80_FR_61091 80 FR 60896 - Public Citizen, Inc. v. Midcontinent Independent System Operator, Inc., The People of the State of Illinois By Illinois Attorney General Lisa Madigan v. Midcontinent Independent System Operator, Inc., Southwestern Electric Cooperative, Inc. v. Midcontinent Independent System Operator, Inc., Dynegy, Inc., and Sellers of Capacity into Zone 4 of the 2015-2016 MISO Planning Resource Auction, Illinois Industrial Energy Consumers v. Midcontinent Independent System Operator, Inc.; Notice of Technical Conference

80 FR 60896 - Public Citizen, Inc. v. Midcontinent Independent System Operator, Inc., The People of the State of Illinois By Illinois Attorney General Lisa Madigan v. Midcontinent Independent System Operator, Inc., Southwestern Electric Cooperative, Inc. v. Midcontinent Independent System Operator, Inc., Dynegy, Inc., and Sellers of Capacity into Zone 4 of the 2015-2016 MISO Planning Resource Auction, Illinois Industrial Energy Consumers v. Midcontinent Independent System Operator, Inc.; Notice of Technical Conference

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 80, Issue 195 (October 8, 2015)

Page Range60896-60897
FR Document2015-25632

Federal Register, Volume 80 Issue 195 (Thursday, October 8, 2015)
[Federal Register Volume 80, Number 195 (Thursday, October 8, 2015)]
[Notices]
[Pages 60896-60897]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-25632]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket Nos. EL15-70-000; EL15-71-000; EL15-72-000; EL15-82-000]


Public Citizen, Inc. v. Midcontinent Independent System Operator, 
Inc., The People of the State of Illinois By Illinois Attorney General 
Lisa Madigan v. Midcontinent Independent System Operator, Inc., 
Southwestern Electric Cooperative, Inc. v. Midcontinent Independent 
System Operator, Inc., Dynegy, Inc., and Sellers of Capacity into Zone 
4 of the 2015-2016 MISO Planning Resource Auction, Illinois Industrial 
Energy Consumers v. Midcontinent Independent System Operator, Inc.; 
Notice of Technical Conference

    Take notice that a staff-led conference will be held on October 20, 
2015, at the offices of the Federal Energy Regulatory Commission, 888 
First Street NE., Washington, DC 20426, between 9:00 a.m. and 4:15 p.m. 
(EST). The purpose of the conference is to obtain further information 
concerning the above referenced complaints.\1\
---------------------------------------------------------------------------

    \1\ As noted in its order issued October 1, 2015 in Docket No. 
IN15-10-000, the Commission's Office of Enforcement is conducting a 
non-public investigation under Part 1b of the Commission's 
regulations into whether market manipulation or other potential 
violations of Commission orders, rules and regulations occurred 
before or during the Auction conducted by MISO in April 2015. This 
technical conference will not address the current investigation.
---------------------------------------------------------------------------

    The technical conference will be transcribed. Transcripts will be 
available for a fee from Ace-Federal Reports, Inc. (202-347-3700).
    There will be a free webcast of the conference. The webcast will 
allow persons to listen to the technical conference, but not 
participate. Anyone with internet access who wants to listen to the 
conference can do so by navigating to the Calendar of Events at 
www.ferc.gov and locating the technical conference in the Calendar. The 
technical conference will contain a link to its webcast. The Capitol 
Connection provides technical support for the webcast and offers the 
option of listening to the meeting via phone-bridge for a fee. If you 
have any questions, visit www.CapitolConnection.org or call 703-993-
3100. The webcast will be available on the Calendar of Events on the 
Commission's Web site www.ferc.gov for three months after the 
conference.
    Advance registration is not required but is highly encouraged. 
Attendees may register at the following Web page: https://www.ferc.gov/whats-new/registration/10-20-15-form.asp. Attendees should allow time 
to pass through building security procedures before the 9:00 a.m. (EST) 
start time of the technical conference. In addition, information on 
this event will be posted on the Calendar of Events on the Commission's 
Web site, www.ferc.gov, prior to the event.
    Discussions at the conference may address matters at issue in the 
following Commission proceeding(s) that are either pending or within 
their rehearing period: Midcontinent Independent System Operator, Inc., 
Docket No. ER11-4081-000, et al.
    Commission conferences are accessible under section 508 of the 
Rehabilitation Act of 1973. For accessibility accommodations, please 
send an email to [email protected] or call toll free (866) 208-
3372 (voice) or (202) 502-8659 (TTY), or send a FAX to (202) 208-2106 
with the required accommodations.

[[Page 60897]]

    The technical conference will consist of four sessions and focus on 
the issues raised in the complaints, as detailed below. Commissioners 
may attend and ask questions. The times given below are approximate and 
may change, as needed.

Conference Introduction: Commission Staff (9:00 a.m.-9:15 a.m.)
Session 1: Market Power Mitigation (9:15 a.m.-12:15 p.m.)
    Panel 1: Implementation of the Current Mitigation Procedures and 
Reference Level Calculations (90 mins)

    Staff will lead a discussion to obtain information on the current 
market power mitigation procedures, including Initial Reference Levels, 
the transmission availability from MISO to PJM Interconnection, L.L.C. 
(PJM), PJM's market for replacement capacity, opportunity costs, and 
the Conduct Threshold for capacity market offer mitigation. Panelists 
should also be prepared to answer questions including, but not limited 
to, the following: For the 2014/15 and 2015/16 delivery years, how much 
PJM replacement capacity was procured after PJM's third incremental 
auction, and of that, how much was from MISO resources, and for what 
prices and durations were these MISO resources contracted? How much 
total transmission capability was available between MISO and PJM during 
the 2014/15 and 2015/16 MISO and PJM delivery years, and how much of 
that transmission capacity was subscribed as of the PJM third 
Incremental Auction for each delivery year? How much total transmission 
capability is expected between MISO and PJM for the 2016/17 and 2017/18 
delivery years, and how much of that transmission capability is already 
subscribed?

    Panel 2: Alternatives to the Current Mitigation Procedures and 
Reference Level Calculation (90 mins)

    Panelists should be prepared to discuss possible alternatives to 
the current market power mitigation procedures and calculations. 
Panelists should also be prepared to answer questions including, but 
not limited to, the following: How should opportunity cost underlying 
reference levels consider physical or economic limitations of capacity 
sales? Should individual reference levels be developed for market 
participants that are pivotal suppliers in the capacity market? If so, 
how should they be determined? What are alternatives to PJM replacement 
capacity sales for determining the opportunity costs used to establish 
mitigation reference levels?

Lunch Break: (12:15 p.m.-1:15 p.m.)
Session 2: Local Requirements (1:15 p.m.-2:15 p.m.)

    Panelists should be prepared to describe the calculations of 
Auction parameters such as Local Reliability Requirements, Capacity 
Import Limits, Capacity Export Limits, and Local Clearing Requirements, 
and to answer questions including, but not limited to, the following: 
What was the rationale behind the methodological change to examine 
constraints below 200 kV in the calculation of Capacity Import Limits 
and Capacity Export Limits? How does MISO's calculation of zonal 
Capacity Import Limits and Capacity Export Limits reflect counter-flows 
from or into neighboring regions?

Session 3: Zonal Boundaries (2:15 p.m.-3:00 p.m.)

    Panelists should be prepared to discuss the current zonal 
boundaries in MISO and the criteria used to establish zonal 
configuration. Panelists should also be prepared to answer questions 
including, but not limited to, the following: Have the six criteria in 
the Tariff established a zonal configuration that reflects the physical 
constraints on the MISO transmission system? If there is little or no 
congestion between adjacent zones, what are the reasons for and against 
combining the zones? What changes to the criteria and/or zonal 
configuration are currently being considered by MISO?

Break: (3:00 p.m.-3:15 p.m.)
Session 4: Wrap Up (3:15 p.m.-4:00 p.m.)

    Panelists should be prepared to answer questions including, but not 
limited to, the following: What changes to the Tariff, including those 
not discussed in the first three sessions, might be necessary to ensure 
just and reasonable outcomes going forward, and, of these changes, 
which can be implemented for the 2016/17 Auction?

Conference Conclusion: Next Steps (4:00 p.m.-4:15 p.m.)

    Following the technical conference, the Commission will consider 
post-technical conference comments regarding the matters discussed at 
the conference submitted on or before November 4, 2015.
    For more information about this technical conference, please 
contact Elizabeth Shen, 202-502-6545, [email protected], 
regarding legal issues; or Angelo Mastrogiacomo, 202-502-8689, 
[email protected], and Emma Nicholson, 202-502-8846, 
[email protected], regarding technical issues; or Sarah McKinley, 
202-502-8368, [email protected], regarding logistical issues.

    Dated: October 1, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-25632 Filed 10-7-15; 8:45 am]
 BILLING CODE 6717-01-P



                                                  60896                        Federal Register / Vol. 80, No. 195 / Thursday, October 8, 2015 / Notices

                                                  within 90 days of this Notice the                       project should submit an original and                 Commission, 888 First Street NE.,
                                                  Commission staff will either: Complete                  two copies of their comments to the                   Washington, DC 20426, between 9:00
                                                  its environmental assessment (EA) and                   Secretary of the Commission.                          a.m. and 4:15 p.m. (EST). The purpose
                                                  place it into the Commission’s public                   Environmental commenters will be                      of the conference is to obtain further
                                                  record (eLibrary) for this proceeding; or               placed on the Commission’s                            information concerning the above
                                                  issue a Notice of Schedule for                          environmental mailing list, will receive              referenced complaints.1
                                                  Environmental Review. If a Notice of                    copies of the environmental documents,                   The technical conference will be
                                                  Schedule for Environmental Review is                    and will be notified of meetings                      transcribed. Transcripts will be
                                                  issued, it will indicate, among other                   associated with the Commission’s                      available for a fee from Ace-Federal
                                                  milestones, the anticipated date for the                environmental review process.                         Reports, Inc. (202–347–3700).
                                                  Commission staff’s issuance of the final                Environmental commenters will not be                     There will be a free webcast of the
                                                  environmental impact statement (FEIS)                   required to serve copies of filed                     conference. The webcast will allow
                                                  or EA for this proposal. The filing of the              documents on all other parties.                       persons to listen to the technical
                                                  EA in the Commission’s public record                    However, the non-party commenters                     conference, but not participate. Anyone
                                                  for this proceeding or the issuance of a                will not receive copies of all documents              with internet access who wants to listen
                                                  Notice of Schedule for Environmental                    filed by other parties or issued by the               to the conference can do so by
                                                  Review will serve to notify federal and                 Commission (except for the mailing of                 navigating to the Calendar of Events at
                                                  state agencies of the timing for the                    environmental documents issued by the                 www.ferc.gov and locating the technical
                                                  completion of all necessary reviews, and                Commission) and will not have the right               conference in the Calendar. The
                                                  the subsequent need to complete all                     to seek court review of the                           technical conference will contain a link
                                                  federal authorizations within 90 days of                Commission’s final order.                             to its webcast. The Capitol Connection
                                                  the date of issuance of the Commission                     The Commission strongly encourages                 provides technical support for the
                                                  staff’s FEIS or EA.                                     electronic filings of comments, protests,             webcast and offers the option of
                                                     There are two ways to become                         and interventions via the internet in lieu            listening to the meeting via phone-
                                                  involved in the Commission’s review of                  of paper. See 18 CFR 385.2001(a) (1) (iii)            bridge for a fee. If you have any
                                                  this project. First, any person wishing to              and the instructions on the                           questions, visit
                                                  obtain legal status by becoming a party                 Commission’s Web site (www.ferc.gov)                  www.CapitolConnection.org or call 703–
                                                  to the proceedings for this project                     under the ‘‘e-Filing’’ link. Persons                  993–3100. The webcast will be available
                                                  should, on or before the comment date                   unable to file electronically should                  on the Calendar of Events on the
                                                  stated below, file with the Federal                     submit an original and 5 copies of the                Commission’s Web site www.ferc.gov for
                                                  Energy Regulatory Commission, 888                       protest or intervention to the Federal                three months after the conference.
                                                  First Street NE., Washington, DC 20426,                                                                          Advance registration is not required
                                                                                                          Energy regulatory Commission, 888
                                                  a motion to intervene in accordance                                                                           but is highly encouraged. Attendees
                                                                                                          First Street NE., Washington, DC 20426.
                                                  with the requirements of the                                                                                  may register at the following Web page:
                                                                                                             Comment Date: 5:00 p.m. Eastern
                                                  Commission’s Rules of Practice and                                                                            https://www.ferc.gov/whats-new/
                                                                                                          Time on October 23, 2015.                             registration/10-20-15-form.asp.
                                                  Procedure (18 CFR 385.214 or 385.211)
                                                  and the Regulations under the NGA (18                     Dated: October 2, 2015.                             Attendees should allow time to pass
                                                  CFR 157.10). A person obtaining party                   Kimberly D. Bose,                                     through building security procedures
                                                  status will be placed on the service list               Secretary.                                            before the 9:00 a.m. (EST) start time of
                                                  maintained by the Secretary of the                      [FR Doc. 2015–25635 Filed 10–7–15; 8:45 am]           the technical conference. In addition,
                                                  Commission and will receive copies of                   BILLING CODE 6717–01–P
                                                                                                                                                                information on this event will be posted
                                                  all documents filed by the applicant and                                                                      on the Calendar of Events on the
                                                  by all other parties. A party must submit                                                                     Commission’s Web site, www.ferc.gov,
                                                  5 copies of filings made with the                       DEPARTMENT OF ENERGY                                  prior to the event.
                                                  Commission and must mail a copy to                                                                               Discussions at the conference may
                                                  the applicant and to every other party in               Federal Energy Regulatory                             address matters at issue in the following
                                                  the proceeding. Only parties to the                     Commission                                            Commission proceeding(s) that are
                                                  proceeding can ask for court review of                                                                        either pending or within their rehearing
                                                                                                          [Docket Nos. EL15–70–000; EL15–71–000;                period: Midcontinent Independent
                                                  Commission orders in the proceeding.                    EL15–72–000; EL15–82–000]
                                                     However, a person does not have to                                                                         System Operator, Inc., Docket No.
                                                  intervene in order to have comments                     Public Citizen, Inc. v. Midcontinent                  ER11–4081–000, et al.
                                                  considered. The second way to                                                                                    Commission conferences are
                                                                                                          Independent System Operator, Inc.,
                                                  participate is by filing with the                                                                             accessible under section 508 of the
                                                                                                          The People of the State of Illinois By
                                                  Secretary of the Commission, as soon as                                                                       Rehabilitation Act of 1973. For
                                                                                                          Illinois Attorney General Lisa Madigan
                                                  possible, an original and two copies of                                                                       accessibility accommodations, please
                                                                                                          v. Midcontinent Independent System
                                                  comments in support of or in opposition                                                                       send an email to accessibility@ferc.gov
                                                                                                          Operator, Inc., Southwestern Electric
                                                  to this project. The Commission will                                                                          or call toll free (866) 208–3372 (voice)
                                                                                                          Cooperative, Inc. v. Midcontinent
                                                  consider these comments in                                                                                    or (202) 502–8659 (TTY), or send a FAX
                                                                                                          Independent System Operator, Inc.,
                                                  determining the appropriate action to be                                                                      to (202) 208–2106 with the required
                                                                                                          Dynegy, Inc., and Sellers of Capacity
                                                  taken, but the filing of a comment alone                                                                      accommodations.
                                                                                                          into Zone 4 of the 2015–2016 MISO
                                                  will not serve to make the filer a party                Planning Resource Auction, Illinois
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                                                                                                                                  1 As noted in its order issued October 1, 2015 in
                                                  to the proceeding. The Commission’s                     Industrial Energy Consumers v.                        Docket No. IN15–10–000, the Commission’s Office
                                                  rules require that persons filing                       Midcontinent Independent System                       of Enforcement is conducting a non-public
                                                  comments in opposition to the project                   Operator, Inc.; Notice of Technical                   investigation under Part 1b of the Commission’s
                                                  provide copies of their protests only to                Conference                                            regulations into whether market manipulation or
                                                  the party or parties directly involved in                                                                     other potential violations of Commission orders,
                                                                                                                                                                rules and regulations occurred before or during the
                                                  the protest.                                              Take notice that a staff-led conference             Auction conducted by MISO in April 2015. This
                                                     Persons who wish to comment only                     will be held on October 20, 2015, at the              technical conference will not address the current
                                                  on the environmental review of this                     offices of the Federal Energy Regulatory              investigation.



                                             VerDate Sep<11>2014   16:41 Oct 07, 2015   Jkt 238001   PO 00000   Frm 00025   Fmt 4703   Sfmt 4703   E:\FR\FM\08OCN1.SGM   08OCN1


                                                                               Federal Register / Vol. 80, No. 195 / Thursday, October 8, 2015 / Notices                                                60897

                                                     The technical conference will consist                Lunch Break: (12:15 p.m.–1:15 p.m.)                   sarah.mckinley@ferc.gov, regarding
                                                  of four sessions and focus on the issues                Session 2: Local Requirements (1:15                   logistical issues.
                                                  raised in the complaints, as detailed                         p.m.–2:15 p.m.)                                   Dated: October 1, 2015.
                                                  below. Commissioners may attend and                        Panelists should be prepared to                    Kimberly D. Bose,
                                                  ask questions. The times given below                    describe the calculations of Auction                  Secretary.
                                                  are approximate and may change, as                      parameters such as Local Reliability
                                                  needed.                                                                                                       [FR Doc. 2015–25632 Filed 10–7–15; 8:45 am]
                                                                                                          Requirements, Capacity Import Limits,
                                                                                                                                                                BILLING CODE 6717–01–P
                                                  Conference Introduction: Commission                     Capacity Export Limits, and Local
                                                       Staff (9:00 a.m.–9:15 a.m.)                        Clearing Requirements, and to answer
                                                  Session 1: Market Power Mitigation                      questions including, but not limited to,
                                                       (9:15 a.m.–12:15 p.m.)                             the following: What was the rationale                 ENVIRONMENTAL PROTECTION
                                                     Panel 1: Implementation of the                       behind the methodological change to                   AGENCY
                                                       Current Mitigation Procedures and                  examine constraints below 200 kV in                   [EPA–HQ–OPP–2015–0669; FRL–9934–99]
                                                       Reference Level Calculations (90                   the calculation of Capacity Import
                                                       mins)                                              Limits and Capacity Export Limits? How                Pesticide Program Dialogue
                                                     Staff will lead a discussion to obtain               does MISO’s calculation of zonal                      Committee; Notice of Public Meeting
                                                  information on the current market                       Capacity Import Limits and Capacity
                                                  power mitigation procedures, including                                                                        AGENCY: Environmental Protection
                                                                                                          Export Limits reflect counter-flows from              Agency (EPA).
                                                  Initial Reference Levels, the                           or into neighboring regions?
                                                  transmission availability from MISO to                                                                        ACTION: Notice.
                                                                                                          Session 3: Zonal Boundaries (2:15 p.m.–
                                                  PJM Interconnection, L.L.C. (PJM),                            3:00 p.m.)                                      SUMMARY:   Pursuant to the Federal
                                                  PJM’s market for replacement capacity,                                                                        Advisory Committee Act, the
                                                  opportunity costs, and the Conduct                         Panelists should be prepared to
                                                                                                          discuss the current zonal boundaries in               Environmental Protection Agency’s
                                                  Threshold for capacity market offer                                                                           Office of Pesticide Programs is
                                                  mitigation. Panelists should also be                    MISO and the criteria used to establish
                                                                                                          zonal configuration. Panelists should                 announcing a public meeting of the
                                                  prepared to answer questions including,                                                                       Pesticide Program Dialogue Committee
                                                  but not limited to, the following: For the              also be prepared to answer questions
                                                                                                          including, but not limited to, the                    (PPDC) on October 21–22, 2015. In
                                                  2014/15 and 2015/16 delivery years,                                                                           addition, EPA is announcing meetings
                                                  how much PJM replacement capacity                       following: Have the six criteria in the
                                                                                                          Tariff established a zonal configuration              on October 20, 2015, of the following
                                                  was procured after PJM’s third                                                                                PPDC Workgroups: Integrated Pest
                                                  incremental auction, and of that, how                   that reflects the physical constraints on
                                                                                                          the MISO transmission system? If there                Management, Comparative Safety
                                                  much was from MISO resources, and for                                                                         Statements, 21st Century Toxicology/
                                                  what prices and durations were these                    is little or no congestion between
                                                                                                          adjacent zones, what are the reasons for              New Integrated Testing Strategies, and
                                                  MISO resources contracted? How much                                                                           Pesticide Incidents. These meetings
                                                  total transmission capability was                       and against combining the zones? What
                                                                                                          changes to the criteria and/or zonal                  provide advice and recommendations to
                                                  available between MISO and PJM during                                                                         the EPA Administrator on issues
                                                  the 2014/15 and 2015/16 MISO and PJM                    configuration are currently being
                                                                                                          considered by MISO?                                   associated with pesticide regulatory
                                                  delivery years, and how much of that                                                                          development and reform initiatives,
                                                  transmission capacity was subscribed as                 Break: (3:00 p.m.–3:15 p.m.)
                                                                                                          Session 4: Wrap Up (3:15 p.m.–4:00                    evolving public policy and program
                                                  of the PJM third Incremental Auction for                                                                      implementation issues, and science
                                                  each delivery year? How much total                            p.m.)
                                                                                                                                                                issues associated with evaluating and
                                                  transmission capability is expected                        Panelists should be prepared to
                                                                                                                                                                reducing risks from use of pesticides.
                                                  between MISO and PJM for the 2016/17                    answer questions including, but not
                                                                                                                                                                DATES: The PPDC meeting will be held
                                                  and 2017/18 delivery years, and how                     limited to, the following: What changes
                                                                                                          to the Tariff, including those not                    on Wednesday, October 21, 2015, from
                                                  much of that transmission capability is
                                                                                                          discussed in the first three sessions,                9 a.m. to 5:00 p.m. and Thursday,
                                                  already subscribed?
                                                                                                          might be necessary to ensure just and                 October 22, 2015, from 9 a.m. to 12:00
                                                     Panel 2: Alternatives to the Current                                                                       p.m.
                                                       Mitigation Procedures and                          reasonable outcomes going forward,
                                                                                                                                                                   Work Group Meetings: On Tuesday,
                                                       Reference Level Calculation (90                    and, of these changes, which can be
                                                                                                                                                                October 20, 2015, PPDC Work Group
                                                       mins)                                              implemented for the 2016/17 Auction?
                                                                                                                                                                meetings are scheduled as follows:
                                                     Panelists should be prepared to                      Conference Conclusion: Next Steps (4:00               Integrated Pest Management Work
                                                  discuss possible alternatives to the                          p.m.–4:15 p.m.)                                 Group, 1:00 p.m. to 3:00 p.m.,
                                                  current market power mitigation                            Following the technical conference,                Comparative Safety Statements Work
                                                  procedures and calculations. Panelists                  the Commission will consider post-                    Group, 2:00 p.m. to 4:00 p.m., 21st
                                                  should also be prepared to answer                       technical conference comments                         Century Toxicology/New Integrated
                                                  questions including, but not limited to,                regarding the matters discussed at the                Testing Strategies Work Group, 1:00
                                                  the following: How should opportunity                   conference submitted on or before                     p.m. to 3:00 p.m., and Pesticide
                                                  cost underlying reference levels                        November 4, 2015.                                     Incidents Work Group, 1:30 p.m. to 4:00
                                                  consider physical or economic                              For more information about this                    p.m.
                                                  limitations of capacity sales? Should                   technical conference, please contact                     Agenda: A draft agenda will be posted
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                  individual reference levels be developed                Elizabeth Shen, 202–502–6545,                         on or before October 7, 2015.
                                                  for market participants that are pivotal                elizabeth.shen@ferc.gov, regarding legal                 Accommodations requests: To request
                                                  suppliers in the capacity market? If so,                issues; or Angelo Mastrogiacomo, 202–                 accommodation of a disability, please
                                                  how should they be determined? What                     502–8689, angelo.mastrogiacomo@                       contact the person listed under FOR
                                                  are alternatives to PJM replacement                     ferc.gov, and Emma Nicholson, 202–                    FURTHER INFORMATON CONTACT,
                                                  capacity sales for determining the                      502–8846, emma.nicholson@ferc.gov,                    preferably at least 10 days prior to the
                                                  opportunity costs used to establish                     regarding technical issues; or Sarah                  meeting, to give EPA as much time as
                                                  mitigation reference levels?                            McKinley, 202–502–8368,                               possible to process your request.


                                             VerDate Sep<11>2014   16:41 Oct 07, 2015   Jkt 238001   PO 00000   Frm 00026   Fmt 4703   Sfmt 4703   E:\FR\FM\08OCN1.SGM   08OCN1



Document Created: 2015-12-15 08:43:03
Document Modified: 2015-12-15 08:43:03
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation80 FR 60896 