80_FR_62010 80 FR 61812 - Commission Information Collection Activities (FERC-725K); Comment Request; Extension

80 FR 61812 - Commission Information Collection Activities (FERC-725K); Comment Request; Extension

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 80, Issue 198 (October 14, 2015)

Page Range61812-61813
FR Document2015-26082

In compliance with the requirements of the Paperwork Reduction Act of 1995, 44 U.S.C. 3506(c)(2)(A), the Federal Energy Regulatory Commission (Commission or FERC) is soliciting public comment on the currently approved information collection, FERC-725K (Mandatory Reliability Standards for the SERC Region).

Federal Register, Volume 80 Issue 198 (Wednesday, October 14, 2015)
[Federal Register Volume 80, Number 198 (Wednesday, October 14, 2015)]
[Notices]
[Pages 61812-61813]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-26082]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. IC16-1-000]


Commission Information Collection Activities (FERC-725K); Comment 
Request; Extension

AGENCY: Federal Energy Regulatory Commission, Energy.

ACTION: Notice of information collection and request for comments.

-----------------------------------------------------------------------

SUMMARY: In compliance with the requirements of the Paperwork Reduction 
Act of 1995, 44 U.S.C. 3506(c)(2)(A), the Federal Energy Regulatory 
Commission (Commission or FERC) is soliciting public comment on the 
currently approved information collection, FERC-725K (Mandatory 
Reliability Standards for the SERC Region).

DATES: Comments on the collection of information are due [insert date 
that is 60 days after publication in the Federal Register].

ADDRESSES: You may submit comments (identified by Docket No. IC16-1-
000) by either of the following methods:
     eFiling at Commission's Web site: http://www.ferc.gov/docs-filing/efiling.asp.
     Mail/Hand Delivery/Courier: Federal Energy Regulatory 
Commission, Secretary of the Commission, 888 First Street NE., 
Washington, DC 20426.
    Instructions: All submissions must be formatted and filed in 
accordance with submission guidelines at: http://www.ferc.gov/help/submission-guide.asp. For user assistance contact FERC Online Support 
by email at ferconlinesupport@ferc.gov, or by phone at: (866) 208-3676 
(toll-free), or (202) 502-8659 for TTY.
    Docket: Users interested in receiving automatic notification of 
activity in this docket or in viewing/downloading comments and 
issuances in this docket may do so at http://www.ferc.gov/docs-filing/docs-filing.asp.

FOR FURTHER INFORMATION CONTACT: Ellen Brown may be reached by email at 
DataClearance@FERC.gov, telephone at (202) 502-8663, and fax at (202) 
273-0873.

SUPPLEMENTARY INFORMATION:
    Title: Mandatory Reliability Standards for the SERC Region.
    OMB Control No.: 1902-0260.
    Type of Request: Three-year extension of the FERC-725K information 
collection requirements with no changes to the current reporting 
requirements.
    Abstract: Section 215 of the Federal Power Act (FPA) requires a 
Commission-certified Electric Reliability Organization (ERO) to develop 
mandatory and enforceable Reliability Standards, which are subject to 
Commission review and approval. Once approved, the Reliability 
Standards may be enforced by NERC, subject to Commission oversight, or 
by the Commission independently.
    Reliability Standards that NERC proposes to the Commission may 
include Reliability Standards that are proposed by a Regional Entity to 
be effective in that region. In Order No. 672, the Commission noted 
that:

    As a general matter, we will accept the following two types of 
regional differences, provided they are otherwise just, reasonable, 
not unduly discriminatory or preferential and in the public 
interest, as required under the statute: (1) a regional difference 
that is more stringent than the continent-wide Reliability Standard, 
including a regional difference that addresses matters that the 
continent-wide Reliability Standard does not; and (2) a regional 
Reliability Standard that is necessitated by a physical difference 
in the Bulk-Power System.

    When NERC reviews a regional Reliability Standard that would be 
applicable on an interconnection-wide basis and that has been proposed 
by a Regional Entity organized on an interconnection-wide basis, NERC 
must rebuttably presume that the regional Reliability Standard is just, 
reasonable, not unduly discriminatory or preferential, and in the 
public interest. In turn, the Commission must give ``due weight'' to 
the technical expertise of NERC and of a Regional Entity organized on 
an interconnection-wide basis.
    On April 19, 2007, the Commission accepted delegation agreements 
between NERC and each of the eight Regional Entities. In the order, the 
Commission accepted SERC as a Regional Entity organized on less than an 
interconnection-wide basis. As a Regional Entity, SERC oversees Bulk-
Power System reliability within the SERC Region, which covers a 
geographic area of approximately 560,000 square miles in a sixteen-
state area in the southeastern and central United States (all of 
Missouri, Alabama, Tennessee, North Carolina, South Carolina, Georgia, 
Mississippi, and portions of Iowa, Illinois, Kentucky, Virginia, 
Oklahoma, Arkansas, Louisiana, Texas and Florida). The SERC Region is 
currently geographically divided into five subregions that are 
identified as Southeastern, Central, VACAR, Delta, and Gateway.
    Type of Respondents: Entities registered with the North American

[[Page 61813]]

Electric Reliability Corporation (within the SERC region).
    Estimate of Annual Burden \1\: The Commission estimates the annual 
public reporting burden for the information collection as:
---------------------------------------------------------------------------

    \1\ The Commission defines burden as the total time, effort, or 
financial resources expended by persons to generate, maintain, 
retain, or disclose or provide information to or for a Federal 
agency. For further explanation of what is included in the 
information collection burden, reference 5 Code of Federal 
Regulations 1320.3.
    \2\ The $66.45 hourly cost figure (including benefits) comes 
from the cost of an engineer as posted on the Bureau of Labor 
Statistics (BLS) Web site: http://www.bls.gov/oes/current/naics2_22.htm#11-0000 (wage category 17-2071).
    \3\ Both figures for PC respondents are not to be totaled. They 
represent the same set of respondents.
    \4\ The $66.45 hourly cost figure (including benefits) comes 
from the cost of an engineer as posted on the Bureau of Labor 
Statistics (BLS) Web site: http://www.bls.gov/oes/current/naics2_22.htm#11-0000 (wage category 17-2071).
    \5\ Both figures for GO respondents are not to be totaled. They 
represent the same set of respondents.
    \6\ The hourly cost for GOs uses the hourly reporting cost of 
$66.45 per hour is based on the cost (including benefits) of an 
engineer to implement the requirements of the rule.
    \7\ The record retention cost of $37.50 per hour (including 
benefits) comes from Commission staff research on record retention 
requirements (wage category 43-4199 for information and record 
clerks).

                                              FERC-725K: Mandatory Reliability Standard for the SERC Region
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                       Total annual
                                            Number of       Annual number of   Total number of     Average burden    burden hours and       Cost per
                                         respondents (1)     responses per        responses         and cost per    total annual cost    respondent ($)
                                                             respondent (2)      (1)*(2)=(3)      response \2\ (4)     (3)*(4)=(5)          (5)/(1)
--------------------------------------------------------------------------------------------------------------------------------------------------------
PCs: Design and Document Automatic                 \3\ 21                  1                 21                  8                168               $532
 UFLS Program.........................                                                                        $532        \4\ $11,172
PCs: Provide Documentation and Data to             \3\ 21                  1                 21                 16                336             $1,064
 SERC.................................                                                                      $1,064            $22,344
GOs: Provide Documentation and Data to            \5\ 104                  1                104                 16              1,664             $1,064
 SERC.................................                                                                      $1,064       \6\ $110,656
GOs: Record Retention.................            \5\ 104                  1                104                  4                416               $150
                                                                                                              $150        \7\ $15,600
    Total.............................  .................  .................  .................                125              2,584             $2,810
                                                                                                                             $159,772
--------------------------------------------------------------------------------------------------------------------------------------------------------

    Comments: Comments are invited on: (1) Whether the collection of 
information is necessary for the proper performance of the functions of 
the Commission, including whether the information will have practical 
utility; (2) the accuracy of the agency's estimate of the burden and 
cost of the collection of information, including the validity of the 
methodology and assumptions used; (3) ways to enhance the quality, 
utility and clarity of the information collection; and (4) ways to 
minimize the burden of the collection of information on those who are 
to respond, including the use of automated collection techniques or 
other forms of information technology.

