80_FR_63964 80 FR 63761 - Empire State Hydro 301, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications

80 FR 63761 - Empire State Hydro 301, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 80, Issue 203 (October 21, 2015)

Page Range63761-63761
FR Document2015-26729

Federal Register, Volume 80 Issue 203 (Wednesday, October 21, 2015)
[Federal Register Volume 80, Number 203 (Wednesday, October 21, 2015)]
[Notices]
[Page 63761]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-26729]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14701-000]


Empire State Hydro 301, LLC; Notice of Preliminary Permit 
Application Accepted for Filing and Soliciting Comments, Motions To 
Intervene, and Competing Applications

    On August 20, 2015, Empire State Hydro 301, LLC filed an 
application for a preliminary permit, pursuant to section 4(f) of the 
Federal Power Act (FPA), proposing to study the feasibility of the 
Diamond Mills Hydroelectric Project (Diamond Mills Project or project) 
to be located at the existing Diamond Mills Dam on Esopus Creek in 
Saugerties, Ulster County, New York. The sole purpose of a preliminary 
permit, if issued, is to grant the permit holder priority to file a 
license application during the permit term. A preliminary permit does 
not authorize the permit holder to perform any land-disturbing 
activities or otherwise enter upon lands or waters owned by others 
without the owners' express permission.
    The proposed project would consist of the following: (1) An 140-
acre impoundment with a normal volume of 826 acre-feet; (2) an existing 
350-foot-long, 32-foot-high concrete gravity dam with a spillway length 
of 340 feet; (3) an existing 30-foot-long, 9-foot-high auxiliary 
spillway; (4) an existing 10-foot-long, 6-foot-diameter penstock; (5) 
two new 750-kilowatt turbines; (6) a new 50-foot-long, 30-foot-wide 
powerhouse; (7) a new 300-foot-long, 12.7-kilovolt transmission line; 
and (8) appurtenant facilities. The estimated annual generation of the 
Diamond Mills Project would be 5,300 megawatt-hours.
    Applicant Contact: Mr. Mark Boumansour, Empire State Hydro 301, 
LLC, c/o Gravity Renewables, Inc., 1401 Walnut Street, Suite 220, 
Boulder, CO 80302; phone: (303) 440-3378.
    FERC Contact: Woohee Choi; phone: (202) 502-6336.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR 4.36.
    The Commission strongly encourages electronic filing. Please file 
comments, motions to intervene, notices of intent, and competing 
applications using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief 
comments up to 6,000 characters, without prior registration, using the 
eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You 
must include your name and contact information at the end of your 
comments. For assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE., 
Washington, DC 20426. The first page of any filing should include 
docket number P-14701-000.
    More information about this project, including a copy of the 
application, can be viewed or printed on the ``eLibrary'' link of the 
Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-14701) in the docket number field to access 
the document. For assistance, contact FERC Online Support.

    Dated: October 15, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-26729 Filed 10-20-15; 8:45 am]
BILLING CODE 6717-01-P



                                                                             Federal Register / Vol. 80, No. 203 / Wednesday, October 21, 2015 / Notices                                                                    63761

                                                                     FERC–914: COGENERATION AND SMALL POWER PRODUCTION—TARIFF FILINGS—Continued
                                                                                                                                         Annual                                                        Total annual
                                                                                                                                                         Total number                 Average                           Cost per
                                                                                                            Number of                   number of                                                      burden hours
                                                                                                                                                               of                  burden & cost                       Respondent
                                                                                                           respondents               responses per                                                        & total
                                                                                                                                                          responses                per response 4                          ($)
                                                                                                                                       respondent                                                       annual cost

                                                                                                                   (1)                    (2)              (1)*(2)=(3)                  (4)             (3)*(4)=(5)       (5)÷(1)

                                              Electric Quarterly Reports (later) .............                                35                    4                     140                    6              840           $1,728
                                                                                                                                                                                              $432          $60,480
                                              Change of Status .....................................                          10                    1                       10                   3               30             $216
                                                                                                                                                                                              $216           $2,160

                                                   TOTAL ..............................................   ........................                185   ........................              7,725        $523,800          $15,120



