80_FR_63960 80 FR 63757 - Mojave Water Agency; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene

80 FR 63757 - Mojave Water Agency; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 80, Issue 203 (October 21, 2015)

Page Range63757-63758
FR Document2015-26723

Federal Register, Volume 80 Issue 203 (Wednesday, October 21, 2015)
[Federal Register Volume 80, Number 203 (Wednesday, October 21, 2015)]
[Notices]
[Pages 63757-63758]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-26723]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CD16-1-000]


Mojave Water Agency; Notice of Preliminary Determination of a 
Qualifying Conduit Hydropower Facility and Soliciting Comments and 
Motions To Intervene

    On October 13, 2015, the Mojave Water Agency filed a notice of 
intent to construct a qualifying conduit hydropower facility, pursuant 
to section 30 of the Federal Power Act (FPA), as amended by section 4 
of the Hydropower Regulatory Efficiency Act of 2013 (HREA). The 
proposed Deep Creek Hydroelectric Project would have an installed 
capacity of 800 kilowatts (kW) and would be located at the Mojave Water 
Agency's existing Deep Creek Recharge Facility. The project would be 
located near the City of Apple Valley in San Bernardino County, 
California.
    Applicant Contact: Darrell Reynolds, Mojave Water Agency, 13846 
Conference Center Drive, Apple Valley, CA 92307, Phone No. (760) 946-
7023.
    FERC Contact: Robert Bell, Phone No. (202) 502-6062, email: 
[email protected].
    Qualifying Conduit Hydropower Facility Description: The proposed 
project would consist of: (1) a proposed 44-foot-long by 24-inch-
diameter pipe running parallel to the pressure reducing valve, off of 
the existing 48-inch-diameter main pipeline; (2) a proposed 1,428 
square foot powerhouse containing one generating unit with an installed 
capacity of 800 kW; (3) a proposed 30-foot-long, 24-inch-diameter 
discharge pipe to the existing 48-inch-diameter main pipeline; and (4) 
appurtenant facilities. The proposed project would have an estimated 
annual generating capacity of 5,424 megawatt-hours.
    A qualifying conduit hydropower facility is one that is determined 
or deemed to meet all of the criteria shown in the table below.

                          Table 1--Criteria for Qualifying Conduit Hydropower Facility
----------------------------------------------------------------------------------------------------------------
                                                                                                      Satisfies
              Statutory provision                                   Description                         (Y/N)
----------------------------------------------------------------------------------------------------------------
FPA 30(a)(3)(A), as amended by HREA............  The conduit the facility uses a tunnel, canal,               Y
                                                  pipeline, aqueduct, flume, ditch, or similar
                                                  manmade water conveyance that is operated for
                                                  the distribution of water for agricultural,
                                                  municipal, or industrial consumption and not
                                                  primarily for the generation of electricity.
FPA 30(a)(3)(C)(i), as amended by HREA.........  The facility is constructed, operated, or                    Y
                                                  maintained for the generation of electric power
                                                  and uses for such generation only the
                                                  hydroelectric potential of a non-federally owned
                                                  conduit.

[[Page 63758]]

 
FPA 30(a)(3)(C)(ii), as amended by HREA........  The facility has an installed capacity that does             Y
                                                  not exceed 5 megawatts.
FPA 30(a)(3)(C)(iii), as amended by HREA.......  On or before August 9, 2013, the facility is not             Y
                                                  licensed, or exempted from the licensing
                                                  requirements of Part I of the FPA.
----------------------------------------------------------------------------------------------------------------

    Preliminary Determination: Based upon the above criteria, 
Commission staff preliminarily determines that the proposal satisfies 
the requirements for a qualifying conduit hydropower facility, which is 
not required to be licensed or exempted from licensing.
    Comments and Motions To Intervene: Deadline for filing comments 
contesting whether the facility meets the qualifying criteria is 45 
days from the issuance date of this notice.
    Deadline for filing motions to intervene is 30 days from the 
issuance date of this notice.
    Anyone may submit comments or a motion to intervene in accordance 
with the requirements of Rules of Practice and Procedure, 18 CFR 
385.210 and 385.214. Any motions to intervene must be received on or 
before the specified deadline date for the particular proceeding.
    Filing and Service of Responsive Documents: All filings must (1) 
bear in all capital letters the ``COMMENTS CONTESTING QUALIFICATION FOR 
A CONDUIT HYDROPOWER FACILITY'' or ``MOTION TO INTERVENE,'' as 
applicable; (2) state in the heading the name of the applicant and the 
project number of the application to which the filing responds; (3) 
state the name, address, and telephone number of the person filing; and 
(4) otherwise comply with the requirements of sections 385.2001 through 
385.2005 of the Commission's regulations.\1\ All comments contesting 
Commission staff's preliminary determination that the facility meets 
the qualifying criteria must set forth their evidentiary basis.
---------------------------------------------------------------------------

    \1\ 18 CFR 385.2001-2005 (2014).
---------------------------------------------------------------------------

    The Commission strongly encourages electronic filing. Please file 
motions to intervene and comments using the Commission's eFiling system 
at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit 
brief comments up to 6,000 characters, without prior registration, 
using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the 
end of your comments. For assistance, please contact FERC Online 
Support at [email protected], (866) 208-3676 (toll free), or 
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper 
copy to: Secretary, Federal Energy Regulatory Commission, 888 First 
Street NE., Washington, DC 20426. A copy of all other filings in 
reference to this application must be accompanied by proof of service 
on all persons listed in the service list prepared by the Commission in 
this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
    Locations of Notice of Intent: Copies of the notice of intent can 
be obtained directly from the applicant or such copies can be viewed 
and reproduced at the Commission in its Public Reference Room, Room 2A, 
888 First Street NE., Washington, DC 20426. The filing may also be 
viewed on the Web at http://www.ferc.gov/docs-filing/elibrary.asp using 
the ``eLibrary'' link. Enter the docket number (e.g., CD16-1-000) in 
the docket number field to access the document. For assistance, call 
toll-free 1-866-208-3676 or email [email protected]. For TTY, 
call (202) 502-8659.

    Dated: October 15, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-26723 Filed 10-20-15; 8:45 am]
BILLING CODE 6717-01-P



                                                                               Federal Register / Vol. 80, No. 203 / Wednesday, October 21, 2015 / Notices                                                               63757

                                              be considered by the Commission in                                   document on all parties listed on the                          listed are grouped bydocket numbers in
                                              reaching its decision. Parties to a                                  official service list for the applicable                       ascending order. These filings are
                                              proceeding may seek the opportunity to                               proceeding in accordance with Rule                             available for electronic review at the
                                              respond to any facts or contentions                                  2010, 18 CFR 385.2010.                                         Commission in the Public Reference
                                              made in a prohibited off-the-record                                    Exempt off-the-record                                        Room or may be viewed on the
                                              communication, and may request that                                  communications are included in the                             Commission’s Web site at http://
                                              the Commission place the prohibited                                  decisional record of the proceeding,                           www.ferc.gov using the eLibrary link.
                                              communication and responses thereto                                  unless the communication was with a                            Enter the docket number, excluding the
                                              in the decisional record. The                                        cooperating agency as described by 40                          last three digits, in the docket number
                                                                                                                   CFR 1501.6, made under 18 CFR
                                              Commission will grant such a request                                                                                                field to access the document. For
                                                                                                                   385.2201(e) (1) (v).
                                              only when it determines that fairness so                               The following is a list of off-the-                          assistance, please contact FERC Online
                                              requires. Any person identified below as                             record communications recently                                 Support at FERCOnlineSupport@
                                              having made a prohibited off-the-record                              received by the Secretary of the                               ferc.gov or toll free at (866) 208–3676, or
                                              communication shall serve the                                        Commission. The communications                                 for TTY, contact (202) 502–8659.

                                                                                               Docket No.                                                            File date                Presenter or requester

                                              Prohibited:
                                                  1. CP15–115–000 .............................................................................................         10–5–15    Anne Kulla.
                                              Exempt:
                                                  1. CP15–93–000 ...............................................................................................         9–8–15    US Representative Tim Murphy.
                                                  2. CP15–132–000 .............................................................................................         9–17–15    FERC Staff.1
                                                  3. CP09–6–001, CP09–7–001, CP13–507–000 ..............................................                                9–22–15    Members of Congress.2
                                                  4. P–10808–000 ...............................................................................................        9–23–15    US Representative John Moolenaar.
                                                  5. CP15–138–000 .............................................................................................         9–24–15    Lebanon County Commissioners.3
                                                  6. CP09–6–001, CP09–7–001, CP13–507–000 ..............................................                                9–25–15    Members of Congress.4
                                                  7. CP15–138–000 .............................................................................................         9–25–15    US Representative Lou Barletta.
                                                  8. CP14–96–000 ...............................................................................................        9–28–15    New York Senator State Brad Hoylman.
                                                  9. CP14–96–000, CP14–497–000 ...................................................................                      10–5–15    Tompkins County Legislature, NY.
                                                  10. CP15–517–000 ...........................................................................................          10–6–15    FERC Staff.5
                                                  11. CP09–6–001, CP09–7–001 .......................................................................                    10–6–15    FERC Staff.6
                                                 1 Summary    of 8–27–15 Inter-agency conference communication regarding the Summerlin Pipe Replacement Project.
                                                 2 U.S. Senators Ron Wyden and Jeffrey A. Merkley and Congresswoman Suzanne Bonamici.
                                                 3 William  E. Ames, Robert J. Phillips, and Jo Ellen Litz.
                                                 4 US Senators Ron Wyden and Jeffrey A. Merkley and Congresswoman Suzanne Bonamici.
                                                 5 Minutes from 9–25–15 conference call with Gulf South Pipeline, LP.
                                                 6 Letters from the Oregon State Historic Preservation Office dated 9–16–15 and 9–18–2015.




                                                Dated: October 8, 2015.                                            construct a qualifying conduit                                   Qualifying Conduit Hydropower
                                              Nathaniel J. Davis, Sr.,                                             hydropower facility, pursuant to section                       Facility Description: The proposed
                                              Deputy Secretary.                                                    30 of the Federal Power Act (FPA), as                          project would consist of: (1) a proposed
                                              [FR Doc. 2015–26702 Filed 10–20–15; 8:45 am]                         amended by section 4 of the                                    44-foot-long by 24-inch-diameter pipe
                                              BILLING CODE 6717–01–P
                                                                                                                   Hydropower Regulatory Efficiency Act                           running parallel to the pressure
                                                                                                                   of 2013 (HREA). The proposed Deep                              reducing valve, off of the existing 48-
                                                                                                                   Creek Hydroelectric Project would have                         inch-diameter main pipeline; (2) a
                                              DEPARTMENT OF ENERGY                                                 an installed capacity of 800 kilowatts                         proposed 1,428 square foot powerhouse
                                                                                                                   (kW) and would be located at the                               containing one generating unit with an
                                              Federal Energy Regulatory                                            Mojave Water Agency’s existing Deep                            installed capacity of 800 kW; (3) a
                                              Commission                                                           Creek Recharge Facility. The project                           proposed 30-foot-long, 24-inch-diameter
                                                                                                                   would be located near the City of Apple                        discharge pipe to the existing 48-inch-
                                              [Docket No. CD16–1–000]                                              Valley in San Bernardino County,                               diameter main pipeline; and (4)
                                              Mojave Water Agency; Notice of                                       California.                                                    appurtenant facilities. The proposed
                                              Preliminary Determination of a                                         Applicant Contact: Darrell Reynolds,                         project would have an estimated annual
                                              Qualifying Conduit Hydropower                                        Mojave Water Agency, 13846                                     generating capacity of 5,424 megawatt-
                                              Facility and Soliciting Comments and                                 Conference Center Drive, Apple Valley,                         hours.
                                              Motions To Intervene                                                 CA 92307, Phone No. (760) 946–7023.                              A qualifying conduit hydropower
                                                                                                                     FERC Contact: Robert Bell, Phone No.                         facility is one that is determined or
                                               On October 13, 2015, the Mojave                                     (202) 502–6062, email: robert.bell@                            deemed to meet all of the criteria shown
                                              Water Agency filed a notice of intent to                             ferc.gov.                                                      in the table below.

                                                                                        TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
tkelley on DSK3SPTVN1PROD with NOTICES




                                                                                                                                                                                                                       Satisfies
                                                       Statutory provision                                                                                Description                                                   (Y/N)

                                              FPA 30(a)(3)(A), as amended                      The conduit the facility uses a tunnel, canal, pipeline, aqueduct, flume, ditch, or similar man-                           Y
                                                by HREA.                                         made water conveyance that is operated for the distribution of water for agricultural, munic-
                                                                                                 ipal, or industrial consumption and not primarily for the generation of electricity.
                                              FPA 30(a)(3)(C)(i), as amended                   The facility is constructed, operated, or maintained for the generation of electric power and                              Y
                                                by HREA.                                         uses for such generation only the hydroelectric potential of a non-federally owned conduit.



                                         VerDate Sep<11>2014       22:39 Oct 20, 2015      Jkt 238001      PO 00000      Frm 00021      Fmt 4703     Sfmt 4703     E:\FR\FM\21OCN1.SGM   21OCN1


                                              63758                      Federal Register / Vol. 80, No. 203 / Wednesday, October 21, 2015 / Notices

                                                                        TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY—Continued
                                                                                                                                                                                                       Satisfies
                                                        Statutory provision                                                            Description                                                      (Y/N)

                                              FPA 30(a)(3)(C)(ii), as amended          The facility has an installed capacity that does not exceed 5 megawatts .....................................      Y
                                                by HREA.
                                              FPA 30(a)(3)(C)(iii), as amend-          On or before August 9, 2013, the facility is not licensed, or exempted from the licensing re-                      Y
                                                ed by HREA.                             quirements of Part I of the FPA.



                                                 Preliminary Determination: Based                      208–3676 (toll free), or (202) 502–8659                    Take notice that the Commission
                                              upon the above criteria, Commission                      (TTY). In lieu of electronic filing, please             received the following electric rate
                                              staff preliminarily determines that the                  send a paper copy to: Secretary, Federal                filings:
                                              proposal satisfies the requirements for a                Energy Regulatory Commission, 888                          Docket Numbers: ER15–1809–001.
                                              qualifying conduit hydropower facility,                  First Street NE., Washington, DC 20426.                    Applicants: ATX Southwest, LLC.
                                              which is not required to be licensed or                  A copy of all other filings in reference                   Description: Compliance filing with
                                              exempted from licensing.                                 to this application must be accompanied                 Pro Forma Service Agreement of ATX
                                                 Comments and Motions To Intervene:                    by proof of service on all persons listed               Southwest, LLC.
                                              Deadline for filing comments contesting                  in the service list prepared by the                        Filed Date: 10/9/15.
                                              whether the facility meets the qualifying                Commission in this proceeding, in                          Accession Number: 20151009–5339.
                                              criteria is 45 days from the issuance                    accordance with 18 CFR 4.34(b) and                         Comments Due: 5 p.m. ET 10/30/15.
                                              date of this notice.                                     385.2010.                                                  Docket Numbers: ER15–2620–000.
                                                 Deadline for filing motions to                          Locations of Notice of Intent: Copies                    Applicants: Little Elk Wind Project,
                                              intervene is 30 days from the issuance                   of the notice of intent can be obtained                 LLC.
                                              date of this notice.                                     directly from the applicant or such                        Description: Baseline eTariff Filing:
                                                 Anyone may submit comments or a                       copies can be viewed and reproduced at                  Little Elk Wind Project, LLC MBR Tariff
                                              motion to intervene in accordance with                   the Commission in its Public Reference                  to be effective 10/1/2015.
                                              the requirements of Rules of Practice                    Room, Room 2A, 888 First Street NE.,                       Filed Date: 9/4/15.
                                              and Procedure, 18 CFR 385.210 and                        Washington, DC 20426. The filing may                       Accession Number: 20150904–5331.
                                              385.214. Any motions to intervene must                   also be viewed on the Web at http://                       Comments Due: 5 p.m. ET 10/27/15.
                                              be received on or before the specified                   www.ferc.gov/docs-filing/elibrary.asp                      Docket Numbers: ER15–2620–000.
                                              deadline date for the particular                         using the ‘‘eLibrary’’ link. Enter the                     Applicants: Little Elk Wind Project,
                                              proceeding.                                              docket number (e.g., CD16–1–000) in                     LLC.
                                                 Filing and Service of Responsive                      the docket number field to access the                      Description: Supplement to
                                              Documents: All filings must (1) bear in                  document. For assistance, call toll-free                September 4, 2015 Little Elk Wind
                                              all capital letters the ‘‘COMMENTS                       1–866–208–3676 or email                                 Project, LLC tariff filing.
                                              CONTESTING QUALIFICATION FOR A                           FERCOnlineSupport@ferc.gov. For TTY,                       Filed Date: 10/9/15.
                                              CONDUIT HYDROPOWER FACILITY’’                            call (202) 502–8659.                                       Accession Number: 20151009–5331.
                                              or ‘‘MOTION TO INTERVENE,’’ as                                                                                      Comments Due: 5 p.m. ET 10/27/15.
                                              applicable; (2) state in the heading the                   Dated: October 15, 2015.
                                              name of the applicant and the project                    Kimberly D. Bose,                                          Take notice that the Commission
                                              number of the application to which the                   Secretary.                                              received the following electric securities
                                              filing responds; (3) state the name,                     [FR Doc. 2015–26723 Filed 10–20–15; 8:45 am]
                                                                                                                                                               filings:
                                              address, and telephone number of the                     BILLING CODE 6717–01–P                                     Docket Numbers: ES15–40–000.
                                              person filing; and (4) otherwise comply                                                                             Applicants: Jersey Central Power &
                                              with the requirements of sections                                                                                Light Company.
                                              385.2001 through 385.2005 of the                         DEPARTMENT OF ENERGY                                       Description: Amendment to July 31,
                                              Commission’s regulations.1 All                                                                                   2015 Application of Jersey Central
                                              comments contesting Commission staff’s                   Federal Energy Regulatory                               Power & Light Company for
                                              preliminary determination that the                       Commission                                              Authorization under Section 204(a) of
                                              facility meets the qualifying criteria                                                                           the Federal Power Act to Issue Short-
                                                                                                       Combined Notice of Filings #1                           Term Debt Securities.
                                              must set forth their evidentiary basis.
                                                 The Commission strongly encourages                                                                               Filed Date: 10/9/15.
                                                                                                          Take notice that the Commission
                                              electronic filing. Please file motions to                                                                           Accession Number: 20151009–5295.
                                                                                                       received the following electric corporate
                                              intervene and comments using the                                                                                    Comments Due: 5 p.m. ET 10/30/15.
                                                                                                       filings:
                                              Commission’s eFiling system at http://                                                                              Docket Numbers: ES15–42–000.
                                                                                                          Docket Numbers: EC15–205–000.                           Applicants: Pennsylvania Power
                                              www.ferc.gov/docs-filing/efiling.asp.
                                              Commenters can submit brief comments                        Applicants: Bishop Hill Energy LLC,                  Company.
                                              up to 6,000 characters, without prior                    California Ridge Wind Energy LLC,                          Description: Amendment to July 31,
                                              registration, using the eComment system                  Prairie Breeze Wind Energy LLC.                         2015 Application of Pennsylvania
                                              at http://www.ferc.gov/docs-filing/                         Description: Supplement to                           Power Company for Authorization
                                                                                                       September 11, 2015 Application for
tkelley on DSK3SPTVN1PROD with NOTICES




                                              ecomment.asp. You must include your                                                                              under Section 204(a) of the Federal
                                              name and contact information at the end                  Authorization under Section 203 of the                  Power Act to Issue Short-Term Debt
                                              of your comments. For assistance,                        Federal Power Act of Bishop Hill Energy                 Securities.
                                              please contact FERC Online Support at                    LLC, et al.                                                Filed Date: 10/9/15.
                                              FERCOnlineSupport@ferc.gov, (866)                           Filed Date: 10/9/15.                                    Accession Number: 20151009–5294.
                                                                                                          Accession Number: 20151009–5337.                        Comments Due: 5 p.m. ET 10/30/15.
                                                1 18   CFR 385.2001–2005 (2014).                          Comments Due: 5 p.m. ET 10/19/15.                       Docket Numbers: ES15–43–000.


                                         VerDate Sep<11>2014    22:39 Oct 20, 2015   Jkt 238001   PO 00000   Frm 00022   Fmt 4703   Sfmt 4703   E:\FR\FM\21OCN1.SGM    21OCN1



Document Created: 2018-02-27 08:54:31
Document Modified: 2018-02-27 08:54:31
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation80 FR 63757 

2025 Federal Register | Disclaimer | Privacy Policy