    Dated: October 7, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-26082 Filed 10-13-15; 8:45 am]
BILLING CODE 6717-01-P



                                              61812                     Federal Register / Vol. 80, No. 198 / Wednesday, October 14, 2015 / Notices

                                              provide copies of their protests only to                DEPARTMENT OF ENERGY                                  Commission-certified Electric
                                              the party or parties directly involved in                                                                     Reliability Organization (ERO) to
                                              the protest.                                            Federal Energy Regulatory                             develop mandatory and enforceable
                                                                                                      Commission                                            Reliability Standards, which are subject
                                                 Persons who wish to comment only
                                              on the environmental review of this                     [Docket No. IC16–1–000]                               to Commission review and approval.
                                                                                                                                                            Once approved, the Reliability
                                              project should submit an original and
                                                                                                      Commission Information Collection                     Standards may be enforced by NERC,
                                              two copies of their comments to the
                                                                                                      Activities (FERC–725K); Comment                       subject to Commission oversight, or by
                                              Secretary of the Commission.                                                                                  the Commission independently.
                                                                                                      Request; Extension
                                              Environmental commentors will be
                                                                                                      AGENCY: Federal Energy Regulatory                        Reliability Standards that NERC
                                              placed on the Commission’s
                                                                                                      Commission, Energy.                                   proposes to the Commission may
                                              environmental mailing list, will receive
                                                                                                                                                            include Reliability Standards that are
                                              copies of the environmental documents,                  ACTION: Notice of information collection
                                                                                                                                                            proposed by a Regional Entity to be
                                              and will be notified of meetings                        and request for comments.
                                                                                                                                                            effective in that region. In Order No.
                                              associated with the Commission’s                                                                              672, the Commission noted that:
                                                                                                      SUMMARY:    In compliance with the
                                              environmental review process.
                                                                                                      requirements of the Paperwork                            As a general matter, we will accept the
                                              Environmental commentors will not be                    Reduction Act of 1995, 44 U.S.C.                      following two types of regional differences,
                                              required to serve copies of filed                       3506(c)(2)(A), the Federal Energy                     provided they are otherwise just, reasonable,
                                              documents on all other parties.                         Regulatory Commission (Commission or                  not unduly discriminatory or preferential and
                                              However, the non-party commentors                       FERC) is soliciting public comment on                 in the public interest, as required under the
                                              will not receive copies of all documents                the currently approved information                    statute: (1) a regional difference that is more
                                              filed by other parties or issued by the                 collection, FERC–725K (Mandatory                      stringent than the continent-wide Reliability
                                              Commission (except for the mailing of                                                                         Standard, including a regional difference that
                                                                                                      Reliability Standards for the SERC                    addresses matters that the continent-wide
                                              environmental documents issued by the                   Region).                                              Reliability Standard does not; and (2) a
                                              Commission) and will not have the right                 DATES: Comments on the collection of                  regional Reliability Standard that is
                                              to seek court review of the                             information are due [insert date that is              necessitated by a physical difference in the
                                              Commission’s final order.                               60 days after publication in the Federal              Bulk-Power System.
                                                 The Commission strongly encourages                   Register].                                              When NERC reviews a regional
                                              electronic filings of comments, protests                ADDRESSES: You may submit comments                    Reliability Standard that would be
                                              and interventions in lieu of paper using                (identified by Docket No. IC16–1–000)                 applicable on an interconnection-wide
                                              the ‘‘eFiling’’ link at http://                         by either of the following methods:                   basis and that has been proposed by a
                                              www.ferc.gov. Persons unable to file                       • eFiling at Commission’s Web site:                Regional Entity organized on an
                                              electronically should submit an original                http://www.ferc.gov/docs-filing/                      interconnection-wide basis, NERC must
                                              and 14 copies of the protest or                         efiling.asp.                                          rebuttably presume that the regional
                                                                                                         • Mail/Hand Delivery/Courier:                      Reliability Standard is just, reasonable,
                                              intervention to the Federal Energy
