80_FR_61948 80 FR 61750 - Drawbridge Operation Regulation; Upper Mississippi River, Dubuque, IA

80 FR 61750 - Drawbridge Operation Regulation; Upper Mississippi River, Dubuque, IA

DEPARTMENT OF HOMELAND SECURITY
Coast Guard

Federal Register Volume 80, Issue 198 (October 14, 2015)

Page Range61750-61750
FR Document2015-26009

The Coast Guard has issued a temporary deviation from the operating schedule that governs the Illinois Central Railroad Drawbridge across the Mississippi River, mile 579.9, at Dubuque, Iowa. The deviation is necessary to allow the bridge owner time to complete electrical and mechanical upgrades and replace the control house essential to the continued safe operation of the drawbridge.

Federal Register, Volume 80 Issue 198 (Wednesday, October 14, 2015)
[Federal Register Volume 80, Number 198 (Wednesday, October 14, 2015)]
[Rules and Regulations]
[Page 61750]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-26009]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF HOMELAND SECURITY

Coast Guard

33 CFR Part 117

[Docket No. USCG-2015-0905]


Drawbridge Operation Regulation; Upper Mississippi River, 
Dubuque, IA

AGENCY: Coast Guard, DHS.

ACTION: Notice of deviation from drawbridge regulation.

-----------------------------------------------------------------------

SUMMARY: The Coast Guard has issued a temporary deviation from the 
operating schedule that governs the Illinois Central Railroad 
Drawbridge across the Mississippi River, mile 579.9, at Dubuque, Iowa. 
The deviation is necessary to allow the bridge owner time to complete 
electrical and mechanical upgrades and replace the control house 
essential to the continued safe operation of the drawbridge.

DATES: This deviation is effective from 7 a.m. on October 21, 2015 to 1 
p.m. on October 22, 2015.

ADDRESSES: The docket for this deviation, (USCG-2015-0905) is available 
at http://www.regulations.gov.

FOR FURTHER INFORMATION CONTACT: If you have questions on this 
temporary deviation, call or email Eric A. Washburn, Bridge 
Administrator, Western Rivers, Coast Guard; telephone 314-269-2378, 
email [email protected].

SUPPLEMENTARY INFORMATION: The Chicago, Central & Pacific Railroad 
requested a temporary deviation for the Illinois Central Railroad 
Drawbridge, across the Upper Mississippi River, mile 579.9, at Dubuque, 
Iowa to remain in the closed-to-navigation position from 7 a.m. to 1 
p.m., on October 21 and 22, 2015 to complete electrical and mechanical 
upgrades and replace the control house essential to the continued safe 
operation of the drawbridge.
    The Illinois Central Railroad Drawbridge currently operates in 
accordance with 33 CFR 117.5, which states the general requirement that 
the drawbridge shall open on signal.
    There are no alternate routes for vessels transiting this section 
of the Upper Mississippi River. The bridge cannot open in case of 
emergency.
    The Illinois Central Railroad Drawbridge provides a vertical 
clearance of 19.9 feet above normal pool in the closed-to-navigation 
position. Navigation on the waterway consists primarily of commercial 
tows and recreational watercraft and will not be significantly 
impacted. This temporary deviation has been coordinated with waterway 
users. No objections were received.
    In accordance with 33 CFR 117.35(e), the drawbridge must return to 
its regular operating schedule immediately at the end of the effective 
period of this temporary deviation. This deviation from the operating 
regulations is authorized under 33 CFR 117.35.

    Dated: October 6, 2015.
David M. Frank,
Bridge Administrator, Eight Coast Guard District.
[FR Doc. 2015-26009 Filed 10-13-15; 8:45 am]
 BILLING CODE 9110-04-P



                                            61750            Federal Register / Vol. 80, No. 198 / Wednesday, October 14, 2015 / Rules and Regulations

                                            the period for initiating timely lawsuits                form the basis for the claim should be                DATES: This deviation is effective from
                                            against the debtors.                                     provided along with the CCLR. Upon its                7 a.m. on October 21, 2015 to 1 p.m. on
                                               (ii) We will make every effort to refer               request, the original documents will be               October 22, 2015.
                                            delinquent debts to the DOJ for                          provided to the DOJ.
                                            litigation within one year of the date                      (d) Minimum amount of referrals. (1)               ADDRESSES:   The docket for this
                                            such debts last became delinquent. In                    Except as provided in paragraph (d)(2)                deviation, (USCG–2015–0905) is
                                            the case of guaranteed or insured loans,                 of this section, we will not refer for                available at http://www.regulations.gov.
                                            we will make every effort to refer these                 litigation claims of less than $2,500                 FOR FURTHER INFORMATION CONTACT:   If
                                            delinquent debts to the DOJ for                          exclusive of interest, penalties, and                 you have questions on this temporary
                                            litigation within one year from the date                 administrative costs, or such other                   deviation, call or email Eric A.
                                            the debt was known to the agency.                        amount as the Attorney General may                    Washburn, Bridge Administrator,
                                               (4) The DOJ has exclusive jurisdiction                prescribe.                                            Western Rivers, Coast Guard; telephone
                                            over debts referred to it pursuant to this                  (2) We will not refer claims of less
                                            subpart. Upon referral of a debt to the                                                                        314–269–2378, email Eric.Washburn@
                                                                                                     than the minimum amount unless:                       uscg.mil.
                                            DOJ, we will:                                               (i) Litigation to collect such smaller
                                               (i) Immediately terminate the use of                  amount is important to ensure                         SUPPLEMENTARY INFORMATION:      The
                                            any administrative collection activities                 compliance with the agency’s policies                 Chicago, Central & Pacific Railroad
                                            to collect the debt;                                     and programs;
                                               (ii) Advise the DOJ of the collection                                                                       requested a temporary deviation for the
                                                                                                        (ii) The agency is referring the claim             Illinois Central Railroad Drawbridge,
                                            tools utilized and the results of                        solely for the purpose of securing a
                                            activities to date; and                                                                                        across the Upper Mississippi River, mile
                                                                                                     judgment against the debtor, which will               579.9, at Dubuque, Iowa to remain in
                                               (iii) Refrain from having any contact                 be filed as a lien against the debtor’s
                                            with the debtor and direct all debtor                                                                          the closed-to-navigation position from 7
                                                                                                     property pursuant to 28 U.S.C. 3201 and
                                            inquiries concerning the debt to the                                                                           a.m. to 1 p.m., on October 21 and 22,
                                                                                                     returned to the agency for enforcement;
                                            DOJ.                                                                                                           2015 to complete electrical and
                                                                                                     or
                                               (5) After referral of a debt under this                                                                     mechanical upgrades and replace the
                                                                                                        (iii) The debtor has the clear ability to
                                            subpart, we will immediately notify the                  pay the claim and the Government can                  control house essential to the continued
                                            DOJ of any payments credited by the                      enforce payment effectively, with due                 safe operation of the drawbridge.
                                            agency to the debtor’s account. Pursuant                 regard for the exemptions available to                   The Illinois Central Railroad
                                            to 31 CFR 904.1(b), after referral of the                the debtor under State and Federal law                Drawbridge currently operates in
                                            debt under this subpart, the DOJ will                    and the judicial remedies available to                accordance with 33 CFR 117.5, which
                                            notify the agency of any payment                         the Government.                                       states the general requirement that the
                                            received from the debtor.                                   (3) We will consult with the Financial
                                               (b) Claims Collection Litigation                                                                            drawbridge shall open on signal.
                                                                                                     Litigation Staff of the Executive Office                 There are no alternate routes for
                                            Report. (1)(i) Unless excepted by the
                                                                                                     for United States Attorneys at DOJ prior
                                            DOJ, we will complete a CCLR and                                                                               vessels transiting this section of the
                                                                                                     to referring claims valued at less than
                                            associated signed Certificate of                                                                               Upper Mississippi River. The bridge
                                                                                                     the minimum amount.
                                            Indebtedness to refer all                                                                                      cannot open in case of emergency.
                                            administratively uncollectible claims to                 [FR Doc. 2015–25544 Filed 10–13–15; 8:45 am]
                                                                                                                                                              The Illinois Central Railroad
                                            the DOJ for litigation.                                  BILLING CODE 4191–02–P
                                                                                                                                                           Drawbridge provides a vertical
                                               (ii) We will complete all sections of
                                                                                                                                                           clearance of 19.9 feet above normal pool
                                            the CCLR appropriate to each debt as
                                            required by the CCLR instructions and                                                                          in the closed-to-navigation position.
                                            furnish such other information as may                    DEPARTMENT OF HOMELAND                                Navigation on the waterway consists
                                            be required in specific cases.                           SECURITY                                              primarily of commercial tows and
                                               (2) We will indicate clearly on the                                                                         recreational watercraft and will not be
                                                                                                     Coast Guard                                           significantly impacted. This temporary
                                            CCLR the actions that we wish the DOJ
                                            to take with respect to the referred debt.                                                                     deviation has been coordinated with
                                                                                                     33 CFR Part 117                                       waterway users. No objections were
                                            We may indicate specifically any of a
                                            number of litigation activities the DOJ                                                                        received.
                                                                                                     [Docket No. USCG–2015–0905]
                                            may choose to pursue, including                                                                                   In accordance with 33 CFR 117.35(e),
                                            enforced collection, judgment lien only,                 Drawbridge Operation Regulation;                      the drawbridge must return to its regular
                                            renew judgment lien only, renew                          Upper Mississippi River, Dubuque, IA                  operating schedule immediately at the
                                            judgment lien and enforced collection,                                                                         end of the effective period of this
                                            program enforcement, foreclosure only,                   AGENCY: Coast Guard, DHS.
                                                                                                                                                           temporary deviation. This deviation
                                            and foreclosure and deficiency                           ACTION:Notice of deviation from                       from the operating regulations is
                                            judgment.                                                drawbridge regulation.
                                               (3) We will also use the CCLR to refer                                                                      authorized under 33 CFR 117.35.
                                            a debt to the DOJ for the purpose of                     SUMMARY:  The Coast Guard has issued a                  Dated: October 6, 2015.
                                            obtaining any necessary approval of a                    temporary deviation from the operating                David M. Frank,
                                            proposal to compromise a debt or to                      schedule that governs the Illinois                    Bridge Administrator, Eight Coast Guard
                                            suspend or terminate administrative                      Central Railroad Drawbridge across the                District.
                                            collection activity on a debt.                           Mississippi River, mile 579.9, at
tkelley on DSK3SPTVN1PROD with RULES




