80_FR_50781 80 FR 50620 - Tennessee Gas Pipeline Company, L.L.C; Notice of Request Under Blanket Authorization

80 FR 50620 - Tennessee Gas Pipeline Company, L.L.C; Notice of Request Under Blanket Authorization

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 80, Issue 161 (August 20, 2015)

Page Range50620-50621
FR Document2015-20576

Federal Register, Volume 80 Issue 161 (Thursday, August 20, 2015)
[Federal Register Volume 80, Number 161 (Thursday, August 20, 2015)]
[Notices]
[Pages 50620-50621]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-20576]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP15-541-000]


Tennessee Gas Pipeline Company, L.L.C; Notice of Request Under 
Blanket Authorization

    Take notice that on August 5, 2015, Tennessee Gas Pipeline Company, 
L.L.C. (Tennessee), 1001 Louisiana Street, Houston, Texas 77002, filed 
in in Docket No. CP15-541-000, a prior notice request pursuant to 
sections 157.203, 157.205 and 157.216 of the Commission's regulations 
under the Natural Gas Act (NGA) for authorization to abandon by removal 
its two inactive supply laterals and associated appurtenances located 
in Terrebonne Parish, Louisiana. Specifically, Tennessee request to 
abandon: (1) Line No. 521A-100 consisting of approximately 1,330 feet 
of 10-inch-diameter pipe and associated appurtenances and (2) Line No. 
520A-300 consisting of approximately 36,739 feet of 10-inch-diameter 
pipeline and associated appurtenances all as more fully set forth in 
the application which is on file with the Commission and open to public 
inspection. The filing may be viewed on the Web at http://www.ferc.gov 
using the ``eLibrary'' link. Enter the docket number excluding the last 
three digits in the docket number field to access the document. For 
assistance, please contact FERC Online Support at 
[email protected] or toll free at (866) 208-3676, or TTY, 
contact (202) 502-8659.
    Any questions concerning this application may be directed to Ben 
Carranza, Manager, Regulatory, Tennessee Gas Pipeline Company, L.L.C. 
1001 Louisiana Street, Houston, Texas 77002, by telephone at (713) 420-
5535, by facsimile at (713) 420-1605, or by email at 
[email protected], or Debbie Kalisek, Regulatory Analyst, 
Tennessee Gas Pipeline Company, L.L.C. 1001 Louisiana Street, Houston, 
Texas 77002, by telephone at (713) 420-3292, by facsimile at (713) 420-
1605, or by email at [email protected].
    Any person or the Commission's staff may, within 60 days after 
issuance of the instant notice by the Commission, file pursuant to Rule 
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to 
intervene or notice of intervention and protest to the request, 
pursuant to section 157.205 of the regulations under the NGA (18 CFR 
157.205). If no protest is filed within the time allowed therefore, the 
proposed activity shall be deemed to be authorized effective the day 
after the time allowed for filing a protest. If a protest is filed and 
not withdrawn within 30 days after the allowed time for filing a 
protest, the instant request shall be treated as an application for 
authorization pursuant to section 7 of the NGA.
    Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9, 
within 90 days of this Notice the Commission staff will either: 
complete its environmental assessment (EA) and place it into the 
Commission's public record (eLibrary) for this proceeding, or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the final environmental impact statement (FEIS) or EA for this 
proposal. The filing of the EA in the Commission's public record for 
this proceeding or the issuance of a Notice of Schedule for 
Environmental Review will serve to notify federal and state agencies of 
the timing for the completion of all necessary reviews, and the 
subsequent need to complete all federal authorizations within 90 days 
of the date of issuance of the Commission staff's FEIS or EA.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission. Environmental commenter's will be 
placed on the Commission's environmental mailing list, will receive 
copies of the environmental documents, and will be notified of meetings 
associated with the Commission's environmental review process. 
Environmental commenter's will not be required to serve copies of filed 
documents on all other parties. However, the non-party commentary, will 
not receive copies of all documents filed by other parties or issued by 
the Commission (except for the mailing of environmental documents 
issued by the Commission) and will not have the right to seek court 
review of the Commission's final order.
    The Commission strongly encourages electronic filings of comments, 
protests, and interventions via the Internet in lieu of paper. See 18 
CFR 385.2001(a) (1) (iii) and the instructions on the

[[Page 50621]]

Commission's Web site (www.ferc.gov) under the ``e-Filing'' link. 
Persons unable to file electronically should submit original and 5 
copies of the protest or intervention to the Federal Energy Regulatory 
Commission, 888 First Street NE., Washington, DC 20426.

    Dated: August 14, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-20576 Filed 8-19-15; 8:45 am]
BILLING CODE 6717-01-P



                                              50620                       Federal Register / Vol. 80, No. 161 / Thursday, August 20, 2015 / Notices

                                                 Description: Section 205(d) Rate                       Dated: August 14, 2015.                             Commission’s Procedural Rules (18 CFR
                                              Filing: Construction Agreement between                  Kimberly D. Bose,                                     385.214) a motion to intervene or notice
                                              MEPCO and Number Nine Wind Farm                         Secretary.                                            of intervention and protest to the
                                              LLC to be effective 8/13/2015.                          [FR Doc. 2015–20575 Filed 8–19–15; 8:45 am]           request, pursuant to section 157.205 of
                                                 Filed Date: 8/14/15.                                 BILLING CODE 6717–01–P                                the regulations under the NGA (18 CFR
                                                 Accession Number: 20150814–5129.                                                                           157.205). If no protest is filed within the
                                                 Comments Due: 5 p.m. ET 9/4/15.                                                                            time allowed therefore, the proposed
                                                 Docket Numbers: ER15–2452–000.                       DEPARTMENT OF ENERGY                                  activity shall be deemed to be
                                                 Applicants: Southwest Power Pool,                                                                          authorized effective the day after the
                                              Inc.                                                    Federal Energy Regulatory                             time allowed for filing a protest. If a
                                                 Description: Section 205(d) Rate                     Commission                                            protest is filed and not withdrawn
                                              Filing: Revisions to Attachment AE                      [Docket No. CP15–541–000]                             within 30 days after the allowed time
                                              Section 3.9 Net Benefit Test Clean-up to                                                                      for filing a protest, the instant request
                                              be effective 3/1/2015.                                  Tennessee Gas Pipeline Company,                       shall be treated as an application for
                                                 Filed Date: 8/14/15.                                 L.L.C; Notice of Request Under Blanket                authorization pursuant to section 7 of
                                                 Accession Number: 20150814–5179.                     Authorization                                         the NGA.
                                                 Comments Due: 5 p.m. ET 9/4/15.                                                                               Pursuant to section 157.9 of the
                                                                                                         Take notice that on August 5, 2015,                Commission’s rules, 18 CFR 157.9,
                                                 Docket Numbers: ER15–2453–000.                       Tennessee Gas Pipeline Company,
                                                 Applicants: Passadumkeag Windpark,                                                                         within 90 days of this Notice the
                                                                                                      L.L.C. (Tennessee), 1001 Louisiana                    Commission staff will either: complete
                                              LLC.                                                    Street, Houston, Texas 77002, filed in in
                                                 Description: Baseline eTariff Filing:                                                                      its environmental assessment (EA) and
                                                                                                      Docket No. CP15–541–000, a prior                      place it into the Commission’s public
                                              Application for Market Based Rate                       notice request pursuant to sections
                                              Authority and Request for Waivers to be                                                                       record (eLibrary) for this proceeding, or
                                                                                                      157.203, 157.205 and 157.216 of the                   issue a Notice of Schedule for
                                              effective 9/18/2015.                                    Commission’s regulations under the
                                                 Filed Date: 8/14/15.                                                                                       Environmental Review. If a Notice of
                                                                                                      Natural Gas Act (NGA) for authorization               Schedule for Environmental Review is
                                                 Accession Number: 20150814–5182.
                                                                                                      to abandon by removal its two inactive                issued, it will indicate, among other
                                                 Comments Due: 5 p.m. ET 9/4/15.
                                                                                                      supply laterals and associated                        milestones, the anticipated date for the
                                                 Docket Numbers: ER15–2454–000.                       appurtenances located in Terrebonne
                                                 Applicants: Otter Tail Power                                                                               Commission staff’s issuance of the final
                                                                                                      Parish, Louisiana. Specifically,                      environmental impact statement (FEIS)
                                              Company.                                                Tennessee request to abandon: (1) Line
                                                 Description: Section 205(d) Rate                                                                           or EA for this proposal. The filing of the
                                                                                                      No. 521A–100 consisting of                            EA in the Commission’s public record
                                              Filing: Filing of Certificate of                        approximately 1,330 feet of 10-inch-                  for this proceeding or the issuance of a
                                              Concurrence—TCRA to be effective 9/1/                   diameter pipe and associated                          Notice of Schedule for Environmental
                                              2015.                                                   appurtenances and (2) Line No. 520A–
                                                 Filed Date: 8/14/15.                                                                                       Review will serve to notify federal and
                                                                                                      300 consisting of approximately 36,739                state agencies of the timing for the
                                                 Accession Number: 20150814–5218.                     feet of 10-inch-diameter pipeline and
                                                 Comments Due: 5 p.m. ET 9/4/15.                                                                            completion of all necessary reviews, and
                                                                                                      associated appurtenances all as more                  the subsequent need to complete all
                                                 Docket Numbers: ER15–2455–000.                       fully set forth in the application which              federal authorizations within 90 days of
                                                 Applicants: Koch Energy Services,                    is on file with the Commission and open               the date of issuance of the Commission
                                              LLC.                                                    to public inspection. The filing may be               staff’s FEIS or EA.
                                                 Description: Baseline eTariff Filing:                viewed on the Web at http://                             Persons who wish to comment only
                                              Application for Market-Based Rate                       www.ferc.gov using the ‘‘eLibrary’’ link.             on the environmental review of this
                                              Authorization to be effective 10/1/2015.                Enter the docket number excluding the                 project should submit an original and
                                                 Filed Date: 8/14/15.                                 last three digits in the docket number                two copies of their comments to the
                                                 Accession Number: 20150814–5221.                     field to access the document. For                     Secretary of the Commission.
                                                 Comments Due: 5 p.m. ET 9/4/15.                      assistance, please contact FERC Online                Environmental commenter’s will be
                                                 The filings are accessible in the                    Support at FERCOnlineSupport@                         placed on the Commission’s
                                              Commission’s eLibrary system by                         ferc.gov or toll free at (866) 208–3676, or           environmental mailing list, will receive
                                              clicking on the links or querying the                   TTY, contact (202) 502–8659.                          copies of the environmental documents,
                                              docket number.                                             Any questions concerning this                      and will be notified of meetings
                                                 Any person desiring to intervene or                  application may be directed to Ben                    associated with the Commission’s
                                              protest in any of the above proceedings                 Carranza, Manager, Regulatory,                        environmental review process.
                                              must file in accordance with Rules 211                  Tennessee Gas Pipeline Company,                       Environmental commenter’s will not be
                                              and 214 of the Commission’s                             L.L.C. 1001 Louisiana Street, Houston,                required to serve copies of filed
                                              Regulations (18 CFR 385.211 and                         Texas 77002, by telephone at (713) 420–               documents on all other parties.
                                              385.214) on or before 5:00 p.m. Eastern                 5535, by facsimile at (713) 420–1605, or              However, the non-party commentary,
                                              time on the specified comment date.                     by email at ben_carranza@                             will not receive copies of all documents
                                              Protests may be considered, but                         kindermorgan.com, or Debbie Kalisek,                  filed by other parties or issued by the
                                              intervention is necessary to become a                   Regulatory Analyst, Tennessee Gas                     Commission (except for the mailing of
                                              party to the proceeding.                                Pipeline Company, L.L.C. 1001                         environmental documents issued by the
                                                 eFiling is encouraged. More detailed                 Louisiana Street, Houston, Texas 77002,               Commission) and will not have the right
tkelley on DSK3SPTVN1PROD with NOTICES




                                              information relating to filing                          by telephone at (713) 420–3292, by                    to seek court review of the
                                              requirements, interventions, protests,                  facsimile at (713) 420–1605, or by email              Commission’s final order.
                                              service, and qualifying facilities filings              at debbie_kalisek@kindermorgan.com.                      The Commission strongly encourages
                                              can be found at: http://www.ferc.gov/                      Any person or the Commission’s staff               electronic filings of comments, protests,
                                              docs-filing/efiling/filing-req.pdf. For                 may, within 60 days after issuance of                 and interventions via the Internet in lieu
                                              other information, call (866) 208–3676                  the instant notice by the Commission,                 of paper. See 18 CFR 385.2001(a) (1) (iii)
                                              (toll free). For TTY, call (202) 502–8659.              file pursuant to Rule 214 of the                      and the instructions on the


                                         VerDate Sep<11>2014   17:31 Aug 19, 2015   Jkt 235001   PO 00000   Frm 00026   Fmt 4703   Sfmt 4703   E:\FR\FM\20AUN1.SGM   20AUN1


                                                                          Federal Register / Vol. 80, No. 161 / Thursday, August 20, 2015 / Notices                                           50621

                                              Commission’s Web site (www.ferc.gov)                      Dated: August 14, 2015.                                Please include the project number (P–
                                              under the ‘‘e-Filing’’ link. Persons                    Kimberly D. Bose,                                     2165–067) on any comments, motions,
                                              unable to file electronically should                    Secretary.                                            or recommendations filed.
                                              submit original and 5 copies of the                     [FR Doc. 2015–20578 Filed 8–19–15; 8:45 am]              k. Description of Request: Alabama
                                              protest or intervention to the Federal                  BILLING CODE 6717–01–P
                                                                                                                                                            Power Company requests Commission
                                              Energy Regulatory Commission, 888                                                                             approval to grant Curry Water
                                              First Street NE., Washington, DC 20426.                                                                       Authority, Inc. a permit to use project
                                                                                                      DEPARTMENT OF ENERGY                                  lands and waters within the project
                                                Dated: August 14, 2015.
                                                                                                                                                            boundary on Smith Lake for the
                                              Kimberly D. Bose,                                                                                             construction of a raw water intake
                                                                                                      Federal Energy Regulatory
                                              Secretary.                                              Commission                                            facility to withdraw up to 3.8 million
                                              [FR Doc. 2015–20576 Filed 8–19–15; 8:45 am]                                                                   gallons per day. A portion of the intake
                                              BILLING CODE 6717–01–P                                  [Project No. 2165–067]                                facility would be constructed within the
                                                                                                                                                            project boundary, consisting of concrete
                                                                                                      Alabama Power Company; Notice of                      encased columns supporting a pump
                                              DEPARTMENT OF ENERGY                                    Application Accepted for Filing,                      house containing four vertical turbine
                                                                                                      Soliciting Comments, Motions To                       pumps over the water (Latitude
                                              Federal Energy Regulatory                               Intervene, and Protests                               33.999941, Longitude -87.283845); a 12
                                              Commission                                                                                                    inch water main running from the pump
                                                                                            Take notice that the following
                                                                                                                                                            house, and a 25 foot long by 10 foot
                                                                                         hydroelectric application has been filed
                                              [Project No. 13806–004–NH]                                                                                    wide walkway supported by piers. Also
                                                                                         with the Federal Energy Regulatory
                                                                                                                                                            included in the construction would be
                                              5440 Hydro, Inc; Notice of Availability    Commission and is available for public
                                                                                                                                                            a control building and a security fence
                                              of Environmental Assessment                inspection:
                                                                                                                                                            located outside the 522 foot contour of
                                                                                            a. Type of Application: Non-project
                                                                                                                                                            the project boundary on land owned by
                                                 In accordance with the National         use   of project lands and water.
                                                                                                                                                            the Curry Water Authority, Inc. off of
                                              Environmental Policy Act of 1969 and          b. Project No: 2165–067.
                                                                                                                                                            Bluff Way Drive.
                                              the Federal Energy Regulatory                 c. Date Filed: July 8, 2015.                                       l. Locations of the Application: A
                                              Commission’s regulations, 18 CFR part         d. Applicant: Alabama Power                                     copy of the application is available for
                                              380 (Order No. 486, 52 FR 47879), the      Company     (licensee).                                            inspection and reproduction at the
                                              Office of Energy Projects has reviewed        e. Name of Project: Warrior River                               Commission’s Public Reference Room,
                                              the application for exemption from         Hydroelectric Project.                                             located at 888 First Street NE., Room
                                              licensing for the Brooklyn Dam                f. Location: Lewis Smith Development                            2A, Washington, DC 20426, or by calling
                                              Hydroelectric Project, to be located on    (Smith    Lake) of the Warrior River                               202–502–8371. This filing may also be
                                              the Upper Ammonoosuc River, in the         Hydroelectric Project located in                                   viewed on the Commission’s Web site at
                                              town of Northumberland, Coos County,       Cullman, Walker, and Winston counties,                             http://www.ferc.gov using the
                                              New Hampshire, and has prepared an         Alabama.                                                           ‘‘eLibrary’’ link. Enter the docket
                                              Environmental Assessment (EA). In the         g. Filed Pursuant to: Federal Power                             number excluding the last three digits in
                                              EA, Commission staff analyzes the          Act, 16 U.S.C. 791a—825r.                                          the docket number field to access the
                                              potential environmental effects of the        h. Applicant Contact: James F. Crew,                            document. You may also register online
                                              project and concludes that issuing an      Hydro Services Manager, Alabama                                    at http://www.ferc.gov/docs-filing/
                                              exemption for the project, with            Power Company, 600 North 18th Street,                              esubscription.asp to be notified via
                                              appropriate environmental measures,        16N–8180, Birmingham, Alabama                                      email of new filings and issuances
                                              would not constitute a major federal       35203; phone (205) 257–4265.                                       related to this or other pending projects.
                                              action significantly affecting the quality    i. FERC Contact: Mr. Robert                                     For assistance, call 866–208–3676 or
                                              of the human environment.                  Ballantine   at 202–502–6289,                                      email FERCOnlineSupport@ferc.gov, for
                                                                                         robert.ballantine@ferc.gov                                         TTY, call 202–502–8659. A copy is also
                                                 A copy of the EA is on file with the       j. Deadline for filing comments,                                available for inspection and
                                              Commission and is available for public     motions to intervene, and protests is 30                           reproduction at the address in item (h)
                                              inspection. The EA may also be viewed      days from the issuance of this notice by                           above.
                                              on the Commission’s Web site at            the Commission. All documents may be                                  m. Individuals desiring to be included
                                              http://www.ferc.gov using the              filed electronically via the Internet. See,                        on the Commission’s mailing list should
                                              ‘‘eLibrary’’ link. Enter the docket        18 CFR 385.2001(a)(1)(iii) and the                                 so indicate by writing to the Secretary
                                              number, excluding the last three digits    instructions on the Commission’s Web                               of the Commission.
                                              in the docket number field, to access the site at http://www.ferc.gov/docs-filing/                               n. Comments, Protests, or Motions to
                                              document. For assistance, contact FERC efiling.asp. If unable to be filed                                     Intervene: Anyone may submit
                                              Online Support at                          electronically, documents may be paper-                            comments, a protest, or a motion to
                                              FERCOnlineSupport@ferc.gov or toll-        filed. To paper-file, an original and                              intervene in accordance with the
                                              free at 1–866–208–3676, or for TTY,        seven copies should be mailed to:                                  requirements of Rules of Practice and
                                              (202) 502–8659. You may also register      Secretary, Federal Energy Regulatory                               Procedure, 18 CFR 385.210, .211, .214.
                                              online at http://www.ferc.gov/docs-        Commission, 888 First Street NE.,                                  In determining the appropriate action to
                                              filing/esubscription.asp to be notified    Washington, DC 20426. Commenters                                   take, the Commission will consider all
                                              via email of new filings and issuances
tkelley on DSK3SPTVN1PROD with NOTICES




                                                                                         can submit brief comments up to 6,000                              protests or other comments filed, but
                                              related to this or other pending projects. characters, without prior registration,                            only those who file a motion to
                                              For assistance, contact FERC Online        using the eComment system at http://                               intervene in accordance with the
                                              Support.                                   www.ferc.gov/docs-filing/                                          Commission’s Rules may become a
                                                 For further information, contact John   ecomment.asp. You must include your                                party to the proceeding. Any comments,
                                              Ramer at (202) 502–8969 or john.ramer@ name and contact information at the end                                protests, or motions to intervene must
                                              ferc.gov.                                  of your comments.                                                  be received on or before the specified


                                         VerDate Sep<11>2014   17:31 Aug 19, 2015   Jkt 235001   PO 00000   Frm 00027   Fmt 4703   Sfmt 4703   E:\FR\FM\20AUN1.SGM   20AUN1



Document Created: 2015-12-15 11:08:53
Document Modified: 2015-12-15 11:08:53
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation80 FR 50620 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR