80_FR_62315 80 FR 62116 - Security Exemptions/License Amendment Requests for Decommissioning Nuclear Power Plants

80 FR 62116 - Security Exemptions/License Amendment Requests for Decommissioning Nuclear Power Plants

NUCLEAR REGULATORY COMMISSION

Federal Register Volume 80, Issue 199 (October 15, 2015)

Page Range62116-62118
FR Document2015-26245

The U.S. Nuclear Regulatory Commission (NRC) is issuing Interim Staff Guidance (ISG) NSIR/DSP-ISG-03, ``Review of Security Exemptions/License Amendment Requests for Decommissioning Nuclear Power Plants,'' dated September 28, 2015. This document provides guidance for NRC staff to ensure clear and consistent reviews of a licensee's request for licensing actions and amendments, the use of alternative measures, and requests for exemption from security regulations for nuclear power reactors after permanent cessation of plant operations.

Federal Register, Volume 80 Issue 199 (Thursday, October 15, 2015)
[Federal Register Volume 80, Number 199 (Thursday, October 15, 2015)]
[Notices]
[Pages 62116-62118]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-26245]


=======================================================================
-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[NRC-2014-0255]


Security Exemptions/License Amendment Requests for 
Decommissioning Nuclear Power Plants

AGENCY: Nuclear Regulatory Commission.

ACTION: Interim staff guidance; issuance.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is issuing 
Interim Staff Guidance (ISG) NSIR/DSP-ISG-03, ``Review of Security 
Exemptions/License Amendment Requests for Decommissioning Nuclear Power 
Plants,'' dated September 28, 2015. This document provides guidance for 
NRC staff to ensure clear and consistent reviews of a licensee's 
request for licensing actions and amendments, the use of alternative 
measures, and requests for exemption from security regulations for 
nuclear power reactors after permanent cessation of plant operations.

DATES: This ISG is effective on November 16, 2015.

ADDRESSES: Please refer to Docket ID NRC-2014-0255 when contacting the 
NRC about the availability of information regarding this document. You 
may obtain publicly-available information related to this document 
using any of the following methods:
     Federal Rulemaking Web site: Go to http://www.regulations.gov and search for Docket ID NRC-2014-0255. Address 
questions about NRC dockets to Carol Gallagher; telephone: 301-415-
3463; email: [email protected]. For technical questions, contact 
the individuals listed in the FOR FURTHER INFORMATION CONTACT section 
of this document.
     NRC's Agencywide Documents Access and Management System

[[Page 62117]]

(ADAMS): You may obtain publicly-available documents online in the 
ADAMS Public Documents collection at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and 
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS, 
please contact the NRC's Public Document Room (PDR) reference staff at 
1-800-397-4209, 301-415-4737, or by email to [email protected]. The 
draft NSIR/DSP-ISG-03, the final NSIR/DSP-ISG-03, the public comments, 
and the NRC staff's responses to public comments are available in ADAMS 
under Accession Nos. ML14294A170, ML15106A737, ML15042A208, and 
ML15054A200, respectively.
     NRC's PDR: You may examine and purchase copies of public 
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 
Rockville Pike, Rockville, Maryland 20852.

FOR FURTHER INFORMATION CONTACT: Douglas Garner, Office of Nuclear 
Security and Incident Response, U.S. Nuclear Regulatory Commission, 
Washington, DC 20555-0001; telephone: 301-287-0229; email: 
[email protected].

SUPPLEMENTARY INFORMATION:

I. Discussion

    Currently, the power reactor physical security requirements in part 
73 of title 10 of the Code of Federal Regulations (10 CFR) and the NRC 
security orders that apply to licensees of nuclear power reactors under 
10 CFR part 50 apply equally to operating and decommissioning power 
reactor licensees; the 10 CFR part 50 license is retained after 
permanent cessation of operations and removal of fuel from the reactor 
vessel. The NRC recognizes that licensees that have permanently ceased 
operations and have no fuel in the reactor vessel present a 
significantly reduced risk to public health and safety compared with 
operating reactors. Because of the lower comparative risk from a 
decommissioning power reactor, licensees typically request exemptions 
from regulatory requirements on the basis that the application of a 
specific regulation in the particular circumstance of decommissioning 
plants is not necessary to achieve the underlying purpose of the 
regulations and orders.
    Licensees have historically used the NRC's existing license 
amendment and exemption processes to propose tailored security 
requirements for site-specific conditions at a decommissioning 
facility. Licensees must follow the process outlined in 10 CFR 73.5 
when applying for exemptions from security regulations.
    This ISG provides guidance to NRC staff in processing requests for 
license amendments and exemptions from the security requirements for 
nuclear power reactors that are undergoing decommissioning. Use of this 
ISG would result in consistent and timely reviews of requests for 
exemption from certain security regulations.

II. Public Comments

    A draft ISG was published for public comment in the Federal 
Register on December 2, 2014 (79 FR 71458). The public comment period 
closed on January 8, 2015. The NRC received 37 separate comments on the 
draft ISG in three submissions from members of the nuclear industry. 
None of the comments received resulted in substantive changes being 
made to the ISG. One submission from the nuclear industry provided 
editorial comments and comments for clarification.

III. Changes to the ISG

    This ISG was revised from the draft that appeared in the Federal 
Register on December 2, 2014. Editorial changes based on public 
comments are described in the NRC staff's responses to public comments. 
The ISG was also revised to provide clarification to staff regarding 
internal NRC processing.

IV. Congressional Review Act

    This ISG, NSIR/DSP-ISG-03 is a rule as defined in the Congressional 
Review Act (5 U.S.C. 801-808). However, the Office of Management and 
Budget has not found it to be a major rule as defined in the 
Congressional Review Act.

V. Backfitting and Issue Finality

    The NRC is issuing interim guidance for the NRC staff regarding its 
review of requests from licensees of decommissioning nuclear power 
plants for license amendments, alternative measures, and exemptions 
from specific security requirements in 10 CFR part 73. Issuance of the 
ISG does not constitute backfitting as defined in 10 CFR 50.109 (the 
Backfit Rule) and is not otherwise inconsistent with the issue finality 
provisions in 10 CFR part 52. The NRC's position is based upon the 
following considerations.
    1. The ISG positions do not constitute backfitting, inasmuch as the 
ISG is internal guidance to NRC staff.
    The ISG provides interim guidance to the staff on how to review 
certain requests for exemption, alternative measures, or license 
amendments. Changes in internal staff guidance are not matters for 
which applicants or licensees are protected under 10 CFR 50.109 or 
issue finality provisions in 10 CFR part 52.
    2. The staff has no intention to impose the ISG on existing nuclear 
power plant licenses or holders of regulatory approvals either now or 
in the future (absent a voluntary request for change from the licensee 
or holder of a regulatory approval).
    The staff does not intend to impose or apply the positions 
described in the ISG to existing (already issued) licenses (e.g., 
operating licenses and combined licenses) and regulatory approvals. 
Hence, the ISG--even if considered guidance that is within the purview 
of the issue finality provisions in 10 CFR part 52--need not be 
evaluated as if it were a backfit or as being inconsistent with issue 
finality provisions. If, in the future, the staff seeks to impose a 
position in the ISG on holders of already issued licenses in a manner 
that does not provide issue finality as described in the applicable 
issue finality provision, then the staff must make the showing as set 
forth in the Backfit Rule, or address the criteria for avoiding issue 
finality as described in the applicable issue finality provision, as 
applicable.
    3. Backfitting and issue finality do not--with limited exceptions 
not applicable here--protect current or future applicants.
    Applicants and potential applicants are not, with certain 
exceptions, protected by either the Backfit Rule or any issue finality 
provisions under 10 CFR part 52. This is because neither the Backfit 
Rule nor the issue finality provisions under 10 CFR part 52--with 
certain exclusions discussed below--were intended to apply to every NRC 
action that substantially changes the expectations of current and 
future applicants.
    The exceptions to the general principle are applicable whenever an 
applicant references a 10 CFR part 52 license (e.g., an early site 
permit) and/or NRC regulatory approval (e.g., a design certification 
rule) with specified issue finality provisions. The staff does not, at 
this time, intend to impose the positions represented in the ISG in a 
manner that is inconsistent with any issue finality provisions.
    If, in the future, the staff seeks to impose a position in the ISG 
in a manner that does not provide issue finality as described in the 
applicable issue finality provision, then the staff must address the 
criteria for avoiding issue finality as described in the applicable 
issue finality provision.

    Dated at Rockville, Maryland, this 30th day of September, 2015.


[[Page 62118]]


    For the Nuclear Regulatory Commission.
Christiana Lui,
Director, Division of Security Policy, Office of Nuclear Security and 
Incident Response.
[FR Doc. 2015-26245 Filed 10-14-15; 8:45 am]
 BILLING CODE 7590-01-P



                                                  62116                       Federal Register / Vol. 80, No. 199 / Thursday, October 15, 2015 / Notices

                                                  displays a currently valid OMB control                  work; (5) MSP-Start Partnerships are for              self-reporting or representing a project
                                                  number.                                                 awardees new to the MSP program,                      and reporting on behalf of many project
                                                  SUPPLEMENTARY INFORMATION:                              especially from minority-serving                      participants. The majority of
                                                    Title of Collection: Monitoring for the               institutions, community colleges and                  respondents (60%) are estimated to
                                                  National Science Foundation’s Math                      primarily undergraduate institutions, to              require fewer than two hours to
                                                  and Science Partnership (MSP) Program.                  support the necessary data analysis,                  complete the survey. The burden on the
                                                    OMB Control No.: 3145–0199.                           project design, evaluation and team                   public is negligible because the study is
                                                                                                          building activities needed to develop a               limited to project participants that have
                                                  1. Abstract
                                                                                                          full MSP Targeted or Institute                        received funding from the MSP
                                                     • This document has been prepared                    Partnership; and (6) Phase II                         Program.
                                                  to support the clearance of data                        Partnerships for prior MSP Partnership                  Dated: October 8, 2015.
                                                  collection instruments to be used in the                awardees focus on specific innovation                 Suzanne H. Plimpton,
                                                  evaluation of the Math and Science                      areas of their work where evidence of
                                                  Partnership (MSP) program. The goals                                                                          Reports Clearance Officer, National Science
                                                                                                          significant positive impact is clearly                Foundation.
                                                  for the program are to (1) ensure that all              documented and where an investment
                                                  K–12 students have access to, are                                                                             [FR Doc. 2015–26161 Filed 10–14–15; 8:45 am]
                                                                                                          of additional resources and time would
                                                  prepared for, and are encouraged to                     produce more robust findings and
                                                                                                                                                                BILLING CODE 7555–01–P

                                                  participate and succeed in challenging                  results.
                                                  curricula and advanced mathematics                        The MSP monitoring information
                                                  and science courses; (2) enhance the                    system, comprised of eight web-based                  NUCLEAR REGULATORY
                                                  quality, quantity, and diversity of the K–              surveys, collects a common core of data               COMMISSION
                                                  12 mathematics and science teacher                      about each component of MSP. The Web                  [NRC–2014–0255]
                                                  workforce; and (3) develop evidence-                    application for MSP has been developed
                                                  based outcomes that contribute to our                   with a modular design that incorporates               Security Exemptions/License
                                                  understanding of how students                           templates and self-contained code                     Amendment Requests for
                                                  effectively learn the knowledge, skills                 modules for rapid development and                     Decommissioning Nuclear Power
                                                  and ways of thinking inherent in                        ease of modification. A downloadable                  Plants
                                                  mathematics, computer science,                          version will also be available for
                                                  engineering, and/or the natural sciences.                                                                     AGENCY:  Nuclear Regulatory
                                                                                                          respondents who prefer a paper version                Commission.
                                                  The motivational force for realizing                    that they can mail or fax to the external
                                                  these goals is the formation of                                                                               ACTION: Interim staff guidance; issuance.
                                                                                                          contractor.
                                                  partnerships between institutions of                      Use of the information: This                        SUMMARY:    The U.S. Nuclear Regulatory
                                                  higher education (IHEs) and K–12                        information is required for effective                 Commission (NRC) is issuing Interim
                                                  school districts. The role of IHE content               program planning, administration,                     Staff Guidance (ISG) NSIR/DSP–ISG–03,
                                                  faculty is the cornerstone of this                      communication, program and project                    ‘‘Review of Security Exemptions/
                                                  intervention. In fact, it is the rigorous               monitoring and evaluation, and for                    License Amendment Requests for
                                                  involvement of science, mathematics,                    measuring attainment of NSF’s program,                Decommissioning Nuclear Power
                                                  and engineering faculty—and the                         project and strategic goals; the Deficit              Plants,’’ dated September 28, 2015. This
                                                  expectation that both IHEs and K–12                     Reduction Act of 2005 (Pub. L. 109–171)               document provides guidance for NRC
                                                  school systems will be transformed—                     which established the Academic                        staff to ensure clear and consistent
                                                  that distinguishes MSP from other                       Competitiveness (ACC). The MSP                        reviews of a licensee’s request for
                                                  education reform efforts.                               program is also directly aligned with
                                                     • The components of the overall MSP                                                                        licensing actions and amendments, the
                                                                                                          two of NSF’s long-term investment                     use of alternative measures, and
                                                  portfolio include active projects whose                 categories: (1) Transform the Frontiers
                                                  initial awards were made in prior MSP                                                                         requests for exemption from security
                                                                                                          and (2) Innovate for Society.                         regulations for nuclear power reactors
                                                  competitions: (1) Comprehensive
                                                  Partnerships that implement change in                   2. Expected Respondents                               after permanent cessation of plant
                                                  mathematics and/or science educational                                                                        operations.
                                                                                                             The expected respondents are
                                                  practices in both higher education                      principal investigators of all Targeted               DATES: This ISG is effective on
                                                  institutions and in schools and school                  and Institute partnership projects;                   November 16, 2015.
                                                  districts, resulting in improved student                STEM and education faculty members                    ADDRESSES: Please refer to Docket ID
                                                  achievement across the K–12                             and administrators who participated in                NRC–2014–0255 when contacting the
                                                  continuum; (2) Targeted Partnerships                    MSP; school districts and IHEs that are               NRC about the availability of
                                                  that focus on improved K–12 student                     partners in an MSP project; and teachers              information regarding this document.
                                                  achievement in a narrower grade range                   participating in Institute Partnerships.              You may obtain publicly-available
                                                  or disciplinary focus within                                                                                  information related to this document
                                                  mathematics or science; (3) Institute                   3. Burden on the Public                               using any of the following methods:
                                                  Partnerships: Teacher Institutes for the                   Number of Respondents: 1936.                          • Federal Rulemaking Web site: Go to
                                                  21st Century that focus on the                             Burden of the Public: The estimated                http://www.regulations.gov and search
                                                  development of mathematics and                          total annual response burden for this                 for Docket ID NRC–2014–0255. Address
                                                  science teachers as school—and district-                collection is 17,727 hours.                           questions about NRC dockets to Carol
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                  based intellectual leaders and master                      This figure is based upon the previous             Gallagher; telephone: 301–415–3463;
                                                  teachers; (4) Research, Evaluation and                  3 years of collecting information under               email: Carol.Gallagher@nrc.gov. For
                                                  Technical Assistance (RETA) projects                    this clearance and anticipated                        technical questions, contact the
                                                  that build and enhance large-scale                      collections. The average annual                       individuals listed in the FOR FURTHER
                                                  research and evaluation capacity for all                reporting burden is estimated to be                   INFORMATION CONTACT section of this
                                                  MSP awardees and provide them with                      between less than 1 and 50 hours per                  document.
                                                  tools and assistance in the                             respondent depending on whether a                        • NRC’s Agencywide Documents
                                                  implementation and evaluation of their                  respondent is a direct participant who is             Access and Management System


                                             VerDate Sep<11>2014   17:19 Oct 14, 2015   Jkt 238001   PO 00000   Frm 00105   Fmt 4703   Sfmt 4703   E:\FR\FM\15OCN1.SGM   15OCN1


                                                                              Federal Register / Vol. 80, No. 199 / Thursday, October 15, 2015 / Notices                                            62117

                                                  (ADAMS): You may obtain publicly-                       applying for exemptions from security                 not matters for which applicants or
                                                  available documents online in the                       regulations.                                          licensees are protected under 10 CFR
                                                  ADAMS Public Documents collection at                      This ISG provides guidance to NRC                   50.109 or issue finality provisions in 10
                                                  http://www.nrc.gov/reading-rm/                          staff in processing requests for license              CFR part 52.
                                                  adams.html. To begin the search, select                 amendments and exemptions from the                       2. The staff has no intention to
                                                  ‘‘ADAMS Public Documents’’ and then                     security requirements for nuclear power               impose the ISG on existing nuclear
                                                  select ‘‘Begin Web-based ADAMS                          reactors that are undergoing                          power plant licenses or holders of
                                                  Search.’’ For problems with ADAMS,                      decommissioning. Use of this ISG                      regulatory approvals either now or in
                                                  please contact the NRC’s Public                         would result in consistent and timely                 the future (absent a voluntary request
                                                  Document Room (PDR) reference staff at                  reviews of requests for exemption from                for change from the licensee or holder
                                                  1–800–397–4209, 301–415–4737, or by                     certain security regulations.                         of a regulatory approval).
                                                  email to pdr.resource@nrc.gov. The draft                                                                         The staff does not intend to impose or
                                                                                                          II. Public Comments                                   apply the positions described in the ISG
                                                  NSIR/DSP–ISG–03, the final NSIR/DSP–
                                                  ISG–03, the public comments, and the                       A draft ISG was published for public               to existing (already issued) licenses
                                                  NRC staff’s responses to public                         comment in the Federal Register on                    (e.g., operating licenses and combined
                                                  comments are available in ADAMS                         December 2, 2014 (79 FR 71458). The                   licenses) and regulatory approvals.
                                                  under Accession Nos. ML14294A170,                       public comment period closed on                       Hence, the ISG—even if considered
                                                  ML15106A737, ML15042A208, and                           January 8, 2015. The NRC received 37                  guidance that is within the purview of
                                                  ML15054A200, respectively.                              separate comments on the draft ISG in                 the issue finality provisions in 10 CFR
                                                     • NRC’s PDR: You may examine and                     three submissions from members of the                 part 52—need not be evaluated as if it
                                                  purchase copies of public documents at                  nuclear industry. None of the comments                were a backfit or as being inconsistent
                                                  the NRC’s PDR, Room O1–F21, One                         received resulted in substantive changes              with issue finality provisions. If, in the
                                                  White Flint North, 11555 Rockville                      being made to the ISG. One submission                 future, the staff seeks to impose a
                                                  Pike, Rockville, Maryland 20852.                        from the nuclear industry provided                    position in the ISG on holders of already
                                                                                                          editorial comments and comments for                   issued licenses in a manner that does
                                                  FOR FURTHER INFORMATION CONTACT:
                                                                                                          clarification.                                        not provide issue finality as described
                                                  Douglas Garner, Office of Nuclear
                                                                                                                                                                in the applicable issue finality
                                                  Security and Incident Response, U.S.                    III. Changes to the ISG                               provision, then the staff must make the
                                                  Nuclear Regulatory Commission,
                                                                                                             This ISG was revised from the draft                showing as set forth in the Backfit Rule,
                                                  Washington, DC 20555–0001; telephone:
                                                                                                          that appeared in the Federal Register on              or address the criteria for avoiding issue
                                                  301–287–0229; email: Douglas.Garner@
                                                                                                          December 2, 2014. Editorial changes                   finality as described in the applicable
                                                  nrc.gov.
                                                                                                          based on public comments are described                issue finality provision, as applicable.
                                                  SUPPLEMENTARY INFORMATION:                              in the NRC staff’s responses to public                   3. Backfitting and issue finality do
                                                                                                          comments. The ISG was also revised to                 not—with limited exceptions not
                                                  I. Discussion
                                                                                                          provide clarification to staff regarding              applicable here—protect current or
                                                     Currently, the power reactor physical                internal NRC processing.                              future applicants.
                                                  security requirements in part 73 of title                                                                        Applicants and potential applicants
                                                  10 of the Code of Federal Regulations                   IV. Congressional Review Act                          are not, with certain exceptions,
                                                  (10 CFR) and the NRC security orders                      This ISG, NSIR/DSP–ISG–03 is a rule                 protected by either the Backfit Rule or
                                                  that apply to licensees of nuclear power                as defined in the Congressional Review                any issue finality provisions under 10
                                                  reactors under 10 CFR part 50 apply                     Act (5 U.S.C. 801–808). However, the                  CFR part 52. This is because neither the
                                                  equally to operating and                                Office of Management and Budget has                   Backfit Rule nor the issue finality
                                                  decommissioning power reactor                           not found it to be a major rule as                    provisions under 10 CFR part 52—with
                                                  licensees; the 10 CFR part 50 license is                defined in the Congressional Review                   certain exclusions discussed below—
                                                  retained after permanent cessation of                   Act.                                                  were intended to apply to every NRC
                                                  operations and removal of fuel from the                                                                       action that substantially changes the
                                                  reactor vessel. The NRC recognizes that                 V. Backfitting and Issue Finality                     expectations of current and future
                                                  licensees that have permanently ceased                     The NRC is issuing interim guidance                applicants.
                                                  operations and have no fuel in the                      for the NRC staff regarding its review of                The exceptions to the general
                                                  reactor vessel present a significantly                  requests from licensees of                            principle are applicable whenever an
                                                  reduced risk to public health and safety                decommissioning nuclear power plants                  applicant references a 10 CFR part 52
                                                  compared with operating reactors.                       for license amendments, alternative                   license (e.g., an early site permit) and/
                                                  Because of the lower comparative risk                   measures, and exemptions from specific                or NRC regulatory approval (e.g., a
                                                  from a decommissioning power reactor,                   security requirements in 10 CFR part 73.              design certification rule) with specified
                                                  licensees typically request exemptions                  Issuance of the ISG does not constitute               issue finality provisions. The staff does
                                                  from regulatory requirements on the                     backfitting as defined in 10 CFR 50.109               not, at this time, intend to impose the
                                                  basis that the application of a specific                (the Backfit Rule) and is not otherwise               positions represented in the ISG in a
                                                  regulation in the particular                            inconsistent with the issue finality                  manner that is inconsistent with any
                                                  circumstance of decommissioning                         provisions in 10 CFR part 52. The NRC’s               issue finality provisions.
                                                  plants is not necessary to achieve the                  position is based upon the following                     If, in the future, the staff seeks to
                                                  underlying purpose of the regulations                   considerations.                                       impose a position in the ISG in a
                                                                                                                                                                manner that does not provide issue
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                  and orders.                                                1. The ISG positions do not constitute
                                                     Licensees have historically used the                 backfitting, inasmuch as the ISG is                   finality as described in the applicable
                                                  NRC’s existing license amendment and                    internal guidance to NRC staff.                       issue finality provision, then the staff
                                                  exemption processes to propose tailored                    The ISG provides interim guidance to               must address the criteria for avoiding
                                                  security requirements for site-specific                 the staff on how to review certain                    issue finality as described in the
                                                  conditions at a decommissioning                         requests for exemption, alternative                   applicable issue finality provision.
                                                  facility. Licensees must follow the                     measures, or license amendments.                        Dated at Rockville, Maryland, this 30th day
                                                  process outlined in 10 CFR 73.5 when                    Changes in internal staff guidance are                of September, 2015.



                                             VerDate Sep<11>2014   17:19 Oct 14, 2015   Jkt 238001   PO 00000   Frm 00106   Fmt 4703   Sfmt 4703   E:\FR\FM\15OCN1.SGM   15OCN1


                                                  62118                       Federal Register / Vol. 80, No. 199 / Thursday, October 15, 2015 / Notices

                                                     For the Nuclear Regulatory Commission.               Schedule, a Statement of Supporting                   DATES:   Comments are due: October 15,
                                                  Christiana Lui,                                         Justification, a certification of                     2015.
                                                  Director, Division of Security Policy, Office           compliance with 39 U.S.C. 3633(a), and                ADDRESSES:   Submit comments
                                                  of Nuclear Security and Incident Response.              an application for non-public treatment               electronically via the Commission’s
                                                  [FR Doc. 2015–26245 Filed 10–14–15; 8:45 am]            of certain materials. It also filed                   Filing Online system at http://
                                                  BILLING CODE 7590–01–P                                  supporting financial workpapers.                      www.prc.gov. Those who cannot submit
                                                                                                          II. Notice of Commission Action                       comments electronically should contact
                                                                                                                                                                the person identified in the FOR FURTHER
                                                  POSTAL REGULATORY COMMISSION                              The Commission establishes Docket                   INFORMATION CONTACT section by
                                                                                                          Nos. MC2016–1 and CP2016–1 to                         telephone for advice on filing
                                                  [Docket Nos. MC2016–1 and CP2016–1;                     consider the Request pertaining to the
                                                  Order No. 2748]                                                                                               alternatives.
                                                                                                          proposed Priority Mail Contract 145
                                                                                                          product and the related contract,                     FOR FURTHER INFORMATION CONTACT:
                                                  New Postal Product                                                                                            David A. Trissell, General Counsel, at
                                                                                                          respectively.
                                                  AGENCY: Postal Regulatory Commission.                     The Commission invites comments on                  202–789–6820.
                                                  ACTION: Notice.                                         whether the Postal Service’s filings in               SUPPLEMENTARY INFORMATION:
                                                                                                          the captioned dockets are consistent
                                                  SUMMARY:   The Commission is noticing a                 with the policies of 39 U.S.C. 3632,                  Table of Contents
                                                  recent Postal Service filing concerning                 3633, or 3642, 39 CFR part 3015, and 39               I. Introduction
                                                  the addition of Priority Mail Contract                  CFR part 3020, subpart B. Comments are                II. Notice of Commission Action
                                                  145 negotiated service agreement to the                 due no later than October 15, 2015. The               III. Ordering Paragraphs
                                                  competitive product list. This notice                   public portions of these filings can be               I. Introduction
                                                  informs the public of the filing, invites               accessed via the Commission’s Web site
                                                  public comment, and takes other                         (http://www.prc.gov).                                   In accordance with 39 U.S.C. 3642
                                                  administrative steps.                                     The Commission appoints Lyudmila                    and 39 CFR 3020.30 et seq., the Postal
                                                  DATES: Comments are due: October 15,                    Y. Bzhilyanskaya to serve as Public                   Service filed a formal request and
                                                  2015.                                                   Representative in these dockets.                      associated supporting information to
                                                  ADDRESSES: Submit comments
                                                                                                                                                                add Priority Mail Contract 147 to the
                                                                                                          III. Ordering Paragraphs                              competitive product list.1
                                                  electronically via the Commission’s
                                                  Filing Online system at http://                           It is ordered:                                        The Postal Service
                                                  www.prc.gov. Those who cannot submit                      1. The Commission establishes Docket                contemporaneously filed a redacted
                                                  comments electronically should contact                  Nos. MC2016–1 and CP2016–1 to                         contract related to the proposed new
                                                  the person identified in the FOR FURTHER                consider the matters raised in each                   product under 39 U.S.C. 3632(b)(3) and
                                                  INFORMATION CONTACT section by                          docket.                                               39 CFR 3015.5. Request, Attachment B.
                                                  telephone for advice on filing                            2. Pursuant to 39 U.S.C. 505,                         To support its Request, the Postal
                                                  alternatives.                                           Lyudmila Y. Bzhilyanskaya is appointed                Service filed a copy of the contract, a
                                                                                                          to serve as an officer of the Commission              copy of the Governors’ Decision
                                                  FOR FURTHER INFORMATION CONTACT:                        to represent the interests of the general             authorizing the product, proposed
                                                  David A. Trissell, General Counsel, at                  public in these proceedings (Public                   changes to the Mail Classification
                                                  202–789–6820.                                           Representative).                                      Schedule, a Statement of Supporting
                                                  SUPPLEMENTARY INFORMATION:                                3. Comments are due no later than                   Justification, a certification of
                                                  Table of Contents                                       October 15, 2015.                                     compliance with 39 U.S.C. 3633(a), and
                                                                                                            4. The Secretary shall arrange for                  an application for non-public treatment
                                                  I. Introduction                                         publication of this order in the Federal              of certain materials. It also filed
                                                  II. Notice of Commission Action                         Register.
                                                  III. Ordering Paragraphs
                                                                                                                                                                supporting financial workpapers.
                                                                                                           By the Commission.                                   II. Notice of Commission Action
                                                  I. Introduction                                         Ruth Ann Abrams,
                                                     In accordance with 39 U.S.C. 3642                                                                            The Commission establishes Docket
                                                                                                          Acting Secretary.
                                                  and 39 CFR 3020.30 et seq., the Postal                                                                        Nos. MC2016–4 and CP2016–4 to
                                                                                                          [FR Doc. 2015–26131 Filed 10–14–15; 8:45 am]
                                                  Service filed a formal request and                                                                            consider the Request pertaining to the
                                                                                                          BILLING CODE 7710–FW–P
                                                  associated supporting information to                                                                          proposed Priority Mail Contract 147
                                                  add Priority Mail Contract 145 to the                                                                         product and the related contract,
                                                  competitive product list.1                                                                                    respectively.
                                                                                                          POSTAL REGULATORY COMMISSION
                                                     The Postal Service                                                                                           The Commission invites comments on
                                                  contemporaneously filed a redacted                      [Docket Nos. MC2016–4 and CP2016–4;                   whether the Postal Service’s filings in
                                                  contract related to the proposed new                    Order No. 2747]                                       the captioned dockets are consistent
                                                  product under 39 U.S.C. 3632(b)(3) and                                                                        with the policies of 39 U.S.C. 3632,
                                                  39 CFR 3015.5. Request, Attachment B.                   New Postal Product                                    3633, or 3642, 39 CFR part 3015, and 39
                                                     To support its Request, the Postal                   AGENCY:   Postal Regulatory Commission.               CFR part 3020, subpart B. Comments are
                                                  Service filed a copy of the contract, a                                                                       due no later than October 15, 2015. The
                                                                                                          ACTION:   Notice.                                     public portions of these filings can be
                                                  copy of the Governors’ Decision
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                  authorizing the product, proposed                       SUMMARY:   The Commission is noticing a               accessed via the Commission’s Web site
                                                  changes to the Mail Classification                      recent Postal Service filing concerning               (http://www.prc.gov).
                                                                                                          the addition of Priority Mail Contract
                                                    1 Request of the United States Postal Service to                                                              1 Request of the United States Postal Service to
                                                                                                          147 negotiated service agreement. This
                                                  Add Priority Mail Contract 145 to Competitive                                                                 Add Priority Mail Contract 147 to Competitive
                                                  Product List and Notice of Filing (Under Seal) of
                                                                                                          notice informs the public of the filing,              Product List and Notice of Filing (Under Seal) of
                                                  Unredacted Governors’ Decision, Contract, and           invites public comment, and takes other               Unredacted Governors’ Decision, Contract, and
                                                  Supporting Data, October 7, 2015 (Request).             administrative steps.                                 Supporting Data, October 7, 2015 (Request).



                                             VerDate Sep<11>2014   17:19 Oct 14, 2015   Jkt 238001   PO 00000   Frm 00107   Fmt 4703   Sfmt 4703   E:\FR\FM\15OCN1.SGM   15OCN1



Document Created: 2018-02-27 08:52:19
Document Modified: 2018-02-27 08:52:19
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionInterim staff guidance; issuance.
DatesThis ISG is effective on November 16, 2015.
ContactDouglas Garner, Office of Nuclear Security and Incident Response, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; telephone: 301-287-0229; email: [email protected]