DEPARTMENT OF THE INTERIOR
National Park Service

Federal Register Volume 80, Issue 196 (October 9, 2015)

Page Range61233-61234
FR Document2015-25786

The National Park Service announces the availability of a Draft Environmental Impact Statement (EIS) for the Scorpion Pier Replacement on Santa Cruz Island, Channel Islands National Park. The Draft EIS analyzes the potential consequences of three alternatives: The No Action Alternative; Alternative 1, which would replace the existing pier in the same location and make road improvements; and Alternative 2, which would construct the new replacement pier south of the existing location and make minor road improvements. The Draft EIS also proposes mitigation measures to minimize the adverse impacts from pier construction or utilization. Road improvements would be more extensive under Alternative 1.

Federal Register, Volume 80 Issue 196 (Friday, October 9, 2015)
[Federal Register Volume 80, Number 196 (Friday, October 9, 2015)]
[Notices]
[Pages 61233-61234]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-25786]


-----------------------------------------------------------------------

DEPARTMENT OF THE INTERIOR

National Park Service

[NPS-PWR-PWRO-18475; PX.P0127341D.00.4]


Draft Environmental Impact Statement, Scorpion Pier Replacement, 
Santa Cruz Island, Channel Islands National Park, Ventura and Santa 
Barbara Counties, California

AGENCY: National Park Service, Interior.

ACTION: Notice of availability.

-----------------------------------------------------------------------

SUMMARY: The National Park Service announces the availability of a 
Draft Environmental Impact Statement (EIS) for the Scorpion Pier 
Replacement on Santa Cruz Island, Channel Islands National Park. The 
Draft EIS analyzes the potential consequences of three alternatives: 
The No Action Alternative; Alternative 1, which would replace the 
existing pier in the same location and make road improvements; and 
Alternative 2, which would construct the new replacement pier south of 
the existing location and make minor road improvements. The Draft EIS 
also proposes mitigation measures to minimize the adverse impacts from 
pier construction or utilization. Road improvements would be more 
extensive under Alternative 1.

DATES: All comments on the Draft EIS must be postmarked or transmitted 
not later than 60 days after the date the Environmental Protection 
Agency publishes notice of filing and release of the EIS in the Federal 
Register. The National Park Service will hold one public meeting during 
the comment period--the date, time, and location of the meeting will be 
announced on http://parkplanning.nps.gov/chis, via local and regional 
press media, and will also be available by contacting Channel Islands 
National Park.

ADDRESSES: Regularly updated project information will be available for 
public review and comment online through the NPS Planning, Environment 
& Public Comment Web site at http://parkplanning.nps.gov.chis, and in 
the office of the Superintendent, Channel Islands National Park, 1901 
Spinnaker Dr., Ventura, CA 93001. You may submit comments by one of two 
methods: Mail or hand-deliver comments to Channel Islands National 
Park, Attn: DEIS--Scorpion Pier Replacement (address above), or you may 
transmit comments electronically via the Web site noted above. Before 
including your address, phone number, email address, or other personal 
identifying information in your comment, you should be aware that your 
entire comment--including your personal identifying information--may be 
made publicly available at any time. While you can ask us in your 
comment to withhold your personal identifying information from public 
review, we cannot guarantee that we will be able to do so.

FOR FURTHER INFORMATION CONTACT: Mr. Russell Galipeau, Superintendent, 
Channel Islands National Park, 1901 Spinnaker Dr., Ventura, CA 93001; 
russell_galipeau@nps.gov; (805) 658-5702.

SUPPLEMENTARY INFORMATION: Channel Islands National Park includes five 
remote islands spanning 2,228 square miles of land and sea. Santa Cruz 
Island, Scorpion Anchorage, is the most visited destination within the 
Park. The existing pier needs to be replaced in order to improve safety 
and accessibility, allowing all visitors to move safely from vessels to 
the pier, and providing easy access to the adjacent shoreline, the 
historic Scorpion Ranch and visitor center, restrooms, orientation 
displays, campground, and hiking trails.
    The need for the Project is driven by the following factors: (1) 
Scorpion Pier should provide safe access to Santa Cruz Island. The 
existing pier is deteriorating and does not meet NPS requirements for 
administrative use or safe visitor access. The access road to the 
current location also requires frequent rebuilding. The current height 
of the pier cannot sufficiently accommodate high and low tides; as 
such, vessel operators have difficulty docking without compromising 
risk to individuals, vessels, and the pier itself. The embarkation 
process requires passengers to climb--one person at a time, often while 
carrying a backpack--a single ladder that is not compliant with 
standards for accessibility.
    (2) Scorpion Pier should facilitate efficient access to Santa Cruz 
Island that accommodates visitor demand. The existing pier and access 
road significantly weaken the efficiency of NPS operations. The one-
person ladder needed for embarkation, for example, lengthens the entire 
boarding process and increases visitor exposure to adverse weather 
conditions. The narrow width of the pier also causes delays because it 
cannot simultaneously accommodate visitors and large cargo (i.e., 
maintenance vehicles); as such, passenger embarkation must occur 
separately from many maintenance activities. Additionally, the lack of 
adequate armoring in the area increases the need for regular and 
expensive repairs to the eroding access road. Improvement of the pier 
and access road is necessary to meet current and future visitor 
demands.
    (3) Scorpion Pier and the access roadway should be operated in a 
manner that protects sensitive resources. The access road is extremely 
susceptible to harsh weather conditions, and is often washed out by 
Scorpion Creek when it floods. Maintenance of the existing pier access 
road currently requires repairing and re-grading several times per year 
due to wave and storm erosion. As a result of these ground-disturbing 
activities, sensitive archaeological resources may be threatened. 
Ongoing re-construction can also impact the environment through air 
emissions, erosion, and possible pollutants to waterways and sensitive 
habitats.
    (4) Scorpion Pier should provide access to Santa Cruz Island in 
consideration of predicted sea level rise. The predicted rise in sea 
level must be considered in the new pier design. Current predictions 
range from 0.33 foot to 1.1 foot by the year 2050, and 0.74 foot to 3.2 
feet by 2100. Anticipated sea level rise has implications for the new 
pier design, as well as for the dynamics of Scorpion Creek during large 
storm events.
    Accordingly, the range of alternatives which have been developed 
will fulfill the following key project objectives:
     Improve visitor experience.
     Improve the pier while protecting marine and terrestrial 
environments and archeological resources.
     Improve access for NPS and concessioner boats.

[[Page 61234]]

     Improve passenger, cargo, and operations circulation.
     Preserve historic landscape qualities and visual character 
of Scorpion Ranch.
     Improve efficiency and sustainability.
    Decision Process: Following due consideration of all public and 
agency comments received, a Final EIS will be prepared and released for 
public inspection during a 30 day no-action period. The official 
responsible for approval of the pier replacement project is the 
Regional Director, Pacific West Region. Subsequently the official 
responsible for implementing the approved project and for monitoring 
results is the Superintendent, Channel Islands National Park.

    Dated: June 5, 2015.
Patricia L. Neubacher,
Acting Regional Director, Pacific West Region.

    Note:  The Office of the Federal Register received this document 
on October 6, 2015.
[FR Doc. 2015-25786 Filed 10-8-15; 8:45 am]
BILLING CODE 4312-FF-P



                                                                             Federal Register / Vol. 80, No. 196 / Friday, October 9, 2015 / Notices                                          61233

                                                 Individuals who are Federally                        period—the date, time, and location of                vessels, and the pier itself. The
                                              registered lobbyists are ineligible to                  the meeting will be announced on                      embarkation process requires passengers
                                              serve on all FACA and non-FACA                          http://parkplanning.nps.gov/chis, via                 to climb—one person at a time, often
                                              boards, committees, or councils in an                   local and regional press media, and will              while carrying a backpack—a single
                                              individual capacity. The term                           also be available by contacting Channel               ladder that is not compliant with
                                              ‘‘individual capacity’’ refers to                       Islands National Park.                                standards for accessibility.
                                              individuals who are appointed to                        ADDRESSES: Regularly updated project                     (2) Scorpion Pier should facilitate
                                              exercise their own individual best                      information will be available for public              efficient access to Santa Cruz Island that
                                              judgment on behalf of the government,                   review and comment online through the                 accommodates visitor demand. The
                                              such as when they are designated                        NPS Planning, Environment & Public                    existing pier and access road
                                              Special Government Employees, rather                    Comment Web site at http://                           significantly weaken the efficiency of
                                              than being appointed to represent a                     parkplanning.nps.gov.chis, and in the                 NPS operations. The one-person ladder
                                              particular interest.                                    office of the Superintendent, Channel                 needed for embarkation, for example,
                                                 All nominations must be compiled                     Islands National Park, 1901 Spinnaker                 lengthens the entire boarding process
                                              and submitted in one complete package.                  Dr., Ventura, CA 93001. You may                       and increases visitor exposure to
                                              Incomplete submissions (missing one or                  submit comments by one of two                         adverse weather conditions. The narrow
                                              more of the items described above) will                 methods: Mail or hand-deliver                         width of the pier also causes delays
                                              not be considered.                                      comments to Channel Islands National                  because it cannot simultaneously
                                                Dated: September 22, 2015.                            Park, Attn: DEIS—Scorpion Pier                        accommodate visitors and large cargo
                                                                                                      Replacement (address above), or you                   (i.e., maintenance vehicles); as such,
                                              Alma Ripps,
                                                                                                      may transmit comments electronically                  passenger embarkation must occur
                                              Chief, Office of Policy.
                                                                                                      via the Web site noted above. Before                  separately from many maintenance
                                              [FR Doc. 2015–25732 Filed 10–8–15; 8:45 am]             including your address, phone number,                 activities. Additionally, the lack of
                                              BILLING CODE 4310–EE–P                                  email address, or other personal                      adequate armoring in the area increases
                                                                                                      identifying information in your                       the need for regular and expensive
                                                                                                      comment, you should be aware that                     repairs to the eroding access road.
                                              DEPARTMENT OF THE INTERIOR                              your entire comment—including your                    Improvement of the pier and access road
                                                                                                      personal identifying information—may                  is necessary to meet current and future
                                              National Park Service
                                                                                                      be made publicly available at any time.               visitor demands.
                                              [NPS–PWR–PWRO–18475;                                    While you can ask us in your comment                     (3) Scorpion Pier and the access
                                              PX.P0127341D.00.4]                                      to withhold your personal identifying                 roadway should be operated in a
                                                                                                      information from public review, we                    manner that protects sensitive
                                              Draft Environmental Impact Statement,                   cannot guarantee that we will be able to
                                              Scorpion Pier Replacement, Santa                                                                              resources. The access road is extremely
                                                                                                      do so.                                                susceptible to harsh weather conditions,
                                              Cruz Island, Channel Islands National
                                                                                                      FOR FURTHER INFORMATION CONTACT: Mr.                  and is often washed out by Scorpion
                                              Park, Ventura and Santa Barbara
                                                                                                      Russell Galipeau, Superintendent,                     Creek when it floods. Maintenance of
                                              Counties, California
                                                                                                      Channel Islands National Park, 1901                   the existing pier access road currently
                                              AGENCY:   National Park Service, Interior.              Spinnaker Dr., Ventura, CA 93001;                     requires repairing and re-grading several
                                              ACTION:   Notice of availability.                       russell_galipeau@nps.gov; (805) 658–                  times per year due to wave and storm
                                                                                                      5702.                                                 erosion. As a result of these ground-
                                              SUMMARY:   The National Park Service                    SUPPLEMENTARY INFORMATION: Channel                    disturbing activities, sensitive
                                              announces the availability of a Draft                   Islands National Park includes five                   archaeological resources may be
                                              Environmental Impact Statement (EIS)                    remote islands spanning 2,228 square                  threatened. Ongoing re-construction can
                                              for the Scorpion Pier Replacement on                    miles of land and sea. Santa Cruz Island,             also impact the environment through air
                                              Santa Cruz Island, Channel Islands                      Scorpion Anchorage, is the most visited               emissions, erosion, and possible
                                              National Park. The Draft EIS analyzes                   destination within the Park. The                      pollutants to waterways and sensitive
                                              the potential consequences of three                     existing pier needs to be replaced in                 habitats.
                                              alternatives: The No Action Alternative;                order to improve safety and                              (4) Scorpion Pier should provide
                                              Alternative 1, which would replace the                  accessibility, allowing all visitors to               access to Santa Cruz Island in
                                              existing pier in the same location and                  move safely from vessels to the pier, and             consideration of predicted sea level rise.
                                              make road improvements; and                             providing easy access to the adjacent                 The predicted rise in sea level must be
                                              Alternative 2, which would construct                    shoreline, the historic Scorpion Ranch                considered in the new pier design.
                                              the new replacement pier south of the                   and visitor center, restrooms,                        Current predictions range from 0.33 foot
                                              existing location and make minor road                   orientation displays, campground, and                 to 1.1 foot by the year 2050, and 0.74
                                              improvements. The Draft EIS also                        hiking trails.                                        foot to 3.2 feet by 2100. Anticipated sea
                                              proposes mitigation measures to                            The need for the Project is driven by              level rise has implications for the new
                                              minimize the adverse impacts from pier                  the following factors: (1) Scorpion Pier              pier design, as well as for the dynamics
                                              construction or utilization. Road                       should provide safe access to Santa Cruz              of Scorpion Creek during large storm
                                              improvements would be more extensive                    Island. The existing pier is deteriorating            events.
                                              under Alternative 1.                                    and does not meet NPS requirements for                   Accordingly, the range of alternatives
                                              DATES: All comments on the Draft EIS                    administrative use or safe visitor access.            which have been developed will fulfill
tkelley on DSK3SPTVN1PROD with NOTICES




                                              must be postmarked or transmitted not                   The access road to the current location               the following key project objectives:
                                              later than 60 days after the date the                   also requires frequent rebuilding. The                   • Improve visitor experience.
                                              Environmental Protection Agency                         current height of the pier cannot                        • Improve the pier while protecting
                                              publishes notice of filing and release of               sufficiently accommodate high and low                 marine and terrestrial environments and
                                              the EIS in the Federal Register. The                    tides; as such, vessel operators have                 archeological resources.
                                              National Park Service will hold one                     difficulty docking without                               • Improve access for NPS and
                                              public meeting during the comment                       compromising risk to individuals,                     concessioner boats.


                                         VerDate Sep<11>2014   17:44 Oct 08, 2015   Jkt 238001   PO 00000   Frm 00079   Fmt 4703   Sfmt 4703   E:\FR\FM\09OCN1.SGM   09OCN1


                                              61234                          Federal Register / Vol. 80, No. 196 / Friday, October 9, 2015 / Notices

                                                 • Improve passenger, cargo, and                      of visitor services and has taken all                 meeting may be obtained from George E.
                                              operations circulation.                                 reasonable and appropriate steps to                   Price, Jr., Superintendent, Cape Cod
                                                 • Preserve historic landscape                        consider alternatives to avoid an                     National Seashore, 99 Marconi Site,
                                              qualities and visual character of                       interruption of visitor services.                     Wellfleet, Massachusetts 02667, or via
                                              Scorpion Ranch.                                           This action is being taken pursuant to              telephone at (508) 771–2144.
                                                 • Improve efficiency and                             36 CFR 51.24(a). This is not a request for            SUPPLEMENTARY INFORMATION: The
                                              sustainability.                                         proposals.                                            Commission was reestablished pursuant
                                                 Decision Process: Following due
                                                                                                        Dated: September 21, 2015.                          to Public Law 87–126, as amended by
                                              consideration of all public and agency
                                                                                                      Jonathan B. Jarvis,                                   Public Law 105–280. The purpose of the
                                              comments received, a Final EIS will be
                                                                                                      Director, National Park Service.                      Commission is to consult with the
                                              prepared and released for public
                                                                                                      [FR Doc. 2015–25787 Filed 10–8–15; 8:45 am]           Secretary of the Interior, or her
                                              inspection during a 30 day no-action
                                                                                                                                                            designee, with respect to matters
                                              period. The official responsible for                    BILLING CODE P
                                                                                                                                                            relating to the development of Cape Cod
                                              approval of the pier replacement project
                                                                                                                                                            National Seashore, and with respect to
                                              is the Regional Director, Pacific West
                                                                                                      DEPARTMENT OF THE INTERIOR                            carrying out the provisions of sections 4
                                              Region. Subsequently the official
                                                                                                                                                            and 5 of the Act establishing the
                                              responsible for implementing the
                                                                                                      National Park Service                                 Seashore.
                                              approved project and for monitoring
                                                                                                                                                               The meeting is open to the public. It
                                              results is the Superintendent, Channel                  [NPS–NERO–CACO–19359; PPNECACOS0,
                                                                                                      PPMPSD1Z.YM0000]                                      is expected that 15 persons will be able
                                              Islands National Park.
                                                                                                                                                            to attend the meeting in addition to
                                                Dated: June 5, 2015.                                  Notice of November 16, 2015, Meeting                  Commission members. Interested
                                              Patricia L. Neubacher,                                  for Cape Cod National Seashore                        persons may make oral/written
                                              Acting Regional Director, Pacific West Region.          Advisory Commission                                   presentations to the Commission during
                                                                                                                                                            the business meeting or file written
                                                Note: The Office of the Federal Register              AGENCY:   National Park Service, Interior.
                                              received this document on October 6, 2015.
                                                                                                                                                            statements. Such requests should be
                                              [FR Doc. 2015–25786 Filed 10–8–15; 8:45 am]
                                                                                                      ACTION:   Meeting notice.                             made to the park superintendent prior
                                                                                                                                                            to the meeting. Before including your
                                              BILLING CODE 4312–FF–P                                  SUMMARY:   This notice sets forth the date            address, telephone number, email
                                                                                                      of the 300th Meeting of the Cape Cod                  address, or other personal identifying
                                                                                                      National Seashore Advisory                            information in your comment, you
                                              DEPARTMENT OF THE INTERIOR                              Commission.                                           should be aware that your entire
                                              National Park Service                                   DATES: The public meeting of the Cape                 comment—including your personal
                                                                                                      Cod National Seashore Advisory                        identifying information—may be made
                                              [NPS–WASO–CONC–ABSV–18183;
                                                                                                      Commission will be held on Monday,                    publicly available at any time. While
                                              PPWOBSADC0, PPMVSCS1Y.Y00000]
                                                                                                      November 16, 2015, at 1:00 p.m.                       you may ask us in your comment to
                                              Temporary Concession Contract for                       (Eastern).                                            withhold your personal identifying
                                              Point Reyes National Seashore                           ADDRESSES:   The 300th meeting of the                 information from public review, we
                                                                                                      Cape Cod National Seashore Advisory                   cannot guarantee that we will be able to
                                              AGENCY:  National Park Service, Interior.                                                                     do so.
                                                                                                      Commission will take place on Monday,
                                              ACTION: Notice of proposed award of                     November 16, 2015, at 1:00 p.m., in the                 Dated: September 29, 2015.
                                              temporary concession contracts for                      conference room at park headquarters,                 Alma Ripps,
                                              Point Reyes National Seashore,                          99 Marconi Site Road, Wellfleet,
                                              California.                                                                                                   Chief, Office of Policy.
                                                                                                      Massachusetts 02667 to discuss the                    [FR Doc. 2015–25731 Filed 10–8–15; 8:45 am]
                                              SUMMARY:   Notice is hereby given that                  following:                                            BILLING CODE 4310–EE–P
                                              the National Park Service (NPS)                         1. Adoption of Agenda
                                              proposes to award a temporary                           2. Approval of Minutes of Previous
                                              concession contract for the conduct of                     Meeting (September 14, 2015)
                                              certain Visitor services within Point                   3. Reports of Officers                                INTERNATIONAL TRADE
                                              Reyes National Seashore, California, for                4. Reports of Subcommittees                           COMMISSION
                                              a term not to exceed 11 months. The                        Update of Pilgrim Nuclear Plant
                                              visitor services include horseback riding                    Emergency Planning Subcommittee                  Notice of Receipt of Complaint;
                                              and horse boarding of the location                      5. Superintendent’s Report                            Solicitation of Comments Relating to
                                              commonly known as Five Brooks                              Shorebird Management Plan/                         the Public Interest
                                              Stables. This action is necessary to                         Environmental Assessment—
                                                                                                           Review of Plan and Preferred                     AGENCY: U.S. International Trade
                                              avoid interruption of visitor services.
                                                                                                           Alternative                                      Commission.
                                              DATES: The term of the temporary
                                                                                                         Outer Cape Bike and Pedestrian                     ACTION: Notice.
                                              concession contracts will commence (if                       Master Plan—Review of Plan and
                                              awarded) on or around December 1,                            Preferred Alternative                            SUMMARY:   Notice is hereby given that
                                              2015.                                                   6. Old Business                                       the U.S. International Trade
                                              SUPPLEMENTARY INFORMATION: The NPS                         Live Lightly Campaign Progress                     Commission has received a complaint
tkelley on DSK3SPTVN1PROD with NOTICES




                                              intends to award the temporary                               Report                                           entitled Certain Height-Adjustable Desk
                                              concession contract to Richard Vaughn,                  7. New Business                                       Platforms and Components Thereof, DN
                                              who the NPS has determined is a                         8. Date and Agenda for Next Meeting                   3090; the Commission is soliciting
                                              qualified person as defined in 36 CFR                   9. Public Comment                                     comments on any public interest issues
                                              51.3. The NPS has determined this                       10. Adjournment                                       raised by the complaint or
                                              temporary concession contract is                        FOR FURTHER INFORMATION CONTACT:                      complainant’s filing under section
                                              necessary in order to avoid interruption                Further information concerning the                    210.8(b) of the Commission’s Rules of


                                         VerDate Sep<11>2014   17:44 Oct 08, 2015   Jkt 238001   PO 00000   Frm 00080   Fmt 4703   Sfmt 4703   E:\FR\FM\09OCN1.SGM   09OCN1



Document Created: 2015-12-15 08:33:59
Document Modified: 2015-12-15 08:33:59
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice of availability.
DatesAll comments on the Draft EIS must be postmarked or transmitted not later than 60 days after the date the Environmental Protection Agency publishes notice of filing and release of the EIS in the Federal Register. The National Park Service will hold one public meeting during the comment period--the date, time, and location of the meeting will be announced on http://parkplanning.nps.gov/chis, via local and regional press media, and will also be available by contacting Channel Islands National Park.
ContactMr. Russell Galipeau, Superintendent, Channel Islands National Park, 1901 Spinnaker Dr., Ventura, CA 93001; [email protected]; (805) 658-5702.
FR Citation80 FR 61233 