934.                                  who will eFile a document and/or be
                                                    searching the Docket ID number ED–                         Total Estimated Number of Annual                    listed as a contact for an intervenor
                                                    2015–ICCD–0062. Comments submitted                       Burden Hours: 138, 467.                               must create and validate an
                                                    in response to this notice should be                       Abstract: The Federal Perkins Loan                  eRegistration account using the
                                                    submitted electronically through the                     Master Promissory Note (MPN) provides                 eRegistration link. Select the eFiling
                                                    Federal eRulemaking Portal at http://                    the terms and conditions of the Perkins               link to log on and submit the
                                                    www.regulations.gov by selecting the                     Loan program and is prepared by the                   intervention or protests.
                                                    Docket ID number or via postal mail,                     participating eligible institution and                   Persons unable to file electronically
                                                    commercial delivery, or hand delivery.                   signed by the borrower. The borrower                  should submit an original and 5 copies
                                                    Please note that comments submitted by                   may receive loans for a single academic               of the intervention or protest to the
                                                    fax or email and those submitted after                   year or multiple academic years. The                  Federal Energy Regulatory Commission,
                                                    the comment period will not be                           adoption of the MPN in the Perkins                    888 First Street, NE., Washington, DC
                                                    accepted. Written requests for                           Loan Program has simplified the loan                  20426.
                                                    information or comments submitted by                     process by eliminating the need for                      The filings in the above-referenced
                                                    postal mail or delivery should be                        institutions to prepare and students to               proceeding are accessible in the
                                                    addressed to the Director of the                         sign, a promissory note each award year.              Commission’s eLibrary system by
                                                    Information Collection Clearance                           Dated: July 16, 2015.                               clicking on the appropriate link in the
                                                    Division, U.S. Department of Education,                                                                        above list. They are also available for
                                                                                                             Kate Mullan,
                                                    400 Maryland Avenue SW, LBJ, Room                                                                              electronic review in the Commission’s
                                                                                                             Acting Director, Information Collection
                                                    2E103, Washington, DC 20202–4537.                                                                              Public Reference Room in Washington,
                                                                                                             Clearance Division, Office of the Chief Privacy
                                                    FOR FURTHER INFORMATION CONTACT: For                     Officer, Office of Management.                        DC. There is an eSubscription link on
                                                    specific questions related to collection                 [FR Doc. 2015–17829 Filed 7–20–15; 8:45 am]
                                                                                                                                                                   the Web site that enables subscribers to
                                                    activities, please contact Beth                                                                                receive email notification when a
                                                                                                             BILLING CODE 4000–01–P
                                                    Grebeldinger, 202–377–4018.                                                                                    document is added to a subscribed
                                                    SUPPLEMENTARY INFORMATION: The                                                                                 docket(s). For assistance with any FERC
                                                    Department of Education (ED), in                                                                               Online service, please email
                                                                                                             DEPARTMENT OF ENERGY                                  FERCOnlineSupport@ferc.gov. or call
                                                    accordance with the Paperwork
                                                    Reduction Act of 1995 (PRA) (44 U.S.C.                   Federal Energy Regulatory                             (866) 208–3676 (toll free). For TTY, call
                                                    3506(c)(2)(A)), provides the general                     Commission                                            (202) 502–8659.
                                                    public and Federal agencies with an                                                                              Dated: July 14, 2015.
                                                    opportunity to comment on proposed,                      [Docket No. ER15–2149–000]
                                                                                                                                                                   Kimberly D. Bose,
                                                    revised, and continuing collections of                   Century Marketer LLC; Supplemental                    Secretary.
                                                    information. This helps the Department                   Notice That Initial Market-Based Rate                 [FR Doc. 2015–17786 Filed 7–20–15; 8:45 am]
                                                    assess the impact of its information                     Filing Includes Request for Blanket                   BILLING CODE 6717–01–P
                                                    collection requirements and minimize                     Section 204 Authorization
                                                    the public’s reporting burden. It also
                                                    helps the public understand the                            This is a supplemental notice in the                DEPARTMENT OF ENERGY
                                                    Department’s information collection                      above-referenced proceeding of Century
                                                    requirements and provide the requested                   Marketer LLC’s application for market-                Federal Energy Regulatory
                                                    data in the desired format. ED is                        based rate authority, with an                         Commission
                                                    soliciting comments on the proposed                      accompanying rate tariff, noting that
                                                    information collection request (ICR) that                such application includes a request for               [Project No. 14675–000]
                                                    is described below. The Department of                    blanket authorization, under 18 CFR                   Siting Renewables, LLC; Notice of
                                                    Education is especially interested in                    part 34, of future issuances of securities            Preliminary Permit Application
                                                    public comment addressing the                            and assumptions of liability.                         Accepted for Filing and Soliciting
                                                    following issues: (1) Is this collection                   Any person desiring to intervene or to              Comments, Motions To Intervene, and
                                                    necessary to the proper functions of the                 protest should file with the Federal
asabaliauskas on DSK5VPTVN1PROD with NOTICES




                                                                                                                                                                   Competing Applications
                                                    Department; (2) will this information be                 Energy Regulatory Commission, 888
                                                    processed and used in a timely manner;                   First Street, NE., Washington, DC 20426,                On April 9, 2015, Siting Renewables,
                                                    (3) is the estimate of burden accurate;                  in accordance with Rules 211 and 214                  LLC, filed an application for a
                                                    (4) how might the Department enhance                     of the Commission’s Rules of Practice                 preliminary permit, pursuant to section
                                                    the quality, utility, and clarity of the                 and Procedure (18 CFR 385.211 and                     4(f) of the Federal Power Act (FPA),
                                                    information to be collected; and (5) how                 385.214). Anyone filing a motion to                   proposing to study the feasibility of a
                                                    might the Department minimize the                        intervene or protest must serve a copy                hydropower project to be located at the
                                                    burden of this collection on the                         of that document on the Applicant.                    existing Chain Dam on the Lehigh River,


                                               VerDate Sep<11>2014   17:58 Jul 20, 2015   Jkt 235001   PO 00000   Frm 00023   Fmt 4703   Sfmt 4703   E:\FR\FM\21JYN1.SGM   21JYN1


                                                    43074                           Federal Register / Vol. 80, No. 139 / Tuesday, July 21, 2015 / Notices

                                                    near the City of Easton, Northampton                     The first page of any filing should                   No. CP15–505–000 to ensure they are
                                                    County, Pennsylvania. The sole purpose                   include docket number P–14675–000.                    considered as part of this proceeding.
                                                    of a preliminary permit, if issued, is to                   More information about this project,                  This notice is being sent to the
                                                    grant the permit holder priority to file                 including a copy of the application, can              Commission’s current environmental
                                                    a license application during the permit                  be viewed or printed on the ‘‘eLibrary’’              mailing list for this Project. State and
                                                    term. A preliminary permit does not                      link of the Commission’s Web site at                  local government representatives should
                                                    authorize the permit holder to perform                   http://www.ferc.gov/docs-filing/                      notify their constituents of this
                                                    any land-disturbing activities or                        elibrary.asp. Enter the docket number                 proposed Project and encourage them to
                                                    otherwise enter upon lands or waters                     (P–14675) in the docket number field to               comment on their areas of concern.
                                                    owned by others without the owners’                      access the document. For assistance,                     If you are a landowner receiving this
                                                    express permission.                                      contact FERC Online Support.                          notice, a Natural representative may
                                                       The proposed Chain Dam                                                                                      contact you about the acquisition of an
                                                                                                               Dated: July 14, 2015.
                                                    Hydroelectric Project would consist of                                                                         easement to construct, operate, and
                                                    the following: (1) An existing 20-foot-                  Kimberly D. Bose,                                     maintain the proposed facilities. The
                                                    high concrete gravity dam with a 690-                    Secretary.                                            company would seek to negotiate a
                                                    foot-long spillway; (2) an existing                      [FR Doc. 2015–17790 Filed 7–20–15; 8:45 am]           mutually acceptable agreement.
                                                    impoundment having a surface area of                     BILLING CODE 6717–01–P                                However, if the Commission approves
                                                    approximately 300 acres and a storage                                                                          the Project, that approval conveys with
                                                    capacity of 1,200 acre-feet at an                                                                              it the right of eminent domain.
                                                    elevation of 190 feet mean sea level                     DEPARTMENT OF ENERGY                                  Therefore, if easement negotiations fail
                                                    (msl); (2) three channels, each with a                                                                         to produce an agreement, the pipeline
                                                    very low head (VLH) 500-kilowatt (kW)                    Federal Energy Regulatory                             company could initiate condemnation
                                                    turbine-generator unit, with a maximum                   Commission                                            proceedings where compensation would
                                                    generating capacity of 1,500 kW, with a                  [Docket No. CP15–505–000]                             be determined in accordance with state
                                                    maximum hydraulic capacity of 2,300                                                                            law.
                                                    cubic feet per second under a net head                   Natural Gas Pipeline Company of                          Natural provided landowners with a
                                                    of 13.5 feet, (3) three new, heavy flotsam               America, LLC; Notice of Intent To                     fact sheet prepared by the FERC entitled
                                                    racks; (4) a crest-mounted walkway                       Prepare an Environmental Assessment                   ‘‘An Interstate Natural Gas Facility On
                                                    carrying hydraulic and electrical                        for the Proposed Chicago Market                       My Land? What Do I Need To Know?’’
                                                    conduits from the VLH turbines to a                      Expansion Project, and Request for                    This fact sheet addresses a number of
                                                    new powerhouse; and (5) a 280-foot-                      Comments on Environmental Issues                      typically asked questions, including the
                                                    long 12.42/7.2 kilovolt primary                                                                                use of eminent domain and how to
                                                    transmission line. The estimated annual                     The staff of the Federal Energy                    participate in the Commission’s
                                                    generation of the proposed project                       Regulatory Commission (FERC or                        proceedings. It is also available for
                                                    would be 7,880,000 kilowatt-hours.                       Commission) will prepare an                           viewing on the FERC Web site
                                                       Applicant Contact: Mr. Ralph J. Jones,                environmental assessment (EA) that will               (www.ferc.gov).
                                                    Siting Renewables, LLC, 1800 Rt. 34,                     discuss the environmental impacts of
                                                    Suite 101, Wall, NJ 07719; phone: (855)                  the Chicago Market Expansion Project                  Public Participation
                                                    946–7652.                                                (Project) involving construction and                    For your convenience, there are three
                                                       FERC Contact: Monir Chowdhury;                        operation of facilities by Natural Gas                methods you can use to submit your
                                                    phone: (202) 502–6736.                                   Pipeline Company of America, LLC                      comments to the Commission. The
                                                       Deadline for filing comments, motions                 (Natural) in Livingston County, Illinois.             Commission encourages electronic filing
                                                    to intervene, competing applications                     The Commission will use this EA in its                of comments and has expert staff
                                                    (without notices of intent), or notices of               decision-making process to determine                  available to assist you at (202) 502–8258
                                                    intent to file competing applications: 60                whether the project is in the public                  or efiling@ferc.gov. Please carefully
                                                    days from the issuance of this notice.                   convenience and necessity.                            follow these instructions so that your
                                                    Competing applications and notices of                       This notice announces the opening of               comments are properly recorded.
                                                    intent must meet the requirements of 18                  the scoping process the Commission                       (1) You can file your comments
                                                    CFR 4.36.                                                will use to gather input from the public              electronically using the eComment
                                                       The Commission strongly encourages                    and interested agencies on the Project.               feature on the Commission’s Web site
                                                    electronic filing. Please file comments,                 You can make a difference by providing                (www.ferc.gov) under the link to
                                                    motions to intervene, notices of intent,                 us with your specific comments or                     Documents and Filings. This is an easy
                                                    and competing applications using the                     concerns about the Project. Your                      method for submitting brief, text-only
                                                    Commission’s eFiling system at http://                   comments should focus on the potential                comments on a project;
                                                    www.ferc.gov/docs-filing/efiling.asp.                    environmental effects, reasonable                        (2) You can file your comments
                                                    Commenters can submit brief comments                     alternatives, and measures to avoid or                electronically by using the eFiling
                                                    up to 6,000 characters, without prior                    lessen environmental impacts. Your                    feature on the Commission’s Web site
                                                    registration, using the eComment system                  input will help the Commission staff                  (www.ferc.gov) under the link to
                                                    at http://www.ferc.gov/docs-filing/                      determine what issues they need to                    Documents and Filings. With eFiling,
                                                    ecomment.asp. You must include your                      evaluate in the EA. To ensure that your               you can provide comments in a variety
                                                    name and contact information at the end                  comments are timely and properly                      of formats by attaching them as a file
asabaliauskas on DSK5VPTVN1PROD with NOTICES




                                                    of your comments. For assistance,                        recorded, please send your comments so                with your submission. New eFiling
                                                    please contact FERC Online Support at                    that the Commission receives them in                  users must first create an account by
                                                    FERCOnlineSupport@ferc.gov, (866)                        Washington, DC on or before August 9,                 clicking on ‘‘eRegister.’’ If you are filing
                                                    208–3676 (toll free), or (202) 502–8659                  2015.                                                 a comment on a particular project,
                                                    (TTY). In lieu of electronic filing, please                 If you sent comments on this Project               please select ‘‘Comment on a Filing’’ as
                                                    send a paper copy to: Secretary, Federal                 to the Commission before the opening of               the filing type; or
                                                    Energy Regulatory Commission, 888                        this docket on June 1, 2015, you will                    (3) You can file a paper copy of your
                                                    First Street NE., Washington, DC 20426.                  need to file those comments in Docket                 comments by mailing them to the


                                               VerDate Sep<11>2014   17:58 Jul 20, 2015   Jkt 235001   PO 00000   Frm 00024   Fmt 4703   Sfmt 4703   E:\FR\FM\21JYN1.SGM   21JYN1



Document Created: 2018-02-23 09:22:57
Document Modified: 2018-02-23 09:22:57
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation80 FR 43073 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR