DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 80, Issue 208 (October 28, 2015)

Page Range65994-65995
FR Document2015-27408

Federal Register, Volume 80 Issue 208 (Wednesday, October 28, 2015)
[Federal Register Volume 80, Number 208 (Wednesday, October 28, 2015)]
[Notices]
[Pages 65994-65995]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-27408]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #1

    Take notice that the Commission received the following exempt 
wholesale generator filings:

    Docket Numbers: EG16-11-000.
    Applicants: Golden Hills Wind, LLC.
    Description: Notice of Self-Certification of Exempt Wholesale 
Generator Status of Golden Hills Wind, LLC.
    Filed Date: 10/21/15.
    Accession Number: 20151021-5241.
    Comments Due: 5 p.m. ET 11/12/15.

    Docket Numbers: EG16-12-000.
    Applicants: Carousel Wind Farm, LLC.
    Description: Notice of Self-certification of Exempt Wholesale 
Generator Status of Carousel Wind Farm, LLC.
    Filed Date: 10/21/15.
    Accession Number: 20151021-5242.
    Comments Due: 5 p.m. ET 11/12/15.

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER10-1819-013; ER10-1820-016; ER10-1818-011; ER10-
1817-012.
    Applicants: Northern States Power Company, a Minnesota corporation, 
Northern States Power Company, a Wisconsin corporation, Public Service 
Company of Colorado, Southwestern Public Service Company.
    Description: Notice of Change in Status of Northern States Power 
Company, a Minnesota corporation, et al.
    Filed Date: 10/21/15.
    Accession Number: 20151021-5213.
    Comments Due: 5 p.m. ET 11/12/15.

    Docket Numbers: ER16-133-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Original Service Agreement 
No. 4280; NQ133 to be effective 10/14/2015.
    Filed Date: 10/22/15.
    Accession Number: 20151022-5102.
    Comments Due: 5 p.m. ET 11/12/15.

    Docket Numbers: ER16-134-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Original Service Agreement 
Nos. 4281,

[[Page 65995]]

4282; Queue No. AA1-100 to be effective 9/23/2015.
    Filed Date: 10/22/15.
    Accession Number: 20151022-5117.
    Comments Due: 5 p.m. ET 11/12/15.

    Docket Numbers: ER16-135-000.
    Applicants: Southwest Power Pool, Inc.
    Description: Sec.  205(d) Rate Filing: 1637R2 Kansas Electric Power 
Cooperative, Inc. NITSA and NOA to be effective 10/1/2015.
    Filed Date: 10/22/15.
    Accession Number: 20151022-5143.
    Comments Due: 5 p.m. ET 11/12/15.

    The filings are accessible in the Commission's eLibrary system by 
clicking on the links or querying the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: http://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: October 22, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-27408 Filed 10-27-15; 8:45 am]
 BILLING CODE 6717-01-P



                                                  65994                     Federal Register / Vol. 80, No. 208 / Wednesday, October 28, 2015 / Notices

                                                  DEPARTMENT OF ENERGY                                    request. If no protest is filed within the              Dated: October 22, 2015.
                                                                                                          time allowed therefore, the proposed                  Kimberly D. Bose,
                                                  Federal Energy Regulatory                               activity shall be deemed to be                        Secretary.
                                                  Commission                                              authorized effective the day after the                [FR Doc. 2015–27401 Filed 10–27–15; 8:45 am]
                                                  [Docket No. CP16–7–000]                                 time allowed for filing a protest. If a               BILLING CODE 6717–01–P
                                                                                                          protest is filed and not withdrawn
                                                  National Fuel Gas Supply Corporation;                   within 30 days after the allowed time
                                                  Notice of Request Under Blanket                         for filing a protest, the instant request             DEPARTMENT OF ENERGY
                                                  Authorization                                           shall be treated as an application for
                                                                                                          authorization pursuant to section 7 of                Federal Energy Regulatory
                                                     Take notice that on October 15, 2015,                the NGA.                                              Commission
                                                  National Fuel Gas Supply Corporation                       Pursuant to section 157.9 of the
                                                  (National Fuel), 6363 Main Street                       Commission’s rules, 18 CFR 157.9,                     Combined Notice of Filings #1
                                                  Williamsville, New York 14221–5887,                     within 90 days of this Notice the
                                                  filed in Docket No. CP16–7–000 a prior                                                                           Take notice that the Commission
                                                                                                          Commission staff will either: complete
                                                  notice request pursuant to sections                                                                           received the following exempt
                                                                                                          its environmental assessment (EA) and
                                                  157.205 and 157.216 of the                                                                                    wholesale generator filings:
                                                                                                          place it into the Commission’s public
                                                  Commission’s regulations under the                      record (eLibrary) for this proceeding, or                Docket Numbers: EG16–11–000.
                                                  Natural Gas Act (NGA) as amended,                       issue a Notice of Schedule for                           Applicants: Golden Hills Wind, LLC.
                                                  requesting authorization to abandon an                  Environmental Review. If a Notice of                     Description: Notice of Self-
                                                  injection/withdrawal well (Well 5596)                   Schedule for Environmental Review is                  Certification of Exempt Wholesale
                                                  at its Henderson Storage Field in Mercer                issued, it will indicate, among other                 Generator Status of Golden Hills Wind,
                                                  County, Pennsylvania. National Fuel                     milestones, the anticipated date for the              LLC.
                                                  avers that Well 5596 is leaking from the                Commission staff’s issuance of the final                 Filed Date: 10/21/15.
                                                  production casing and cannot be                         environmental impact statement (FEIS)                    Accession Number: 20151021–5241.
                                                  economically repaired. National Fuel                    or EA for this proposal. The filing of the               Comments Due: 5 p.m. ET 11/12/15.
                                                  asserts that with the abandonment of the                EA in the Commission’s public record                     Docket Numbers: EG16–12–000.
                                                  well, the associated well line will no                  for this proceeding or the issuance of a                 Applicants: Carousel Wind Farm,
                                                  longer be required and thus requests                    Notice of Schedule for Environmental                  LLC.
                                                  authorization to abandon in place the                   Review will serve to notify federal and                  Description: Notice of Self-
                                                  approximately 775 feet of 4-inch-                       state agencies of the timing for the                  certification of Exempt Wholesale
                                                  diameter pipe. National Fuel states that                completion of all necessary reviews, and              Generator Status of Carousel Wind
                                                  it will replace an existing culvert                     the subsequent need to complete all                   Farm, LLC.
                                                  crossing on an access road as part of the               federal authorizations within 90 days of                 Filed Date: 10/21/15.
                                                  abandonment activities. National Fuel                                                                            Accession Number: 20151021–5242.
                                                                                                          the date of issuance of the Commission                   Comments Due: 5 p.m. ET 11/12/15.
                                                  states that the proposed abandonment of                 staff’s FEIS or EA.
                                                  Well 5596 and the associated well line                     Persons who wish to comment only                      Take notice that the Commission
                                                  will have no impact on National Fuel’s                  on the environmental review of this                   received the following electric rate
                                                  existing customers or storage operations,               project should submit an original and                 filings:
                                                  all as more fully set forth in the                      two copies of their comments to the                      Docket Numbers: ER10–1819–013;
                                                  application which is on file with the                   Secretary of the Commission.                          ER10–1820–016; ER10–1818–011;
                                                  Commission and open to public                           Environmental commenters will be                      ER10–1817–012.
                                                  inspection. The filing may also be                      placed on the Commission’s                               Applicants: Northern States Power
                                                  viewed on the web at http://                            environmental mailing list, will receive              Company, a Minnesota corporation,
                                                  www.ferc.gov using the ‘‘eLibrary’’ link.               copies of the environmental documents,                Northern States Power Company, a
                                                  Enter the docket number excluding the                   and will be notified of meetings                      Wisconsin corporation, Public Service
                                                  last three digits in the docket number                  associated with the Commission’s                      Company of Colorado, Southwestern
                                                  field to access the document. For                       environmental review process.                         Public Service Company.
                                                  assistance, please contact FERC Online                  Environmental commenters will not be                     Description: Notice of Change in
                                                  Support at FERCOnlineSupport@                           required to serve copies of filed                     Status of Northern States Power
                                                  ferc.gov or toll free at (866) 208–3676, or             documents on all other parties.                       Company, a Minnesota corporation, et
                                                  TTY, contact (202) 502–8659.                            However, the non-party commenters,                    al.
                                                     Any questions concerning this                        will not receive copies of all documents                 Filed Date: 10/21/15.
                                                  application may be directed to Kenneth                  filed by other parties or issued by the                  Accession Number: 20151021–5213.
                                                  E. Webster, Attorney, National Fuel Gas                 Commission (except for the mailing of                    Comments Due: 5 p.m. ET 11/12/15.
                                                  Supply Corporation, 6363 Main Street,                   environmental documents issued by the                    Docket Numbers: ER16–133–000.
                                                  Williamsville, New York, 14221–5887,                    Commission) and will not have the right                  Applicants: PJM Interconnection,
                                                  by telephone at (716) 857–7067, by                      to seek court review of the                           L.L.C.
                                                  facsimile at (716) 857–7206, or by email                Commission’s final order.                                Description: § 205(d) Rate Filing:
                                                  at websterk@natfuel.com.                                   The Commission strongly encourages                 Original Service Agreement No. 4280;
                                                     Any person or the Commission’s staff                 electronic filings of comments, protests              NQ133 to be effective 10/14/2015.
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                  may, within 60 days after issuance of                   and interventions in lieu of paper using                 Filed Date: 10/22/15.
                                                  the instant notice by the Commission,                   the ‘‘eFiling’’ link at http://                          Accession Number: 20151022–5102.
                                                  file pursuant to Rule 214 of the                        www.ferc.gov. Persons unable to file                     Comments Due: 5 p.m. ET 11/12/15.
                                                  Commission’s Procedural Rules (18 CFR                   electronically should submit an original                 Docket Numbers: ER16–134–000.
                                                  385.214) a motion to intervene or notice                and seven copies of the protest or                       Applicants: PJM Interconnection,
                                                  of intervention and pursuant to section                 intervention to the Federal Energy                    L.L.C.
                                                  157.205 of the regulations under the                    Regulatory Commission, 888 First Street                  Description: § 205(d) Rate Filing:
                                                  NGA (18 CFR 157.205), a protest to the                  NE., Washington, DC 20426.                            Original Service Agreement Nos. 4281,


                                             VerDate Sep<11>2014   19:16 Oct 27, 2015   Jkt 238001   PO 00000   Frm 00012   Fmt 4703   Sfmt 4703   E:\FR\FM\28OCN1.SGM   28OCN1


                                                                            Federal Register / Vol. 80, No. 208 / Wednesday, October 28, 2015 / Notices                                            65995

                                                  4282; Queue No. AA1–100 to be                           Maine. The transfer of an exemption                   DEPARTMENT OF ENERGY
                                                  effective 9/23/2015.                                    does not require Commission approval.
                                                    Filed Date: 10/22/15.                                   2. Green Power USA, LLC is now the                  Federal Energy Regulatory
                                                    Accession Number: 20151022–5117.                      exemptee of the Corriveau Project, No.                Commission
                                                    Comments Due: 5 p.m. ET 11/12/15.                     12629. All correspondence should be                   [Project No. 2790–064]
                                                    Docket Numbers: ER16–135–000.                         forwarded to: Ms. Nancy Lausier, Green
                                                    Applicants: Southwest Power Pool,                     Power USA, LLC, 24 Standpipe Road,                    Boott Hydropower, Inc.; Eldred L. Field
                                                  Inc.                                                    Mechanic Falls, Maine 04256.                          Hydro Facility Trust; Notice of
                                                                                                                                                                Application for Partial Transfer of
                                                    Description: § 205(d) Rate Filing:                      Dated: October 22, 2015.
                                                                                                                                                                License and Soliciting Comments,
                                                  1637R2 Kansas Electric Power                            Kimberly D. Bose,
                                                                                                                                                                Motions to Intervene, and Protests
                                                  Cooperative, Inc. NITSA and NOA to be                   Secretary.
                                                  effective 10/1/2015.                                    [FR Doc. 2015–27406 Filed 10–27–15; 8:45 am]             On October 9, 2015, Boott
                                                    Filed Date: 10/22/15.                                 BILLING CODE 6717–01–P
                                                                                                                                                                Hydropower, Inc., co-licensee and
                                                    Accession Number: 20151022–5143.                                                                            Eldred L. Field Hydro Facility Trust, co-
                                                    Comments Due: 5 p.m. ET 11/12/15.                                                                           licensee (transferors) jointly filed an
                                                                                                          DEPARTMENT OF ENERGY                                  application for the partial transfer of the
                                                     The filings are accessible in the                                                                          license of the Lowell Hydroelectric
                                                  Commission’s eLibrary system by                         Federal Energy Regulatory                             Project No. 2790 to remove as co-
                                                  clicking on the links or querying the                   Commission                                            licensee Eldred L. Hydro Facility Trust
                                                  docket number.                                                                                                and to convert Boott Hydropower, Inc.
                                                     Any person desiring to intervene or                  Notice of Commissioner and Staff                      to an LLC. The project is located on the
                                                  protest in any of the above proceedings                 Attendance at North American Electric                 Merrimack River in Middlesex County,
                                                  must file in accordance with Rules 211                  Reliability Corporation Meetings                      Massachusetts.
                                                  and 214 of the Commission’s                                                                                      Boott Hydropower, Inc. is a subsidiary
                                                  Regulations (18 CFR 385.211 and                           The Federal Energy Regulatory                       of Enel Green Power North America,
                                                  385.214) on or before 5:00 p.m. Eastern                 Commission (Commission) hereby gives                  Inc. As part of an internal reorganization
                                                  time on the specified comment date.                     notice that members of the Commission                 Boott Hydropower, Inc. intends to
                                                  Protests may be considered, but                         and/or Commission staff may attend the                convert to an LLC, (Boott Hydropower,
                                                  intervention is necessary to become a                   following meetings:                                   LLC). Boott Hydropower, Inc. seeks
                                                  party to the proceeding.                                North American Electric Reliability                   Commission approval to transfer the
                                                     eFiling is encouraged. More detailed                   Corporation                                         license for the Lowell Hydroelectric
                                                  information relating to filing                          Member Representatives Committee and                  Project to Boott Hydropower, LLC as
                                                  requirements, interventions, protests,                    Board of Trustees Meetings                          sole licensee in association with the
                                                  service, and qualifying facilities filings              Board of Trustees Corporate Governance                conversion, effective on the date Boott
                                                  can be found at: http://www.ferc.gov/                     and Human Resources Committee,                      Hydropower, LLC submits certified
                                                  docs-filing/efiling/filing-req.pdf. For                   Finance and Audit Committee,                        copies of its articles of conversion, plan
                                                  other information, call (866) 208–3676                    Compliance Committee, and                           of conversion, and limited liability
                                                  (toll free). For TTY, call (202) 502–8659.                                                                    company operating agreement to the
                                                                                                          Standards Oversight and Technology
                                                    Dated: October 22, 2015.                                                                                    Commission.
                                                                                                            Committee Meetings                                     Applicant Contact: For Applicants:
                                                  Nathaniel J. Davis, Sr.,
                                                                                                          The Westin Buckhead, 3391 Peachtree                   Ms. Megan Beauregard, Senior Associate
                                                  Deputy Secretary.                                         Road NE., Atlanta, GA 30326.                        General Counsel, Enel Green Power
                                                  [FR Doc. 2015–27408 Filed 10–27–15; 8:45 am]
                                                                                                            November 4 (7:30 a.m.–5:00 p.m.) and                North America, Inc., One Tech Drive,
                                                  BILLING CODE 6717–01–P
                                                                                                          November 5 (8:30 a.m.–12:00 p.m.),                    Suite 220, Andover, MA 01810,
                                                                                                          2015.                                                 telephone: 978–681–1900, email:
                                                                                                            Further information regarding these                 megan.beauregard@enel.com.
                                                  DEPARTMENT OF ENERGY
                                                                                                          meetings may be found at: http://                        FERC Contact: Patricia W. Gillis, (202)
                                                  Federal Energy Regulatory                               www.nerc.com/Pages/Calendar.aspx.                     502–8735.
                                                  Commission                                                                                                       Deadline for filing comments, motions
                                                                                                            The discussions at the meetings,
                                                                                                                                                                to intervene, and protests: 30 days from
                                                                                                          which are open to the public, may
                                                                                                                                                                the date that the Commission issues this
                                                  [Project No. 12629–004]                                 address matters at issue in the following
                                                                                                                                                                notice. The Commission strongly
                                                                                                          Commission proceedings:
                                                                                                                                                                encourages electronic filing. Please file
                                                  Milltown Hydroelectric, LLC, Green                      Docket No. RR15–12, North American                    motions to intervene, comments, and
                                                  Power USA, LLC; Notice of Transfer of                     Electric Reliability Corporation                    protests using the Commission’s eFiling
                                                  Exemption
                                                                                                          Docket No. RR15–16, North American                    system at http://www.ferc.gov/docs-
                                                     1. By letter filed October 6, 2015,                    Electric Reliability Corporation                    filing/efiling.asp. Commenters can
                                                  Milltown Hydroelectric, LLC and Green                   Docket No. RD15–5, North American                     submit brief comments up to 6,000
                                                  Power USA, LLC informed the                               Electric Reliability Corporation                    characters, without prior registration,
                                                  Commission that the exemption from                        For further information, please                     using the eComment system at http://
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                  licensing for the Corriveau Project, No.                contact Jonathan First, 202–502–8529,                 www.ferc.gov/docs-filing/
                                                  12629, originally issued October 24,                    or jonathan.first@ferc.gov.                           ecomment.asp. You must include your
                                                  2006,1 has been transferred to Green                                                                          name and contact information at the end
                                                                                                            Dated: October 21, 2015.                            of your comments. For assistance,
                                                  Power USA, LLC. The project is located
                                                  on the Swift River in Oxford County,                    Kimberly D. Bose,                                     please contact FERC Online Support at
                                                                                                          Secretary.                                            FERCOnlineSupport@ferc.gov, (866)
                                                    1 117 FERC ¶ 62,059, Order Granting Exemption         [FR Doc. 2015–27402 Filed 10–27–15; 8:45 am]          208–3676 (toll free), or (202) 502–8659
                                                  from Licensing (5 MW or Less (2006).                    BILLING CODE 6717–01–P                                (TTY). In lieu of electronic filing, please


                                             VerDate Sep<11>2014   19:16 Oct 27, 2015   Jkt 238001   PO 00000   Frm 00013   Fmt 4703   Sfmt 4703   E:\FR\FM\28OCN1.SGM   28OCN1



Document Created: 2018-02-27 08:58:00
Document Modified: 2018-02-27 08:58:00
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
Dates10/21/15.
FR Citation80 FR 65994 