80_FR_60841
Page Range | 60647-60657 | |
FR Document | 2015-25586 |
[Federal Register Volume 80, Number 194 (Wednesday, October 7, 2015)] [Notices] [Pages 60647-60657] From the Federal Register Online [www.thefederalregister.org] [FR Doc No: 2015-25586] ======================================================================= ----------------------------------------------------------------------- DEPARTMENT OF DEFENSE Department of the Army, Corps of Engineers One-Time Deauthorization of Water Resources Projects AGENCY: Army Corps of Engineers, DoD. ACTION: Notice of Interim Deauthorization List. ----------------------------------------------------------------------- SUMMARY: The U.S. Army Corps of Engineers is publishing an Interim Deauthorization List of water resources development projects and separable elements that have been identified for deauthorization in accordance with section 6001(c) of the Water Resources Reform and Development Act of 2014, Public Law 113-121, 128 STAT. 1346-1347 (WRRDA 2014), and is soliciting comments from the public on the list for 90 calendar days. Comments should be provided to the contact named below by January 4, 2016. FOR FURTHER INFORMATION CONTACT: Mr. Joseph W. Aldridge, Headquarters, U.S. Army Corps of Engineers, Attention: CECW-IP, Washington, DC 20314- 1000. Tel. (202) 761-4130 or [email protected]. SUPPLEMENTARY INFORMATION: Interim Deauthorization List required by Sec. 6001(c). Section 6001(c) provides that the Secretary shall develop an Interim Deauthorization List that identifies each water resources development project, or separable element of a project, that meets the following criteria. Projects and separable elements eligible for deauthorization are those uncompleted construction projects and separable elements meeting all of the following criteria: (1) They were authorized for construction before November 8, 2007, or their most recent modification of the construction authorization predates November 8, 2007; (2) their construction has not been initiated, or, if construction has been initiated, there have been no obligations of Federal or non-federal funds for construction in the current fiscal year or any of the past 6 fiscal years; and, (3) there has been no funding for a post-authorization study in the current fiscal year or any of the past 6 fiscal years. As specifically provided in section 6001(f)(1)(B) of WRRDA 2014, water resources development projects include environmental infrastructure assistance projects and programs of the U.S. Army Corps of Engineers. In accordance with section 103(f) of the Water Resources Development Act of 1986, separable elements is defined as ``a portion of a project-- (1) which is physically separable from other portions of the project; and (2) which-- (A) achieves hydrologic effects, or (B) produces physical or economic benefits, which are separately identifiable from those produced by other portions of the project.'' The following elements of an authorized water resources development project also qualify as separable elements: An element for which there is an executed design agreement or project partnership agreement specific to that element; an element that has received funding specified for that element; an element that was authorized separately from or as an amendment to the authorization for the remainder of the water resources development project, that was separately identified in the authorization for the water resources development project, or for which a statute specifies an authorized cost, estimated cost, or amount authorized to be appropriated; an element that has been placed in service or for which the Government or the non-federal partner has assumed operation and maintenance; an element that has been deauthorized; or the remaining portion of the water resources development project apart from other separable elements. Following a 90-day public review period of the Interim Deauthorization List, the Assistant Secretary of the Army for Civil Works (ASA(CW)) will publish a Final Deauthorization List in the Federal Register. Section 6001(d)(2)(A) of WRRDA 2014 requires that the Secretary shall include on the Final Deauthorization List projects and separable elements of projects that have, in the aggregate, an estimated Federal cost to complete that is at least $18 billion. The ASA(CW) has strived to meet the requirements of Section 6001, but was not able to identify projects that totaled $18 billion. The projects and elements on the Final Deauthorization List will be deauthorized automatically after 180 days following the date that the ASA(CW) submits the Final Deauthorization List to Congress, unless [[Page 60648]] the Congress passes a joint resolution disapproving the Final Deauthorization List or the non-Federal interest for the project or separable element of the project provides sufficient funds to complete the project or separable element. The amount shown as the Federal Balance to complete is a working estimate generally based on the authorization and as such any non-Federal interests considering providing sufficient funds to complete a project or separable element should contact the appropriate District Commander to discuss the process necessary to develop a final cost to complete a project or separable element. The Interim Deauthorization List follows below in Table 1. [[Page 60649]] Table 1 (Interim Deauthorization List) ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Latest fiscal Federal balance Public law of Project/element year of federal to complete State Business line Corps Congressional Project/element Project/element authorization Section of phase and status or non-federal (subject to district districts name type \(1)\ or latest public law \(2)\ obligations for Section 902 where amendment construction applicable) ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ AL........... NAV.......... SAM.......... AL 2, 3 & 4....... ALABAMA-COOSA PROJECT........... 99-662 813........... CONSTRUCTION NOT 1986............. $3,781,921,691 RIVER AND INITIATED. TRIBUTARIES, AL (COOSA RIVER BETWEEN MONTGOMERY AND GADSDEN). AL........... EI........... SAM.......... AL 4.............. DUCK RIVER, AL.... PROJECT........... 106-554 108a.......... CONSTRUCTION NOT NO OBLIGATION FOR 5,000,000 INITIATED. CONSTRUCTION. AR........... EI........... MVK.......... AR 4.............. UNION COUNTY, AR.. PROJECT........... 106-554 108d.......... CONSTRUCTION NOT 2008............. 51,247,100 INITIATED. AR........... FRM.......... MVM.......... AR 1.............. L'ANGUILLE RIVER PROJECT........... 99-662 103........... CONSTRUCTION NOT 2004............. 19,466,768 BASIN, AR. INITIATED. AR........... FRM.......... SWL.......... AR 1, 2, 3 & 4; OK ARKANSAS RIVER PROJECT........... 101-640 110(a1)....... NEVER FUNDED..... NO OBLIGATION FOR 591,605 1. LEVEES, AR. CONSTRUCTION. AR........... AER.......... SWL.......... AR 3.............. BEAVER DAM , AR SEPARABLE ELEMENT. 94-587 105........... NEVER FUNDED..... NO OBLIGATION FOR 5,990,000 (TROUT PRODUCTION CONSTRUCTION. CENTER). AR........... EI........... SWL.......... AR 3.............. BEAVER LAKE, SEPARABLE ELEMENT. 104-303 523........... CONSTRUCTION 2002............. 5,000,000 BENTON/WASH, AR. PAUSED. CA........... EI........... SPK.......... CA 4.............. CALAVERAS COUNTY, PROJECT........... 104-303 526........... NEVER FUNDED..... NO OBLIGATION FOR 1,500,000 CA. CONSTRUCTION. CA........... EI........... SPK.......... CA 3 & 5.......... CLEAR LAKE BASIN, PROJECT........... 106-554 108a.......... NEVER FUNDED..... NO OBLIGATION FOR 1,543,324 CA. CONSTRUCTION. CA........... FRM.......... SPK.......... CA 3.............. COLUSA TROUGH PROJECT........... 99-662 830........... NEVER FUNDED..... NO OBLIGATION FOR 18,900,846 DRAINAGE CANAL, CONSTRUCTION. SACRAMENTO RIVER AND TRIBUTARIES, CA. CA........... EI........... SPK.......... CA 21............. PINE FLAT DAM, CA. PROJECT........... 106-541 101b(7)....... NEVER FUNDED..... NO OBLIGATION FOR 41,502,918 CONSTRUCTION. CA........... EI........... SPL.......... CA 39............. CHINO HILLS, CA... PROJECT........... 106-554 108a.......... NEVER FUNDED..... NO OBLIGATION FOR 1,543,324 CONSTRUCTION. CA........... EI........... SPL.......... CA 39 & 45........ EASTERN MUNICIPAL PROJECT........... 106-554 108a.......... NEVER FUNDED..... NO OBLIGATION FOR 1,543,324 WATER DISTRICT, CONSTRUCTION. CA. CA........... FRM.......... SPL.......... CA 24............. GOLETA & VICINITY, PROJECT........... 102-580 102b.......... CONSTRUCTION 1984............. 1,233,626 CA. PAUSED. CA........... EI........... SPL.......... CA 44............. LOS ANGELES HARBOR/ PROJECT........... 106-554 108d.......... NEVER FUNDED..... NO OBLIGATION FOR 6,500,000 TERMINAL ISLAND, CONSTRUCTION. CA. CA........... FRM.......... SPL.......... CA 24............. LOWER MISSION PROJECT........... 100-676 3a............ NEVER FUNDED..... NO OBLIGATION FOR 14,625,971 CREEK, CA. CONSTRUCTION. CA........... EI........... SPL.......... CA 26, 27 & 29.... SAN DIEGO AREA PROJECT........... 102-580 217c(2)....... NEVER FUNDED..... NO OBLIGATION FOR 5,000,000 WATER REUSE CONSTRUCTION. DEMOSTRATION FACILITIES, CA. CA........... EI........... SPL.......... CA 52............. SAN DIEGO COUNTY, PROJECT........... 106-554 108d.......... NEVER FUNDED..... NO OBLIGATION FOR 10,000,000 CA (CORONADO CONSTRUCTION. TRANSBAY WASTEWATER PIPELINE). CA........... EI........... SPL.......... CA 26, 27 & 29.... SOUTHERN PROJECT........... 102-580 217c(1)....... NEVER FUNDED..... NO OBLIGATION FOR 5,000,000 CALIFORNIA CONSTRUCTION. COMPREHENSIVE WATER REUSE SYSTEM, CA. [[Page 60650]] CT........... EI........... NAE.......... CT 4.............. BRIDGEPORT PROJECT........... 106-53 502b.......... CONSTRUCTION NOT NO OBLIGATION FOR 10,000,000 COMBINED SEWER INITIATED. CONSTRUCTION. OVERFLOW PTOJECT, CT. CT........... EI........... NAE.......... CT 1.............. HARTFORD, CT...... PROJECT........... 106-53 502b.......... NEVER FUNDED..... NO OBLIGATION FOR 10,000,000 CONSTRUCTION. CT........... EI........... NAE.......... CT 3.............. NEW HAVEN, CT..... PROJECT........... 106-53 502b.......... NEVER FUNDED..... NO OBLIGATION FOR 10,000,000 CONSTRUCTION. CT, ME, MA, AER.......... NAE.......... CT 1, 2, 3, 4 & 5; NEW ENGLAND WATER PROJECT........... 106-541 507........... NEVER FUNDED..... NO OBLIGATION FOR (3)0 NH, RI & VT. ME 1, & 2; MA 1, RESOURCES AND CONSTRUCTION. 2, 3, 4, 5, 6, 7, ECOSYSTEM 8, & 9; NH 1 & 2; RESTORATION, CT, RI 1 & 2; VT AT ME, MA, NH, RI & LARGE. VT. DC & MD...... EI........... NAB.......... .................. WASHINGTON DC AND PROJECT........... 106-554 108d.......... CONSTRUCTION NOT 1998............. 14,807,000 MARYLAND, D.C. & INITIATED. MD. FL........... AER.......... SAJ.......... FL 17, 18, 19, 20, COMPREHENSIVE SEPARABLE ELEMENT. 106-541 601 b2biiii... CONSTRUCTION NOT 2005............. 17,000,000 21, 22 & 23. EVERGLADES INITIATED. RESTORATION PLAN, FL (LAKE BELT GROUND RESERVOIR TECHNOLOGY). FL........... AER.......... SAJ.......... FL 17, 18, 20, 21, COMPREHENSIVE SEPARABLE ELEMENT. 106-541 601 b2cix..... NEVER FUNDED..... NO OBLIGATION FOR 67,150,000 22, 23, 25, 26 & EVERGLADES CONSTRUCTION. 27. RESTORATION PLAN, FL (NORTH NEW RIVER IMPROVEMENTS). FL........... AER.......... SAJ.......... FL 18, 20, 21, 22, COMPREHENSIVE SEPARABLE ELEMENT. 106-541 601 b2cviii... NEVER FUNDED..... NO OBLIGATION FOR 21,500,000 23, 24, 25, 26 & EVERGLADES CONSTRUCTION. 27. RESTORATION PLAN, FL (RAISE AND BRIDGE EAST PORTION OF TAMIAMI TRAIL AND FILL MIAMI CANAL WITHIN WATER) (CONSEVATION AREA 3). FL........... AER.......... SAJ.......... FL 16 & 23........ COMPREHENSIVE SEPARABLE ELEMENT. 106-541 601 b2cvii.... CONSTRUCTION NOT NO OBLIGATION FOR 67,800,000 EVERGLADES INITIATED. CONSTRUCTION. RESTORATION PLAN, FL (TAYLOR CREEK/ NUBBIN SLOUGH STORAGE AND TREATMENT AREA). FL........... AER.......... SAJ.......... FL 17, 18, 20, 21, COMPREHENSIVE SEPARABLE ELEMENT. 106-541 601 b2biiii... CONSTRUCTION NOT 2005............. 20,500,000 22, 23, 25, 26 & EVERGLADES INITIATED. 27. RESTORATION PLAN, FL (WASTEWATER REUSE TECHNOLOGY). FL........... NAV.......... SAJ.......... FL 12............. HUDSON RIVER, FL.. PROJECT........... 81-516 101........... NEVER FUNDED..... NO OBLIGATION FOR 3,650,000 CONSTRUCTION. [[Page 60651]] FL........... EI........... SAJ.......... FL 27............. KEY BISCAYNE, FL.. PROJECT........... 106-554 108a.......... NEVER FUNDED..... NO OBLIGATION FOR 1,543,324 CONSTRUCTION. FL........... FRM.......... SAJ.......... FL 14............. LITTLE TALBOT PROJECT........... 106-53 101b7......... CONSTRUCTION 2000............. 6,786,030 ISLAND, FL. PAUSED. FL........... EI........... SAJ.......... FL 14............. SOUTH TAMPA, FL... PROJECT........... 106-554 108a.......... NEVER FUNDED..... NO OBLIGATION FOR 1,543,324 CONSTRUCTION. FL........... NAV.......... SAJ.......... FL 10, 11, 12 & 13 TAMPA HARBOR, PROJECT........... 106-554 107........... CONSTRUCTION NOT 2006............. 64,771,847 ALAFIA RIVER, FL. INITIATED. FL........... NAV.......... SAJ.......... FL 10, 11, 12 & 13 TAMPA HARBOR, FL SEPARABLE ELEMENT. 99-662 858........... NEVER FUNDED..... NO OBLIGATION FOR 8,434,881 ((PORT SUTTON CONSTRUCTION. TURNING BASIN) WIDENING TO AN ADDITIONAL 105 FEET TO THE FENDER LINE ALONG PENDOLA POINT). HI........... FRM.......... POH.......... HI 1.............. WAIKIKI EROSION PROJECT........... 89-298 301........... NEVER FUNDED..... NO OBLIGATION FOR 16,584,000 CONTROL, HI. CONSTRUCTION. IL........... EI........... LRC.......... IL 11 & 14........ AURORA, IL........ PROJECT........... 106-554 108d.......... NEVER FUNDED..... NO OBLIGATION FOR 8,000,000 CONSTRUCTION. IL........... FRM.......... LRC.......... IL 9, 10 & 14..... DES PLAINES RIVER, SEPARABLE ELEMENT. 106-53 101b10........ NEVER FUNDED..... NO OBLIGATION FOR 5,795,400 IL (NORTH FORK CONSTRUCTION. MILL CREEK DAM MODIFICATION). IN........... EI........... LRE.......... IN 3.............. FORT WAYNE, IN.... PROJECT........... 106-554 108a.......... NEVER FUNDED..... NO OBLIGATION FOR 1,529,324 CONSTRUCTION. IN........... EI........... LRL.......... IN 7.............. INDIANAPOLIS, IN.. PROJECT........... 106-554 108a.......... NEVER FUNDED..... NO OBLIGATION FOR 1,543,324 CONSTRUCTION. KY........... FRM.......... LRH.......... KY 5.............. BEAVER CREEK PROJECT........... 89-298 204........... NEVER FUNDED..... NO OBLIGATION FOR 20,873,500 BASIN, KY. CONSTRUCTION. KY & TN...... AER.......... MVM.......... TN 8; KY 1........ REELFOOT LAKE, TN PROJECT........... 106-53 101b11........ NEVER FUNDED..... NO OBLIGATION FOR 33,072,769 & KY. CONSTRUCTION. LA........... FRM.......... MVK.......... LA 1.............. PEARL RIVER, PROJECT........... 99-662 401b.......... CONSTRUCTION NOT 2002............. 29,311,000 SLIDELL, SAINT INITIATED. TAMMANY PARISH, LA. LA........... FRM.......... MVN.......... LA 1, 2 & 6....... AMITE RIVER AND PROJECT........... 102-580 101(11)....... NEVER FUNDED..... NO OBLIGATION FOR 38,058,405 TRIBUTARIES, LA. CONSTRUCTION. LA........... FRM.......... MVN.......... LA 6.............. BAYOU COCODRIE AND PROJECT........... 93-251 87............ CONSTRUCTION 1987............. 345,472,000 TRIBUTARIES, LA. PAUSED. LA........... NAV.......... MVN.......... LA 1, 2, 3 & 6.... GULF INTRACOASTAL PROJECT........... 87-874 101........... NEVER FUNDED..... NO OBLIGATION FOR 201,422,000 WATERWAY, LA-TX CONSTRUCTION. SECTION, LA & TX. LA........... EI........... MVN.......... LA 1 & 2.......... KENNER, LA........ PROJECT........... 106-554 108........... NEVER FUNDED..... NO OBLIGATION FOR 5,000,000 CONSTRUCTION. LA........... EI........... MVN.......... LA 1 & 2.......... ST. CHARLES, ST. PROJECT........... 106-554 108a.......... NEVER FUNDED..... NO OBLIGATION FOR 1,543,324 BERNARD, AND CONSTRUCTION. PLAQUEMINES PARISHES, LA. LA........... EI........... MVN.......... LA 2 & 6.......... ST. JOHN THE PROJECT........... 106-554 108a.......... NEVER FUNDED..... NO OBLIGATION FOR 1,543,324 BAPTIST AND ST. CONSTRUCTION. JAMES PARISHES, LA. LA........... FRM.......... MVN.......... LA 1.............. TANGIPAHOA, PROJECT........... 99-662 401........... NEVER FUNDED..... NO OBLIGATION FOR 21,723,000 TCHEFUNCTE, AND CONSTRUCTION. TICKFAW RIVERS, LA. MA........... EI........... NAE.......... MA 9.............. FALL RIVER AND NEW PROJECT........... 106-554 108c.......... NEVER FUNDED..... NO OBLIGATION FOR 35,000,000 BEDFORD, MA. CONSTRUCTION. [[Page 60652]] MA........... FRM.......... NAE.......... MA 4, 7 & 8....... MUDDY RIVER, SEPARABLE ELEMENT. 106-541 522........... NEVER FUNDED..... NO OBLIGATION FOR 24,050,000 BROOKLINE AND CONSTRUCTION. BOSTON, MA (AQUATIC ECOSYSTEM RESTORATION FEATURES). MI........... NAV.......... LRE.......... MI 1.............. ALPENA HARBOR, MI PROJECT........... 104-303 363d.......... NEVER FUNDED..... NO OBLIGATION FOR 4,063,120 (25 FOOT CHANNEL). CONSTRUCTION. MI........... NAV.......... LRE.......... MI 5.............. BAY CITY, MI...... PROJECT........... 101-640 105........... NEVER FUNDED..... NO OBLIGATION FOR 8,466,275 CONSTRUCTION. MI........... EI........... LRE.......... MI 6.............. BENTON HARBOR, ST PROJECT........... 106-554 108d.......... NEVER FUNDED..... NO OBLIGATION FOR 1,500,000 JOSEPH WASTEWATER CONSTRUCTION. TREATMENT PLANT, ST JOSEPH, MI. MI........... NAV.......... LRE.......... MI 1.............. CHARLEVOIX, MI SEPARABLE ELEMENT. 106-53 373........... NEVER FUNDED..... NO OBLIGATION FOR 52,500 (REVETMENT CONSTRUCTION. CONNECTION). MI........... NAV.......... LRE.......... MI 1.............. ONTONAGON HARBOR, PROJECT........... 104-303 363e.......... NEVER FUNDED..... NO OBLIGATION FOR 37,134,623 ONTONAGON COUNTY CONSTRUCTION. MI. MI........... FRM.......... LRE.......... MI 5.............. SAGINAW RIVER AND SEPARABLE ELEMENT. 106-53 364(3)........ NEVER FUNDED..... NO OBLIGATION FOR 13,909,394 TRIBUTARIES, MI CONSTRUCTION. (CASS RIVER AT VASSAR). MI........... FRM.......... LRE.......... MI 4 & 5.......... SAGINAW RIVER AND SEPARABLE ELEMENT. 99-662 845........... NEVER FUNDED..... NO OBLIGATION FOR 720,653 TRIBUTARIES, MI CONSTRUCTION. (CURTIS ROAD BRIDGE). MI........... FRM.......... LRE.......... MI 5.............. SAGINAW RIVER AND SEPARABLE ELEMENT. 104-303 329........... NEVER FUNDED..... NO OBLIGATION FOR 571,781 TRIBUTARIES, MI CONSTRUCTION. (FLINT RIVER AT FLINT). MI........... FRM.......... LRE.......... MI 4 & 5.......... SAGINAW RIVER AND SEPARABLE ELEMENT. 106-53 364(4)........ NEVER FUNDED..... NO OBLIGATION FOR 106,825,583 TRIBUTARIES, MI CONSTRUCTION. (SHIAWASSEE FLATS). MI, MN & WI.. NAV.......... LRE.......... MI 1; MN 8; WI 7.. GREAT LAKES PROJECT........... 101-640 101a15........ NEVER FUNDED..... NO OBLIGATION FOR 17,938,174 CONNECTING CONSTRUCTION. CHANNELS & HARBORS, MN, MI & WI. MN........... NAV.......... LRE.......... MN 8.............. DULUTH, MN PROJECT........... 104-303 541a/b........ NEVER FUNDED..... NO OBLIGATION FOR 1,000,000 (ALTERNATIVE CONSTRUCTION. TECHNOLOGY PROJECT). MN........... EI........... LRE.......... MN 8.............. LAKE SUPERIOR PROJECT........... 104-303 542........... NEVER FUNDED..... NO OBLIGATION FOR 10,000,000 CENTER, MN. CONSTRUCTION. MN........... EI........... MVP.......... MN 5.............. MISSISSIPPI PLACE, PROJECT........... 106-53 577........... CONSTRUCTION NOT 2006............. 2,968,178 MN. INITIATED. MN & WI...... NAV.......... LRE.......... MN 8; WI 7........ DULUTH--SUPERIOR PROJECT........... 99-662 201a.......... CONSTRUCTION 1995............. 14,064,481 CHANNEL PAUSED. EXTENSION, MN & WI. MO........... EI........... NWK.......... MO 4 & 6.......... KANSAS CITY, MO... PROJECT........... 106-53 502b.......... NEVER FUNDED..... NO OBLIGATION FOR 15,000,000 CONSTRUCTION. [[Page 60653]] MO & IL...... NAV.......... MVS.......... MO 1, 2, 3, & 8; ST LOUIS HARBOR, PROJECT........... 99-662 601a.......... NEVER FUNDED..... NO OBLIGATION FOR 43,253,100 IL 12 & 13. MO & IL. CONSTRUCTION. MS........... FRM.......... MVK.......... MS 2.............. YAZOO BASIN, PROJECT........... 89-298 204........... CONSTRUCTION 2007............. 233,490,728 TRIBUTARIES, MS. PAUSED. MS........... NAV.......... MVK.......... MS 2.............. YAZOO RIVER, MS SEPARABLE ELEMENT. 99-662 822........... NEVER FUNDED..... NO OBLIGATION FOR 2,011,094 (SHEPARDSTOWN CONSTRUCTION. BRIDGE). MS & LA...... AER.......... MVN.......... LA 2.............. MISSISSIPPI AND PROJECT........... 100-676 3(a)8......... CONSTRUCTION NOT 2003............. 70,668,540 LOUISIANA INITIATED. ESTUARINE AREAS, MS & LA. NC........... EI........... SAW.......... NC 8.............. LUMBERTON, NC..... PROJECT........... 106-53 502b.......... NEVER FUNDED..... NO OBLIGATION FOR 1,700,000 CONSTRUCTION. NC........... EI........... SAW.......... NC 8 & 9.......... UNION COUNTY, NC.. PROJECT........... 106-554 108a.......... NEVER FUNDED..... NO OBLIGATION FOR 1,543,324 CONSTRUCTION. NC & SC...... FRM.......... SAW.......... NC 9 & 12......... SUGAR CREEK BASIN, PROJECT........... 99-662 401a.......... NEVER FUNDED..... NO OBLIGATION FOR 54,523,100 NC & SC. CONSTRUCTION. NH........... EI........... NAE.......... NH 2.............. NASHUA, NH PROJECT........... 106-53 502b.......... CONSTRUCTION NOT NO OBLIGATION FOR 19,853,000 (COMBINED SEWER INITIATED. CONSTRUCTION. OVERFLOW). NH........... EI........... NAE.......... NH 1.............. ROCHESTER, NH..... PROJECT........... 104-303 504(e) (4).... CONSTRUCTION NOT NO OBLIGATION FOR 10,897,120 INITIATED. CONSTRUCTION. NJ........... EI........... NAN.......... NJ 8.............. ELIZABETH, NJ..... PROJECT........... 106-53 502(f)........ NEVER FUNDED..... NO OBLIGATION FOR 20,000,000 CONSTRUCTION. NJ........... EI........... NAN.......... NJ 8.............. NORTH HUDSON, NJ.. PROJECT........... 106-53 502(f)........ NEVER FUNDED..... NO OBLIGATION FOR 20,000,000 CONSTRUCTION. NJ........... EI........... NAN.......... NJ 9.............. PATTERSON AND PROJECT........... 106-554 108c.......... NEVER FUNDED..... NO OBLIGATION FOR 30,000,000 PASSAIC COUNTY, CONSTRUCTION. NJ. NJ........... EI........... NAP.......... NJ 4, 6 & 12...... STATE OF NEW PROJECT........... 102-580 219c (10)..... NEVER FUNDED..... NO OBLIGATION FOR 1,543,324 JERSEY AND NEW CONSTRUCTION. JERSEY WASTEWATER TREATMENT TRUST, NJ. NJ........... EI........... NAP.......... NJ 5.............. TOWN OF NEWTON, NJ PROJECT........... 106-554 108d.......... NEVER FUNDED..... NO OBLIGATION FOR 7,000,000 CONSTRUCTION. NV........... FRM.......... SPL.......... NV 4.............. LAS VEGAS WASH AND PROJECT........... 102-580 101(13)....... CONSTRUCTION NOT NO OBLIGATION FOR 3,360,938 TRIBUTARIES, NV. INITIATED. CONSTRUCTION. NV........... FRM.......... SPL.......... NV 4.............. LAS VEGAS, NV..... PROJECT........... 109-103 115........... NEVER FUNDED..... NO OBLIGATION FOR 20,000,000 CONSTRUCTION. NY........... EI........... LRB.......... NY26 & 27......... ERIE COUNTY, SEPARABLE ELEMENT. 102-580 221........... NEVER FUNDED..... NO OBLIGATION FOR 7,000,000 BUFFALO AMHRST, CONSTRUCTION. NY. NY........... EI........... LRB.......... NY 26 & 27........ ERIE COUNTY, NY PROJECT........... 102-580 219c (12)..... NEVER FUNDED..... NO OBLIGATION FOR 1,543,324 (SLUDGE DISPOSAL). CONSTRUCTION. NY........... EI........... LRB.......... NY 26 & 27........ ERIE COUNTY, NY PROJECT........... 102-580 219c (11)..... NEVER FUNDED..... NO OBLIGATION FOR 1,543,324 (WATER QUALITY CONSTRUCTION. TUNNEL). NY........... EI........... LRB.......... NY26 & 27......... LEWISTON SEPARABLE ELEMENT. 102-580 222........... NEVER FUNDED..... NO OBLIGATION FOR 200,000 STORMWATER, NY. CONSTRUCTION. NY........... EI........... LRB.......... NY 24............. LIVERPOOL, NY..... PROJECT........... 106-554 108d.......... NEVER FUNDED..... NO OBLIGATION FOR 2,000,000 CONSTRUCTION. NY........... EI........... NAN.......... NY 10 & 11; NJ 8.. INNER HARBOR PROJECT........... 106-53 502(f)........ NEVER FUNDED..... NO OBLIGATION FOR 15,000,000 PROJECT, NEW CONSTRUCTION. YORK, NY. NY........... FRM.......... NAN.......... NY 17, 18, 19 & 20 LOWER HUDSON RIVER PROJECT........... 106-53 212e.......... NEVER FUNDED..... NO OBLIGATION FOR 30,000,000 & TRIBUTARIES, NY. CONSTRUCTION. NY........... EI........... NAN.......... NY 6 & 11......... OUTER HARBOR PROJECT........... 106-53 502(f)........ NEVER FUNDED..... NO OBLIGATION FOR 15,000,000 PROJECT, NEW CONSTRUCTION. YORK, NY. [[Page 60654]] NY/NJ........ NAV.......... NAN.......... NJ 6, 9 & 13; NY NEW YORK HARBOR PROJECT........... 101-640 102........... CONSTRUCTION 2005............. 201,549,768 7, 8, 9, 12, COLLECTION AND PAUSED. 13,14 & 15. REMOVAL OF DRIFT, NY & NJ. OH........... NAV.......... LRB.......... OH 9.............. OTTAWA RIVER PROJECT........... 101-640 107a7......... CONSTRUCTION NOT 2006............. 13,218,200 HARBOR, OH. INITIATED. OH........... FRM.......... LRH.......... OH 15............. HOCKING RIVER, PROJECT........... 99-662 401a.......... NEVER FUNDED..... NO OBLIGATION FOR 16,282,709 LOGAN, OH. CONSTRUCTION. OH........... FRM.......... LRL.......... OH 8.............. MIAMI RIVER BASIN, PROJECT........... 99-662 401a.......... CONSTRUCTION NOT NO OBLIGATION FOR 18,041,480 PLEASANT RUN, INITIATED. CONSTRUCTION. VICINITY FAIRFIELD, OH. OK........... HYD.......... SWT.......... OK 2.............. FORT GIBSON LAKE, SEPARABLE ELEMENT. 99-662 601a.......... NEVER FUNDED..... NO OBLIGATION FOR 45,485,000 OK (POWER UNITS 5 CONSTRUCTION. & 6). OR........... EI........... NWP.......... OR 1.............. ASTORIA, OR....... PROJECT........... 106-53 502b.......... NEVER FUNDED..... NO OBLIGATION FOR 5,000,000 CONSTRUCTION. OR........... EI........... NWP.......... OR 2.............. HOOD RIVER, OR.... PROJECT........... 106-554 108a (36)..... NEVER FUNDED..... NO OBLIGATION FOR 1,543,324 CONSTRUCTION. OR........... EI........... NWP.......... OR 2.............. MEDFORD, OR....... PROJECT........... 106-554 108a (37)..... NEVER FUNDED..... NO OBLIGATION FOR 1,543,324 CONSTRUCTION. OR........... EI........... NWP.......... OR 1 & 2.......... PORTLAND, OR...... PROJECT........... 106-554 108a (38)..... NEVER FUNDED..... NO OBLIGATION FOR 1,543,324 CONSTRUCTION. PA........... EI........... LRP.......... PA 5.............. COUDERSPORT, PA... PROJECT........... 106-554 108........... NEVER FUNDED..... NO OBLIGATION FOR 1,543,324 CONSTRUCTION. PA........... EI........... LRP.......... PA 18............. FINDLAY TOWNSHIP, PROJECT........... 106-53 502........... NEVER FUNDED..... NO OBLIGATION FOR 11,000,000 PA. CONSTRUCTION. PA........... EI........... LRP.......... PA 9.............. GREENSBORO AND PROJECT........... 102-580 219c(15)...... NEVER FUNDED..... NO OBLIGATION FOR 1,543,324 GLASSWORKS, PA. CONSTRUCTION. PA........... EI........... LRP.......... PA 9.............. JEFFERSON PROJECT........... 106-53 502........... NEVER FUNDED..... NO OBLIGATION FOR 1,000,000 TOWNSHIP, GREENE CONSTRUCTION. COUNTY, PA. PA........... EI........... LRP.......... PA 18............. NORTH FAYETTE PROJECT........... 106-53 502........... NEVER FUNDED..... NO OBLIGATION FOR 500,000 TOWNSHIP, CONSTRUCTION. ALLEGHENY COUNTY, PA. PA........... EI........... LRP.......... PA 18............. ROBINSON TOWNSHIP, PROJECT........... 106-53 502........... NEVER FUNDED..... NO OBLIGATION FOR 1,200,000 PA. CONSTRUCTION. PA........... EI........... LRP.......... PA 14............. SPRINGDALE PROJECT........... 106-53 502........... NEVER FUNDED..... NO OBLIGATION FOR 500,000 BOROUGH, PA. CONSTRUCTION. PA........... EI........... LRP.......... PA 3.............. TITUSVILLE, PA.... PROJECT........... 106-554 108........... NEVER FUNDED..... NO OBLIGATION FOR 7,300,000 CONSTRUCTION. PA........... EI........... LRP.......... PA 9, 12, 14 & 18. WASHINGTON, PROJECT........... 106-554 108........... NEVER FUNDED..... NO OBLIGATION FOR 8,000,000 GREENE, CONSTRUCTION. WESTMORELAND, AND FAYETTE COUNTIES, PA. PA........... EI........... NAB.......... PA 10............. BRADFORD AND SEPARABLE ELEMENT. 106-53 548........... NEVER FUNDED..... NO OBLIGATION FOR 13,000,000 SULLIVAN CONSTRUCTION. COUNTIES, PA. PA........... EI........... NAB.......... PA 11 & 15........ DAUPHIN COUNTY, PA PROJECT........... 106-53 502b.......... NEVER FUNDED..... NO OBLIGATION FOR 2,000,000 CONSTRUCTION. PA........... EI........... NAB.......... PA 4.............. DILLSBURG BOROUGH PROJECT........... 106-53 502b.......... NEVER FUNDED..... NO OBLIGATION FOR 2,000,000 AUTHORITY, PA. CONSTRUCTION. PA........... EI........... NAB.......... PA 4.............. HAMPDEN TOWNSHIP, PROJECT........... 106-53 502b.......... NEVER FUNDED..... NO OBLIGATION FOR 3,000,000 PA. CONSTRUCTION. [[Page 60655]] PA........... EI........... NAB.......... PA 4 & 11......... MOUNT JOY TOWNSHIP PROJECT........... 106-554 108d.......... NEVER FUNDED..... NO OBLIGATION FOR 8,300,000 AND CONEWAGO CONSTRUCTION. TOWNSHIP, PA. PA........... EI........... NAB.......... PA 5.............. PATTON TOWNSHIP, PROJECT........... 106-53 502b.......... NEVER FUNDED..... NO OBLIGATION FOR 1,400,000 PA. CONSTRUCTION. PA........... EI........... NAB.......... PA 4.............. UPPER ALLEN PROJECT........... 106-53 502b.......... NEVER FUNDED..... NO OBLIGATION FOR 3,400,000 TOWNSHIP, PA. CONSTRUCTION. PA........... FRM.......... NAP.......... PA 17............. DELAWARE RIVER PROJECT........... 93-251 2............. CONSTRUCTION NOT 1993............. 13,194,000 BASIN--WABASH INITIATED. CREEK, BOROUGH OF TAMAQUA, PA. PA........... FRM.......... NAP.......... PA 2 & 3.......... PHILADELPHIA, PA PROJECT........... 104-303 564e.......... NEVER FUNDED..... NO OBLIGATION FOR 900,000 (FRANKFORD DAM). CONSTRUCTION. PA........... FRM.......... NAP.......... PA 1, 2, 3 & 13... PHILADELPHIA, PA PROJECT........... 104-303 564d.......... NEVER FUNDED..... NO OBLIGATION FOR 15,000,000 (PENNYPACK PARK). CONSTRUCTION. PA........... FRM.......... NAP.......... PA 2 & 3.......... PHILADELPHIA, PA PROJECT........... 104-303 564a.......... NEVER FUNDED..... NO OBLIGATION FOR 1,000,000 (WATER WORKS CONSTRUCTION. RESTORATION). PA........... EI........... NAP.......... PA 6.............. PHOENIXVILLE PROJECT........... 106-554 108d.......... NEVER FUNDED..... NO OBLIGATION FOR 2,400,000 BOROUGH, CHESTER CONSTRUCTION. COUNTY, PA. PA........... EI........... NAP.......... PA 8.............. TOWAMENCIN PROJECT........... 106-53 502b.......... CONSTRUCTION NOT 2005............. 1,462,000 TOWNSHIP, PA. INITIATED. PR........... FRM.......... SAJ.......... PR AT LARGE....... GUANAJIBO RIVER, PROJECT........... 106-53 101........... NEVER FUNDED..... NO OBLIGATION FOR 33,495,941 PR. CONSTRUCTION. PR........... FRM.......... SAJ.......... PR AT LARGE....... RIO NIGUA AT PROJECT........... 106-53 101........... NEVER FUNDED..... NO OBLIGATION FOR 12,145,000 SALINAS, PR. CONSTRUCTION. RI........... EI........... NAE.......... RI 2.............. CRANSTON, RI...... PROJECT........... 101-640 54............ NEVER FUNDED..... NO OBLIGATION FOR 6,000,000 CONSTRUCTION. RI........... EI........... NAE.......... RI 1 & 2.......... DREDGING OF SALT PROJECT........... 106-53 578........... NEVER FUNDED..... NO OBLIGATION FOR 1,100,000 PONDS IN THE CONSTRUCTION. STATE OF RHODE ISLAND, RI. SC........... EI........... SAC.......... SC 1.............. CHARLESTON, SC.... PROJECT........... 108-137 127........... NEVER FUNDED..... NO OBLIGATION FOR 10,000,000 CONSTRUCTION. TN........... NAV.......... MVM.......... TN 9.............. MEMPHIS HARBOR, PROJECT........... 106-53 364........... NEVER FUNDED..... NO OBLIGATION FOR 110,044,000 MEMPHIS, TN. CONSTRUCTION. TN........... FRM.......... MVM.......... TN 8.............. NONCONNAH CREEK, SEPARABLE ELEMENT. 106-541 334........... CONSTRUCTION NOT 2004............. 36,188,000 TN & MS INITIATED. (EXTENSION). TX........... FRM.......... SWF.......... TX 8 & 17......... NAVASOTA RIVER SEPARABLE ELEMENT. 90-483 203........... CONSTRUCTION NOT 1983............. 778,421,000 BASIN, TX INITIATED. (MILLICAN LAKE, TX). TX........... FRM.......... SWF.......... TX 2, 8 & 14...... TRINITY RIVER AND SEPARABLE ELEMENT. 108-447 116........... CONSTRUCTION NOT 1981............. 19,985,000 TRIBUTARIES, TX INITIATED. (LIBERTY LOCAL PROTECTION PROJECT). TX........... NAV.......... SWF.......... TX 2, 8 & 14...... TRINITY RIVER AND SEPARABLE ELEMENT. 108-447 116........... CONSTRUCTION NOT 1981............. 5,412,060,000 TRIBUTARIES, TX INITIATED. (NAVIGATION CHANNEL ABOVE LIBERTY). TX........... FRM.......... SWF.......... TX 2, 8 & 14...... TRINITY RIVER AND SEPARABLE ELEMENT. 108-447 116........... CONSTRUCTION NOT 1981............. 119,408,000 TRIBUTARIES, TX INITIATED. (WEST FORK FLOODWAY). TX........... FRM.......... SWG.......... TX 2, 7, 8, 10, 18 BUFFALO BAYOU AND SEPARABLE ELEMENT. 101-640 101(21)....... NEVER FUNDED..... NO OBLIGATION FOR 112,536,000 & 29. TRIBUTARIES, TX CONSTRUCTION. (HALLS BAYOU). [[Page 60656]] TX........... FRM.......... SWG.......... TX 15 & 34........ LOWER RIO GRANDE SEPARABLE ELEMENT. 99-662 401a.......... CONSTRUCTION NOT 2005............. 207,183,000 BASIN, TEXAS INITIATED. (SOUTH MAIN CHANNEL), TX. TX & OK...... NAV.......... SWT.......... TX 4; OK 2........ RED RIVER WATERWAY SEPARABLE ELEMENT. 90-483 101........... CONSTRUCTION NOT 2004............. 685,324,228 (BANK INITIATED. STABILIZATION FEATURES). UT........... EI........... SPK.......... UT 1.............. CACHE COUNTY, UT.. PROJECT........... 106-53 502b.......... NEVER FUNDED..... NO OBLIGATION FOR 5,000,000 CONSTRUCTION. UT........... FRM.......... SPK.......... UT 4.............. UPPER JORDAN PROJECT........... 106-53 357........... CONSTRUCTION NOT 2004............. 11,087,268 RIVER, UT. INITIATED. VA........... FRM.......... LRH.......... VA 9.............. LEVISA AND TUG SEPARABLE ELEMENT. 104-303 353........... CONSTRUCTION NOT 1989............. 185,915,319 FORKS AND UPPER INITIATED. CUMBERLAND RIVER VA, WV, KY (HAYSI LAKE, VA). VA........... NAV.......... NAO.......... VA 3.............. NORFOLK HARBOR PROJECT........... 101-640 107a13........ NEVER FUNDED..... NO OBLIGATION FOR 63,130,000 ANCHORAGES, VA. CONSTRUCTION. VA........... FRM.......... NAO.......... VA 2.............. WALLOPS ISLAND, VA PROJECT........... 106-53 567........... NEVER FUNDED..... NO OBLIGATION FOR 8,000,000 CONSTRUCTION. WA........... REC.......... NWW.......... WA 5.............. SNAKE RIVER PROJECT........... 108-137 124........... CONSTRUCTION NOT 2004............. 3,750,044 INTERPRETIVE INITIATED. CENTER, CLARKSTON, WA. WA........... AER.......... NWS.......... WA 1 & 2.......... STILLAGUMAISH PROJECT........... 106-541 101b (27)..... NEVER FUNDED..... NO OBLIGATION FOR 26,047,966 RIVER BASIN, WA. CONSTRUCTION. WV........... FRM.......... LRH.......... WV 2.............. CABIN CREEK LPP, PROJECT........... 99-662 601a.......... NEVER FUNDED..... NO OBLIGATION FOR 10,409,900 WV. CONSTRUCTION. WV........... FRM.......... LRH.......... WV 3.............. ISLAND CREEK SEPARABLE ELEMENT. 99-662 401a.......... NEVER FUNDED..... NO OBLIGATION FOR 107,707,600 BASIN, VICINITY CONSTRUCTION. OF LOGAN, WV (NON- STRUCTURAL FEATURES). WV........... NAV.......... LRH.......... WV 1.............. WEST VIRGINIA PORT PROJECT........... 106-53 557(3)........ NEVER FUNDED..... NO OBLIGATION FOR 24,144,000 DEVELOPMENT, WV. CONSTRUCTION. WV........... NAV.......... LRP.......... WV 1.............. WEIRTON PORT, WV.. PROJECT........... 106-53 557(2)........ NEVER FUNDED..... NO OBLIGATION FOR 15,274,778 CONSTRUCTION. -------------------------------------------------------------------------------------------------------------------------------- ............. ............. .................. # PROJECTS........ 147............... .............. .............. ................. TOTAL............ 14,348,670,778 ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ NOTES: (1) PROJECT/ELEMENT TYPE: PROJECT = WATER RESOURCES DEVELOPMENT PROJECT AUTHORIZED FOR CONSTRUCTION, INCLUDING AUTHORIZED ENVIRONMENTAL INFRASTRUCTURE ASSISTANCE PROGRAM IN ACCORDANCE WITH WRRDA 2014, SECTION 6001(f)(1)(B). (2) PROJECT/ELEMENT PHASE AND STATUS: NEVER FUNDED = NEVER FUNDED FOR CONSTRUCTION, INCLUDING PROJECTS IN PRECONSTRUCTION ENGINEERING AND DESIGN; CONSTRUCTION NOT INITIATED = CONSTRUCTION FUNDED BUT PHYSICAL CONSTRUCTION NOT INITIATED; CONSTRUCTION PAUSED = CONSTRUCTION FUNDED BUT PHYSICAL CONSTRUCTION PAUSED. (3) PER PUBLIC LAW 106-541, SEC. 507, NO CRITICAL RESTORATION PROJECT MAY BE INITIATED UNDER THIS SUBSECTION AFTER SEPTEMBER 30, 2005. [[Page 60657]] Authority: This notice is required by Sec. 6001(c) of the Water Resources Reform and Development Act of 2014, Public Law 113-121, 128 STAT 1346-1347. Dated: September 30, 2015. Jo-Ellen Darcy, Assistant Secretary of the Army (Civil Works). [FR Doc. 2015-25586 Filed 10-6-15; 8:45 am] BILLING CODE 3720-58-P
Category | Regulatory Information | |
Collection | Federal Register | |
sudoc Class | AE 2.7: GS 4.107: AE 2.106: | |
Publisher | Office of the Federal Register, National Archives and Records Administration | |
Section | Notices | |
Action | Notice of Interim Deauthorization List. | |
Contact | Mr. Joseph W. Aldridge, Headquarters, U.S. Army Corps of Engineers, Attention: CECW-IP, Washington, DC 20314- 1000. Tel. (202) 761-4130 or [email protected] | |
FR Citation | 80 FR 60647 |