The U.S. Nuclear Regulatory Commission (NRC) is issuing a confirmatory order to BWXT Nuclear Operations Group, Inc. (BWXT NOG), confirming a modification to the license issued on August 10, 2015. In issuing the Order, BWXT NOG must comply with the measures detailed in Section IV of the Order. This Order is effective 20 days after the date it is issued.

Federal Register, Volume 80 Issue 172 (Friday, September 4, 2015)
[Federal Register Volume 80, Number 172 (Friday, September 4, 2015)]
[Notices]
[Pages 53588-53591]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-21937]


-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[EA-15-006; NRC-2015-0201]


In the Matter of BWXT Nuclear Operations Group, Inc.

AGENCY: Nuclear Regulatory Commission.

ACTION: Confirmatory order; issuance.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is issuing a 
confirmatory order to BWXT Nuclear Operations Group, Inc. (BWXT NOG), 
confirming a modification to the license issued on August 10, 2015. In 
issuing the Order, BWXT NOG must comply with the measures detailed in 
Section IV of the Order. This Order is effective 20 days after the date 
it is issued.

DATES: The confirmatory order was signed August 10, 2015.

ADDRESSES: Please refer to Docket ID NRC-2015-0201 when contacting the 
NRC about the availability of information regarding this document. You 
may obtain publicly-available information related to this action by the 
following methods:
     Federal Rulemaking Web site: Go to http://www.regulations.gov and search for Docket ID NRC-2015-0201. Address 
questions about NRC dockets to Carol Gallagher; telephone: 301-415-
3463;

[[Page 53589]]

email: [email protected]. For questions about this Order, contact 
the individual listed in the FOR FURTHER INFORMATION CONTACT section of 
this document.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may access publicly-available documents online in the 
ADAMS Public Documents collection at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and 
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS, 
please contact the NRC's Public Document Room (PDR) reference staff at 
1-800-397-4209, 301-415-4737, or by email to [email protected]. The 
ADAMS accession number for each document referenced (if that document 
is available in ADAMS) is provided the first time that a document is 
referenced.
     NRC's PDR: You may examine and purchase copies of public 
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 
Rockville Pike, Rockville, Maryland 20852.

FOR FURTHER INFORMATION CONTACT: Merritt Baker, telephone: 301-415-
7119, email [email protected], Office of Nuclear Material Safety 
and Safeguards, U.S. Nuclear Regulatory Commission, Washington, DC 
20555-0001.

SUPPLEMENTARY INFORMATION: The text of the Order is attached.

    Dated at Rockville, Maryland, this 27th day of August, 2015.

    For the Nuclear Regulatory Commission.
Craig Erlanger,
Deputy Director, Division of Fuel Cycle Safety, Safeguards, and 
Environmental Review Office of Nuclear Material Safety and Safeguards.

Attachment--CONFIRMATORY ORDER

UNITED STATES OF AMERICA

NUCLEAR REGULATORY COMMISSION

In the Matter of BWXT Nuclear operations Group, Inc.;

Lynchburg, Virginia

[Docket No. 70-27; License No. SNM-42]

EA-2015-006

Confirmatory Order

I.
    BWXT Nuclear Operations Group, Inc. (BWXT NOG or the licensee) is 
the operator of the BWXT Nuclear Operations Group-Lynchburg facility 
(BWXT NOG or the facility), and holder of License No. SNM-42 and Docket 
No.70-27 issued by the U.S. Nuclear Regulatory Commission (NRC or 
Commission) under Title 10, ``Energy,'' of the Code of Federal 
Regulations (10 CFR) Part 70, ``Domestic Licensing of Special Nuclear 
Material.'' The license authorizes the operation of the facility with 
the conditions specified therein. The facility is located on the 
licensee's site in Campbell County, Virginia.
II.
    By application dated April 24, 2014, as supplemented by letters 
dated December 16, 2013, and July 25, 2014, BWXT NOG requested 
preemption authority, pursuant to Commission Order EA-13-092, under the 
provisions of Section 161A of the Atomic Energy Act of 1954, as 
amended. Section 161A confers on the Commission the authority to permit 
a licensee's security personnel to transfer, receive, possess, 
transport, import, and use certain firearms, ammunition or devices, 
notwithstanding local, State, and certain Federal firearms laws, 
including regulations, that may prohibit such conduct.
    Upon review of the BWXT NOG application for Commission 
authorization to use Section 161A at BWXT NOG-L, the NRC staff has 
found the following:
    (1) The BWXT NOG application complies with the standards and 
requirements of Section 161A and the Commission's rules and regulations 
set forth in 10 CFR part 73, ``Physical Protection of Plants and 
Materials'';
    (2) There is reasonable assurance that the facility will operate in 
conformance with the application; the provisions of the Atomic Energy 
Act of 1954, as amended; and the rules and regulations of the 
Commission;
    (3) There is reasonable assurance that the activities permitted by 
the Commission authorization to use Section 161A preemption authority 
is consistent with the protection of public health and safety, and that 
such activities will be conducted in compliance with the Commission's 
regulations and the requirements of this Confirmatory Order;
    (4) The issuance of Commission authorization to use Section 161A 
preemption authority will not be inimical to the common defense and 
security or to the health and safety of the public; and
    (5) The issuance of this Commission authorization to use Section 
161A preemption authority will be in accordance with the Commission's 
regulations in 10 CFR part 51, ``Environmental Protection Regulations 
for Domestic Licensing and Related Regulatory Functions.''
    The findings, set forth above, are supported by an NRC staff 
technical evaluation under Accession Number ML15044A450.
III.
    To carry out the statutory authority discussed above, the 
Commission has determined that the license for BWXT NOG-L must be 
modified to include provisions with respect to the Commission 
authorization to use Section 161A preemption authority as identified in 
Section II of this Confirmatory Order. The requirements needed to 
exercise the foregoing are set forth in Section IV below.
    The NRC staff has found that the license modifications set forth in 
Section IV are acceptable and necessary. It further concluded that, 
with the effective implementation of these provisions, the licensee's 
physical protection program will meet the specific physical protection 
program requirements set forth in 10 CFR 73.45, ``Performance 
Capabilities for Fixed Site Physical Protection Systems''; in 10 CFR 
73.46, ``Fixed Site Physical Protection Systems, Subsystems, 
Components, and Procedures'' (for facilities handling Category I 
special nuclear material).
    On January 29, 2015, BWXT NOG consented to the issuance of this 
Order. The licensee further agreed that this Order will be effective 20 
days after the date of issuance and that it has waived its right to a 
hearing on this Order.
IV
    Accordingly, under Sections 53, 103 and/or 104b, 161b, 161i, 161o, 
161A, 182, and 186 of the Atomic Energy Act of 1954, as amended, and 
the Commission's regulations in 10 CFR 2.202, ``Orders'' and 10 CFR 
part 70, IT IS HEREBY ORDERED that:
    1. The BWXT NOG application for Commission authorization to use 
Section 161A preemption authority at B&W NOG is approved. This 
authorization does not grant B&W NOG authority to use enhanced weapons.
    2. In accordance with 10 CFR part 73, the licensee shall review and 
revise its NRC-approved security plans or procedures, as necessary, to 
describe how the requirements of this Confirmatory Order will be met.
    3. The licensee shall establish and maintain a program consistent 
with Commission Order EA-13-092 such that all security personnel who 
require access to firearms in the discharge of their official duties 
are subject to a firearms background check.
    The Commission is engaged in an ongoing rulemaking to implement the 
Commission's authority under Section

[[Page 53590]]

161A. On the effective date of that final rulemaking, the Commission 
may take action to relax or rescind any or all of the requirements set 
forth in this Confirmatory Order.
    The Director, Office of Nuclear Material Safety and Safeguards may, 
in writing, relax or rescind this Confirmatory Order upon demonstration 
by the licensee of good cause.
    This Confirmatory Order is effective 20 days after the date of its 
issuance.
    For further details with respect to this Confirmatory Order, see 
the staff's technical evaluation dated January 29, 2015 (Agencywide 
Documents Access and Management System (ADAMS) Accession No. 
ML15044A450), which is available for public inspection, at the 
Commission's Public Document Room (PDR), located at One White Flint 
North, Public File Area 01 F21, 11555 Rockville Pike (first floor), 
Rockville, Maryland. Publicly available documents created or received 
at the NRC are accessible electronically through ADAMS in the NRC 
Library at http://www.nrc.gov/reading-rm/adams.html. Persons who do not 
have access to ADAMS, or who encounter problems in accessing the 
documents located in ADAMS, should contact the NRC PDR reference staff 
by telephone at 1-800-397-4209 or 301-415-4737, or by email to 
[email protected].
    In accordance with 10 CFR 2.202, any other person adversely 
affected by this Order may submit an answer to this Order within 20 
days of its publication in the Federal Register. In addition, any other 
person adversely affected by this Order may request a hearing on this 
Order within 20 days of its publication in the Federal Register. Where 
good cause is shown, consideration will be given to extending the time 
to answer or request a hearing. A request for extension of time must be 
directed to the Director, Office of Enforcement, U.S. Nuclear 
Regulatory Commission, and include a statement of good cause for the 
extension.
    If a hearing is requested by a person whose interest is adversely 
affected, the Commission will issue an order designating the time and 
place of any hearings. If a hearing is held, the issue to be considered 
at such hearing shall be whether this Order should be sustained.
    All documents filed in NRC adjudicatory proceedings, including a 
request for hearing, a petition for leave to intervene, any motion or 
other document filed in the proceeding prior to the submission of a 
request for hearing or petition to intervene, and documents filed by 
interested governmental entities participating under 10 CFR 2.315(c), 
must be filed in accordance with the NRC E-Filing rule (published at 72 
FR 49139 on August 28, 2007). The E-Filing process requires 
participants to submit and serve all adjudicatory documents over the 
internet, or (in some cases) to mail copies on electronic storage 
media. Participants may not submit paper copies of their filings unless 
they seek an exemption in accordance with the procedures described 
below.
    To comply with the procedural requirements of E-Filing, the 
participant should contact the Office of the Secretary (at least 10 
days before the filing deadline) by email to [email protected], or 
by telephone at (301) 415-1677, to: (1) request a digital ID 
certificate, which allows the participants (or its counsel or 
representative) to digitally sign documents and access the E-Submittal 
server for any proceeding in which it is participating; and (2) advise 
the Secretary that the participant will be submitting a request or 
petition for hearing (even in instances in which the participant, or 
its counsel or representative, already holds an NRC-issued digital ID 
certificate). Based upon this information, the Secretary will establish 
an electronic docket for the hearing in this proceeding if the 
Secretary has not already established an electronic docket.
    Information about applying for a digital ID certificate is 
available on NRC's public Web site at http://www.nrc.gov/site-help/e-submittals/apply-certificates.html. System requirements for accessing 
the E-Submittal server are detailed in NRC's ``Guidance for Electronic 
Submission,'' which is available on the agency's public Web site at 
http://www.nrc.gov/site-help/e-submittals.html. Participants may 
attempt to use other software not listed on the Web site, but should 
note that the NRC's E-Filing system does not support unlisted software, 
and the NRC Meta System Help Desk will not be able to offer assistance 
in using unlisted software.
    If a participant is electronically submitting a document to the NRC 
in accordance with the E-Filing rule, the participant must file the 
document using the NRC's online, web-based submission form. In order to 
serve documents through the Electronic Information Exchange, users will 
be required to install a web browser plug-in from the NRC Web site. 
Further information on the web-based submission form, including the 
installation of the Web browser plug-in, is available on the NRC's 
public Web site at http://www.nrc.gov/site-help/e-submittals.html.
    Once a participant has obtained a digital ID certificate and a 
docket has been created, the participant can then submit a request for 
hearing or petition for leave to intervene. Submissions should be in 
Portable Document Format (pdf) in accordance with NRC guidance 
available on the NRC public Web site at http://www.nrc.gov/site-help/e-submittals.html. A filing is considered complete at the time the 
documents are submitted through the NRC's E-Filing system. To be 
timely, an electronic filing must be submitted to the E-Filing system 
no later than 11:59 p.m. Eastern Time on the due date. Upon receipt of 
a transmission, the E-Filing system time-stamps the document and sends 
the submitter an email notice confirming receipt of the document. The 
E-Filing system also distributes an email notice that provides access 
to the document to the NRC Office of the General Counsel and any others 
who have advised the Office of the Secretary that they wish to 
participate in the proceeding, so that the filer need not serve the 
documents on those participants separately. Therefore, applicants and 
other participants (or their counsel or representative) must apply for, 
and receive, a digital ID certificate before a hearing request/petition 
to intervene is filed so that they can obtain access to the document 
via the E-Filing system.
    A person filing electronically using the agency's adjudicatory E-
Filing system may seek assistance by contacting the NRC Meta System 
Help Desk through the ``Contact Us'' link located on the NRC Web site 
at http://www.nrc.gov/site-help/e-submittals.html, by email at 
[email protected], or by a toll-free call at (866) 672-7640. The 
NRC Meta System Help Desk is available between 8 a.m. and 8 p.m., 
Eastern Time, Monday through Friday, excluding government holidays.
    Participants who believe that they have a good cause for not 
submitting documents electronically must file an exemption request, in 
accordance with 10 CFR 2.302(g), with their initial paper filing 
requesting authorization to continue to submit documents in paper 
format. Such filings must be submitted by: (1) first class mail 
addressed to the Office of the Secretary of the Commission, U.S. 
Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention: 
Rulemaking and Adjudications Staff; or (2) courier, express mail, or 
expedited delivery service to the Office of the Secretary, Sixteenth 
Floor, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 
20852, Attention: Rulemaking

[[Page 53591]]

and Adjudications Staff. Participants filing a document in this manner 
are responsible for serving the document on all other participants. 
Filing is considered complete by first-class mail as of the time of 
deposit in the mail, or by courier, express mail, or expedited delivery 
service upon depositing the document with the provider of the service. 
A presiding officer, having granted an exemption request from using E-
Filing, may require a participant or party to use E-Filing if the 
presiding officer subsequently determines that the reason for granting 
the exemption from use of E-Filing no longer exists.
    Documents submitted in adjudicatory proceedings will appear in 
NRC's electronic hearing docket, which is available to the public at 
http://ehd.nrc.gov/EHD_Proceeding/home.asp, unless excluded pursuant to 
an order of the Commission, or the presiding officer. Participants are 
requested not to include personal privacy information, such as social 
security numbers, home addresses, or home phone numbers in their 
filings, unless an NRC regulation or other law requires submission of 
such information. With respect to copyrighted works, except for limited 
excerpts that serve the purpose of the adjudicatory filings and would 
constitute a Fair Use application, participants are requested not to 
include copyrighted materials in their submission.
    If a person other than the licensee requests a hearing, that person 
shall set forth with particularity the manner in which his interest is 
adversely affected by this Order and shall address the criteria set 
forth in 10 CFR paragraphs 2.309(d) and (f).
    In the absence of any request for hearing, or written approval of 
an extension of time in which to request a hearing, the provisions 
specified in Section IV above shall be final 20 days from the date of 
this Order without further order or proceedings. If an extension of 
time for requesting a hearing has been approved, the provisions 
specified in Section IV shall be final when the extension expires if a 
hearing request has not been received.

Dated at Rockville, Maryland this 10th day of August, 2015.

For the Nuclear Regulatory Commission.

Catherine Haney, Director,

Office of Nuclear Material Safety and Safeguards.

[FR Doc. 2015-21937 Filed 9-3-15; 8:45 am]
BILLING CODE 7590-01-P



                                                  53588                       Federal Register / Vol. 80, No. 172 / Friday, September 4, 2015 / Notices

                                                  server for any proceeding in which it is                notice that provides access to the                    ehd1.nrc.gov/ehd/, unless excluded
                                                  participating; and (2) advise the                       document to the NRC’s Office of the                   pursuant to an order of the Commission,
                                                  Secretary that the participant will be                  General Counsel and any others who                    or the presiding officer. Participants are
                                                  submitting a request or petition for                    have advised the Office of the Secretary              requested not to include personal
                                                  hearing (even in instances in which the                 that they wish to participate in the                  privacy information, such as social
                                                  participant, or its counsel or                          proceeding, so that the filer need not                security numbers, home addresses, or
                                                  representative, already holds an NRC-                   serve the documents on those                          home phone numbers in their filings,
                                                  issued digital ID certificate). Based upon              participants separately. Therefore,                   unless an NRC regulation or other law
                                                  this information, the Secretary will                    applicants and other participants (or                 requires submission of such
                                                  establish an electronic docket for the                  their counsel or representative) must                 information. However, a request to
                                                  hearing in this proceeding if the                       apply for and receive a digital ID                    intervene will require including
                                                  Secretary has not already established an                certificate before a hearing request/                 information on local residence in order
                                                  electronic docket.                                      petition to intervene is filed so that they           to demonstrate a proximity assertion of
                                                     Information about applying for a                     can obtain access to the document via                 interest in the proceeding. With respect
                                                  digital ID certificate is available on the              the E-Filing system.                                  to copyrighted works, except for limited
                                                  NRC’s public Web site at http://                           A person filing electronically using               excerpts that serve the purpose of the
                                                  www.nrc.gov/site-help/e-submittals/                     the NRC’s adjudicatory E-Filing system                adjudicatory filings and would
                                                  getting-started.html. System                            may seek assistance by contacting the                 constitute a Fair Use application,
                                                  requirements for accessing the E-                       NRC Meta System Help Desk through                     participants are requested not to include
                                                  Submittal server are detailed in the                    the ‘‘Contact Us’’ link located on the                copyrighted materials in their
                                                  NRC’s ‘‘Guidance for Electronic                         NRC’s public Web site at http://                      submission.
                                                  Submission,’’ which is available on the                 www.nrc.gov/site-help/e-
                                                                                                                                                                  Dated at Rockville, Maryland, this 25th day
                                                  agency’s public Web site at http://                     submittals.html, by email to
                                                                                                                                                                of August 2015.
                                                  www.nrc.gov/site-help/e-                                MSHD.Resource@nrc.gov, or by a toll-
                                                  submittals.html. Participants may                       free call at 1–866–672–7640. The NRC                    For the Nuclear Regulatory Commission.
                                                  attempt to use other software not listed                Meta System Help Desk is available                    Andrew Persinko,
                                                  on the Web site, but should note that the               between 8 a.m. and 8 p.m., Eastern                    Deputy Director, Division of
                                                  NRC’s E-Filing system does not support                  Time, Monday through Friday,                          Decommissioning, Uranium Recovery, and
                                                  unlisted software, and the NRC Meta                     excluding government holidays.                        Waste Programs, Office of Nuclear Material
                                                                                                             Participants who believe that they                 Safety and Safeguards.
                                                  System Help Desk will not be able to
                                                  offer assistance in using unlisted                      have a good cause for not submitting                  [FR Doc. 2015–21933 Filed 9–3–15; 8:45 am]
                                                  software.                                               documents electronically must file an                 BILLING CODE 7590–01–P
                                                     If a participant is electronically                   exemption request, in accordance with
                                                  submitting a document to the NRC in                     10 CFR 2.302(g), with their initial paper
                                                  accordance with the E-Filing rule, the                  filing requesting authorization to                    NUCLEAR REGULATORY
                                                  participant must file the document                      continue to submit documents in paper                 COMMISSION
                                                  using the NRC’s online, Web-based                       format. Such filings must be submitted                [EA–15–006; NRC–2015–0201]
                                                  submission form. In order to serve                      by: (1) first class mail addressed to the
                                                  documents through the Electronic                        Office of the Secretary of the                        In the Matter of BWXT Nuclear
                                                  Information Exchange System, users                      Commission, U.S. Nuclear Regulatory                   Operations Group, Inc.
                                                  will be required to install a Web                       Commission, Washington, DC 20555–
                                                  browser plug-in from the NRC’s Web                      0001, Attention: Rulemaking and                       AGENCY:  Nuclear Regulatory
                                                  site. Further information on the Web-                   Adjudications Staff; or (2) courier,                  Commission.
                                                  based submission form, including the                    express mail, or expedited delivery                   ACTION: Confirmatory order; issuance.
                                                  installation of the Web browser plug-in,                service to the Office of the Secretary,
                                                                                                                                                                SUMMARY:   The U.S. Nuclear Regulatory
                                                  is available on the NRC’s public Web                    Sixteenth Floor, One White Flint North,
                                                                                                                                                                Commission (NRC) is issuing a
                                                  site at http://www.nrc.gov/site-help/e-                 11555 Rockville Pike, Rockville,
                                                                                                                                                                confirmatory order to BWXT Nuclear
                                                  submittals.html.                                        Maryland, 20852, Attention:
                                                     Once a participant has obtained a                                                                          Operations Group, Inc. (BWXT NOG),
                                                                                                          Rulemaking and Adjudications Staff.
                                                  digital ID certificate and a docket has                                                                       confirming a modification to the license
                                                                                                          Participants filing a document in this
                                                  been created, the participant can then                                                                        issued on August 10, 2015. In issuing
                                                                                                          manner are responsible for serving the
                                                  submit a request for hearing or petition                                                                      the Order, BWXT NOG must comply
                                                                                                          document on all other participants.
                                                  for leave to intervene. Submissions                     Filing is considered complete by first-               with the measures detailed in Section IV
                                                  should be in Portable Document Format                   class mail as of the time of deposit in               of the Order. This Order is effective 20
                                                  (PDF) in accordance with NRC guidance                   the mail, or by courier, express mail, or             days after the date it is issued.
                                                  available on the NRC’s public Web site                  expedited delivery service upon                       DATES: The confirmatory order was
                                                  at http://www.nrc.gov/site-help/e-                      depositing the document with the                      signed August 10, 2015.
                                                  submittals.html. A filing is considered                 provider of the service. A presiding                  ADDRESSES: Please refer to Docket ID
                                                  complete at the time the documents are                  officer, having granted an exemption                  NRC–2015–0201 when contacting the
                                                  submitted through the NRC’s E-Filing                    request from using E-Filing, may require              NRC about the availability of
                                                  system. To be timely, an electronic                     a participant or party to use E-Filing if             information regarding this document.
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                  filing must be submitted to the E-Filing                the presiding officer subsequently                    You may obtain publicly-available
                                                  system no later than 11:59 p.m. Eastern                 determines that the reason for granting               information related to this action by the
                                                  Time on the due date. Upon receipt of                   the exemption from use of E-Filing no                 following methods:
                                                  a transmission, the E-Filing system                     longer exists.                                           • Federal Rulemaking Web site: Go to
                                                  time-stamps the document and sends                         Documents submitted in adjudicatory                http://www.regulations.gov and search
                                                  the submitter an email notice                           proceedings will appear in the NRC’s                  for Docket ID NRC–2015–0201. Address
                                                  confirming receipt of the document. The                 electronic hearing docket which is                    questions about NRC dockets to Carol
                                                  E-Filing system also distributes an email               available to the public at http://                    Gallagher; telephone: 301–415–3463;


                                             VerDate Sep<11>2014   16:57 Sep 03, 2015   Jkt 235001   PO 00000   Frm 00104   Fmt 4703   Sfmt 4703   E:\FR\FM\04SEN1.SGM   04SEN1


                                                                              Federal Register / Vol. 80, No. 172 / Friday, September 4, 2015 / Notices                                          53589