                                                Comments: Comments are invited on:                                permit, if issued, is to grant the permit                          FERCOnlineSupport@ferc.gov, (866)
                                              (1) Whether the collection of                                       holder priority to file a license                                  208–3676 (toll free), or (202) 502–8659
                                              information is necessary for the proper                             application during the permit term. A                              (TTY). In lieu of electronic filing, please
                                              performance of the functions of the                                 preliminary permit does not authorize                              send a paper copy to: Secretary, Federal
                                              Commission, including whether the                                   the permit holder to perform any land-                             Energy Regulatory Commission, 888
                                              information will have practical utility;                            disturbing activities or otherwise enter                           First Street NE., Washington, DC 20426.
                                              (2) the accuracy of the agency’s estimate                           upon lands or waters owned by others                               The first page of any filing should
                                              of the burden and cost of the collection                            without the owners’ express permission.                            include docket number P–14701–000.
                                              of information, including the validity of                              The proposed project would consist of                              More information about this project,
                                              the methodology and assumptions used;                               the following: (1) An 140-acre                                     including a copy of the application, can
                                              (3) ways to enhance the quality, utility                            impoundment with a normal volume of                                be viewed or printed on the ‘‘eLibrary’’
                                              and clarity of the information collection;                          826 acre-feet; (2) an existing 350-foot-                           link of the Commission’s Web site at
                                              and (4) ways to minimize the burden of                              long, 32-foot-high concrete gravity dam                            http://www.ferc.gov/docs-filing/
                                              the collection of information on those                              with a spillway length of 340 feet; (3) an                         elibrary.asp. Enter the docket number
                                              who are to respond, including the use                               existing 30-foot-long, 9-foot-high                                 (P–14701) in the docket number field to
                                              of automated collection techniques or                               auxiliary spillway; (4) an existing 10-                            access the document. For assistance,
                                              other forms of information technology.                              foot-long, 6-foot-diameter penstock; (5)                           contact FERC Online Support.
                                                                                                                  two new 750-kilowatt turbines; (6) a
                                                Dated: October 15, 2015.                                                                                                               Dated: October 15, 2015.
                                                                                                                  new 50-foot-long, 30-foot-wide
                                              Kimberly D. Bose,                                                   powerhouse; (7) a new 300-foot-long,                               Kimberly D. Bose,
                                              Secretary.                                                          12.7-kilovolt transmission line; and (8)                           Secretary.
                                              [FR Doc. 2015–26727 Filed 10–20–15; 8:45 am]                        appurtenant facilities. The estimated                              [FR Doc. 2015–26729 Filed 10–20–15; 8:45 am]
                                              BILLING CODE 6717–01–P                                              annual generation of the Diamond Mills                             BILLING CODE 6717–01–P
                                                                                                                  Project would be 5,300 megawatt-hours.
                                                                                                                     Applicant Contact: Mr. Mark
                                              DEPARTMENT OF ENERGY                                                Boumansour, Empire State Hydro 301,                                DEPARTMENT OF ENERGY
                                                                                                                  LLC, c/o Gravity Renewables, Inc., 1401
                                              Federal Energy Regulatory                                           Walnut Street, Suite 220, Boulder, CO                              Federal Energy Regulatory
                                              Commission                                                          80302; phone: (303) 440–3378.                                      Commission
                                              [Project No. 14701–000]                                                FERC Contact: Woohee Choi; phone:
                                                                                                                  (202) 502–6336.                                                    Combined Notice of Filings #2
                                              Empire State Hydro 301, LLC; Notice of                                 Deadline for filing comments, motions                              Take notice that the Commission
                                              Preliminary Permit Application                                      to intervene, competing applications                               received the following electric corporate
                                              Accepted for Filing and Soliciting                                  (without notices of intent), or notices of                         filings:
                                              Comments, Motions To Intervene, and                                 intent to file competing applications: 60
                                                                                                                  days from the issuance of this notice.                                Docket Numbers: EC16–6–000.
                                              Competing Applications                                                                                                                    Applicants: Noble Altona Windpark,
                                                                                                                  Competing applications and notices of
                                                On August 20, 2015, Empire State                                  intent must meet the requirements of 18                            LLC, Noble Bliss Windpark, LLC, Noble
                                              Hydro 301, LLC filed an application for                             CFR 4.36.                                                          Clinton Windpark I, LLC, Noble
                                              a preliminary permit, pursuant to                                      The Commission strongly encourages                              Ellenburg Windpark, LLC, Noble
                                              section 4(f) of the Federal Power Act                               electronic filing. Please file comments,                           Chateaugay Windpark, LLC, Noble Great
                                              (FPA), proposing to study the feasibility                           motions to intervene, notices of intent,                           Plains Windpark, LLC, Noble
                                              of the Diamond Mills Hydroelectric                                  and competing applications using the                               Wethersfield Windpark, LLC.
                                              Project (Diamond Mills Project or                                   Commission’s eFiling system at http://                                Description: Application for
                                              project) to be located at the existing                              www.ferc.gov/docs-filing/efiling.asp.                              Authorization Under Section 203 of the
                                              Diamond Mills Dam on Esopus Creek in                                Commenters can submit brief comments                               Federal Power Act and Request for
                                                                                                                                                                                     Waivers, Confidential Treatment, and
tkelley on DSK3SPTVN1PROD with NOTICES




                                              Saugerties, Ulster County, New York.                                up to 6,000 characters, without prior
                                              The sole purpose of a preliminary                                   registration, using the eComment system                            Expedited Consideration of Noble
                                                                                                                  at http://www.ferc.gov/docs-filing/                                Altona Windpark, LLC, et al.
                                                4 The estimates for cost per response are derived
                                                                                                                  ecomment.asp. You must include your                                   Filed Date: 10/8/15.
                                              using the following formula: Average Burden Hours                                                                                         Accession Number: 20151008–5174.
                                              per Response * $72.00 per Hour = Average Cost per
                                                                                                                  name and contact information at the end
                                              Response. The hourly cost figure comes from the                     of your comments. For assistance,                                     Comments Due: 5 p.m. ET 10/29/15.
                                              FERC average salary of $149,489/year.                               please contact FERC Online Support at                                 Docket Numbers: EC16–7–000.


                                         VerDate Sep<11>2014      22:39 Oct 20, 2015      Jkt 238001      PO 00000       Frm 00025     Fmt 4703    Sfmt 4703     E:\FR\FM\21OCN1.SGM          21OCN1



Document Created: 2018-02-27 08:54:16
Document Modified: 2018-02-27 08:54:16
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation80 FR 63761 

2025 Federal Register | Disclaimer | Privacy Policy