                                                                                                      Federal Energy Regulatory Commission,                 not unduly discriminatory or
                                              regulatory Commission, 888 First Street,
                                                                                                      Secretary of the Commission, 888 First                preferential, and in the public interest.
                                              NE., Washington, DC 20426.
                                                                                                      Street NE., Washington, DC 20426.                     In turn, the Commission must give ‘‘due
                                                 This filing is accessible on-line at                    Instructions: All submissions must be
                                                                                                                                                            weight’’ to the technical expertise of
                                              http://www.ferc.gov, using the                          formatted and filed in accordance with
                                                                                                                                                            NERC and of a Regional Entity
                                              ‘‘eLibrary’’ link and is available for                  submission guidelines at: http://
                                                                                                                                                            organized on an interconnection-wide
                                              review in the Commission’s Public                       www.ferc.gov/help/submission-
                                                                                                                                                            basis.
                                              Reference Room in Washington, DC                        guide.asp. For user assistance contact
                                                                                                      FERC Online Support by email at                         On April 19, 2007, the Commission
                                              There is an ‘‘eSubscription’’ link on the
                                                                                                      ferconlinesupport@ferc.gov, or by phone               accepted delegation agreements between
                                              Web site that enables subscribers to
                                                                                                      at: (866) 208–3676 (toll-free), or (202)              NERC and each of the eight Regional
                                              receive email notification when a
                                                                                                      502–8659 for TTY.                                     Entities. In the order, the Commission
                                              document is added to a subscribed                                                                             accepted SERC as a Regional Entity
                                              docket(s). For assistance with any FERC                    Docket: Users interested in receiving
                                                                                                      automatic notification of activity in this            organized on less than an
                                              Online service, please email                                                                                  interconnection-wide basis. As a
                                                                                                      docket or in viewing/downloading
                                              FERCOnlineSupport@ferc.gov, or call                                                                           Regional Entity, SERC oversees Bulk-
                                                                                                      comments and issuances in this docket
                                              (866) 208–3676 (toll free). For TTY, call                                                                     Power System reliability within the
                                                                                                      may do so at http://www.ferc.gov/docs-
                                              (202) 502–8659.                                                                                               SERC Region, which covers a
                                                                                                      filing/docs-filing.asp.
                                                 Comment Date: 5:00 p.m. Eastern                      FOR FURTHER INFORMATION CONTACT:
                                                                                                                                                            geographic area of approximately
                                              Time on October 28, 2015.                               Ellen Brown may be reached by email                   560,000 square miles in a sixteen-state
                                                                                                      at DataClearance@FERC.gov, telephone                  area in the southeastern and central
                                                Dated: October 7, 2015.
                                                                                                      at (202) 502–8663, and fax at (202) 273–              United States (all of Missouri, Alabama,
                                              Kimberly D. Bose,                                                                                             Tennessee, North Carolina, South
                                                                                                      0873.
                                              Secretary.                                                                                                    Carolina, Georgia, Mississippi, and
                                                                                                      SUPPLEMENTARY INFORMATION:
                                              [FR Doc. 2015–26077 Filed 10–13–15; 8:45 am]
                                                                                                         Title: Mandatory Reliability Standards             portions of Iowa, Illinois, Kentucky,
                                              BILLING CODE 6717–01–P                                  for the SERC Region.                                  Virginia, Oklahoma, Arkansas,
                                                                                                                                                            Louisiana, Texas and Florida). The
tkelley on DSK3SPTVN1PROD with NOTICES




                                                                                                         OMB Control No.: 1902–0260.
                                                                                                         Type of Request: Three-year extension              SERC Region is currently geographically
                                                                                                      of the FERC–725K information                          divided into five subregions that are
                                                                                                      collection requirements with no changes               identified as Southeastern, Central,
                                                                                                      to the current reporting requirements.                VACAR, Delta, and Gateway.
                                                                                                         Abstract: Section 215 of the Federal                 Type of Respondents: Entities
                                                                                                      Power Act (FPA) requires a                            registered with the North American


                                         VerDate Sep<11>2014   16:39 Oct 13, 2015   Jkt 238001   PO 00000   Frm 00023   Fmt 4703   Sfmt 4703   E:\FR\FM\14OCN1.SGM   14OCN1


                                                                             Federal Register / Vol. 80, No. 198 / Wednesday, October 14, 2015 / Notices                                                                            61813

                                              Electric Reliability Corporation (within                                 Estimate of Annual Burden 1: The                                   reporting burden for the information
                                              the SERC region).                                                      Commission estimates the annual public                               collection as:

                                                                                   FERC–725K: MANDATORY RELIABILITY STANDARD FOR THE SERC REGION
                                                                                                           Annual number of                                                   Average burden       Total annual bur-     Cost per respond-
                                                                             Number of re-                                                    Total number of
                                                                                                           responses per re-                                                  and cost per re-      den hours and               ent
                                                                              spondents                                                         responses
                                                                                                               spondent                                                          sponse 2          total annual cost            ($)
                                                                                 (1)                                                            (1)*(2)=(3)
                                                                                                                  (2)                                                               (4)               (3)*(4)=(5)             (5)÷(1)

                                              PCs: Design and
                                               Document Auto-
                                               matic UFLS Pro-
                                               gram .................                            3 21                                  1                             21                      8                    168                   $532
                                                                                                                                                                                          $532               4 $11,172

                                              PCs: Provide Doc-
                                               umentation and
                                               Data to SERC ...                                  3 21                                 1                              21                     16                    336                 $1,064
                                                                                                                                                                                        $1,064                $22,344
                                              GOs: Provide Doc-
                                               umentation and
                                               Data to SERC ...                                5 104                                   1                            104                     16                  1,664                 $1,064
                                                                                                                                                                                        $1,064              6 $110,656

                                              GOs: Record Re-
                                               tention ...............                         5 104                                  1                             104                      4                    416                   $150
                                                                                                                                                                                          $150               7 $15,600

                                                   Total ..............   ..............................   ..............................   ..............................                 125                  2,584                 $2,810
                                                                                                                                                                                                             $159,772



                                                Comments: Comments are invited on:                                   DEPARTMENT OF ENERGY                                                 powerhouse containing four 2-megawatt
                                              (1) Whether the collection of                                                                                                               Kaplan hydropower turbine-generators
                                              information is necessary for the proper                                Federal Energy Regulatory                                            having a total combined generating
                                              performance of the functions of the                                    Commission                                                           capacity of 8.0 megawatts; (3) one new
                                              Commission, including whether the                                      [Project No. 14710–000]                                              1000-foot-long by 220-foot-wide tailrace;
                                              information will have practical utility;                                                                                                    (4) a new 85-foot-long by 43-foot-high
                                              (2) the accuracy of the agency’s estimate                              Energy Resources USA Inc.; Notice of                                 by 3-foot-thick intake retaining wall and
                                              of the burden and cost of the collection                               Preliminary Permit Application                                       a new 40-foot-long by 43-foot-high by 3-
                                              of information, including the validity of                              Accepted For Filing and Soliciting                                   foot-thick tailrace retaining wall; (5) a
                                              the methodology and assumptions used;                                  Comments, Motions To Intervene, and                                  new 60-foot-long by 50-foot-wide
                                              (3) ways to enhance the quality, utility                               Competing Applications                                               substation; (6) a new 6.54-mile-long,
                                              and clarity of the information collection;                                                                                                  115-kilovolt transmission line; and (7)
                                                                                                                        On September 2, 2015, the Energy                                  appurtenant facilities. The project
                                              and (4) ways to minimize the burden of                                 Resources USA Inc. filed an application                              would have an estimated annual
                                              the collection of information on those                                 for a preliminary permit under section                               generation of 66.4 gigawatt-hours.
                                              who are to respond, including the use                                  4(f) of the Federal Power Act proposing                                 Applicant Contact: Mr. Ander
                                              of automated collection techniques or                                  to study the feasibility of the proposed                             Gonzalez, 2655 Le Jeune Road, Suite
                                              other forms of information technology.                                 Lock and Dam No.22 Hydroelectric                                     804, Coral Gables, Florida 33134;
                                                Dated: October 7, 2015.                                              Project No. 14710–000, to be located at                              telephone +34 932523840.
                                              Kimberly D. Bose,                                                      the existing Mississippi River Lock and                                 FERC Contact: Tyrone A. Williams,
                                                                                                                     Dam No. 22 on the Mississippi River,                                 (202) 502–6331.
                                              Secretary.                                                                                                                                     Deadline for filing comments, motions
                                                                                                                     near the City of Hannibal, in Ralls
                                              [FR Doc. 2015–26082 Filed 10–13–15; 8:45 am]                                                                                                to intervene, competing applications
                                                                                                                     County, Missouri and Pike County,
                                              BILLING CODE 6717–01–P                                                 Illinois. The Mississippi River Lock and                             (without notices of intent), or notices of
                                                                                                                     Dam No. 22 is owned by the United                                    intent to file competing applications: 60
                                                                                                                     States government and operated by the                                days from the issuance of this notice.
                                                                                                                     U.S. Army Corps of Engineers.                                        Competing applications and notices of
                                                                                                                        The proposed project would consist                                intent must meet the requirements of 18
                                                                                                                     of: (1) A new 770-foot-long by 300-foot-                             CFR 4.36. The Commission strongly
                                                                                                                     wide earthen intake area; (2) a new 220-                             encourages electronic filing. Please file
                                                                                                                     foot by 90-foot reinforced concrete                                  comments, motions to intervene, notices
                                                1 The Commission defines burden as the total                         site: http://www.bls.gov/oes/current/naics2_                            6 The hourly cost for GOs uses the hourly

                                              time, effort, or financial resources expended by                       22.htm#11-0000 (wage category 17–2071).                              reporting cost of $66.45 per hour is based on the
                                                                                                                        3 Both figures for PC respondents are not to be
                                              persons to generate, maintain, retain, or disclose or                                                                                       cost (including benefits) of an engineer to
tkelley on DSK3SPTVN1PROD with NOTICES




                                              provide information to or for a Federal agency. For                    totaled. They represent the same set of respondents.                 implement the requirements of the rule.
                                                                                                                        4 The $66.45 hourly cost figure (including
                                              further explanation of what is included in the                                                                                                 7 The record retention cost of $37.50 per hour

                                              information collection burden, reference 5 Code of                     benefits) comes from the cost of an engineer as
                                                                                                                                                                                          (including benefits) comes from Commission staff
                                                                                                                     posted on the Bureau of Labor Statistics (BLS) Web
                                              Federal Regulations 1320.3.                                                                                                                 research on record retention requirements (wage
                                                                                                                     site: http://www.bls.gov/oes/current/naics2_
                                                2 The $66.45 hourly cost figure (including                                                                                                category 43–4199 for information and record
                                                                                                                     22.htm#11-0000 (wage category 17–2071).
                                              benefits) comes from the cost of an engineer as                           5 Both figures for GO respondents are not to be                   clerks).
                                              posted on the Bureau of Labor Statistics (BLS) Web                     totaled. They represent the same set of respondents.



                                         VerDate Sep<11>2014     16:39 Oct 13, 2015        Jkt 238001       PO 00000        Frm 00024        Fmt 4703       Sfmt 4703        E:\FR\FM\14OCN1.SGM   14OCN1



Document Created: 2018-02-27 08:50:34
Document Modified: 2018-02-27 08:50:34
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice of information collection and request for comments.
DatesComments on the collection of information are due [insert date that is 60 days after publication in the Federal Register].
ContactEllen Brown may be reached by email at [email protected], telephone at (202) 502-8663, and fax at (202) 273-0873.
FR Citation80 FR 61812 

2024 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR