DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 80, Issue 198 (October 14, 2015)

Page Range61808-61809
FR Document2015-26071

Federal Register, Volume 80 Issue 198 (Wednesday, October 14, 2015)
[Federal Register Volume 80, Number 198 (Wednesday, October 14, 2015)]
[Notices]
[Pages 61808-61809]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-26071]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14695-000; Project No. 14705-000]


Lock+TM Hydro Friends Fund X, LLC; Energy Resources 
USA Inc.; Notice of Competing Preliminary Permit Applications Accepted 
for Filing and Soliciting Comments, Motions to Intervene, and Competing 
Applications

    On July 20, 2015, and August 26, 2015, Lock+TM Hydro 
Friends Fund X, LLC and Energy Resources USA Inc. respectively, filed 
preliminary permit applications pursuant to section 4(f) of the Federal 
Power Act proposing to study the feasibility of a hydropower project, 
to be located at the existing Mississippi River Lock and Dam No. 24 on 
the Mississippi River, near the city of Clarksville in Pike County, 
Missouri and Calhoun County, Illinois. Mississippi River Lock and Dam 
No. 24 is owned by the United States government and operated by the 
United States Army Corps of Engineers. The sole purpose of a 
preliminary permit, if issued, is to grant the permit holder priority 
to file a license application during the permit term. A preliminary 
permit does not authorize the permit holder to perform any land-
disturbing activities or otherwise enter upon lands or waters owned by 
others without the owner's express permission.
    Lock+TM Hydro Friends Fund X, LLC's proposed project 
would consist of: (1) three new 450-foot-wide by 25-foot-deep modular 
hydropower systems, each containing ten new 1-megawatt (MW) turbine-
generator units, having a total combined generating capacity of 30 
megawatts; (2) a new 200-foot-long by 450-foot-wide tailrace; (3) a new 
3-mile-long, 69-kilovolt transmission line; (4) a new 25-foot by 50-
foot switchyard; and (5) appurtenant facilities. The project would have 
an estimated annual generation of 170,000 megawatt-hours.
    Applicant Contact: Mr. Wayne Krouse, P.O. Box 43796, Birmingham, AL 
35243; (877) 556-6566, extension 709.
    Energy Resources USA Inc.'s proposed project would consist of: (1) 
a new 770-foot-long by 300-foot-wide intake area; (2) a new 90-foot by 
220-foot reinforced concrete powerhouse; (3)

[[Page 61809]]

four 3-MW turbine-generators, having a total combined generating 
capacity of 12 MW; (4) a new 1,000-foot-long by 220-foot-wide tailrace 
area; (5) a new 60-foot-long by 50-foot-wide substation; (6) a new 50-
foot-wide by 60-foot-long substation; (7) a new 5.49-mile-long, 115-
kilovolt transmission line; and (8) appurtenant facilities. The project 
would have an estimated annual generation of 102.5 gigawatt-hours.
    Applicant Contact: Mr. Ander Gonzalez, 2655 Le June Road, Suite 
804, Coral Gables, FL 33134; +34 93 252 3840.
    FERC Contact: Tyrone A. Williams, (202) 502-6331.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR 4.36. The Commission strongly encourages electronic filing. 
Please file comments, motions to intervene, notices of intent, and 
competing applications using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief 
comments up to 6,000 characters, without prior registration, using the 
eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You 
must include your name and contact information at the end of your 
comments. For assistance, please contact FERC Online Support at 
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE., 
Washington, DC 20426. The first page of any filing should include 
docket number P-14695-000 or P-14705-000.
    More information about this project, including a copy of either 
application can be viewed or printed on the ``eLibrary'' link of 
Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-14695 or P-14705) in the docket number field 
to access the document. For assistance, contact FERC Online Support.

    Dated: October 7, 2015.
 Kimberly D. Bose,
 Secretary.
[FR Doc. 2015-26071 Filed 10-13-15; 8:45 am]
BILLING CODE 6717-01-P



                                              61808                     Federal Register / Vol. 80, No. 198 / Wednesday, October 14, 2015 / Notices

                                              2317–031; ER13–1351–013; ER10–2330–                        Applicants: Otter Tail Power                         Dated: October 7, 2015.
                                              038.                                                    Company.                                              Nathaniel J. Davis, Sr.,
                                                 Applicants: J.P. Morgan Ventures                        Description: Initial rate filing:                  Deputy Secretary.
                                              Energy Corporation, AlphaGen Power                      Operating Services Agreement with                     [FR Doc. 2015–26112 Filed 10–13–15; 8:45 am]
                                              LLC, BE Alabama LLC, BE CA LLC,                         Central Power Electric Cooperative, Inc.              BILLING CODE 6717–01–P
                                              Florida Power Development LLC, Utility                  to be effective 10/15/2015.
                                              Contract Funding, L.L.C.                                   Filed Date: 10/6/15.
                                                 Description: Notice of Non-Material                     Accession Number: 20151006–5319.                   DEPARTMENT OF ENERGY
                                              Change in Status of the J.P. Morgan                        Comments Due: 5 p.m. ET 10/27/15.
                                              Sellers.                                                                                                      Federal Energy Regulatory
                                                 Filed Date: 10/7/15.                                    Docket Numbers: ER16–32–000.                       Commission
                                                 Accession Number: 20151007–5148.                        Applicants: Midcontinent
                                                                                                                                                            [Project No. 14695–000; Project No. 14705–
                                                 Comments Due: 5 p.m. ET 10/28/15.                    Independent System Operator, Inc.                     000]
                                                 Docket Numbers: ER10–2331–041;                          Description: Section 205(d) Rate
                                              ER14–630–018; ER10–2319–033; ER10–                      Filing: 2015–10–07—Module A, Section                  Lock+TM Hydro Friends Fund X, LLC;
                                              2317–033; ER13–1351–015; ER10–2330–                     3 Ancillary Services Revisions to be                  Energy Resources USA Inc.; Notice of
                                              040.                                                    effective 12/6/2015.                                  Competing Preliminary Permit
                                                 Applicants: J.P. Morgan Ventures                        Filed Date: 10/7/15.                               Applications Accepted for Filing and
                                              Energy Corporation, AlphaGen Power                         Accession Number: 20151007–5099.                   Soliciting Comments, Motions to
                                              LLC, BE Alabama LLC, BE CA LLC,                            Comments Due: 5 p.m. ET 10/28/15.                  Intervene, and Competing Applications
                                              Florida Power Development LLC, Utility                     Docket Numbers: ER16–33–000.                          On July 20, 2015, and August 26,
                                              Contract Funding, L.L.C.                                   Applicants: Midcontinent                           2015, Lock+TM Hydro Friends Fund X,
                                                 Description: Notice of Non-Material                  Independent System Operator, Inc.                     LLC and Energy Resources USA Inc.
                                              Change in Status of the J.P. Morgan                        Description: Section 205(d) Rate                   respectively, filed preliminary permit
                                              Sellers.                                                Filing: 2015–10–07—SA 2849                            applications pursuant to section 4(f) of
                                                 Filed Date: 10/7/15.                                 Consumers Energy Lake Winds Energy                    the Federal Power Act proposing to
                                                 Accession Number: 20151007–5170.                     Park GIA to be effective 1/1/2016.                    study the feasibility of a hydropower
                                                 Comments Due: 5 p.m. ET 10/28/15.                       Filed Date: 10/7/15.                               project, to be located at the existing
                                                 Docket Numbers: ER15–2211–003.                          Accession Number: 20151007–5106.                   Mississippi River Lock and Dam No. 24
                                                 Applicants: MidAmerican Energy                          Comments Due: 5 p.m. ET 10/28/15.                  on the Mississippi River, near the city
                                              Services, LLC.                                                                                                of Clarksville in Pike County, Missouri
                                                 Description: Compliance filing: ER15–                   Take notice that the Commission                    and Calhoun County, Illinois.
                                              2211–000 Compliance Filing to be                        received the following electric securities            Mississippi River Lock and Dam No. 24
                                              effective 9/14/2015.                                    filings:                                              is owned by the United States
                                                 Filed Date: 10/7/15.                                    Docket Numbers: ES15–67–000.                       government and operated by the United
                                                 Accession Number: 20151007–5110.                        Applicants: Louisville Gas & Electric              States Army Corps of Engineers. The
                                                 Comments Due: 5 p.m. ET 10/28/15.                    Company.                                              sole purpose of a preliminary permit, if
                                                 Docket Numbers: ER15–2380–000.                          Description: Revised Exhibits C, D,                issued, is to grant the permit holder
                                                 Applicants: Willey Battery Utility,                  and E to September 4, 2015 Application                priority to file a license application
                                              LLC.                                                    under Section 204 of the Federal Power                during the permit term. A preliminary
                                                 Description: Request of Willey Battery               Act of Louisville Gas and Electric                    permit does not authorize the permit
                                              Utility, LLC to Change Effective Date of                Company.                                              holder to perform any land-disturbing
                                              Market-Based Wholesale Power Sales                         Filed Date: 10/6/15.                               activities or otherwise enter upon lands
                                              Tariff.                                                    Accession Number: 20151006–5237.                   or waters owned by others without the
                                                 Filed Date: 10/7/15.                                    Comments Due: 5 p.m. ET 10/27/15.                  owner’s express permission.
                                                 Accession Number: 20151007–5140.                                                                              Lock+TM Hydro Friends Fund X,
                                                                                                         The filings are accessible in the                  LLC’s proposed project would consist
                                                 Comments Due: 5 p.m. ET 10/28/15.                    Commission’s eLibrary system by
                                                 Docket Numbers: ER15–2483–001.                                                                             of: (1) three new 450-foot-wide by 25-
                                                                                                      clicking on the links or querying the                 foot-deep modular hydropower systems,
                                                 Applicants: LRI Renewable Energy                     docket number.
                                              LLC.                                                                                                          each containing ten new 1-megawatt
                                                                                                         Any person desiring to intervene or                (MW) turbine-generator units, having a
                                                 Description: Tariff Amendment:                       protest in any of the above proceedings
                                              Emerald City Amendment to LRI—                                                                                total combined generating capacity of 30
                                                                                                      must file in accordance with Rules 211                megawatts; (2) a new 200-foot-long by
                                              Refile to be effective 10/7/2015.                       and 214 of the Commission’s
                                                 Filed Date: 10/7/15.                                                                                       450-foot-wide tailrace; (3) a new 3-mile-
                                                                                                      Regulations (18 CFR 385.211 and                       long, 69-kilovolt transmission line; (4) a
                                                 Accession Number: 20151007–5101.                     385.214) on or before 5:00 p.m. Eastern
                                                 Comments Due: 5 p.m. ET 10/28/15.                                                                          new 25-foot by 50-foot switchyard; and
                                                                                                      time on the specified comment date.                   (5) appurtenant facilities. The project
                                                 Docket Numbers: ER16–30–000.                         Protests may be considered, but                       would have an estimated annual
                                                 Applicants: PJM Interconnection,                     intervention is necessary to become a                 generation of 170,000 megawatt-hours.
                                              L.L.C.                                                  party to the proceeding.                                 Applicant Contact: Mr. Wayne
                                                 Description: Section 205(d) Rate                        eFiling is encouraged. More detailed               Krouse, P.O. Box 43796, Birmingham,
                                              Filing: First Revised Interconnection
tkelley on DSK3SPTVN1PROD with NOTICES




                                                                                                      information relating to filing                        AL 35243; (877) 556–6566, extension
                                              Service Agreement No. 2005, Queue No.                   requirements, interventions, protests,                709.
                                              Y2–064 to be effective 9/11/2015.                       service, and qualifying facilities filings               Energy Resources USA Inc.’s
                                                 Filed Date: 10/6/15.                                 can be found at: http://www.ferc.gov/                 proposed project would consist of: (1) a
                                                 Accession Number: 20151006–5298.                     docs-filing/efiling/filing-req.pdf. For               new 770-foot-long by 300-foot-wide
                                                 Comments Due: 5 p.m. ET 10/27/15.                    other information, call (866) 208–3676                intake area; (2) a new 90-foot by 220-
                                                 Docket Numbers: ER16–31–000.                         (toll free). For TTY, call (202) 502–8659.            foot reinforced concrete powerhouse; (3)


                                         VerDate Sep<11>2014   16:39 Oct 13, 2015   Jkt 238001   PO 00000   Frm 00019   Fmt 4703   Sfmt 4703   E:\FR\FM\14OCN1.SGM   14OCN1


                                                                        Federal Register / Vol. 80, No. 198 / Wednesday, October 14, 2015 / Notices                                                61809

                                              four 3–MW turbine-generators, having a                  DEPARTMENT OF ENERGY                                  further order or notice by the
                                              total combined generating capacity of 12                                                                      Commission, unless the Commission
                                              MW; (4) a new 1,000-foot-long by 220-                   Federal Energy Regulatory                             orders otherwise.
                                              foot-wide tailrace area; (5) a new 60-                  Commission                                              If the project is not subject to section
                                              foot-long by 50-foot-wide substation; (6)               [Project No. 7518–000]                                15 of the FPA, notice is hereby given
                                              a new 50-foot-wide by 60-foot-long                                                                            that the co-licensees, Erie Boulevard
                                              substation; (7) a new 5.49-mile-long,                   Erie Boulevard Hydropower, L.P.; Saint                Hydropower, L.P., and Saint Regis
                                              115-kilovolt transmission line; and (8)                 Regis Mohawk Tribe; Notice of                         Mohawk Tribe are authorized to
                                              appurtenant facilities. The project                     Authorization for Continued Project                   continue operation of the Hogansburg
                                              would have an estimated annual                          Operation                                             Hydroelectric Project, until such time as
                                                                                                                                                            the Commission acts on its application
                                              generation of 102.5 gigawatt-hours.                        On September 30, 2013, Erie                        for a subsequent license.
                                                 Applicant Contact: Mr. Ander                         Boulevard Hydropower, L.P., and Saint
                                                                                                      Regis Mohawk Tribe, co-licensees for                    Dated: October 6, 2015.
                                              Gonzalez, 2655 Le June Road, Suite 804,
                                                                                                      the Hogansburg Hydroelectric Project,                 Kimberly D. Bose,
                                              Coral Gables, FL 33134; +34 93 252
                                                                                                      filed an Application for a New License                Secretary.
                                              3840.
                                                                                                      pursuant to the Federal Power Act                     [FR Doc. 2015–26079 Filed 10–13–15; 8:45 am]
                                                 FERC Contact: Tyrone A. Williams,                    (FPA) and the Commission’s regulations                BILLING CODE 6717–01–P
                                              (202) 502–6331.                                         thereunder. The Hogansburg
                                                 Deadline for filing comments, motions                Hydroelectric Project is located on the
                                              to intervene, competing applications                    St. Regis River in Franklin County, New               DEPARTMENT OF ENERGY
                                              (without notices of intent), or notices of              York.
                                              intent to file competing applications: 60                  The license for Project No.7518 was                Federal Energy Regulatory
                                              days from the issuance of this notice.                  issued for a period ending September                  Commission
                                              Competing applications and notices of                   30, 2015. Section 15(a)(1) of the FPA, 16
                                                                                                      U.S.C. 808(a)(1), requires the                        Combined Notice of Filings—2
                                              intent must meet the requirements of 18
                                              CFR 4.36. The Commission strongly                       Commission, at the expiration of a                      Take notice that the Commission has
                                                                                                      license term, to issue from year-to-year              received the following Natural Gas
                                              encourages electronic filing. Please file
                                                                                                      an annual license to the then licensee                Pipeline Rate and Refund Report filings:
                                              comments, motions to intervene, notices                 under the terms and conditions of the
                                              of intent, and competing applications                   prior license until a new license is                  Filings Instituting Proceedings
                                              using the Commission’s eFiling system                   issued, or the project is otherwise                      Docket Numbers: PR15–37–001 and
                                              at http://www.ferc.gov/docs-filing/                     disposed of as provided in section 15 or              PR15–37–002.
                                              efiling.asp. Commenters can submit                      any other applicable section of the FPA.                 Applicants: Bay Gas Storage
                                              brief comments up to 6,000 characters,                  If the project’s prior license waived the             Company, Ltd.
                                              without prior registration, using the                   applicability of section 15 of the FPA,                  Description: Submits tariff filing per
                                              eComment system at http://                              then, based on section 9(b) of the                    284.123(b), (e), (g): Amendment to
                                              www.ferc.gov/docs-filing/                               Administrative Procedure Act, 5 U.S.C.                Petition under NGPA Section 311 to be
                                              ecomment.asp. You must include your                     558(c), and as set forth at 18 CFR                    effective 6/8/2015; Filing Type: 1270.
                                              name and contact information at the end                 16.21(a), if the licensee of such project                Filed Dates: 10/2/15; 10/5/15.
                                              of your comments. For assistance,                       has filed an application for a subsequent                Accession Numbers: 20151002–5097;
                                              please contact FERC Online Support at                   license, the licensee may continue to                 20151005–5226.
                                              FERCOnlineSupport@ferc.gov, (866)                       operate the project in accordance with                   Comments Due: 5 p.m. ET 10/26/15.
                                              208–3676 (toll free), or (202) 502–8659                 the terms and conditions of the license                  284.123(g) Protests Due: 5 p.m. ET 10/
                                              (TTY). In lieu of electronic filing, please             after the minor or minor part license                 26/15.
                                              send a paper copy to: Secretary, Federal                expires, until the Commission acts on                    Docket Numbers: RP16–1–000.
                                              Energy Regulatory Commission, 888                       its application. If the licensee of such a               Applicants: Texas Gas Transmission,
                                              First Street NE., Washington, DC 20426.                 project has not filed an application for              LLC.
                                              The first page of any filing should                     a subsequent license, then it may be                     Description: Section 4(d) Rate Filing:
                                              include docket number P–14695–000 or                    required, pursuant to 18 CFR 16.21(b),                2015 Fuel Tracker Filing to be effective
                                                                                                      to continue project operations until the              11/1/2015.
                                              P–14705–000.
                                                                                                      Commission issues someone else a                         Filed Date: 10/1/15.
                                                 More information about this project,                 license for the project or otherwise                     Accession Number: 20151001–5077.
                                              including a copy of either application                  orders disposition of the project.                       Comments Due: 5 p.m. ET 10/13/15.
                                              can be viewed or printed on the                            If the project is subject to section 15               Docket Numbers: RP16–2–000.
                                              ‘‘eLibrary’’ link of Commission’s Web                   of the FPA, notice is hereby given that                  Applicants: Panhandle Eastern Pipe
                                              site at http://www.ferc.gov/docs-filing/                an annual license for Project No. 7518                Line Company, LP.
                                              elibrary.asp. Enter the docket number                   is issued to the licensee for a period                   Description: Section 4(d) Rate Filing:
                                              (P–14695 or P–14705) in the docket                      effective October 1, 2015 through                     Fuel Filing on 10–1–15 to be effective
                                              number field to access the document.                    September 30, 2016 or until the                       11/1/2015.
                                              For assistance, contact FERC Online                     issuance of a new license for the project                Filed Date: 10/1/15.
                                              Support.                                                or other disposition under the FPA,                      Accession Number: 20151001–5086.
tkelley on DSK3SPTVN1PROD with NOTICES




                                                                                                      whichever comes first. If issuance of a                  Comments Due: 5 p.m. ET 10/13/15.
                                                Dated: October 7, 2015.
                                                                                                      new license (or other disposition) does                  Docket Numbers: RP16–3–000.
                                              Kimberly D. Bose,                                       not take place on or before September                    Applicants: Trunkline Gas Company,
                                              Secretary.                                              30, 2016, notice is hereby given that,                LLC.
                                              [FR Doc. 2015–26071 Filed 10–13–15; 8:45 am]            pursuant to 18 CFR 16.18(c), an annual                   Description: Section 4(d) Rate Filing:
                                              BILLING CODE 6717–01–P                                  license under section 15(a)(1) of the                 Fuel Filing on 10–1–15 to be effective
                                                                                                      FPA is renewed automatically without                  11/1/2015.


                                         VerDate Sep<11>2014   16:39 Oct 13, 2015   Jkt 238001   PO 00000   Frm 00020   Fmt 4703   Sfmt 4703   E:\FR\FM\14OCN1.SGM   14OCN1



Document Created: 2018-02-27 08:50:08
Document Modified: 2018-02-27 08:50:08
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation80 FR 61808 