                                                                                                                                                           [FR Doc. 2015–26009 Filed 10–13–15; 8:45 am]
                                               (c) Preservation of evidence. We will                 Dubuque, Iowa. The deviation is
                                                                                                                                                           BILLING CODE 9110–04–P
                                            maintain and preserve all files and                      necessary to allow the bridge owner
                                            records that may be needed by the DOJ                    time to complete electrical and
                                            to prove our claim in court. When                        mechanical upgrades and replace the
                                            referring debts to the DOJ for litigation,               control house essential to the continued
                                            certified copies of the documents that                   safe operation of the drawbridge.


                                       VerDate Sep<11>2014    16:10 Oct 13, 2015   Jkt 238001   PO 00000   Frm 00034   Fmt 4700   Sfmt 9990   E:\FR\FM\14OCR1.SGM   14OCR1



Document Created: 2018-02-27 08:50:15
Document Modified: 2018-02-27 08:50:15
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionRules and Regulations
ActionNotice of deviation from drawbridge regulation.
DatesThis deviation is effective from 7 a.m. on October 21, 2015 to 1 p.m. on October 22, 2015.
ContactIf you have questions on this temporary deviation, call or email Eric A. Washburn, Bridge Administrator, Western Rivers, Coast Guard; telephone 314-269-2378, email [email protected]
FR Citation80 FR 61750 

2024 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR