80_FR_57841 80 FR 57656 - FY15 Discretionary Funding Opportunity: Low or No Emission Vehicle Deployment Program (LoNo) Program

80 FR 57656 - FY15 Discretionary Funding Opportunity: Low or No Emission Vehicle Deployment Program (LoNo) Program

DEPARTMENT OF TRANSPORTATION
Federal Transit Administration

Federal Register Volume 80, Issue 185 (September 24, 2015)

Page Range57656-57661
FR Document2015-24231

The Federal Transit Administration (FTA) announces the availability of $22.5 million of Fiscal Year (FY) 2015 funds for the deployment of low or no emission transit buses. Of that amount, a minimum of $3.0 million is available for supporting facilities and related equipment. If additional funding is appropriated for this program in FY 2016, FTA may, at its discretion, also make those funds available under this announcement.

Federal Register, Volume 80 Issue 185 (Thursday, September 24, 2015)
[Federal Register Volume 80, Number 185 (Thursday, September 24, 2015)]
[Notices]
[Pages 57656-57661]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-24231]


-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION

Federal Transit Administration


FY15 Discretionary Funding Opportunity: Low or No Emission 
Vehicle Deployment Program (LoNo) Program

AGENCY: Federal Transit Administration (FTA), DOT.

ACTION: Notice of Funding Availability (NOFA) and for Request for 
Proposals (RFP).

-----------------------------------------------------------------------

SUMMARY: The Federal Transit Administration (FTA) announces the 
availability of $22.5 million of Fiscal Year (FY) 2015 funds for the 
deployment of low or no emission transit buses. Of that amount, a 
minimum of $3.0 million is available for supporting facilities and 
related equipment. If additional funding is appropriated for this 
program in FY 2016, FTA may, at its discretion, also make those funds 
available under this announcement.

DATES: Complete proposals must be submitted electronically through the 
grants.gov ``Apply'' function by November 23, 2015. Prospective 
applicants should initiate the process by registering on the GRANTS.GOV 
Web site promptly to ensure completion of the application process 
before the submission deadline. Instructions for applying can be found 
on FTA's Web site at http://www.fta.dot.gov/grants/13077.html and in 
the ``find'' module of grants.gov. Mail and fax submissions will not be 
accepted.

FOR FURTHER INFORMATION CONTACT: Sean Ricketson, FTA Office of Research 
Demonstration and Innovation, 202-366-6678 or [email protected].

SUPPLEMENTARY INFORMATION: 

Table of Contents

A. Program Description
B. Federal Award Information
C. Eligibility Information
D. Application and Submission Information
E. Application Review
F. Federal Award Administration
G. Federal Awarding Agency Contacts

A. Program Description

    The Low and No Emission Vehicle Deployment (LoNo) Program provides 
funding for transit agencies for capital acquisitions and leases of 
zero-emission and low-emission transit buses, including acquisition, 
construction, and leasing of required supporting facilities such as 
recharging, refueling, and maintenance facilities.
    The main purpose of the LoNo Program is to deploy the cleanest and 
most energy efficient U.S.-made transit buses that have been largely 
proven in testing and demonstrations but are not yet widely deployed in 
transit fleets. The LoNo Program is a capital program focused on 
deploying new production vehicles that are market-ready or near market-
ready. It is not a program for designing and developing prototypes. The 
program gives priority consideration to the deployment of buses with 
the lowest energy consumption and least harmful emissions, including 
direct carbon emissions.

B. Federal Award Information

    The Moving Ahead for Progress in the 21st Century Act (MAP-21), 
Public Law 112-141, July 6, 2012, amended 49 U.S.C. 5312 to add a new 
paragraph (d)(5) authorizing FTA to make grants to finance eligible 
projects under the ``Low or No Emission Vehicle Deployment Program'' 
(LoNo Program).
    The Consolidated and Further Continuing Appropriations Act, 2015 
(FY 2015 Appropriations) Public Law 113-235, December 16, 2014, has 
made available $22.5 million in FY 2015 to carry out the LoNo Program. 
Of that amount, a minimum of $3.0 million is available for supporting 
facilities and related equipment. Given that projects must be 
competitively selected pursuant

[[Page 57657]]

to 49 U.S.C. 5312(d)(5)(E), if additional funding is appropriated for 
this program in FY 2016, FTA may, at its discretion, apply those funds 
to either scale up selections made under this announcement, or to fund 
meritorious proposals that were not selected for lack of FY 2015 
funding.

C. Eligibility Information

1. Eligible Applicants

    The FTA will consider projects from eligible applicants located in 
eligible areas, as defined in 49 U.S.C 5312(d). Eligible areas are 
limited to non-attainment and maintenance areas. Specifically, an 
eligible area is defined as an area that is:
    (i) Designated as a nonattainment area for ozone or carbon monoxide 
under section 107(d) of the Clean Air Act (42 U.S.C. 7407(d)); or
    (ii) A maintenance area, as defined in section 5303, for ozone or 
carbon monoxide.
    Eligible applicants and recipients under this program are limited 
to designated recipients in eligible areas over 200,000 in population 
and State Departments of Transportation (DOTs) for eligible areas under 
200,000 in population. State DOTs must apply for and administer the 
proposal and if selected, subsequent grant, for projects located in 
eligible areas under 200,000 in population.
    For more information about Designated Recipients, please see FTA 
Circular 9030.1E, ``Urbanized Area Formula Program: Program Guidance 
and Application Instructions'', January 16, 2014, Chapter II, which can 
be found on FTA's Web site in its Law Library. For information about 
non-attainment and maintenance areas, please visit the Environmental 
Protection Administration's Greenbook, at http://www.epa.gov/airquality/greenbook/.
    Eligible applicants may apply on behalf of eligible subrecipients, 
to include other public transportation providers, tribes, and a project 
team member identified in the proposal and deemed a ``Key Party'' by 
FTA. Project teams may include consultants, manufacturers, vendors, 
systems integrators and facilities providers. Tribes and other FTA 
direct recipients should work with State DOTs or eligible designated 
recipients in their area to apply on their behalf.

2. Cost Sharing or Matching

    The FTA has determined that all eligible expenses under this 
program are attributable to compliance with the Clean Air Act. 
Therefore under the provisions of 49 U.S.C. 5323(i) the Federal 
Government's participation in the costs of leasing or acquiring a 
transit bus financed under the LoNo Program is limited to 85 percent of 
the total transit bus cost. The proposer may seek a lower Federal 
contribution.
    Further, the Federal Government's participation in the cost of 
leasing or acquiring transit bus-related equipment and facilities under 
the LoNo Program is limited to 90 percent of the net project cost of 
the equipment or facilities attributable to compliance with the Clean 
Air Act.
    The Federal Share is limited to 80 percent for the cost of 
equipment and facilities not attributable to compliance with the Clean 
Air Act. Again, the proposer may seek a lower Federal contribution.
    Therefore, at a minimum, the proposer must provide at least 15 
percent of the cost of all transit bus acquisitions and 10 percent of 
the cost for all related equipment and facilities.

3. Eligible Projects

    The following projects are eligible for funding, in accordance with 
section 5312(d)(5)(A)(ii):
    (i) Acquiring or leasing low or no emission transit buses;
    (ii) Constructing or leasing facilities and related equipment for 
low or no emission transit buses;
    (iii) Constructing new public transportation facilities to 
accommodate low or no emission transit buses; or,
    (iv) Rehabilitating or improving existing public transportation 
facilities to accommodate low or no emission transit buses.

4. Eligible Vehicles

    Proposals for bus acquisitions should result in the deployment of 
at least five (5) new transit buses per location. Proposals for 
supporting facilities should support at least five (5) buses. Buses 
must be largely identical. To be eligible, vehicles must be production 
transit buses used to provide public transportation and meet either the 
zero-emission bus, or the low emission bus definition below.
    For the purposes of this solicitation, a zero-emission transit bus 
is defined as a bus that produces no direct carbon emissions and no 
particulate matter emissions under any and all possible operational 
modes and conditions. A hydrogen fuel-cell bus qualifies as a zero-
emission bus. A battery-electric bus qualifies as a zero-emission 
transit bus. A zero-emission bus and a no emission bus are the same.
    For the purposes of this solicitation, a low emission bus is 
defined as any transit bus that is powered by an engine that produces 
lower non-methane hydrocarbons (NMHC) and oxides of nitrogen 
(NOX) than are legally permitted under EPA's engine 
standards at 49 CFR part 86.
    All transit buses proposed for deployment under the LoNo Program 
must complete current FTA bus testing for production transit buses 
pursuant to 49 U.S.C. 5318. The FTA will only evaluate proposals for 
production transit buses that have either completed testing or will be 
tested prior to deployment. The LoNo Program is not a platform for the 
development of prototypes.

D. Application and Submission Information

1. Address To Request Application Package
    A complete proposal submission will consist of at least two files: 
(1) The SF424 Mandatory form (downloaded from GRANTS.GOV) and (2) the 
Applicant and Proposal Profile supplemental form for LoNo funding 
(Supplemental Form) found on grants.gov and the FTA Web site by 
clicking (or copying and pasting) the LoNo Program link at http://www.fta.dot.gov/grants/13077.html. The Supplemental Form provides 
guidance and a consistent format for proposers to respond to the 
criteria outlined in this NOFA.

2. Content and Form of Application Submission

(i) Proposal Submission
    A complete proposal submission consists of a minimum of two forms: 
The SF424 Mandatory Form and the Supplemental Form. The Supplemental 
Form must be placed in the attachments section of the SF424 Mandatory 
Form. Proposers must use the Supplemental Form designated for the LoNo 
Program and attach it to the submission in GRANTS.GOV to successfully 
complete the application process.
    A proposal submission may contain additional supporting 
documentation as attachments. If an applicant elects to attach an 
additional proposal narrative, it must not exceed 10 numbered pages. 
Submissions must be presentable and use standard fonts, font sizing, 
and at least one-inch margins so the information can easily be read by 
the reviewers.
    Within 48 hours after submitting an electronic application, the 
applicant should receive three email messages from grants.gov: (1) 
Confirmation of successful transmission to grants.gov, (2) confirmation 
of successful validation by grants.gov, and (3) confirmation of

[[Page 57658]]

successful validation by FTA. If confirmations of successful validation 
are not received or a notice of failed validation or incomplete 
materials is received, the applicant must address the reason for the 
failed validation, as described in the email notice, and resubmit 
before the submission deadline. If making a resubmission for any 
reason, include all original attachments regardless of which 
attachments were updated and check the box on the supplemental form 
indicating this is a resubmission.
    The FTA urges proposers to submit applications at least 72 hours 
prior to the due date to allow time to receive the validation messages 
and to correct any problems that may have caused a rejection 
notification. The FTA will not accept submissions after the stated 
deadline. Grants.gov scheduled maintenance and outage times are 
announced on the grants.gov Web site. Deadlines will not be extended 
due to scheduled Web site maintenance.
    Proposers are encouraged to begin the process of registration on 
the grants.gov site well in advance of the submission deadline. 
Registration is a multi-step process, which may take several weeks to 
complete before an application can be submitted. Registered proposers 
may still be required to take steps to keep their registration up to 
date before submissions can be made successfully: (1) Registration in 
the System for Award Management (SAM) is renewed annually; and, (2) 
persons making submissions on behalf of the Authorized Organization 
Representative (AOR) must be authorized in grants.gov by the AOR to 
make submissions. Instructions on the grants.gov registration process 
are provided in the Appendix.
    Applicants that submit multiple projects in one proposal must be 
sure to clearly define each project by completing a separate 
Supplemental Form for each project.
    Information such as proposer name, Federal amount requested, local 
match amount, description of areas served, etc. may be requested in 
varying degrees of detail on both the SF424 form and Supplemental Form. 
Proposers must fill in all fields unless stated otherwise on the forms. 
The Supplemental Form template supports pasting copied text from other 
documents; applicants should verify that pasted text is fully captured 
on the Supplemental Form and has not been truncated by the character 
limits built into the form. Proposers should use both the ``Check 
Package for Errors'' and the ``Validate Form'' validation buttons on 
both forms to check all required fields on the forms, and ensure that 
the federal and local amounts specified are consistent.
(ii) Application Content
    The SF424 Mandatory Form and the Supplemental Form will prompt 
applicants for the required information, including:
    a. Applicant name;
    b. Dun and Bradstreet (D&B) Data Universal Numbering System (DUNS) 
number if available. (Note: If selected, applicant will be required to 
provide DUNS number prior to award);
    c. Key contact information (including contact name, address, email 
address, phone and fax number;
    d. Description of services provided by the agency, including areas 
served;
    e. Congressional district(s) where the deployment will take place;
    f. A list of project team organizational members, by organization 
name and address;
    g. A Letter of Commitment from each organizational member of the 
project team;
    h. A description of the technical, legal and financial capacity of 
the applicant and partners to carry out the proposed project;
    i. A description of the project and how it meets the program 
purpose, including any related projects funded under other sources;
    j. A description of the transit bus model(s) proposed, including 
propulsion type, operating ranges, recharging/refueling requirements, 
and whether it qualifies as a zero-emission bus under this notice;
    k. A listing of all greenhouse gas and criteria pollutants that may 
be emitted by the bus;
    l. A description of required support facilities and infrastructure 
in existence, being procured through other programs, and being proposed 
through this program;
    m. A description of the applicant's commitment to deploying a zero-
emission or low emission fleet and how this project contributes to the 
agency's future plans.
    n. A project management plan;
    o. A line-item budget. The budget should be at least for the 
minimum 5 bus deployment and show the source of funds (requested under 
this NOFA, local share, other Federal (identify source)). For projects 
that propose to use LoNo Program funds solely for the incremental 
costs, the applicants' budget should detail the other sources of 
funding supporting the bus procurement. Budgets must also identify the 
amount that is specifically being requested for facilities and 
equipment;
    p. If the project can be scaled, a scaling plan;
    q. A project schedule outlining steps through completion, including 
significant milestones; and
    r. The proposed deployment location(s).

3. Unique Entity Identifier and System for Award Management (SAM)

Registration in Brief
    Registration can take as little as 3-5 business days, but since 
there could be unexpected steps or delays (for example, if you need to 
obtain an Employer Identification Number), FTA recommends allowing 
ample time, up to several weeks, for completion of all steps.
STEP 1: Obtain DUNS Number
    Same day. If requested by phone (1-866-705-5711) DUNS is provided 
immediately. If your organization does not have one, you will need to 
go to the Dun & Bradstreet Web site at http://fedgov.dnb.com/webform to 
obtain the number. *Information for Foreign Registrants. *Webform 
requests take 1-2 business days.
STEP 2: Register With SAM
    Three to five business days or up to two weeks. If you already have 
a TIN, your SAM registration will take 3-5 business days to process. If 
you are applying for an EIN please allow up to two weeks. Ensure that 
your organization is registered with the System for Award Management 
(SAM). If your organization is not, an authorizing official of your 
organization must register.
STEP 3: Username & Password
    Same day. Complete your AOR (Authorized Organization 
Representative) profile on Grants.gov and create your username and 
password. You will need to use your organization's DUNS Number to 
complete this step. https://apply07.grants.gov/apply/OrcRegister.
STEP 4: AOR Authorization
    *Same day. The E-Business Point of Contact (E-Biz POC) at your 
organization must login to Grants.gov to confirm you as an Authorized 
Organization Representative (AOR). Please note that there can be more 
than one AOR for your organization. In some cases the E-Biz POC is also 
the AOR for an organization. *Time depends on responsiveness of your E-
Biz POC.
STEP 5: TRACK AOR STATUS
    At any time, you can track your AOR status by logging in with your 
username and password. Login as an Applicant (enter your username & 
password you

[[Page 57659]]

obtained in Step (3) using the following link: applicant_profile.jsp.

4. Submission Dates and Times

    Project proposals must be submitted electronically through 
GRANTS.GOV by November 23, 2015. Mail and fax submissions will not be 
accepted.

5. Funding Restrictions

    Funds under this NOFA cannot be used to reimburse projects for 
otherwise eligible expenses incurred prior to FTA award of a Grant 
Agreement or Cooperative Agreement unless FTA has issued a ``Letter of 
No Prejudice'' for the project before the expenses are incurred.

6. Other Submission Requirements

    If possible, FTA asks that proposals for bus projects be scalable 
upwards in increments of 1 or 2 transit buses so FTA can allocate all 
available funding under the LoNo Program, including FY 2016 funds if 
these become available and FTA elects to apply them to proposals 
received under this announcement. To help FTA allocate program funding, 
applicants are encouraged to identify how the proposed budgets are 
scalable. In addition, the FTA must allocate a minimum of $3.0 million 
for supporting facilities and related equipment. Therefore, applicants 
are encouraged to include a facilities and related equipment component 
to their proposal with a scalable budget for facilities and equipment. 
This will enable FTA to ensure the $3.0 million minimum can be met with 
a given portfolio of selected projects. Applicants should use the 
separate budget section on the Supplemental Form to itemize any portion 
of the proposed project that is specifically for related facilities and 
equipment.
    All proposals should describe how the proposed project fits with 
long term goals of creating and deploying a zero-emission bus fleet.

E. Application Review

1. Selection Criteria
    The FTA will use the following primary selection criteria when 
evaluating competing projects eligible under this program:
i. Bus Model
    The bus model is a priority consideration of the LoNo program. The 
proposed bus model must receive at least a ``Recommended'' rating for a 
proposal to be recommended for funding.
    a. The proposed bus model will be evaluated on the extent to which 
it has been successfully demonstrated in revenue service but is not yet 
widely deployed in transit agency fleets (meeting the purpose of the 
program) and the quality of the supporting evidence. Note that a bus 
model's transit revenue service demonstration need not take place in 
the United States. The FTA prefers bus models that have been 
successfully demonstrated in the United States, but the documented 
demands of the transit service and the quality of documentation of the 
bus model's performance is more important than whether the 
demonstration took place in the United States.
    b. To meet the requirements of section 5312(d)(5)(F), priority 
consideration will be given to projects that support bus models with 
the greatest reduction in energy consumption and harmful emissions, 
including direct carbon emissions, when compared to other buses. A 
zero-emission bus project, for example, will receive priority 
consideration over a project that proposes buses that produce some 
level of emissions.
    c. The proposed bus model will be evaluated by the status of its 
FTA Bus Testing report; if bus testing is not complete, proposals will 
be evaluated by the demonstrated commitment to complete transit bus 
testing prior to bus delivery.
    d. The proposed bus model will be evaluated by whether there is 
sufficient documentation that it meets Buy-America domestic content 
requirements.
    e. Zero-emission bus technology, while ready for wider deployment, 
is still developing in many respects. It is important that proposed bus 
models advance bus technology that will contribute to the further 
commercialization of zero-emission buses. Therefore proposed bus models 
will be evaluated by the extent to which they advance technology that 
can lead to better or less costly zero-emission buses.

    Note:  If no bus acquisition is being proposed (such as in a 
proposal for facilities and equipment only) all four Bus Model 
criteria (a-d) must still be addressed, describing the bus model 
that the proposed facilities and equipment would support.

ii. Project Effectiveness
    The following four criteria address the likelihood the proposal 
will be effective in meeting critical considerations of the LoNo 
program:
    a. The likelihood the project will result in, or support, the 
successful deployment of at least five largely-identical qualified 
transit buses operating in a single geographic location.
    b. The projected emissions of the proposed transit bus model, 
including greenhouse gas and Criteria (EPA-regulated) emissions.
    c. The extent to which the proposal leverages or expands a fleet of 
zero-emission transit buses.
    d. The extent to which the proposal builds on past or current 
Federally-funded research efforts.
iii. Transit Agency and Community Commitment
    Overcoming the challenges of deploying new technology requires 
leadership and commitment. The FTA seeks both prospective and existing 
operators of clean technology buses who can demonstrate the technical 
capacity and commitment required for sustained successful deployments. 
Transit agencies who are already industry leaders should emphasize and 
demonstrate their commitment to supporting and deploying the cleanest 
and most energy efficient buses available.
    a. Proposals will be evaluated by the extent to which they 
demonstrate the transit agency's and the community's ongoing and long-
term commitment to the deployment of a zero-emission bus fleet.
    b. Transit agencies should highlight their technical capacity and 
commitment for applying the resources necessary for success, including 
how they will train the agency's workforce to support clean bus 
technology. In this regard, proposals will be evaluated by the extent 
to which they demonstrate the transit agency's consideration of, and 
commitment to, workforce development and training in support of zero-
emission technology.
    c. In order to maximize LoNo Program impact, FTA seeks to build on 
existing transit bus procurements, where possible. Therefore, the 
selection process will prioritize proposals that leverage other funds 
such that LoNo Program funds are used to cover only the incremental 
cost of procuring the proposed transit bus model above that of a more 
conventional higher-emission transit bus. Therefore proposals will be 
evaluated by the extent to which they offer a method to use program 
funds to cover only the incremental cost of the proposed bus model or 
facility over the cost of a transit bus or facility of a more widely 
deployed propulsion system.
iv. Safety
    Safety considerations are critical in the deployment of new 
technology, to ensure public and worker safety and to protect public 
and private investment. Therefore proposals will be evaluated

[[Page 57660]]

by the extent to which they demonstrate an understanding of, and make 
accommodation for, the safety considerations of the proposed bus 
technology.
v. Technical Capacity
    To reduce project risk, the following criteria will assist FTA to 
determine the technical capacity of the project team:
    a. The extent to which the proposal identifies by name a 
comprehensive project team, including transit agencies, bus 
manufacturers, and facilities providers, as well as systems 
integrators, and project management consultants.
    The FTA encourages the use of experienced project management 
consultants on project teams especially if the transit agency involved 
lacks experience with the technology being proposed. In the event that 
an applicant or transit agency has a pending procurement or an open 
procurement for the same type of transit bus that qualifies under this 
NOFA and the agency wishes to expand the procurement through the LoNo 
Program, FTA recognizes that identifying all project team members could 
contradict or delay the procurement process. Therefore, identifying all 
project team members is not required. Applicants in this or similar 
situations are strongly encouraged to apply and in such case the lack 
of identified team members will not be penalized by FTA. Instead, the 
applicant should cite the procurement as evidence of ongoing interest 
and commitment. This clarification applies to procurements of vehicles 
that qualify under this NOFA.
    b. The extent to which the proposal identifies and demonstrates the 
technical capacity and commitment of agencies, partners or teams with 
expertise in the sustained successful deployment of similar projects or 
propulsion technologies.
vi. Project Management
    The applicant must demonstrate the capacity to carry out the 
project through a project management plan that shows:
    a. The applicant is in a fundable status for the FTA grant award;
    b. A viable project approach, budget, and schedule;
    c. There are no outstanding legal, technical, or financial issues 
with the applicant that would make this a high-risk project;
    d. The source(s) of local share and that the funds are available 
for prompt project implementation if selected; and,
    e. The applicant has the ability and commitment to collect 
information and document the results of the project as part of an FTA 
project evaluation effort.

2. Review and Selection Process

    A technical evaluation committee comprised of FTA staff and 
representatives of other collaborative government agencies will review 
project proposals against the described evaluation criteria. The 
technical evaluation committee reserves the right to evaluate proposals 
it receives and to seek clarification from any proposer about any 
statement that is made in a proposal that FTA finds ambiguous. The FTA 
may also request additional documentation or information to be 
considered during the evaluation process. After the evaluation of all 
eligible proposals, the technical evaluation committee will provide 
project recommendations to the FTA Administrator. The FTA Administrator 
will determine the final list of project selections, and the amount of 
funding for each project. To better evaluate technologies in a variety 
of conditions and locales, FTA may select a portfolio of geographically 
diverse projects.

F. Federal Award Administration

1. Federal Award Notice

    Subsequent to an announcement by the FTA Administrator of the final 
project selections posted on the FTA Web site, FTA will publish a list 
of the selected projects, including Federal dollar amounts and 
recipients. Project recipients should contact their FTA Regional 
Offices for information about setting up grant agreements with FTA.

2. Award Administration

    Successful proposals will be awarded through FTA's Transit Award 
Management System (TrAMS) as either Cooperative Agreements or Grant 
Agreements, at FTA's discretion. Proposals that expand existing 
procurements will likely be handled consistently with the agreement 
supporting the existing procurement. The appropriate FTA Regional 
Office in consultation with the FTA Research Office will manage project 
agreements.
    Applicants must sign and submit current Certifications and 
Assurances before FTA may award funding under a Cooperative Agreement 
or Grant Agreement for a competitively selected project. If the 
applicant has already submitted the annual Certifications and 
Assurances for the fiscal year in which the award will be made in 
TrAMS, they do not need to be resubmitted.
    To enhance the value of the portfolio of the projects to be 
implemented, FTA reserves the right to request an adjustment of the 
project scope and budget of any proposal selected for funding. Such 
adjustments shall not constitute a material alteration of any aspect of 
the proposal that influenced the proposal evaluation or decision to 
fund the project.
    The FTA considers the competitive nature of LoNo Program proposal 
selection to constitute adequate competition for the purpose of 
satisfying third-party contracting requirements applicable to the 
procurement of proposed transit bus models by selected applicants. The 
FTA makes this determination with respect to the funding provided 
through this NOFA and any other Federal funds that may be involved in 
the selected LoNo bus acquisition proposal.
    Further, FTA reserves the right to name any or all proposed project 
team members as a ``Key Party'' and to make any award conditional upon 
the participation of the ``Key Party.'' A ``Key Party'' is essential to 
the project as approved by FTA and, is, therefore, eligible for a 
noncompetitive award by the project sponsor to provide the goods or 
services described in the proposal. Participation by members of the 
``Key Party'' on a selected project may not later be substituted 
without FTA's approval.

3. Administrative and National Policy Requirements

    Except as otherwise provided in this NOFA, grants or cooperative 
agreements are subject to the requirements of 49 U.S.C. 5307 as 
described in the latest FTA Circular 9030.1 for the Urbanized Area 
Formula Program. Additionally, under the LoNo Program FTA may, at its 
discretion, consider exceptions to assist in the commercialization of 
zero-emission bus technology, such as modifying spare ratio or useful 
life requirements. The FTA will not consider any requests for bus 
testing waivers.
    All transit buses and related infrastructure and facilities under 
the LoNo Program must be Buy-America compliant pursuant to 49 U.S.C. 
5323(j) and its implementing regulations. The FTA will not consider any 
Buy America waivers under the LoNo Program.

4. Reporting

    The legislation that created the LoNo Program requires FTA to 
evaluate all projects in the program. Therefore, the applicant must 
agree to participate and cooperate with FTA project evaluation 
activity. Evaluation activity that FTA expects applicants to perform 
includes collecting and providing raw, unaltered vehicle performance 
and maintenance

[[Page 57661]]

data, meeting with FTA evaluators or FTA's evaluation representative on 
a quarterly basis, and providing evaluators access to the project site 
and to project team members, when requested by FTA. The FTA Research 
Office is sensitive to the importance of proprietary information and 
has a successful record of accommodating those concerns.

G. Federal Awarding Agency Contacts

    For further information concerning this notice please contact the 
(LoNo) Program staff via email at [email protected], or call Sean 
Ricketson at 202-366-6678. A TDD is available for individuals who are 
deaf or hard of hearing at 1-800-877-8339. In addition, DOT will post 
answers to questions and requests for clarifications on DOT's Web site 
at www.fta.dot.gov. To ensure applicants receive accurate information 
about eligibility or the program, the applicant is encouraged to 
contact DOT directly, rather than through intermediaries or third 
parties, with questions. DOT staff may also conduct briefings on the 
LoNo program discretionary grants selection and award process upon 
request.

H. Other Information

    The applicant assures that it will comply with all applicable 
Federal statutes, regulations, executive orders, FTA Circulars, and 
other Federal administrative requirements in carrying out any project 
supported by the FTA agreement. The applicant acknowledges that it is 
under a continuing obligation to comply with the terms and conditions 
of the agreement executed with FTA for its project. The applicant 
understands that Federal laws, regulations, policies, and 
administrative practices might be modified from time to time and may 
affect the implementation of the project. The applicant agrees that the 
most recent Federal requirements will apply to the project, unless FTA 
issues a written determination otherwise.

Matthew J. Welbes,
Executive Director.
[FR Doc. 2015-24231 Filed 9-23-15; 8:45 am]
BILLING CODE P



                                              57656                    Federal Register / Vol. 80, No. 185 / Thursday, September 24, 2015 / Notices

                                              F. Federal Award Administration                         that are accepted by industry practice                the application process before the
                                              Information                                             and standards, to the extent possible. If             submission deadline. Instructions for
                                                                                                      the application includes information                  applying can be found on FTA’s Web
                                              1. Federal Award Notices
                                                                                                      you consider to be a trade secret or                  site at http://www.fta.dot.gov/grants/
                                                 After FHWA has selected the                          confidential commercial or financial                  13077.html and in the ‘‘find’’ module of
                                              proposals to be funded, it will notify                  information, the applicant should do the              grants.gov. Mail and fax submissions
                                              successful applicants by email or                       following: (1) Note on the front cover                will not be accepted.
                                              telephone of their status. In addition,                 that the submission ‘‘Contains                        FOR FURTHER INFORMATION CONTACT:
                                              FHWA will publish a notice in the                       Confidential Business Information                     Sean Ricketson, FTA Office of Research
                                              Federal Register announcing successful                  (CBI)’’; (2) mark each affected page                  Demonstration and Innovation, 202–
                                              applicants. Upon notification of intent                 ‘‘CBI’’; and (3) highlight or otherwise               366–6678 or sean.ricketson@dot.gov.
                                              to award funds, FHWA may withdraw                       denote the CBI portions.                              SUPPLEMENTARY INFORMATION:
                                              its offer to provide Federal assistance if                 The FHWA protects such information
                                              the recipient or subrecipient does not                  from disclosure to the extent allowed                 Table of Contents
                                              commence its competitive process to                     under applicable law. In the event                    A. Program Description
                                              solicit partners and/or consultants                     FHWA receives a Freedom of                            B. Federal Award Information
                                              consistent with its proposal submission                 Information Act (FOIA) request for the                C. Eligibility Information
                                              within 90 days following the date of the                information, FHWA will follow the                     D. Application and Submission Information
                                              offer.                                                  procedures described in its FOIA                      E. Application Review
                                                                                                      regulations at 49 CFR 7.17. Only                      F. Federal Award Administration
                                              2. Administrative and National Policy                                                                         G. Federal Awarding Agency Contacts
                                              Requirements                                            information that is ultimately
                                                                                                      determined to be confidential under that              A. Program Description
                                                 All awards will be administered
                                                                                                      procedure will be exempt from
                                              pursuant to the Uniform Administrative                                                                          The Low and No Emission Vehicle
                                                                                                      disclosure under FOIA.
                                              Requirements, Cost Principles, and                                                                            Deployment (LoNo) Program provides
                                              Audit Requirements for Federal Awards                     Authority: 23 U.S.C. 140(b).                        funding for transit agencies for capital
                                              found in 2 CFR part 200. Applicable                       Issued: September 18, 2015.                         acquisitions and leases of zero-emission
                                              Federal laws, rules, and regulations set                Gregory G. Nadeau,                                    and low-emission transit buses,
                                              forth in title 23, U.S.C., and title 23 of              Administrator, Federal Highway                        including acquisition, construction, and
                                              the CFR, apply.                                         Administration.                                       leasing of required supporting facilities
                                                 The successful applicant shall grant                 [FR Doc. 2015–24245 Filed 9–23–15; 8:45 am]           such as recharging, refueling, and
                                              FHWA, upon request, the right of access                                                                       maintenance facilities.
                                                                                                      BILLING CODE 4910–22–P
                                              to all records and the right to audit all                                                                       The main purpose of the LoNo
                                              aspects of the project.                                                                                       Program is to deploy the cleanest and
                                                 The successful applicant, and all                    DEPARTMENT OF TRANSPORTATION                          most energy efficient U.S.-made transit
                                              partners and consultants shall be                                                                             buses that have been largely proven in
                                              required to submit non-collusion                        Federal Transit Administration                        testing and demonstrations but are not
                                              certifications.                                                                                               yet widely deployed in transit fleets.
                                                                                                      FY15 Discretionary Funding                            The LoNo Program is a capital program
                                              3. Reporting
                                                                                                      Opportunity: Low or No Emission                       focused on deploying new production
                                                 The FHWA requires the successful                     Vehicle Deployment Program (LoNo)                     vehicles that are market-ready or near
                                              applicant to submit quarterly written                   Program                                               market-ready. It is not a program for
                                              reports to FHWA, containing statistical                                                                       designing and developing prototypes.
                                              data and narrative sufficient to evaluate               AGENCY: Federal Transit Administration
                                                                                                                                                            The program gives priority
                                              the progress of the project and to                      (FTA), DOT.
                                                                                                                                                            consideration to the deployment of
                                              identify any problems. The FHWA also                    ACTION: Notice of Funding Availability                buses with the lowest energy
                                              requires the successful applicant to                    (NOFA) and for Request for Proposals                  consumption and least harmful
                                              submit a detailed final report at the                   (RFP).                                                emissions, including direct carbon
                                              project end, containing statistical data                                                                      emissions.
                                              and narrative sufficient to evaluate                    SUMMARY:   The Federal Transit
                                              whether the project met its projected                   Administration (FTA) announces the                    B. Federal Award Information
                                              outcomes.                                               availability of $22.5 million of Fiscal                  The Moving Ahead for Progress in the
                                                                                                      Year (FY) 2015 funds for the                          21st Century Act (MAP–21), Public Law
                                              G. Federal Awarding Agency Contacts                     deployment of low or no emission                      112–141, July 6, 2012, amended 49
                                                For general program information,                      transit buses. Of that amount, a                      U.S.C. 5312 to add a new paragraph
                                              please use the contact information in                   minimum of $3.0 million is available for              (d)(5) authorizing FTA to make grants to
                                              the front of this notice. Please contact                supporting facilities and related                     finance eligible projects under the ‘‘Low
                                              the grants.gov helpdesk for assistance                  equipment. If additional funding is                   or No Emission Vehicle Deployment
                                              with electronic applications via email at               appropriated for this program in FY                   Program’’ (LoNo Program).
                                              support@grants.gov or call toll-free at                 2016, FTA may, at its discretion, also                   The Consolidated and Further
                                              (800) 518–4726.                                         make those funds available under this                 Continuing Appropriations Act, 2015
                                                                                                      announcement.                                         (FY 2015 Appropriations) Public Law
                                              H. Other Information
tkelley on DSK3SPTVN1PROD with NOTICES




                                                                                                      DATES:  Complete proposals must be                    113–235, December 16, 2014, has made
                                              1. Protection of Confidential Business                  submitted electronically through the                  available $22.5 million in FY 2015 to
                                              Information                                             grants.gov ‘‘Apply’’ function by                      carry out the LoNo Program. Of that
                                                 All information submitted as part of                 November 23, 2015. Prospective                        amount, a minimum of $3.0 million is
                                              or in support of any application shall                  applicants should initiate the process by             available for supporting facilities and
                                              use publicly available data or data that                registering on the GRANTS.GOV Web                     related equipment. Given that projects
                                              can be made public and methodologies                    site promptly to ensure completion of                 must be competitively selected pursuant


                                         VerDate Sep<11>2014   16:45 Sep 23, 2015   Jkt 235001   PO 00000   Frm 00090   Fmt 4703   Sfmt 4703   E:\FR\FM\24SEN1.SGM   24SEN1


                                                                       Federal Register / Vol. 80, No. 185 / Thursday, September 24, 2015 / Notices                                          57657

                                              to 49 U.S.C. 5312(d)(5)(E), if additional               Federal Government’s participation in                 that produces lower non-methane
                                              funding is appropriated for this program                the costs of leasing or acquiring a transit           hydrocarbons (NMHC) and oxides of
                                              in FY 2016, FTA may, at its discretion,                 bus financed under the LoNo Program is                nitrogen (NOX) than are legally
                                              apply those funds to either scale up                    limited to 85 percent of the total transit            permitted under EPA’s engine standards
                                              selections made under this                              bus cost. The proposer may seek a lower               at 49 CFR part 86.
                                              announcement, or to fund meritorious                    Federal contribution.                                    All transit buses proposed for
                                              proposals that were not selected for lack                  Further, the Federal Government’s                  deployment under the LoNo Program
                                              of FY 2015 funding.                                     participation in the cost of leasing or               must complete current FTA bus testing
                                                                                                      acquiring transit bus-related equipment               for production transit buses pursuant to
                                              C. Eligibility Information                              and facilities under the LoNo Program is              49 U.S.C. 5318. The FTA will only
                                              1. Eligible Applicants                                  limited to 90 percent of the net project              evaluate proposals for production
                                                                                                      cost of the equipment or facilities                   transit buses that have either completed
                                                 The FTA will consider projects from                                                                        testing or will be tested prior to
                                              eligible applicants located in eligible                 attributable to compliance with the
                                                                                                      Clean Air Act.                                        deployment. The LoNo Program is not a
                                              areas, as defined in 49 U.S.C 5312(d).                                                                        platform for the development of
                                                                                                         The Federal Share is limited to 80
                                              Eligible areas are limited to non-                                                                            prototypes.
                                                                                                      percent for the cost of equipment and
                                              attainment and maintenance areas.
                                                                                                      facilities not attributable to compliance             D. Application and Submission
                                              Specifically, an eligible area is defined
                                                                                                      with the Clean Air Act. Again, the                    Information
                                              as an area that is:
                                                                                                      proposer may seek a lower Federal
                                                 (i) Designated as a nonattainment area                                                                     1. Address To Request Application
                                                                                                      contribution.
                                              for ozone or carbon monoxide under                                                                            Package
                                                                                                         Therefore, at a minimum, the
                                              section 107(d) of the Clean Air Act (42
                                                                                                      proposer must provide at least 15                        A complete proposal submission will
                                              U.S.C. 7407(d)); or
                                                                                                      percent of the cost of all transit bus                consist of at least two files: (1) The
                                                 (ii) A maintenance area, as defined in
                                                                                                      acquisitions and 10 percent of the cost               SF424 Mandatory form (downloaded
                                              section 5303, for ozone or carbon
                                                                                                      for all related equipment and facilities.             from GRANTS.GOV) and (2) the
                                              monoxide.
                                                 Eligible applicants and recipients                   3. Eligible Projects                                  Applicant and Proposal Profile
                                              under this program are limited to                                                                             supplemental form for LoNo funding
                                                                                                         The following projects are eligible for            (Supplemental Form) found on
                                              designated recipients in eligible areas                 funding, in accordance with section
                                              over 200,000 in population and State                                                                          grants.gov and the FTA Web site by
                                                                                                      5312(d)(5)(A)(ii):                                    clicking (or copying and pasting) the
                                              Departments of Transportation (DOTs)                       (i) Acquiring or leasing low or no
                                              for eligible areas under 200,000 in                                                                           LoNo Program link at http://
                                                                                                      emission transit buses;
                                              population. State DOTs must apply for                                                                         www.fta.dot.gov/grants/13077.html. The
                                                                                                         (ii) Constructing or leasing facilities
                                              and administer the proposal and if                                                                            Supplemental Form provides guidance
                                                                                                      and related equipment for low or no
                                              selected, subsequent grant, for projects                                                                      and a consistent format for proposers to
                                                                                                      emission transit buses;
                                              located in eligible areas under 200,000                    (iii) Constructing new public                      respond to the criteria outlined in this
                                              in population.                                          transportation facilities to accommodate              NOFA.
                                                 For more information about                           low or no emission transit buses; or,                 2. Content and Form of Application
                                              Designated Recipients, please see FTA                      (iv) Rehabilitating or improving                   Submission
                                              Circular 9030.1E, ‘‘Urbanized Area                      existing public transportation facilities
                                              Formula Program: Program Guidance                       to accommodate low or no emission                     (i) Proposal Submission
                                              and Application Instructions’’, January                 transit buses.                                           A complete proposal submission
                                              16, 2014, Chapter II, which can be found                                                                      consists of a minimum of two forms:
                                              on FTA’s Web site in its Law Library.                   4. Eligible Vehicles                                  The SF424 Mandatory Form and the
                                              For information about non-attainment                       Proposals for bus acquisitions should              Supplemental Form. The Supplemental
                                              and maintenance areas, please visit the                 result in the deployment of at least five             Form must be placed in the attachments
                                              Environmental Protection                                (5) new transit buses per location.                   section of the SF424 Mandatory Form.
                                              Administration’s Greenbook, at http://                  Proposals for supporting facilities                   Proposers must use the Supplemental
                                              www.epa.gov/airquality/greenbook/.                      should support at least five (5) buses.               Form designated for the LoNo Program
                                                 Eligible applicants may apply on                     Buses must be largely identical. To be                and attach it to the submission in
                                              behalf of eligible subrecipients, to                    eligible, vehicles must be production                 GRANTS.GOV to successfully complete
                                              include other public transportation                     transit buses used to provide public                  the application process.
                                              providers, tribes, and a project team                   transportation and meet either the zero-                 A proposal submission may contain
                                              member identified in the proposal and                   emission bus, or the low emission bus                 additional supporting documentation as
                                              deemed a ‘‘Key Party’’ by FTA. Project                  definition below.                                     attachments. If an applicant elects to
                                              teams may include consultants,                             For the purposes of this solicitation,             attach an additional proposal narrative,
                                              manufacturers, vendors, systems                         a zero-emission transit bus is defined as             it must not exceed 10 numbered pages.
                                              integrators and facilities providers.                   a bus that produces no direct carbon                  Submissions must be presentable and
                                              Tribes and other FTA direct recipients                  emissions and no particulate matter                   use standard fonts, font sizing, and at
                                              should work with State DOTs or eligible                 emissions under any and all possible                  least one-inch margins so the
                                              designated recipients in their area to                  operational modes and conditions. A                   information can easily be read by the
                                              apply on their behalf.                                  hydrogen fuel-cell bus qualifies as a                 reviewers.
tkelley on DSK3SPTVN1PROD with NOTICES




                                                                                                      zero-emission bus. A battery-electric bus                Within 48 hours after submitting an
                                              2. Cost Sharing or Matching                             qualifies as a zero-emission transit bus.             electronic application, the applicant
                                                 The FTA has determined that all                      A zero-emission bus and a no emission                 should receive three email messages
                                              eligible expenses under this program are                bus are the same.                                     from grants.gov: (1) Confirmation of
                                              attributable to compliance with the                        For the purposes of this solicitation,             successful transmission to grants.gov,
                                              Clean Air Act. Therefore under the                      a low emission bus is defined as any                  (2) confirmation of successful validation
                                              provisions of 49 U.S.C. 5323(i) the                     transit bus that is powered by an engine              by grants.gov, and (3) confirmation of


                                         VerDate Sep<11>2014   16:45 Sep 23, 2015   Jkt 235001   PO 00000   Frm 00091   Fmt 4703   Sfmt 4703   E:\FR\FM\24SEN1.SGM   24SEN1


                                              57658                    Federal Register / Vol. 80, No. 185 / Thursday, September 24, 2015 / Notices

                                              successful validation by FTA. If                        and ensure that the federal and local                   q. A project schedule outlining steps
                                              confirmations of successful validation                  amounts specified are consistent.                     through completion, including
                                              are not received or a notice of failed                                                                        significant milestones; and
                                                                                                      (ii) Application Content                                r. The proposed deployment
                                              validation or incomplete materials is
                                              received, the applicant must address the                   The SF424 Mandatory Form and the                   location(s).
                                              reason for the failed validation, as                    Supplemental Form will prompt
                                                                                                      applicants for the required information,              3. Unique Entity Identifier and System
                                              described in the email notice, and                                                                            for Award Management (SAM)
                                              resubmit before the submission                          including:
                                              deadline. If making a resubmission for                     a. Applicant name;                                 Registration in Brief
                                              any reason, include all original                           b. Dun and Bradstreet (D&B) Data
                                                                                                      Universal Numbering System (DUNS)                       Registration can take as little as 3–5
                                              attachments regardless of which                                                                               business days, but since there could be
                                              attachments were updated and check                      number if available. (Note: If selected,
                                                                                                      applicant will be required to provide                 unexpected steps or delays (for
                                              the box on the supplemental form                                                                              example, if you need to obtain an
                                              indicating this is a resubmission.                      DUNS number prior to award);
                                                                                                         c. Key contact information (including              Employer Identification Number), FTA
                                                 The FTA urges proposers to submit                    contact name, address, email address,                 recommends allowing ample time, up to
                                              applications at least 72 hours prior to                 phone and fax number;                                 several weeks, for completion of all
                                              the due date to allow time to receive the                  d. Description of services provided by             steps.
                                              validation messages and to correct any                  the agency, including areas served;
                                              problems that may have caused a                                                                               STEP 1: Obtain DUNS Number
                                                                                                         e. Congressional district(s) where the
                                              rejection notification. The FTA will not                deployment will take place;                             Same day. If requested by phone (1–
                                              accept submissions after the stated                        f. A list of project team organizational           866–705–5711) DUNS is provided
                                              deadline. Grants.gov scheduled                          members, by organization name and                     immediately. If your organization does
                                              maintenance and outage times are                        address;                                              not have one, you will need to go to the
                                              announced on the grants.gov Web site.                      g. A Letter of Commitment from each                Dun & Bradstreet Web site at http://
                                              Deadlines will not be extended due to                   organizational member of the project                  fedgov.dnb.com/webform to obtain the
                                              scheduled Web site maintenance.                         team;                                                 number. *Information for Foreign
                                                 Proposers are encouraged to begin the                   h. A description of the technical, legal           Registrants. *Webform requests take 1–
                                              process of registration on the grants.gov               and financial capacity of the applicant               2 business days.
                                              site well in advance of the submission                  and partners to carry out the proposed
                                                                                                                                                            STEP 2: Register With SAM
                                              deadline. Registration is a multi-step                  project;
                                              process, which may take several weeks                      i. A description of the project and                   Three to five business days or up to
                                              to complete before an application can be                how it meets the program purpose,                     two weeks. If you already have a TIN,
                                              submitted. Registered proposers may                     including any related projects funded                 your SAM registration will take 3–5
                                              still be required to take steps to keep                 under other sources;                                  business days to process. If you are
                                              their registration up to date before                       j. A description of the transit bus                applying for an EIN please allow up to
                                              submissions can be made successfully:                   model(s) proposed, including                          two weeks. Ensure that your
                                              (1) Registration in the System for Award                propulsion type, operating ranges,                    organization is registered with the
                                              Management (SAM) is renewed                             recharging/refueling requirements, and                System for Award Management (SAM).
                                              annually; and, (2) persons making                       whether it qualifies as a zero-emission               If your organization is not, an
                                              submissions on behalf of the Authorized                 bus under this notice;                                authorizing official of your organization
                                                                                                         k. A listing of all greenhouse gas and             must register.
                                              Organization Representative (AOR)
                                                                                                      criteria pollutants that may be emitted
                                              must be authorized in grants.gov by the                                                                       STEP 3: Username & Password
                                                                                                      by the bus;
                                              AOR to make submissions. Instructions                      l. A description of required support                 Same day. Complete your AOR
                                              on the grants.gov registration process                  facilities and infrastructure in existence,           (Authorized Organization
                                              are provided in the Appendix.                           being procured through other programs,                Representative) profile on Grants.gov
                                                 Applicants that submit multiple                      and being proposed through this                       and create your username and
                                              projects in one proposal must be sure to                program;                                              password. You will need to use your
                                              clearly define each project by                             m. A description of the applicant’s                organization’s DUNS Number to
                                              completing a separate Supplemental                      commitment to deploying a zero-                       complete this step. https://
                                              Form for each project.                                  emission or low emission fleet and how                apply07.grants.gov/apply/OrcRegister.
                                                 Information such as proposer name,                   this project contributes to the agency’s
                                              Federal amount requested, local match                   future plans.                                         STEP 4: AOR Authorization
                                              amount, description of areas served, etc.                  n. A project management plan;                        *Same day. The E-Business Point of
                                              may be requested in varying degrees of                     o. A line-item budget. The budget                  Contact (E-Biz POC) at your
                                              detail on both the SF424 form and                       should be at least for the minimum 5                  organization must login to Grants.gov to
                                              Supplemental Form. Proposers must fill                  bus deployment and show the source of                 confirm you as an Authorized
                                              in all fields unless stated otherwise on                funds (requested under this NOFA, local               Organization Representative (AOR).
                                              the forms. The Supplemental Form                        share, other Federal (identify source)).              Please note that there can be more than
                                              template supports pasting copied text                   For projects that propose to use LoNo                 one AOR for your organization. In some
                                              from other documents; applicants                        Program funds solely for the                          cases the E-Biz POC is also the AOR for
                                              should verify that pasted text is fully                 incremental costs, the applicants’                    an organization. *Time depends on
tkelley on DSK3SPTVN1PROD with NOTICES




                                              captured on the Supplemental Form and                   budget should detail the other sources                responsiveness of your E-Biz POC.
                                              has not been truncated by the character                 of funding supporting the bus
                                              limits built into the form. Proposers                   procurement. Budgets must also identify               STEP 5: TRACK AOR STATUS
                                              should use both the ‘‘Check Package for                 the amount that is specifically being                   At any time, you can track your AOR
                                              Errors’’ and the ‘‘Validate Form’’                      requested for facilities and equipment;               status by logging in with your username
                                              validation buttons on both forms to                        p. If the project can be scaled, a                 and password. Login as an Applicant
                                              check all required fields on the forms,                 scaling plan;                                         (enter your username & password you


                                         VerDate Sep<11>2014   16:45 Sep 23, 2015   Jkt 235001   PO 00000   Frm 00092   Fmt 4703   Sfmt 4703   E:\FR\FM\24SEN1.SGM   24SEN1


                                                                       Federal Register / Vol. 80, No. 185 / Thursday, September 24, 2015 / Notices                                            57659

                                              obtained in Step (3) using the following                revenue service but is not yet widely                   b. The projected emissions of the
                                              link: applicant_profile.jsp.                            deployed in transit agency fleets                     proposed transit bus model, including
                                                                                                      (meeting the purpose of the program)                  greenhouse gas and Criteria (EPA-
                                              4. Submission Dates and Times
                                                                                                      and the quality of the supporting                     regulated) emissions.
                                                 Project proposals must be submitted                  evidence. Note that a bus model’s transit               c. The extent to which the proposal
                                              electronically through GRANTS.GOV by                    revenue service demonstration need not                leverages or expands a fleet of zero-
                                              November 23, 2015. Mail and fax                         take place in the United States. The FTA              emission transit buses.
                                              submissions will not be accepted.                       prefers bus models that have been                       d. The extent to which the proposal
                                              5. Funding Restrictions                                 successfully demonstrated in the United               builds on past or current Federally-
                                                                                                      States, but the documented demands of                 funded research efforts.
                                                 Funds under this NOFA cannot be                      the transit service and the quality of
                                              used to reimburse projects for otherwise                                                                      iii. Transit Agency and Community
                                                                                                      documentation of the bus model’s                      Commitment
                                              eligible expenses incurred prior to FTA
                                                                                                      performance is more important than
                                              award of a Grant Agreement or                                                                                    Overcoming the challenges of
                                                                                                      whether the demonstration took place in
                                              Cooperative Agreement unless FTA has                                                                          deploying new technology requires
                                                                                                      the United States.
                                              issued a ‘‘Letter of No Prejudice’’ for the                                                                   leadership and commitment. The FTA
                                                                                                         b. To meet the requirements of section
                                              project before the expenses are incurred.                                                                     seeks both prospective and existing
                                                                                                      5312(d)(5)(F), priority consideration
                                              6. Other Submission Requirements                        will be given to projects that support                operators of clean technology buses who
                                                                                                      bus models with the greatest reduction                can demonstrate the technical capacity
                                                 If possible, FTA asks that proposals                                                                       and commitment required for sustained
                                              for bus projects be scalable upwards in                 in energy consumption and harmful
                                                                                                      emissions, including direct carbon                    successful deployments. Transit
                                              increments of 1 or 2 transit buses so                                                                         agencies who are already industry
                                              FTA can allocate all available funding                  emissions, when compared to other
                                                                                                      buses. A zero-emission bus project, for               leaders should emphasize and
                                              under the LoNo Program, including FY                                                                          demonstrate their commitment to
                                              2016 funds if these become available                    example, will receive priority
                                                                                                      consideration over a project that                     supporting and deploying the cleanest
                                              and FTA elects to apply them to                                                                               and most energy efficient buses
                                              proposals received under this                           proposes buses that produce some level
                                                                                                      of emissions.                                         available.
                                              announcement. To help FTA allocate                                                                               a. Proposals will be evaluated by the
                                              program funding, applicants are                            c. The proposed bus model will be
                                                                                                                                                            extent to which they demonstrate the
                                              encouraged to identify how the                          evaluated by the status of its FTA Bus
                                                                                                                                                            transit agency’s and the community’s
                                              proposed budgets are scalable. In                       Testing report; if bus testing is not
                                                                                                                                                            ongoing and long-term commitment to
                                              addition, the FTA must allocate a                       complete, proposals will be evaluated
                                                                                                                                                            the deployment of a zero-emission bus
                                              minimum of $3.0 million for supporting                  by the demonstrated commitment to
                                                                                                                                                            fleet.
                                              facilities and related equipment.                       complete transit bus testing prior to bus                b. Transit agencies should highlight
                                              Therefore, applicants are encouraged to                 delivery.                                             their technical capacity and
                                              include a facilities and related                           d. The proposed bus model will be                  commitment for applying the resources
                                              equipment component to their proposal                   evaluated by whether there is sufficient              necessary for success, including how
                                              with a scalable budget for facilities and               documentation that it meets Buy-                      they will train the agency’s workforce to
                                              equipment. This will enable FTA to                      America domestic content requirements.                support clean bus technology. In this
                                              ensure the $3.0 million minimum can                        e. Zero-emission bus technology,                   regard, proposals will be evaluated by
                                              be met with a given portfolio of selected               while ready for wider deployment, is                  the extent to which they demonstrate
                                              projects. Applicants should use the                     still developing in many respects. It is              the transit agency’s consideration of,
                                              separate budget section on the                          important that proposed bus models                    and commitment to, workforce
                                              Supplemental Form to itemize any                        advance bus technology that will                      development and training in support of
                                              portion of the proposed project that is                 contribute to the further                             zero-emission technology.
                                              specifically for related facilities and                 commercialization of zero-emission                       c. In order to maximize LoNo Program
                                              equipment.                                              buses. Therefore proposed bus models                  impact, FTA seeks to build on existing
                                                 All proposals should describe how                    will be evaluated by the extent to which              transit bus procurements, where
                                              the proposed project fits with long term                they advance technology that can lead                 possible. Therefore, the selection
                                              goals of creating and deploying a zero-                 to better or less costly zero-emission                process will prioritize proposals that
                                              emission bus fleet.                                     buses.                                                leverage other funds such that LoNo
                                              E. Application Review                                     Note: If no bus acquisition is being                Program funds are used to cover only
                                                                                                      proposed (such as in a proposal for facilities        the incremental cost of procuring the
                                              1. Selection Criteria                                   and equipment only) all four Bus Model                proposed transit bus model above that
                                                 The FTA will use the following                       criteria (a–d) must still be addressed,               of a more conventional higher-emission
                                                                                                      describing the bus model that the proposed
                                              primary selection criteria when                                                                               transit bus. Therefore proposals will be
                                                                                                      facilities and equipment would support.
                                              evaluating competing projects eligible                                                                        evaluated by the extent to which they
                                              under this program:                                     ii. Project Effectiveness                             offer a method to use program funds to
                                                                                                                                                            cover only the incremental cost of the
                                              i. Bus Model                                               The following four criteria address the            proposed bus model or facility over the
                                                 The bus model is a priority                          likelihood the proposal will be effective             cost of a transit bus or facility of a more
                                              consideration of the LoNo program. The                  in meeting critical considerations of the             widely deployed propulsion system.
tkelley on DSK3SPTVN1PROD with NOTICES




                                              proposed bus model must receive at                      LoNo program:
                                              least a ‘‘Recommended’’ rating for a                       a. The likelihood the project will                 iv. Safety
                                              proposal to be recommended for                          result in, or support, the successful                   Safety considerations are critical in
                                              funding.                                                deployment of at least five largely-                  the deployment of new technology, to
                                                 a. The proposed bus model will be                    identical qualified transit buses                     ensure public and worker safety and to
                                              evaluated on the extent to which it has                 operating in a single geographic                      protect public and private investment.
                                              been successfully demonstrated in                       location.                                             Therefore proposals will be evaluated


                                         VerDate Sep<11>2014   16:45 Sep 23, 2015   Jkt 235001   PO 00000   Frm 00093   Fmt 4703   Sfmt 4703   E:\FR\FM\24SEN1.SGM   24SEN1


                                              57660                    Federal Register / Vol. 80, No. 185 / Thursday, September 24, 2015 / Notices

                                              by the extent to which they demonstrate                 document the results of the project as                adjustment of the project scope and
                                              an understanding of, and make                           part of an FTA project evaluation effort.             budget of any proposal selected for
                                              accommodation for, the safety                                                                                 funding. Such adjustments shall not
                                                                                                      2. Review and Selection Process
                                              considerations of the proposed bus                                                                            constitute a material alteration of any
                                              technology.                                                A technical evaluation committee                   aspect of the proposal that influenced
                                                                                                      comprised of FTA staff and                            the proposal evaluation or decision to
                                              v. Technical Capacity                                   representatives of other collaborative                fund the project.
                                                 To reduce project risk, the following                government agencies will review project                  The FTA considers the competitive
                                              criteria will assist FTA to determine the               proposals against the described                       nature of LoNo Program proposal
                                              technical capacity of the project team:                 evaluation criteria. The technical                    selection to constitute adequate
                                                 a. The extent to which the proposal                  evaluation committee reserves the right               competition for the purpose of satisfying
                                              identifies by name a comprehensive                      to evaluate proposals it receives and to              third-party contracting requirements
                                              project team, including transit agencies,               seek clarification from any proposer                  applicable to the procurement of
                                              bus manufacturers, and facilities                       about any statement that is made in a                 proposed transit bus models by selected
                                              providers, as well as systems                           proposal that FTA finds ambiguous. The                applicants. The FTA makes this
                                              integrators, and project management                     FTA may also request additional                       determination with respect to the
                                              consultants.                                            documentation or information to be                    funding provided through this NOFA
                                                 The FTA encourages the use of                        considered during the evaluation                      and any other Federal funds that may be
                                              experienced project management                          process. After the evaluation of all                  involved in the selected LoNo bus
                                              consultants on project teams especially                 eligible proposals, the technical                     acquisition proposal.
                                              if the transit agency involved lacks                    evaluation committee will provide                        Further, FTA reserves the right to
                                              experience with the technology being                    project recommendations to the FTA                    name any or all proposed project team
                                              proposed. In the event that an applicant                Administrator. The FTA Administrator                  members as a ‘‘Key Party’’ and to make
                                              or transit agency has a pending                         will determine the final list of project              any award conditional upon the
                                              procurement or an open procurement                      selections, and the amount of funding                 participation of the ‘‘Key Party.’’ A ‘‘Key
                                              for the same type of transit bus that                   for each project. To better evaluate                  Party’’ is essential to the project as
                                              qualifies under this NOFA and the                       technologies in a variety of conditions               approved by FTA and, is, therefore,
                                              agency wishes to expand the                             and locales, FTA may select a portfolio               eligible for a noncompetitive award by
                                              procurement through the LoNo Program,                   of geographically diverse projects.                   the project sponsor to provide the goods
                                              FTA recognizes that identifying all                                                                           or services described in the proposal.
                                                                                                      F. Federal Award Administration                       Participation by members of the ‘‘Key
                                              project team members could contradict
                                              or delay the procurement process.                       1. Federal Award Notice                               Party’’ on a selected project may not
                                              Therefore, identifying all project team                                                                       later be substituted without FTA’s
                                                                                                        Subsequent to an announcement by                    approval.
                                              members is not required. Applicants in                  the FTA Administrator of the final
                                              this or similar situations are strongly                 project selections posted on the FTA                  3. Administrative and National Policy
                                              encouraged to apply and in such case                    Web site, FTA will publish a list of the              Requirements
                                              the lack of identified team members will                selected projects, including Federal                     Except as otherwise provided in this
                                              not be penalized by FTA. Instead, the                   dollar amounts and recipients. Project                NOFA, grants or cooperative agreements
                                              applicant should cite the procurement                   recipients should contact their FTA                   are subject to the requirements of 49
                                              as evidence of ongoing interest and                     Regional Offices for information about                U.S.C. 5307 as described in the latest
                                              commitment. This clarification applies                  setting up grant agreements with FTA.                 FTA Circular 9030.1 for the Urbanized
                                              to procurements of vehicles that qualify
                                                                                                      2. Award Administration                               Area Formula Program. Additionally,
                                              under this NOFA.
                                                                                                                                                            under the LoNo Program FTA may, at its
                                                 b. The extent to which the proposal                    Successful proposals will be awarded                discretion, consider exceptions to assist
                                              identifies and demonstrates the                         through FTA’s Transit Award                           in the commercialization of zero-
                                              technical capacity and commitment of                    Management System (TrAMS) as either                   emission bus technology, such as
                                              agencies, partners or teams with                        Cooperative Agreements or Grant                       modifying spare ratio or useful life
                                              expertise in the sustained successful                   Agreements, at FTA’s discretion.                      requirements. The FTA will not
                                              deployment of similar projects or                       Proposals that expand existing                        consider any requests for bus testing
                                              propulsion technologies.                                procurements will likely be handled                   waivers.
                                              vi. Project Management                                  consistently with the agreement                          All transit buses and related
                                                                                                      supporting the existing procurement.                  infrastructure and facilities under the
                                                 The applicant must demonstrate the                   The appropriate FTA Regional Office in                LoNo Program must be Buy-America
                                              capacity to carry out the project through               consultation with the FTA Research                    compliant pursuant to 49 U.S.C. 5323(j)
                                              a project management plan that shows:                   Office will manage project agreements.                and its implementing regulations. The
                                                 a. The applicant is in a fundable                      Applicants must sign and submit                     FTA will not consider any Buy America
                                              status for the FTA grant award;                         current Certifications and Assurances                 waivers under the LoNo Program.
                                                 b. A viable project approach, budget,                before FTA may award funding under a
                                              and schedule;                                           Cooperative Agreement or Grant                        4. Reporting
                                                 c. There are no outstanding legal,                   Agreement for a competitively selected                   The legislation that created the LoNo
                                              technical, or financial issues with the                 project. If the applicant has already                 Program requires FTA to evaluate all
tkelley on DSK3SPTVN1PROD with NOTICES




                                              applicant that would make this a high-                  submitted the annual Certifications and               projects in the program. Therefore, the
                                              risk project;                                           Assurances for the fiscal year in which               applicant must agree to participate and
                                                 d. The source(s) of local share and                  the award will be made in TrAMS, they                 cooperate with FTA project evaluation
                                              that the funds are available for prompt                 do not need to be resubmitted.                        activity. Evaluation activity that FTA
                                              project implementation if selected; and,                  To enhance the value of the portfolio               expects applicants to perform includes
                                                 e. The applicant has the ability and                 of the projects to be implemented, FTA                collecting and providing raw, unaltered
                                              commitment to collect information and                   reserves the right to request an                      vehicle performance and maintenance


                                         VerDate Sep<11>2014   16:45 Sep 23, 2015   Jkt 235001   PO 00000   Frm 00094   Fmt 4703   Sfmt 4703   E:\FR\FM\24SEN1.SGM   24SEN1


                                                                       Federal Register / Vol. 80, No. 185 / Thursday, September 24, 2015 / Notices                                                 57661

                                              data, meeting with FTA evaluators or                    SUMMARY:   Pursuant to United States                  Travel Regulations, members are
                                              FTA’s evaluation representative on a                    Code, Title 31, section 5135 (b), the                 reimbursed for their travel and lodging
                                              quarterly basis, and providing                          United States Mint is accepting                       expenses to attend meetings. Members
                                              evaluators access to the project site and               applications for appointment to the                   are Special Government Employees and
                                              to project team members, when                           Citizens Coinage Advisory Committee                   are subject to the Standards of Ethical
                                              requested by FTA. The FTA Research                      (CCAC) for a new member specially                     Conduct for Employees of the Executive
                                              Office is sensitive to the importance of                qualified to serve on the CCAC by virtue              Branch (5 CFR part 2653).
                                              proprietary information and has a                       of his or her education, training, or
                                              successful record of accommodating                      experience in numismatics. The CCAC                      The United States Mint will review all
                                              those concerns.                                         was established to:                                   submissions and will forward its
                                                                                                        D Advise the Secretary of the Treasury              recommendations to the Secretary of the
                                              G. Federal Awarding Agency Contacts                                                                           Treasury for appointment consideration.
                                                                                                      on any theme or design proposals
                                                For further information concerning                    relating to circulating coinage, bullion              Candidates should include specific
                                              this notice please contact the (LoNo)                   coinage, Congressional Gold Medals,                   skills, abilities, talents, and credentials
                                              Program staff via email at                              and national and other medals produced                to support their applications. The
                                              sean.ricketson@dot.gov, or call Sean                    by the United States Mint.                            United States Mint is interested in
                                              Ricketson at 202–366–6678. A TDD is                       D Advise the Secretary of the Treasury              candidates who have demonstrated
                                              available for individuals who are deaf or               with regard to the events, persons, or                leadership skills, have received
                                              hard of hearing at 1–800–877–8339. In                   places that the CCAC recommends to be                 recognition by their peers in their field
                                              addition, DOT will post answers to                      commemorated by the issuance of                       of interest, have a record of
                                              questions and requests for clarifications               commemorative coins in each of the five               participation in public service or
                                              on DOT’s Web site at www.fta.dot.gov.                   calendar years succeeding the year in                 activities, and are willing to commit the
                                              To ensure applicants receive accurate                   which a commemorative coin                            time and effort to participate in the
                                              information about eligibility or the                    designation is made.
                                              program, the applicant is encouraged to                                                                       CCAC meetings and related activities.
                                                                                                        D Make recommendations with
                                              contact DOT directly, rather than                                                                                Application Deadline: October 9,
                                                                                                      respect to the mintage level for any
                                              through intermediaries or third parties,                commemorative coin recommended.                       2015.
                                              with questions. DOT staff may also                        Total membership consists of 11                        Receipt of Applications: Any member
                                              conduct briefings on the LoNo program                   voting members appointed by the                       of the public wishing to be considered
                                              discretionary grants selection and award                Secretary of the Treasury:                            for participation on the committee
                                              process upon request.                                     D One person specially qualified by                 should submit a resume and cover letter
                                              H. Other Information                                    virtue of his or her education, training,             describing his or her reasons for seeking
                                                The applicant assures that it will                    or experience as nationally or                        and qualifications for membership, by
                                              comply with all applicable Federal                      internationally recognized curator in the             email to info@ccac.gov, by fax to 202–
                                              statutes, regulations, executive orders,                United States of a numismatic                         756–6525, or by mail to the United
                                              FTA Circulars, and other Federal                        collection;                                           States Mint; 801 9th Street NW.;
                                              administrative requirements in carrying                   D One person specially qualified by                 Washington, DC 20220, Attn: Greg
                                              out any project supported by the FTA                    virtue of his or her experience in the                Weinman. Submissions must be
                                              agreement. The applicant acknowledges                   medallic arts or sculpture;                           postmarked no later than Friday,
                                              that it is under a continuing obligation                  D One person specially qualified by
                                                                                                                                                            October 9, 2015.
                                              to comply with the terms and                            virtue of his or her education, training,
                                                                                                      or experience in American history;                       Notice Concerning Delivery of First-
                                              conditions of the agreement executed
                                              with FTA for its project. The applicant                   D One person specially qualified by                 Class and Priority Mail: First-class mail
                                                                                                      virtue of his or her education, training,             to the United States Mint is put through
                                              understands that Federal laws,
                                              regulations, policies, and administrative               or experience in numismatics;                         an irradiation process to protect against
                                              practices might be modified from time                     D Three persons who can represent                   biological contamination. Support
                                              to time and may affect the                              the interests of the general public in the            materials put through this process may
                                              implementation of the project. The                      coinage of the United States; and                     suffer irreversible damage. We
                                              applicant agrees that the most recent                     D Four persons appointed by the                     encourage you to consider using
                                              Federal requirements will apply to the                  Secretary of the Treasury on the basis of             alternate delivery services, especially
                                              project, unless FTA issues a written                    the recommendations by the U.S. House                 when sending time-sensitive material.
                                              determination otherwise.                                and Senate leadership.
                                                                                                        Members are appointed for a term of                 FOR FURTHER INFORMATION CONTACT:
                                              Matthew J. Welbes,                                      four years. No individual may be                      William Norton, United States Mint
                                              Executive Director.                                     appointed to the CCAC while serving as                Liaison to the CCAC; 801 Ninth Street
                                              [FR Doc. 2015–24231 Filed 9–23–15; 8:45 am]             an officer or employee of the Federal                 NW.; Washington, DC 20220; or call
                                              BILLING CODE P                                          Government.                                           202–354–7458.
                                                                                                        The CCAC is subject to the direction                  Dated: September 16, 2015.
                                                                                                      of the Secretary of the Treasury.
                                                                                                                                                            Richard A. Peterson,
                                              DEPARTMENT OF THE TREASURY                              Meetings of the CCAC are open to the
                                                                                                      public and are held approximately six to              Deputy Director for Manufacturing and
                                              United States Mint                                      eight times per year. The United States               Quality, United States Mint.
tkelley on DSK3SPTVN1PROD with NOTICES




                                                                                                      Mint is responsible for providing the                 [FR Doc. 2015–24129 Filed 9–23–15; 8:45 am]
                                              Request for Citizens Coinage Advisory                   necessary support, technical services,                BILLING CODE P
                                              Committee Membership Application                        and advice to the CCAC. CCAC
                                                                                                      members are not paid for their time or
                                              ACTION:   Notice.
                                                                                                      services, but, consistent with Federal




                                         VerDate Sep<11>2014   16:45 Sep 23, 2015   Jkt 235001   PO 00000   Frm 00095   Fmt 4703   Sfmt 9990   E:\FR\FM\24SEN1.SGM   24SEN1



Document Created: 2018-02-26 10:17:46
Document Modified: 2018-02-26 10:17:46
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice of Funding Availability (NOFA) and for Request for Proposals (RFP).
DatesComplete proposals must be submitted electronically through the grants.gov ``Apply'' function by November 23, 2015. Prospective applicants should initiate the process by registering on the GRANTS.GOV Web site promptly to ensure completion of the application process before the submission deadline. Instructions for applying can be found on FTA's Web site at http://www.fta.dot.gov/grants/13077.html and in the ``find'' module of grants.gov. Mail and fax submissions will not be accepted.
ContactSean Ricketson, FTA Office of Research Demonstration and Innovation, 202-366-6678 or [email protected]ov.
FR Citation80 FR 57656 