                                                  email: Carol.Gallagher@nrc.gov. For                     Regulatory Commission (NRC or                           The findings, set forth above, are
                                                  questions about this Order, contact the                 Commission) under Title 10, ‘‘Energy,’’               supported by an NRC staff technical
                                                  individual listed in the FOR FURTHER                    of the Code of Federal Regulations (10                evaluation under Accession Number
                                                  INFORMATION CONTACT section of this                     CFR) Part 70, ‘‘Domestic Licensing of                 ML15044A450.
                                                  document.                                               Special Nuclear Material.’’ The license
                                                     • NRC’s Agencywide Documents                                                                               III.
                                                                                                          authorizes the operation of the facility
                                                  Access and Management System                            with the conditions specified therein.                   To carry out the statutory authority
                                                  (ADAMS): You may access publicly-                       The facility is located on the licensee’s             discussed above, the Commission has
                                                  available documents online in the                       site in Campbell County, Virginia.                    determined that the license for BWXT
                                                  ADAMS Public Documents collection at                                                                          NOG–L must be modified to include
                                                  http://www.nrc.gov/reading-rm/                          II.                                                   provisions with respect to the
                                                  adams.html. To begin the search, select                    By application dated April 24, 2014,               Commission authorization to use
                                                  ‘‘ADAMS Public Documents’’ and then                     as supplemented by letters dated                      Section 161A preemption authority as
                                                  select ‘‘Begin Web-based ADAMS                          December 16, 2013, and July 25, 2014,                 identified in Section II of this
                                                  Search.’’ For problems with ADAMS,                      BWXT NOG requested preemption                         Confirmatory Order. The requirements
                                                  please contact the NRC’s Public                         authority, pursuant to Commission                     needed to exercise the foregoing are set
                                                  Document Room (PDR) reference staff at                  Order EA–13–092, under the provisions                 forth in Section IV below.
                                                  1–800–397–4209, 301–415–4737, or by                     of Section 161A of the Atomic Energy                     The NRC staff has found that the
                                                  email to pdr.resource@nrc.gov. The                      Act of 1954, as amended. Section 161A                 license modifications set forth in
                                                  ADAMS accession number for each                         confers on the Commission the                         Section IV are acceptable and necessary.
                                                  document referenced (if that document                   authority to permit a licensee’s security             It further concluded that, with the
                                                  is available in ADAMS) is provided the                  personnel to transfer, receive, possess,              effective implementation of these
                                                  first time that a document is referenced.               transport, import, and use certain                    provisions, the licensee’s physical
                                                     • NRC’s PDR: You may examine and                     firearms, ammunition or devices,                      protection program will meet the
                                                  purchase copies of public documents at                  notwithstanding local, State, and certain             specific physical protection program
                                                  the NRC’s PDR, Room O1–F21, One                         Federal firearms laws, including                      requirements set forth in 10 CFR 73.45,
                                                  White Flint North, 11555 Rockville                      regulations, that may prohibit such                   ‘‘Performance Capabilities for Fixed Site
                                                  Pike, Rockville, Maryland 20852.                        conduct.                                              Physical Protection Systems’’; in 10 CFR
                                                  FOR FURTHER INFORMATION CONTACT:                           Upon review of the BWXT NOG                        73.46, ‘‘Fixed Site Physical Protection
                                                  Merritt Baker, telephone: 301–415–                      application for Commission                            Systems, Subsystems, Components, and
                                                  7119, email Merritt.Baker@nrc.gov,                      authorization to use Section 161A at                  Procedures’’ (for facilities handling
                                                  Office of Nuclear Material Safety and                   BWXT NOG–L, the NRC staff has found                   Category I special nuclear material).
                                                  Safeguards, U.S. Nuclear Regulatory                     the following:                                           On January 29, 2015, BWXT NOG
                                                  Commission, Washington, DC 20555–                          (1) The BWXT NOG application                       consented to the issuance of this Order.
                                                  0001.                                                   complies with the standards and                       The licensee further agreed that this
                                                                                                          requirements of Section 161A and the                  Order will be effective 20 days after the
                                                  SUPPLEMENTARY INFORMATION: The text of
                                                                                                          Commission’s rules and regulations set                date of issuance and that it has waived
                                                  the Order is attached.
                                                                                                          forth in 10 CFR part 73, ‘‘Physical                   its right to a hearing on this Order.
                                                     Dated at Rockville, Maryland, this 27th day          Protection of Plants and Materials’’;
                                                  of August, 2015.                                           (2) There is reasonable assurance that             IV
                                                     For the Nuclear Regulatory Commission.               the facility will operate in conformance                 Accordingly, under Sections 53, 103
                                                  Craig Erlanger,                                         with the application; the provisions of               and/or 104b, 161b, 161i, 161o, 161A,
                                                  Deputy Director, Division of Fuel Cycle Safety,         the Atomic Energy Act of 1954, as                     182, and 186 of the Atomic Energy Act
                                                  Safeguards, and Environmental Review Office             amended; and the rules and regulations                of 1954, as amended, and the
                                                  of Nuclear Material Safety and Safeguards.              of the Commission;                                    Commission’s regulations in 10 CFR
                                                  Attachment—CONFIRMATORY                                    (3) There is reasonable assurance that             2.202, ‘‘Orders’’ and 10 CFR part 70, IT
                                                  ORDER                                                   the activities permitted by the                       IS HEREBY ORDERED that:
                                                                                                          Commission authorization to use                          1. The BWXT NOG application for
                                                  UNITED STATES OF AMERICA                                Section 161A preemption authority is                  Commission authorization to use
                                                  NUCLEAR REGULATORY                                      consistent with the protection of public              Section 161A preemption authority at
                                                  COMMISSION                                              health and safety, and that such                      B&W NOG is approved. This
                                                                                                          activities will be conducted in                       authorization does not grant B&W NOG
                                                  In the Matter of BWXT Nuclear
                                                                                                          compliance with the Commission’s                      authority to use enhanced weapons.
                                                  operations Group, Inc.;                                                                                          2. In accordance with 10 CFR part 73,
                                                                                                          regulations and the requirements of this
                                                  Lynchburg, Virginia                                     Confirmatory Order;                                   the licensee shall review and revise its
                                                  [Docket No. 70–27; License No. SNM–                        (4) The issuance of Commission                     NRC-approved security plans or
                                                  42]                                                     authorization to use Section 161A                     procedures, as necessary, to describe
                                                                                                          preemption authority will not be                      how the requirements of this
                                                  EA–2015–006                                             inimical to the common defense and                    Confirmatory Order will be met.
                                                  Confirmatory Order                                      security or to the health and safety of                  3. The licensee shall establish and
                                                                                                          the public; and                                       maintain a program consistent with
                                                  I.
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                                                                             (5) The issuance of this Commission                Commission Order EA–13–092 such
                                                    BWXT Nuclear Operations Group,                        authorization to use Section 161A                     that all security personnel who require
                                                  Inc. (BWXT NOG or the licensee) is the                  preemption authority will be in                       access to firearms in the discharge of
                                                  operator of the BWXT Nuclear                            accordance with the Commission’s                      their official duties are subject to a
                                                  Operations Group-Lynchburg facility                     regulations in 10 CFR part 51,                        firearms background check.
                                                  (BWXT NOG or the facility), and holder                  ‘‘Environmental Protection Regulations                   The Commission is engaged in an
                                                  of License No. SNM–42 and Docket                        for Domestic Licensing and Related                    ongoing rulemaking to implement the
                                                  No.70–27 issued by the U.S. Nuclear                     Regulatory Functions.’’                               Commission’s authority under Section


                                             VerDate Sep<11>2014   16:57 Sep 03, 2015   Jkt 235001   PO 00000   Frm 00105   Fmt 4703   Sfmt 4703   E:\FR\FM\04SEN1.SGM   04SEN1


                                                  53590                       Federal Register / Vol. 80, No. 172 / Friday, September 4, 2015 / Notices

                                                  161A. On the effective date of that final               accordance with the NRC E-Filing rule                    Once a participant has obtained a
                                                  rulemaking, the Commission may take                     (published at 72 FR 49139 on August                   digital ID certificate and a docket has
                                                  action to relax or rescind any or all of                28, 2007). The E-Filing process requires              been created, the participant can then
                                                  the requirements set forth in this                      participants to submit and serve all                  submit a request for hearing or petition
                                                  Confirmatory Order.                                     adjudicatory documents over the                       for leave to intervene. Submissions
                                                    The Director, Office of Nuclear                       internet, or (in some cases) to mail                  should be in Portable Document Format
                                                  Material Safety and Safeguards may, in                  copies on electronic storage media.                   (pdf) in accordance with NRC guidance
                                                  writing, relax or rescind this                          Participants may not submit paper                     available on the NRC public Web site at
                                                  Confirmatory Order upon demonstration                   copies of their filings unless they seek              http://www.nrc.gov/site-help/e-
                                                  by the licensee of good cause.                          an exemption in accordance with the                   submittals.html. A filing is considered
                                                    This Confirmatory Order is effective                  procedures described below.                           complete at the time the documents are
                                                  20 days after the date of its issuance.                    To comply with the procedural                      submitted through the NRC’s E-Filing
                                                    For further details with respect to this              requirements of E-Filing, the participant             system. To be timely, an electronic
                                                  Confirmatory Order, see the staff’s                     should contact the Office of the                      filing must be submitted to the E-Filing
                                                  technical evaluation dated January 29,                  Secretary (at least 10 days before the                system no later than 11:59 p.m. Eastern
                                                  2015 (Agencywide Documents Access                       filing deadline) by email to                          Time on the due date. Upon receipt of
                                                  and Management System (ADAMS)                           hearing.docket@nrc.gov, or by telephone               a transmission, the E-Filing system
                                                  Accession No. ML15044A450), which is                    at (301) 415–1677, to: (1) request a                  time-stamps the document and sends
                                                  available for public inspection, at the                 digital ID certificate, which allows the              the submitter an email notice
                                                  Commission’s Public Document Room                       participants (or its counsel or                       confirming receipt of the document. The
                                                  (PDR), located at One White Flint North,                representative) to digitally sign                     E-Filing system also distributes an email
                                                  Public File Area 01 F21, 11555                          documents and access the E-Submittal                  notice that provides access to the
                                                  Rockville Pike (first floor), Rockville,                server for any proceeding in which it is              document to the NRC Office of the
                                                  Maryland. Publicly available documents                  participating; and (2) advise the                     General Counsel and any others who
                                                  created or received at the NRC are                      Secretary that the participant will be                have advised the Office of the Secretary
                                                  accessible electronically through                       submitting a request or petition for                  that they wish to participate in the
                                                  ADAMS in the NRC Library at http://                     hearing (even in instances in which the               proceeding, so that the filer need not
                                                  www.nrc.gov/reading-rm/adams.html.                      participant, or its counsel or                        serve the documents on those
                                                  Persons who do not have access to                       representative, already holds an NRC-                 participants separately. Therefore,
                                                  ADAMS, or who encounter problems in                     issued digital ID certificate). Based upon            applicants and other participants (or
                                                  accessing the documents located in                      this information, the Secretary will                  their counsel or representative) must
                                                  ADAMS, should contact the NRC PDR                       establish an electronic docket for the                apply for, and receive, a digital ID
                                                  reference staff by telephone at 1–800–                  hearing in this proceeding if the                     certificate before a hearing request/
                                                  397–4209 or 301–415–4737, or by email                   Secretary has not already established an              petition to intervene is filed so that they
                                                  to pdr.resource@nrc.gov.                                electronic docket.                                    can obtain access to the document via
                                                    In accordance with 10 CFR 2.202, any                     Information about applying for a                   the E-Filing system.
                                                  other person adversely affected by this                 digital ID certificate is available on                   A person filing electronically using
                                                  Order may submit an answer to this                      NRC’s public Web site at http://                      the agency’s adjudicatory E-Filing
                                                  Order within 20 days of its publication                 www.nrc.gov/site-help/e-submittals/                   system may seek assistance by
                                                  in the Federal Register. In addition, any               apply-certificates.html. System                       contacting the NRC Meta System Help
                                                  other person adversely affected by this                 requirements for accessing the E-                     Desk through the ‘‘Contact Us’’ link
                                                  Order may request a hearing on this                     Submittal server are detailed in NRC’s                located on the NRC Web site at http://
                                                  Order within 20 days of its publication                 ‘‘Guidance for Electronic Submission,’’               www.nrc.gov/site-help/e-
                                                  in the Federal Register. Where good                     which is available on the agency’s                    submittals.html, by email at
                                                  cause is shown, consideration will be                   public Web site at http://www.nrc.gov/                MSHD.Resource@nrc.gov, or by a toll-
                                                  given to extending the time to answer or                site-help/e-submittals.html. Participants             free call at (866) 672–7640. The NRC
                                                  request a hearing. A request for                        may attempt to use other software not                 Meta System Help Desk is available
                                                  extension of time must be directed to                   listed on the Web site, but should note               between 8 a.m. and 8 p.m., Eastern
                                                  the Director, Office of Enforcement, U.S.               that the NRC’s E-Filing system does not               Time, Monday through Friday,
                                                  Nuclear Regulatory Commission, and                      support unlisted software, and the NRC                excluding government holidays.
                                                  include a statement of good cause for                   Meta System Help Desk will not be able                   Participants who believe that they
                                                  the extension.                                          to offer assistance in using unlisted                 have a good cause for not submitting
                                                    If a hearing is requested by a person                 software.                                             documents electronically must file an
                                                  whose interest is adversely affected, the                  If a participant is electronically                 exemption request, in accordance with
                                                  Commission will issue an order                          submitting a document to the NRC in                   10 CFR 2.302(g), with their initial paper
                                                  designating the time and place of any                   accordance with the E-Filing rule, the                filing requesting authorization to
                                                  hearings. If a hearing is held, the issue               participant must file the document                    continue to submit documents in paper
                                                  to be considered at such hearing shall be               using the NRC’s online, web-based                     format. Such filings must be submitted
                                                  whether this Order should be sustained.                 submission form. In order to serve                    by: (1) first class mail addressed to the
                                                    All documents filed in NRC                            documents through the Electronic                      Office of the Secretary of the
                                                  adjudicatory proceedings, including a                   Information Exchange, users will be                   Commission, U.S. Nuclear Regulatory
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                  request for hearing, a petition for leave               required to install a web browser plug-               Commission, Washington, DC 20555–
                                                  to intervene, any motion or other                       in from the NRC Web site. Further                     0001, Attention: Rulemaking and
                                                  document filed in the proceeding prior                  information on the web-based                          Adjudications Staff; or (2) courier,
                                                  to the submission of a request for                      submission form, including the                        express mail, or expedited delivery
                                                  hearing or petition to intervene, and                   installation of the Web browser plug-in,              service to the Office of the Secretary,
                                                  documents filed by interested                           is available on the NRC’s public Web                  Sixteenth Floor, One White Flint North,
                                                  governmental entities participating                     site at http://www.nrc.gov/site-help/e-               11555 Rockville Pike, Rockville,
                                                  under 10 CFR 2.315(c), must be filed in                 submittals.html.                                      Maryland 20852, Attention: Rulemaking


                                             VerDate Sep<11>2014   16:57 Sep 03, 2015   Jkt 235001   PO 00000   Frm 00106   Fmt 4703   Sfmt 4703   E:\FR\FM\04SEN1.SGM   04SEN1


                                                                              Federal Register / Vol. 80, No. 172 / Friday, September 4, 2015 / Notices                                            53591

                                                  and Adjudications Staff. Participants                   NUCLEAR REGULATORY                                    SUPPLEMENTARY INFORMATION:       Notice is
                                                  filing a document in this manner are                    COMMISSION                                            hereby given that the Director of the
                                                  responsible for serving the document on                                                                       Office of Nuclear Reactor Regulation has
                                                                                                          [Docket Nos. 50–338 and 50–339; NRC–
                                                  all other participants. Filing is                       2012–0258; License Nos.: NPF–4 and NPF–
                                                                                                                                                                issued a Director’s Decision with regard
                                                  considered complete by first-class mail                 7]                                                    to a petition dated October 20, 2011
                                                  as of the time of deposit in the mail, or                                                                     (ADAMS Accession No. ML11293A116),
                                                  by courier, express mail, or expedited                  North Anna Power Station, Units 1 and                 filed by the petitioners. The petition
                                                  delivery service upon depositing the                    2; Virginia Electric and Power                        was supplemented on November 2, 2011
                                                  document with the provider of the                       Company                                               (ADAMS Accession No. ML11308A027)
                                                  service. A presiding officer, having                                                                          and December 15, 2011 (ADAMS
                                                                                                          AGENCY: Nuclear Regulatory                            Accession No. ML12060A197). The
                                                  granted an exemption request from                       Commission.
                                                  using E-Filing, may require a participant                                                                     petition concerns the operation of the
                                                                                                          ACTION: Director’s Decision under 10                  North Anna Power Station, Units 1 and
                                                  or party to use E-Filing if the presiding               CFR 2.206; issuance.                                  2 (North Anna 1 and 2), by the Virginia
                                                  officer subsequently determines that the
                                                                                                          SUMMARY:   The U.S. Nuclear Regulatory                Electric and Power Company (VEPCO or
                                                  reason for granting the exemption from                                                                        the licensee). The petition requested
                                                  use of E-Filing no longer exists.                       Commission (NRC or the Commission)
                                                                                                          is giving notice that the Director of the             that the NRC suspend the operating
                                                     Documents submitted in adjudicatory                  Office of Nuclear Reactor Regulation has              licenses for North Anna 1 and 2, until
                                                  proceedings will appear in NRC’s                        issued a final Director’s Decision with               the completion of a set of activities
                                                  electronic hearing docket, which is                     regard to a petition dated October 20,                described in the petition. The petitioner
                                                  available to the public at http://                      2011, filed by Paul Gunter et al, herein              also requested that a public meeting be
                                                  ehd.nrc.gov/EHD_Proceeding/home.asp,                    referred to as ‘‘the petitioners.’’                   held to discuss this matter in the
                                                  unless excluded pursuant to an order of                 DATES: September 4, 2015.                             Washington, DC area.
                                                  the Commission, or the presiding                        ADDRESSES: Please refer to Docket ID
                                                                                                                                                                   As the basis for the October 20, 2011,
                                                  officer. Participants are requested not to              NRC–2012–0258 when contacting the                     request, the petitioner raised several
                                                  include personal privacy information,                   NRC about the availability of                         concerns, of which 12 were accepted for
                                                  such as social security numbers, home                   information regarding this document.                  review by the NRC staff by letter dated
                                                  addresses, or home phone numbers in                     You may obtain publicly-available                     March 16, 2012 (ADAMS Accession No.
                                                  their filings, unless an NRC regulation                 information related to this document                  ML12060A090). These summarized as
                                                  or other law requires submission of such                using any of the following methods:                   follows:
                                                  information. With respect to                               • Federal Rulemaking Web site: Go to                  (1) Prior to the approval of restart for
                                                  copyrighted works, except for limited                   http://www.regulations.gov and search                 North Anna 1 and 2, after the
                                                                                                          for Docket ID NRC–2012–0258. Address                  earthquake of August 23, 2011, Virginia
                                                  excerpts that serve the purpose of the
                                                                                                          questions about NRC dockets to Carol                  Electric and Power Company (the
                                                  adjudicatory filings and would
                                                                                                          Gallagher; telephone: 301–415–3463;                   licensee) should be required to obtain a
                                                  constitute a Fair Use application,                                                                            license amendment from the NRC that
                                                  participants are requested not to include               email: Carol.Gallagher@nrc.gov. For
                                                                                                          technical questions, contact the                      reanalyzes and reevaluates the plant’s
                                                  copyrighted materials in their                                                                                design basis for earthquakes and for
                                                                                                          individual listed in the FOR FURTHER
                                                  submission.                                                                                                   associated necessary retrofits.
                                                                                                          INFORMATION CONTACT section of this
                                                     If a person other than the licensee                  document.                                                (2) Prior to the approval of restart for
                                                  requests a hearing, that person shall set                  • NRC’s Agencywide Documents                       North Anna 1 and 2, after the
                                                  forth with particularity the manner in                  Access and Management System                          earthquake of August 23, 2011, the
                                                  which his interest is adversely affected                (ADAMS): You may access publicly                      licensee should be required to ensure
                                                  by this Order and shall address the                     available documents online in the NRC                 that North Anna 1 and 2, are subjected
                                                  criteria set forth in 10 CFR paragraphs                 Library at http://www.nrc.gov/reading-                to thorough inspections of the same
                                                  2.309(d) and (f).                                       rm/adams.html. To begin the search,                   level and rigor.
                                                                                                          select ‘‘ADAMS Public Documents’’ and                    (3) The licensee should be required to
                                                     In the absence of any request for
                                                                                                          then select ‘‘Begin Web-based ADAMS                   reanalyze and reevaluate the North
                                                  hearing, or written approval of an
                                                                                                          Search.’’ For problems with ADAMS,                    Anna Independent Spent Fuel Storage
                                                  extension of time in which to request a                                                                       Installation (lSFSI) due to damage
                                                                                                          please contact the NRC’s Public
                                                  hearing, the provisions specified in                    Document Room (PDR) reference staff at                caused by the earthquake of August 23,
                                                  Section IV above shall be final 20 days                 1–800–397–4209, 301–415–4737, or by                   2011, and ensure that no threat is posed
                                                  from the date of this Order without                     email to PDR.Resource@nrc.gov. The                    to public health and safety by its
                                                  further order or proceedings. If an                     ADAMS accession number for each                       operation.
                                                  extension of time for requesting a                      document (if that document is available                  (4) The licensee should ensure the
                                                  hearing has been approved, the                          in ADAMS) is provided the first time                  reliability and accuracy of the seismic
                                                  provisions specified in Section IV shall                that a document is referenced.                        instrumentation at North Anna 1 and 2.
                                                  be final when the extension expires if a                   • NRC’s PDR: You may examine and                      (5) The NRC staff made hasty
                                                  hearing request has not been received.                  purchase copies of public documents at                decisions about the restart of North
                                                  Dated at Rockville, Maryland this 10th day of           the NRC’s PDR, Room O1–F21, One                       Anna 1 and 2, and gave priority to
                                                                                                          White Flint North, 11555 Rockville
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                       August, 2015.                                                                                            economic considerations. The long-term
                                                  For the Nuclear Regulatory Commission.
                                                                                                          Pike, Rockville, Maryland 20852.                      action plan was not even complete
                                                                                                          FOR FURTHER INFORMATION CONTACT: V.                   before the NRC staff gave authorization
                                                  Catherine Haney, Director,
                                                                                                          Sreenivas, Office of Nuclear Reactor                  to restart.
                                                  Office of Nuclear Material Safety and                   Regulation, U.S. Nuclear Regulatory                      (6) Regulatory commitments are an
                                                  Safeguards.                                             Commission, Washington, DC 20555–                     inadequate regulatory tool for ensuring
                                                  [FR Doc. 2015–21937 Filed 9–3–15; 8:45 am]              0001; telephone: 301–415–2597; email:                 that the critical long-term tasks
                                                  BILLING CODE 7590–01–P                                  V.Sreenivas@nrc.gov.                                  identified in the NRC staff’s


                                             VerDate Sep<11>2014   16:57 Sep 03, 2015   Jkt 235001   PO 00000   Frm 00107   Fmt 4703   Sfmt 4703   E:\FR\FM\04SEN1.SGM   04SEN1



Document Created: 2015-12-15 09:58:22
Document Modified: 2015-12-15 09:58:22
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionConfirmatory order; issuance.
DatesThe confirmatory order was signed August 10, 2015.
ContactMerritt Baker, telephone: 301-415- 7119, email [email protected], Office of Nuclear Material Safety and Safeguards, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001.
FR Citation80 FR 53588 