80_FR_61083 80 FR 60888 - PacifiCorp; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests

80 FR 60888 - PacifiCorp; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 80, Issue 195 (October 8, 2015)

Page Range60888-60888
FR Document2015-25639

Federal Register, Volume 80 Issue 195 (Thursday, October 8, 2015)
[Federal Register Volume 80, Number 195 (Thursday, October 8, 2015)]
[Notices]
[Page 60888]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-25639]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 4580-006]


PacifiCorp; Notice of Application Accepted for Filing, Soliciting 
Comments, Motions To Intervene, and Protests

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Types of Application: Amendment of Exemption.
    b. Project Nos.: 4580-006.
    c. Date Filed: September 21, 2015.
    d. Applicant: PacifiCorp.
    e. Name of Projects: Last Chance Canal Hydroelectric Project.
    f. Location: The project is located at the Last Chance Canal, a 
diversion from the Bear River in Caribou County, Idaho.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
    h. Applicant Contact: Roger L. Raeburn, Chief Dam Safety Engineer, 
PacifiCorp, 825 NE. Multnomah Street, Suite 1500, Portland, OR 97232; 
(503) 813-6667 or [email protected].
    i. FERC Contact: B. Peter Yarrington, (202) 502-6129 or 
[email protected].
    j. Deadline for filing comments, motions to intervene, and protests 
is 15 days from the issuance date of this notice by the Commission. The 
Commission strongly encourages electronic filing. Please file motions 
to intervene, protests, or comments using the Commission's eFiling 
system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can 
submit brief comments up to 6,000 characters, without prior 
registration, using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information 
at the end of your comments. For assistance, please contact FERC Online 
Support at [email protected], (866) 208-3676 (toll free), or 
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper 
copy to: Secretary, Federal Energy Regulatory Commission, 888 First 
Street NE., Washington, DC 20426. Please include the project number (P-
4580-006) on any comments, motions to intervene, or protests filed.
    k. Description of Request: The applicant proposes to replace the 
project's wood-crib diversion dam, and parts of the canal intake 
structure. An engineering inspection in April 2015 found significant 
deterioration of the diversion dam, which is over 100 years old, in 
addition to seepage where the intake structure meets the dam. The 
existing diversion dam would be replaced with a new structure of 
reinforced concrete and roller-compacted concrete. The work would not 
result in any changes to dam height, dam width, associated water 
levels, or project operation.
    l. Locations of the Application: A copy of the application is 
available for inspection and reproduction at the Commission's Public 
Reference Room, located at 888 First Street NE., Room 2A, Washington, 
DC 20426, or by calling (202) 502-8371. This filing may also be viewed 
on the Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number excluding the last three digits 
in the docket number field to access the document. You may also 
register online at http://www.ferc.gov/docs-filing/esubscription.asp to 
be notified via email of new filings and issuances related to this or 
other pending projects. For assistance, call 1 (866) 208-3676 or email 
[email protected], for TTY, call (202) 502-8659. A copy is 
also available for inspection and reproduction at the address in item 
(h) above.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Comments, Protests, or Motions to Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214. In determining the appropriate action to take, the Commission 
will consider all protests or other comments filed, but only those who 
file a motion to intervene in accordance with the Commission's Rules 
may become a party to the proceeding. Any comments, protests, or 
motions to intervene must be received on or before the specified 
comment date for the particular application.
    o. Filing and Service of Responsive Documents: Any filing must (1) 
bear in all capital letters the title ``COMMENTS'', ``PROTEST'', or 
``MOTION TO INTERVENE'' as applicable; (2) set forth in the heading the 
name of the applicant and the project number of the application to 
which the filing responds; (3) furnish the name, address, and telephone 
number of the person protesting or intervening; and (4) otherwise 
comply with the requirements of 18 CFR 385.2001 through 385.2005. All 
comments, motions to intervene, or protests must set forth their 
evidentiary basis and otherwise comply with the requirements of 18 CFR 
4.34(b). All comments, motions to intervene, or protests should relate 
to project works which are the subject of the amendment application. 
Agencies may obtain copies of the application directly from the 
applicant. A copy of any protest or motion to intervene must be served 
upon each representative of the applicant specified in the particular 
application. If an intervener files comments or documents with the 
Commission relating to the merits of an issue that may affect the 
responsibilities of a particular resource agency, they must also serve 
a copy of the document on that resource agency. A copy of all other 
filings in reference to this application must be accompanied by proof 
of service on all persons listed in the service list prepared by the 
Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 
385.2010.

    Dated: October 2, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-25639 Filed 10-7-15; 8:45 am]
 BILLING CODE 6717-01-P



                                                  60888                        Federal Register / Vol. 80, No. 195 / Thursday, October 8, 2015 / Notices

                                                    Dated: October 2, 2015.                               4580–006) on any comments, motions to                 project number of the application to
                                                  Kimberly D. Bose,                                       intervene, or protests filed.                         which the filing responds; (3) furnish
                                                  Secretary.                                                 k. Description of Request: The                     the name, address, and telephone
                                                  [FR Doc. 2015–25636 Filed 10–7–15; 8:45 am]             applicant proposes to replace the                     number of the person protesting or
                                                  BILLING CODE 6717–01–P
                                                                                                          project’s wood-crib diversion dam, and                intervening; and (4) otherwise comply
                                                                                                          parts of the canal intake structure. An               with the requirements of 18 CFR
                                                                                                          engineering inspection in April 2015                  385.2001 through 385.2005. All
                                                  DEPARTMENT OF ENERGY                                    found significant deterioration of the                comments, motions to intervene, or
                                                                                                          diversion dam, which is over 100 years                protests must set forth their evidentiary
                                                  Federal Energy Regulatory                               old, in addition to seepage where the                 basis and otherwise comply with the
                                                  Commission                                              intake structure meets the dam. The                   requirements of 18 CFR 4.34(b). All
                                                                                                          existing diversion dam would be                       comments, motions to intervene, or
                                                  [Project No. 4580–006]                                  replaced with a new structure of                      protests should relate to project works
                                                                                                          reinforced concrete and roller-                       which are the subject of the amendment
                                                  PacifiCorp; Notice of Application                       compacted concrete. The work would                    application. Agencies may obtain copies
                                                  Accepted for Filing, Soliciting                         not result in any changes to dam height,              of the application directly from the
                                                  Comments, Motions To Intervene, and                     dam width, associated water levels, or                applicant. A copy of any protest or
                                                  Protests                                                project operation.                                    motion to intervene must be served
                                                                                                             l. Locations of the Application: A                 upon each representative of the
                                                     Take notice that the following
                                                                                                          copy of the application is available for              applicant specified in the particular
                                                  hydroelectric application has been filed
                                                                                                          inspection and reproduction at the                    application. If an intervener files
                                                  with the Commission and is available                    Commission’s Public Reference Room,
                                                  for public inspection:                                                                                        comments or documents with the
                                                                                                          located at 888 First Street NE., Room                 Commission relating to the merits of an
                                                     a. Types of Application: Amendment                   2A, Washington, DC 20426, or by calling
                                                  of Exemption.                                                                                                 issue that may affect the responsibilities
                                                                                                          (202) 502–8371. This filing may also be               of a particular resource agency, they
                                                     b. Project Nos.: 4580–006.                           viewed on the Commission’s Web site at
                                                     c. Date Filed: September 21, 2015.                                                                         must also serve a copy of the document
                                                                                                          http://www.ferc.gov/docs-filing/                      on that resource agency. A copy of all
                                                     d. Applicant: PacifiCorp.                            elibrary.asp. Enter the docket number
                                                     e. Name of Projects: Last Chance                                                                           other filings in reference to this
                                                                                                          excluding the last three digits in the                application must be accompanied by
                                                  Canal Hydroelectric Project.                            docket number field to access the
                                                     f. Location: The project is located at                                                                     proof of service on all persons listed in
                                                                                                          document. You may also register online                the service list prepared by the
                                                  the Last Chance Canal, a diversion from                 at http://www.ferc.gov/docs-filing/
                                                  the Bear River in Caribou County, Idaho.                                                                      Commission in this proceeding, in
                                                                                                          esubscription.asp to be notified via
                                                     g. Filed Pursuant to: Federal Power                                                                        accordance with 18 CFR 4.34(b) and
                                                                                                          email of new filings and issuances
                                                  Act, 16 U.S.C. 791a–825r.                                                                                     385.2010.
                                                                                                          related to this or other pending projects.
                                                     h. Applicant Contact: Roger L.                       For assistance, call 1 (866) 208–3676 or                Dated: October 2, 2015.
                                                  Raeburn, Chief Dam Safety Engineer,                     email FERCOnlineSupport@ferc.gov, for                 Kimberly D. Bose,
                                                  PacifiCorp, 825 NE. Multnomah Street,                   TTY, call (202) 502–8659. A copy is also              Secretary.
                                                  Suite 1500, Portland, OR 97232; (503)                   available for inspection and                          [FR Doc. 2015–25639 Filed 10–7–15; 8:45 am]
                                                  813–6667 or roger.raeburn@                              reproduction at the address in item (h)               BILLING CODE 6717–01–P
                                                  pacificorp.com.                                         above.
                                                     i. FERC Contact: B. Peter Yarrington,                   m. Individuals desiring to be included
                                                  (202) 502–6129 or peter.yarrington@                     on the Commission’s mailing list should               DEPARTMENT OF ENERGY
                                                  ferc.gov.                                               so indicate by writing to the Secretary
                                                     j. Deadline for filing comments,                     of the Commission.                                    Federal Energy Regulatory
                                                  motions to intervene, and protests is 15                   n. Comments, Protests, or Motions to               Commission
                                                  days from the issuance date of this                     Intervene: Anyone may submit
                                                  notice by the Commission. The                                                                                 [Project No. 77–276]
                                                                                                          comments, a protest, or a motion to
                                                  Commission strongly encourages                          intervene in accordance with the                      Pacific Gas and Electric Company;
                                                  electronic filing. Please file motions to               requirements of Rules of Practice and                 Notice of Application Accepted for
                                                  intervene, protests, or comments using                  Procedure, 18 CFR 385.210, .211, .214.                Filing, Soliciting Comments, Motions
                                                  the Commission’s eFiling system at                      In determining the appropriate action to              To Intervene, and Protests
                                                  http://www.ferc.gov/docs-filing/                        take, the Commission will consider all
                                                  efiling.asp. Commenters can submit                      protests or other comments filed, but                   Take notice that the following
                                                  brief comments up to 6,000 characters,                  only those who file a motion to                       hydroelectric application has been filed
                                                  without prior registration, using the                   intervene in accordance with the                      with the Commission and is available
                                                  eComment system at http://                              Commission’s Rules may become a                       for public inspection:
                                                  www.ferc.gov/docs-filing/                               party to the proceeding. Any comments,                  a. Type of Application: Application
                                                  ecomment.asp. You must include your                     protests, or motions to intervene must                for Temporary Variance of Minimum
                                                  name and contact information at the end                 be received on or before the specified                Flow Requirement.
                                                  of your comments. For assistance,                       comment date for the particular                         b. Project No.: 77–276.
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                  please contact FERC Online Support at                   application.                                            c. Date Filed: September 30, 2015.
                                                  FERCOnlineSupport@ferc.gov, (866)                          o. Filing and Service of Responsive                  d. Applicant: Pacific Gas and Electric
                                                  208–3676 (toll free), or (202) 502–8659                 Documents: Any filing must (1) bear in                Company (licensee).
                                                  (TTY). In lieu of electronic filing, please             all capital letters the title                           e. Name of Project: Potter Valley
                                                  send a paper copy to: Secretary, Federal                ‘‘COMMENTS’’, ‘‘PROTEST’’, or                         Project.
                                                  Energy Regulatory Commission, 888                       ‘‘MOTION TO INTERVENE’’ as                              f. Location: Eel River and East Fork
                                                  First Street NE., Washington, DC 20426.                 applicable; (2) set forth in the heading              Russian River in Lake and Mendocino
                                                  Please include the project number (P–                   the name of the applicant and the                     Counties, California.


                                             VerDate Sep<11>2014   16:41 Oct 07, 2015   Jkt 238001   PO 00000   Frm 00017   Fmt 4703   Sfmt 4703   E:\FR\FM\08OCN1.SGM   08OCN1



Document Created: 2015-12-15 08:42:22
Document Modified: 2015-12-15 08:42:22
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation80 FR 60888 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR