80_FR_57786 80 FR 57601 - Pacific Gas and Electric Company; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests

80 FR 57601 - Pacific Gas and Electric Company; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 80, Issue 185 (September 24, 2015)

Page Range57601-57602
FR Document2015-24243

Federal Register, Volume 80 Issue 185 (Thursday, September 24, 2015)
[Federal Register Volume 80, Number 185 (Thursday, September 24, 2015)]
[Notices]
[Pages 57601-57602]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-24243]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 1333-064]


Pacific Gas and Electric Company; Notice of Application Accepted 
for Filing, Soliciting Comments, Motions To Intervene, and Protests

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Type of Application: Application for Amendment of License.
    b. Project No.: 1333-064.
    c. Date Filed: September 14, 2015.
    d. Applicant: Pacific Gas and Electric Company (licensee).
    e. Name of Project: Tule River Hydroelectric Project.
    f. Location: On the North Fork of the Middle Fork Tule River, 
Hossack Creek, and Doyle Springs, in Tulare County, California. The 
project occupies U.S. Forest Service lands within the Sequoia National 
Forest.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
    h. Applicant Contact: Ms. Elisabeth Rossi, License Coordinator, 
Pacific Gas and Electric Company, Mail Code: N11C, P.O. Box 770000, San 
Francisco, CA 94177. Phone (415) 973-3082.
    i. FERC Contact: Mr. Mark Pawlowski, (202) 502-6052, or 
[email protected].
    j. Deadline for filing comments, motions to intervene, protests, 
and recommendations is 30 days from the issuance date of this notice by 
the Commission. The Commission strongly encourages electronic filing. 
Please file motions to intervene, protests, comments, or 
recommendations using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief 
comments up to 6,000 characters, without prior registration, using the 
eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You 
must include your name and contact information at the end of your 
comments. For assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE., 
Washington, DC 20426. Please include the project number (P-1333-064) on 
any comments, motions to intervene, protests, or recommendations filed.
    k. Description of Request: The licensee requests that the minimum 
flow requirements of article 105 of the license for the Tule Project be 
revised to reflect the requirements of the conditions submitted by the 
U.S. Forest Service (FS) pursuant to its mandatory conditioning 
authority under section 4(e) of the Federal Power Act. Article 105 
requires the licensee to release from Tule Diversion Dam a minimum 
``target'' flow of 4 cubic feet per second (cfs) in dry water years and 
a minimum ``target'' flow of 2 cfs from Doyle Springs Diversion Dam 
where the ``target'' flow is defined as the daily average flow at each 
dam and an instantaneous flow of not less than 10 percent of the daily 
average flow. However, the FS's condition 5 filed with the Commission 
on October 31, 1989 and November 26, 1991, requires the licensee to 
release from Tule Diversion Dam a minimum ``target'' flow of 4 cfs in 
dry water years and a minimum ``target'' flow of 2 cfs from Doyle 
Springs Diversion Dam, or the natural instream flow, whichever is less. 
The licensee requests that article 105 be revised to make it clear that 
the minimum flow requirements are dependent on and subject to the 
natural instream flow of the Tule River at Tule Diversion Dam and Doyle 
Springs Diversion Dam.
    l. Locations of the Application: A copy of the application is 
available for inspection and reproduction at the Commission's Public 
Reference Room, located at 888 First Street NE., Room 2A, Washington, 
DC 20426, or by calling (202) 502-8371. This filing may also be viewed 
on the Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number excluding the last three digits 
in the docket number field to access the document. You may also 
register online at http://www.ferc.gov/docs-filing/esubscription.asp to 
be notified via email of new filings and issuances related to this or 
other pending projects. For assistance, call 1-866-208-3676 or email 
[email protected], for TTY, call (202) 502-8659. A copy is 
also available for inspection and reproduction at the address in item 
(h) above.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Comments, Protests, or Motions to Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214. In determining the appropriate action to take, the Commission 
will consider all protests or other comments filed, but only those who 
file a motion to intervene in accordance with the Commission's Rules 
may become a party to the proceeding. Any comments, protests, or 
motions to intervene must be received on or before the specified 
comment date for the particular application.
    o. Filing and Service of Responsive Documents: Any filing must (1) 
bear in all capital letters the title ``COMMENTS'', ``PROTEST'', or 
``MOTION TO INTERVENE'' as applicable; (2) set forth in the heading the 
name of the applicant and the project number of the application to 
which the filing responds; (3) furnish the name, address, and telephone 
number of the person protesting or intervening; and (4) otherwise 
comply with the requirements of 18 CFR 385.2001 through 385.2005. All 
comments, motions to intervene, or protests must set forth their 
evidentiary basis and otherwise comply with the requirements of 18 CFR 
4.34(b). All comments, motions to intervene, or protests should relate 
to project works which are the subject of the license surrender. 
Agencies may obtain copies of the application directly from the 
applicant. A copy of any protest or motion to intervene must be served

[[Page 57602]]

upon each representative of the applicant specified in the particular 
application. If an intervener files comments or documents with the 
Commission relating to the merits of an issue that may affect the 
responsibilities of a particular resource agency, they must also serve 
a copy of the document on that resource agency. A copy of all other 
filings in reference to this application must be accompanied by proof 
of service on all persons listed in the service list prepared by the 
Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 
385.2010.

    Dated: September 18, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-24243 Filed 9-23-15; 8:45 am]
BILLING CODE 6717-01-P



                                                                       Federal Register / Vol. 80, No. 185 / Thursday, September 24, 2015 / Notices                                           57601

                                              385.2001 through 385.2005. All                          N11C, P.O. Box 770000, San Francisco,                    l. Locations of the Application: A
                                              comments, motions to intervene, or                      CA 94177. Phone (415) 973–3082.                       copy of the application is available for
                                              protests must set forth their evidentiary                  i. FERC Contact: Mr. Mark Pawlowski,               inspection and reproduction at the
                                              basis and otherwise comply with the                     (202) 502–6052, or mark.pawlowski@                    Commission’s Public Reference Room,
                                              requirements of 18 CFR 4.34(b). All                     ferc.gov.                                             located at 888 First Street NE., Room
                                              comments, motions to intervene, or                         j. Deadline for filing comments,                   2A, Washington, DC 20426, or by calling
                                              protests should relate to the non-project               motions to intervene, protests, and                   (202) 502–8371. This filing may also be
                                              use application. Agencies may obtain                    recommendations is 30 days from the                   viewed on the Commission’s Web site at
                                              copies of the application directly from                 issuance date of this notice by the                   http://www.ferc.gov/docs-filing/
                                              the applicant. A copy of any protest or                 Commission. The Commission strongly                   elibrary.asp. Enter the docket number
                                              motion to intervene must be served                      encourages electronic filing. Please file             excluding the last three digits in the
                                              upon each representative of the                         motions to intervene, protests,                       docket number field to access the
                                              applicant specified in the particular                   comments, or recommendations using                    document. You may also register online
                                              application. If an intervener files                     the Commission’s eFiling system at                    at http://www.ferc.gov/docs-filing/
                                              comments or documents with the                          http://www.ferc.gov/docs-filing/                      esubscription.asp to be notified via
                                              Commission relating to the merits of an                 efiling.asp. Commenters can submit                    email of new filings and issuances
                                              issue that may affect the responsibilities              brief comments up to 6,000 characters,                related to this or other pending projects.
                                              of a particular resource agency, they                   without prior registration, using the                 For assistance, call 1–866–208–3676 or
                                              must also serve a copy of the document                  eComment system at http://                            email FERCOnlineSupport@ferc.gov, for
                                              on that resource agency. A copy of all                  www.ferc.gov/docs-filing/                             TTY, call (202) 502–8659. A copy is also
                                              other filings in reference to this                      ecomment.asp. You must include your                   available for inspection and
                                              application must be accompanied by                      name and contact information at the end               reproduction at the address in item (h)
                                              proof of service on all persons listed in               of your comments. For assistance,                     above.
                                              the service list prepared by the                        please contact FERC Online Support at                    m. Individuals desiring to be included
                                              Commission in this proceeding, in                       FERCOnlineSupport@ferc.gov, (866)                     on the Commission’s mailing list should
                                              accordance with 18 CFR 4.34(b) and                      208–3676 (toll free), or (202) 502–8659               so indicate by writing to the Secretary
                                              385.2010.                                               (TTY). In lieu of electronic filing, please           of the Commission.
                                                                                                      send a paper copy to: Secretary, Federal                 n. Comments, Protests, or Motions to
                                                Dated: September 18, 2015.                            Energy Regulatory Commission, 888                     Intervene: Anyone may submit
                                              Nathaniel J. Davis, Sr.,                                First Street NE., Washington, DC 20426.               comments, a protest, or a motion to
                                              Deputy Secretary.                                       Please include the project number (P–                 intervene in accordance with the
                                              [FR Doc. 2015–24242 Filed 9–23–15; 8:45 am]             1333–064) on any comments, motions to                 requirements of Rules of Practice and
                                              BILLING CODE 6717–01–P                                  intervene, protests, or recommendations               Procedure, 18 CFR 385.210, .211, .214.
                                                                                                      filed.                                                In determining the appropriate action to
                                                                                                         k. Description of Request: The                     take, the Commission will consider all
                                              DEPARTMENT OF ENERGY                                    licensee requests that the minimum                    protests or other comments filed, but
                                                                                                      flow requirements of article 105 of the               only those who file a motion to
                                              Federal Energy Regulatory                               license for the Tule Project be revised to            intervene in accordance with the
                                              Commission                                              reflect the requirements of the                       Commission’s Rules may become a
                                              [Project No. 1333–064]
                                                                                                      conditions submitted by the U.S. Forest               party to the proceeding. Any comments,
                                                                                                      Service (FS) pursuant to its mandatory                protests, or motions to intervene must
                                              Pacific Gas and Electric Company;                       conditioning authority under section                  be received on or before the specified
                                              Notice of Application Accepted for                      4(e) of the Federal Power Act. Article                comment date for the particular
                                              Filing, Soliciting Comments, Motions                    105 requires the licensee to release from             application.
                                              To Intervene, and Protests                              Tule Diversion Dam a minimum                             o. Filing and Service of Responsive
                                                                                                      ‘‘target’’ flow of 4 cubic feet per second            Documents: Any filing must (1) bear in
                                                Take notice that the following                        (cfs) in dry water years and a minimum                all capital letters the title
                                              hydroelectric application has been filed                ‘‘target’’ flow of 2 cfs from Doyle                   ‘‘COMMENTS’’, ‘‘PROTEST’’, or
                                              with the Commission and is available                    Springs Diversion Dam where the                       ‘‘MOTION TO INTERVENE’’ as
                                              for public inspection:                                  ‘‘target’’ flow is defined as the daily               applicable; (2) set forth in the heading
                                                a. Type of Application: Application                   average flow at each dam and an                       the name of the applicant and the
                                              for Amendment of License.                               instantaneous flow of not less than 10                project number of the application to
                                                b. Project No.: 1333–064.                             percent of the daily average flow.                    which the filing responds; (3) furnish
                                                c. Date Filed: September 14, 2015.                    However, the FS’s condition 5 filed with              the name, address, and telephone
                                                d. Applicant: Pacific Gas and Electric                the Commission on October 31, 1989                    number of the person protesting or
                                              Company (licensee).                                     and November 26, 1991, requires the                   intervening; and (4) otherwise comply
                                                e. Name of Project: Tule River                        licensee to release from Tule Diversion               with the requirements of 18 CFR
                                              Hydroelectric Project.                                  Dam a minimum ‘‘target’’ flow of 4 cfs                385.2001 through 385.2005. All
                                                f. Location: On the North Fork of the                 in dry water years and a minimum                      comments, motions to intervene, or
                                              Middle Fork Tule River, Hossack Creek,                  ‘‘target’’ flow of 2 cfs from Doyle                   protests must set forth their evidentiary
                                              and Doyle Springs, in Tulare County,                    Springs Diversion Dam, or the natural                 basis and otherwise comply with the
                                              California. The project occupies U.S.                   instream flow, whichever is less. The                 requirements of 18 CFR 4.34(b). All
tkelley on DSK3SPTVN1PROD with NOTICES




                                              Forest Service lands within the Sequoia                 licensee requests that article 105 be                 comments, motions to intervene, or
                                              National Forest.                                        revised to make it clear that the                     protests should relate to project works
                                                g. Filed Pursuant to: Federal Power                   minimum flow requirements are                         which are the subject of the license
                                              Act, 16 U.S.C. 791a–825r.                               dependent on and subject to the natural               surrender. Agencies may obtain copies
                                                h. Applicant Contact: Ms. Elisabeth                   instream flow of the Tule River at Tule               of the application directly from the
                                              Rossi, License Coordinator, Pacific Gas                 Diversion Dam and Doyle Springs                       applicant. A copy of any protest or
                                              and Electric Company, Mail Code:                        Diversion Dam.                                        motion to intervene must be served


                                         VerDate Sep<11>2014   16:45 Sep 23, 2015   Jkt 235001   PO 00000   Frm 00035   Fmt 4703   Sfmt 4703   E:\FR\FM\24SEN1.SGM   24SEN1


                                              57602                    Federal Register / Vol. 80, No. 185 / Thursday, September 24, 2015 / Notices

                                              upon each representative of the                            Description: Notification of Change in                Applicants: Entergy New Orleans, Inc.
                                              applicant specified in the particular                   Status of NextEra Resources Entities.                    Description: Compliance filing: ENOI
                                              application. If an intervener files                        Filed Date: 9/17/15.                               Compliance (ER14–73) 9–17–2015 to be
                                              comments or documents with the                             Accession Number: 20150917–5156.                   effective 12/19/2013.
                                              Commission relating to the merits of an                    Comments Due: 5 p.m. ET 10/8/15.                      Filed Date: 9/17/15.
                                              issue that may affect the responsibilities                 Docket Numbers: ER13–2073–002.                        Accession Number: 20150917–5124.
                                              of a particular resource agency, they                      Applicants: Source Power & Gas LLC.                   Comments Due: 5 p.m. ET 10/8/15.
                                              must also serve a copy of the document                     Description: Notification of Change in                Docket Numbers: ER15–2667–000.
                                              on that resource agency. A copy of all                  Status by Source Power & Gas LLC.                        Applicants: Entergy Texas, Inc.
                                              other filings in reference to this                         Filed Date: 9/17/15.                                  Description: Compliance filing: ETI
                                              application must be accompanied by                         Accession Number: 20150917–5148.                   Compliance (ER14–73) 9–17–2015 to be
                                              proof of service on all persons listed in                  Comments Due: 5 p.m. ET 10/8/15.                   effective 12/19/2013.
                                              the service list prepared by the                           Docket Numbers: ER14–649–004.                         Filed Date: 9/17/15.
                                              Commission in this proceeding, in                          Applicants: Midcontinent                              Accession Number: 20150917–5125.
                                              accordance with 18 CFR 4.34(b) and                      Independent System Operator, Inc.,                       Comments Due: 5 p.m. ET 10/8/15.
                                              385.2010.                                               Entergy Services, Inc.                                   Docket Numbers: ER15–2668–000.
                                                Dated: September 18, 2015.                               Description: Compliance filing: 2015–                 Applicants: Land of the Sky MT, LLC.
                                              Nathaniel J. Davis, Sr.,                                09–17_Entergy Attachment O                               Description: Baseline eTariff Filing:
                                              Deputy Secretary.                                       Compliance Filing ER13–948 to be                      Application for Market-Based Rate
                                              [FR Doc. 2015–24243 Filed 9–23–15; 8:45 am]             effective 11/1/2015.                                  Tariff, Blanket Approval and Waivers to
                                                                                                         Filed Date: 9/17/15.                               be effective 10/1/2015.
                                              BILLING CODE 6717–01–P
                                                                                                         Accession Number: 20150917–5114.                      Filed Date: 9/17/15.
                                                                                                         Comments Due: 5 p.m. ET 10/8/15.                      Accession Number: 20150917–5144.
                                              DEPARTMENT OF ENERGY                                       Docket Numbers: ER15–883–003.                         Comments Due: 5 p.m. ET 10/8/15.
                                                                                                         Applicants: Southern California                       Docket Numbers: ER15–2669–000.
                                              Federal Energy Regulatory                               Edison Company.                                          Applicants: Southwest Power Pool,
                                              Commission                                                 Description: Tariff Amendment:                     Inc.
                                                                                                      Executed GIA and Executed Distrib Serv                   Description: Notice of Cancellation of
                                              Combined Notice of Filings #1                           Agmt with San Gorgonio Westwinds II,                  Firm Point-To-Point Transmission
                                                 Take notice that the Commission                      LLC to be effective 1/20/2015.                        Service Agreement No. 1487 of
                                              received the following electric rate                       Filed Date: 9/18/15.                               Southwest Power Pool, Inc.
                                              filings:                                                   Accession Number: 20150918–5003.                      Filed Date: 9/18/15.
                                                 Docket Numbers: ER12–569–008;                           Comments Due: 5 p.m. ET 10/9/15.                      Accession Number: 20150918–5054.
                                              ER13–712–008; ER10–1849–007;                               Docket Numbers: ER15–2662–000.                        Comments Due: 5 p.m. ET 10/9/15.
                                                 ER11–2037–007; ER12–2227–                               Applicants: PacifiCorp.                               Docket Numbers: ER15–2670–000.
                                              007;ER10–1852–011;                                         Description: Section 205(d) Rate                      Applicants: Midcontinent
                                                 ER10–1887–007; ER10–1920–                            Filing: Dugway Non-Conforming SGIA                    Independent System Operator, Inc.
                                              009;ER10–1928–009;                                      to be effective 9/9/2015.                                Description: Section 205(d) Rate
                                                 ER10–1952–007; ER12–1228–                               Filed Date: 9/17/15.                               Filing: 2015–09–18_SA 2698 OTP-
                                              009;ER10–1961–007;                                         Accession Number: 20150917–5116.                   Northern States Power Company 1st Rev
                                                 ER14–2707–004; ER10–2720–                               Comments Due: 5 p.m. ET 10/8/15.                   GIA (J262/J263) to be effective 9/19/
                                              009;ER11–4428–009;                                         Docket Numbers: ER15–2663–000.                     2015.
                                                 ER12–1880–008; ER12–895–                                Applicants: Entergy Gulf States                       Filed Date: 9/18/15.
                                              007;ER10–1971–021;                                      Louisiana, L.L.C.                                        Accession Number: 20150918–5089.
                                                 ER14–2710–004; ER15–58–002;ER15–                        Description: Compliance filing: EGSL                  Comments Due: 5 p.m. ET 10/9/15.
                                              30–002;                                                 Compliance (ER14–73) 9–17–2015 to be                     Take notice that the Commission
                                                 ER14–2708–005; ER14–2709–                            effective 12/19/2013.                                 received the following electric securities
                                              004;ER13–2474–003                                          Filed Date: 9/17/15.                               filings:
                                                 Applicants: Blackwell Wind, LLC,
                                                                                                         Accession Number: 20150917–5119.                      Docket Numbers: ES15–70–000.
                                              Cimarron Wind Energy, LLC, Elk City
                                                                                                         Comments Due: 5 p.m. ET 10/8/15.                      Applicants: Georgia Power Company.
                                              Wind, LLC, Elk City II Wind, LLC,
                                              Ensign Wind, LLC Florida Power &                           Docket Numbers: ER15–2664–000.                        Description: Application of Georgia
                                              Light Company, FPL Energy Cowboy                           Applicants: Entergy Louisiana, LLC.                Power Company for authorization to
                                              Wind, LLC, FPL Energy Oklahoma                             Description: Compliance filing: ELL                issue securities.
                                              Wind, LLC, FPL Energy Sooner Wind,                      Compliance (ER14–73) 9–17–2015 to be                     Filed Date: 9/17/15.
                                              LLC, Gray County Wind Energy, LLC,                      effective 12/19/2013.                                    Accession Number: 20150917–5147.
                                              High Majestic Wind II, LLC, High                           Filed Date: 9/17/15.                                  Comments Due: 5 p.m. ET 10/8/15.
                                              Majestic Wind Energy Center, LLC,                          Accession Number: 20150917–5122.                      Take notice that the Commission
                                              Mammoth Plains Wind Project, LLC,                          Comments Due: 5 p.m. ET 10/8/15.                   received the following electric
                                              Minco Wind, LLC, Minco Wind II, LLC,                       Docket Numbers: ER15–2665–000.                     reliability filings:
                                              Minco Wind III, LLC, Minco Wind                            Applicants: Entergy Mississippi, Inc.                 Docket Numbers: RD15–7–000.
                                                                                                         Description: Compliance filing: EMI
tkelley on DSK3SPTVN1PROD with NOTICES




                                              Interconnection Services, LLC, NextEra                                                                           Applicants: North American Electric
                                              Energy Power Marketing, LLC, Palo                       Compliance (ER14–73) 9–17–2015 to be                  Reliability Corporation.
                                              Duro Wind Energy, LLC, Palo Duro                        effective 12/19/2013.                                    Description: Petition of the North
                                              Wind Interconnection Services, LLC,                        Filed Date: 9/17/15.                               American Electric Reliability
                                              Seiling Wind Interconnection Services,                     Accession Number: 20150917–5123.                   Corporation for Approval of Proposed
                                              LLC, Seiling Wind, LLC, Seiling Wind                       Comments Due: 5 p.m. ET 10/8/15.                   Interconnection Reliability Operations
                                              II, LLC, Steel Flats Wind Project, LLC                     Docket Numbers: ER15–2666–000.                     and Coordination Reliability Standards.


                                         VerDate Sep<11>2014   16:45 Sep 23, 2015   Jkt 235001   PO 00000   Frm 00036   Fmt 4703   Sfmt 4703   E:\FR\FM\24SEN1.SGM   24SEN1



Document Created: 2018-02-26 10:18:21
Document Modified: 2018-02-26 10:18:21
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation80 FR 57601 

2024 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR