80_FR_66206 80 FR 65998 - Texas Eastern Transmission, LP; Notice of Application

80 FR 65998 - Texas Eastern Transmission, LP; Notice of Application

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 80, Issue 208 (October 28, 2015)

Page Range65998-65998
FR Document2015-27399

Federal Register, Volume 80 Issue 208 (Wednesday, October 28, 2015)
[Federal Register Volume 80, Number 208 (Wednesday, October 28, 2015)]
[Notices]
[Page 65998]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-27399]



[[Page 65998]]

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP16-3-000]


Texas Eastern Transmission, LP; Notice of Application

    Take notice that on October 8, 2015, Texas Eastern Transmission, LP 
(Texas Eastern) 5400 Westheimer Court, Houston, Texas 77056-5310, filed 
an application pursuant to section 7(c) of the Natural Gas Act (NGA) 
and the Federal Energy Regulatory Commission's (Commission) regulations 
seeking authorization to: (1) Construct, install, own, operate, and 
maintain approximately 15.8 miles of 36-inch diameter pipeline at three 
locations in Ohio; (2) install a new 16,875 horsepower compressor unit 
at an existing compressor station in Tompkinsville, Kentucky; and (3) 
modify 12 existing compressor stations to allow for reverse flow 
capabilities in various states. These facilities are more fully 
described herein and comprise the Access South Project, Adair Southwest 
Project and the Lebanon Extension Project (Projects), all as more fully 
described in the application which is on file with the Commission and 
open to public inspection. The filing may also be viewed on the Web at 
http://www.ferc.gov using the ``eLibrary'' link. Enter the docket 
number excluding the last three digits in the docket number field to 
access the document. For assistance, contact FERC at 
[email protected] or call toll-free, (866) 208-3676 or TTY, 
(202) 502-8659.
    Any questions regarding this application should be directed to 
Steven Hellman, Associate General Counsel, Texas Eastern Transmission, 
LP, P.O. Box 1642, Houston, Texas 77251-1642, or call (713) 627-5215, 
or fax (713) 386-4405, or by email [email protected].
    On March 31, 2015, Commission staff granted Texas Eastern's request 
to use the pre-filing process and assigned Docket No. PF15-17-000 to 
staff activities involving the Projects. Now, as of the filing of this 
application on October 8, 2015, the NEPA Pre-Filing Process for this 
project has ended. From this time forward, this proceeding will be 
conducted in Docket No. CP16-3-000 as noted in the caption of this 
Notice.
    Texas Eastern states the Projects will enable it to transport up to 
an additional 622,000 dekatherms per day (Dth/d) of natural gas on 
Texas Eastern's existing mainline facilities from a receipt point in 
Uniontown, Pennsylvania. Specifically, the Access South Project would 
provide up to 320,000 Dth/d of capacity to transport supply from a 
receipt point in Uniontown, Pennsylvania to delivery points in Texas 
Eastern's Access Area Zone ELA and Market Zone M1 in Attala County, 
Mississippi. The Adair Southwest Project would provide up to 200,000 
Dth/d of capacity to transport supply from a receipt point in 
Uniontown, Pennsylvania to delivery points in Texas Eastern's Market 
Zone M2 in Adair County, Kentucky. Finally, the Lebanon Extension 
Project would provide up to 102,000 Dth/d of capacity to transport 
supply from the Uniontown, Pennsylvania receipt point to delivery 
points in Market Zone M2 in or near Lebanon, Ohio. Texas Eastern has 
executed Precedent Agreements for long-term firm transportation service 
for the total capacity of all three Projects and has made standalone 
contractual commitments with the customers of each Project to construct 
the facilities required to provide service under each of the Projects, 
as necessary.
    Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9, 
within 90 days of this Notice the Commission staff will either: 
complete its environmental assessment (EA) and place it into the 
Commission's public record (eLibrary) for this proceeding; or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the final environmental impact statement (FEIS) or EA for this 
proposal. The filing of the EA in the Commission's public record for 
this proceeding or the issuance of a Notice of Schedule for 
Environmental Review will serve to notify federal and state agencies of 
the timing for the completion of all necessary reviews, and the 
subsequent need to complete all federal authorizations within 90 days 
of the date of issuance of the Commission staff's FEIS or EA.
    There are two ways to become involved in the Commission's review of 
this project. First, any person wishing to obtain legal status by 
becoming a party to the proceedings for this project should, on or 
before the comment date stated below file with the Federal Energy 
Regulatory Commission, 888 First Street NE., Washington, DC 20426, a 
motion to intervene in accordance with the requirements of the 
Commission's Rules of Practice and Procedure (18 CFR 385.214 or 
385.211) and the Regulations under the NGA (18 CFR 157.10). A person 
obtaining party status will be placed on the service list maintained by 
the Secretary of the Commission and will receive copies of all 
documents filed by the applicant and by all other parties. A party must 
submit 7 copies of filings made in the proceeding with the Commission 
and must mail a copy to the applicant and to every other party. Only 
parties to the proceeding can ask for court review of Commission orders 
in the proceeding.
    However, a person does not have to intervene in order to have 
comments considered. The second way to participate is by filing with 
the Secretary of the Commission, as soon as possible, an original and 
two copies of comments in support of or in opposition to this project. 
The Commission will consider these comments in determining the 
appropriate action to be taken, but the filing of a comment alone will 
not serve to make the filer a party to the proceeding. The Commission's 
rules require that persons filing comments in opposition to the project 
provide copies of their protests only to the party or parties directly 
involved in the protest.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission. Environmental commentors will be 
placed on the Commission's environmental mailing list, will receive 
copies of the environmental documents, and will be notified of meetings 
associated with the Commission's environmental review process. 
Environmental commentors will not be required to serve copies of filed 
documents on all other parties. However, the non-party commentors will 
not receive copies of all documents filed by other parties or issued by 
the Commission (except for the mailing of environmental documents 
issued by the Commission) and will not have the right to seek court 
review of the Commission's final order.
    The Commission strongly encourages electronic filings of comments, 
protests and interventions in lieu of paper using the ``eFiling'' link 
at http://www.ferc.gov. Persons unable to file electronically should 
submit an original and 5 copies of the protest or intervention to the 
Federal Energy Regulatory Commission, 888 First Street NE., Washington, 
DC 20426.
    Comment Date: November 12, 2015.

    Dated: October 22, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-27399 Filed 10-27-15; 8:45 am]
 BILLING CODE 6717-01-P



                                                  65998                     Federal Register / Vol. 80, No. 208 / Wednesday, October 28, 2015 / Notices

                                                  DEPARTMENT OF ENERGY                                    in Uniontown, Pennsylvania.                           status will be placed on the service list
                                                                                                          Specifically, the Access South Project                maintained by the Secretary of the
                                                  Federal Energy Regulatory                               would provide up to 320,000 Dth/d of                  Commission and will receive copies of
                                                  Commission                                              capacity to transport supply from a                   all documents filed by the applicant and
                                                  [Docket No. CP16–3–000]                                 receipt point in Uniontown,                           by all other parties. A party must submit
                                                                                                          Pennsylvania to delivery points in                    7 copies of filings made in the
                                                  Texas Eastern Transmission, LP;                         Texas Eastern’s Access Area Zone ELA                  proceeding with the Commission and
                                                  Notice of Application                                   and Market Zone M1 in Attala County,                  must mail a copy to the applicant and
                                                                                                          Mississippi. The Adair Southwest                      to every other party. Only parties to the
                                                     Take notice that on October 8, 2015,                 Project would provide up to 200,000                   proceeding can ask for court review of
                                                  Texas Eastern Transmission, LP (Texas                   Dth/d of capacity to transport supply                 Commission orders in the proceeding.
                                                  Eastern) 5400 Westheimer Court,                         from a receipt point in Uniontown,                       However, a person does not have to
                                                  Houston, Texas 77056–5310, filed an                     Pennsylvania to delivery points in                    intervene in order to have comments
                                                  application pursuant to section 7(c) of                 Texas Eastern’s Market Zone M2 in                     considered. The second way to
                                                  the Natural Gas Act (NGA) and the                       Adair County, Kentucky. Finally, the                  participate is by filing with the
                                                  Federal Energy Regulatory                               Lebanon Extension Project would                       Secretary of the Commission, as soon as
                                                  Commission’s (Commission) regulations                   provide up to 102,000 Dth/d of capacity               possible, an original and two copies of
                                                  seeking authorization to: (1) Construct,                to transport supply from the                          comments in support of or in opposition
                                                  install, own, operate, and maintain                     Uniontown, Pennsylvania receipt point                 to this project. The Commission will
                                                  approximately 15.8 miles of 36-inch                     to delivery points in Market Zone M2 in               consider these comments in
                                                  diameter pipeline at three locations in                 or near Lebanon, Ohio. Texas Eastern                  determining the appropriate action to be
                                                  Ohio; (2) install a new 16,875                          has executed Precedent Agreements for                 taken, but the filing of a comment alone
                                                  horsepower compressor unit at an                        long-term firm transportation service for             will not serve to make the filer a party
                                                  existing compressor station in                          the total capacity of all three Projects              to the proceeding. The Commission’s
                                                  Tompkinsville, Kentucky; and (3)                        and has made standalone contractual                   rules require that persons filing
                                                  modify 12 existing compressor stations                  commitments with the customers of                     comments in opposition to the project
                                                  to allow for reverse flow capabilities in               each Project to construct the facilities              provide copies of their protests only to
                                                  various states. These facilities are more               required to provide service under each                the party or parties directly involved in
                                                  fully described herein and comprise the                 of the Projects, as necessary.                        the protest.
                                                  Access South Project, Adair Southwest                      Pursuant to section 157.9 of the                      Persons who wish to comment only
                                                  Project and the Lebanon Extension                       Commission’s rules, 18 CFR 157.9,                     on the environmental review of this
                                                  Project (Projects), all as more fully                   within 90 days of this Notice the                     project should submit an original and
                                                  described in the application which is on                Commission staff will either: complete                two copies of their comments to the
                                                  file with the Commission and open to                    its environmental assessment (EA) and                 Secretary of the Commission.
                                                  public inspection. The filing may also                  place it into the Commission’s public                 Environmental commentors will be
                                                  be viewed on the Web at http://                         record (eLibrary) for this proceeding; or             placed on the Commission’s
                                                  www.ferc.gov using the ‘‘eLibrary’’ link.               issue a Notice of Schedule for                        environmental mailing list, will receive
                                                  Enter the docket number excluding the                   Environmental Review. If a Notice of                  copies of the environmental documents,
                                                  last three digits in the docket number                  Schedule for Environmental Review is                  and will be notified of meetings
                                                  field to access the document. For                       issued, it will indicate, among other                 associated with the Commission’s
                                                  assistance, contact FERC at                             milestones, the anticipated date for the              environmental review process.
                                                  FERCOnlineSupport@ferc.gov or call                      Commission staff’s issuance of the final              Environmental commentors will not be
                                                  toll-free, (866) 208–3676 or TTY, (202)                 environmental impact statement (FEIS)                 required to serve copies of filed
                                                  502–8659.                                               or EA for this proposal. The filing of the            documents on all other parties.
                                                     Any questions regarding this                         EA in the Commission’s public record                  However, the non-party commentors
                                                  application should be directed to Steven                for this proceeding or the issuance of a              will not receive copies of all documents
                                                  Hellman, Associate General Counsel,                     Notice of Schedule for Environmental                  filed by other parties or issued by the
                                                  Texas Eastern Transmission, LP, P.O.                    Review will serve to notify federal and               Commission (except for the mailing of
                                                  Box 1642, Houston, Texas 77251–1642,                    state agencies of the timing for the                  environmental documents issued by the
                                                  or call (713) 627–5215, or fax (713) 386–               completion of all necessary reviews, and              Commission) and will not have the right
                                                  4405, or by email sehellman@                            the subsequent need to complete all                   to seek court review of the
                                                  spectraenergy.com.                                      federal authorizations within 90 days of              Commission’s final order.
                                                     On March 31, 2015, Commission staff                  the date of issuance of the Commission                   The Commission strongly encourages
                                                  granted Texas Eastern’s request to use                  staff’s FEIS or EA.                                   electronic filings of comments, protests
                                                  the pre-filing process and assigned                        There are two ways to become                       and interventions in lieu of paper using
                                                  Docket No. PF15–17–000 to staff                         involved in the Commission’s review of                the ‘‘eFiling’’ link at http://
                                                  activities involving the Projects. Now, as              this project. First, any person wishing to            www.ferc.gov. Persons unable to file
                                                  of the filing of this application on                    obtain legal status by becoming a party               electronically should submit an original
                                                  October 8, 2015, the NEPA Pre-Filing                    to the proceedings for this project                   and 5 copies of the protest or
                                                  Process for this project has ended. From                should, on or before the comment date                 intervention to the Federal Energy
                                                  this time forward, this proceeding will                 stated below file with the Federal                    Regulatory Commission, 888 First Street
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                  be conducted in Docket No. CP16–3–                      Energy Regulatory Commission, 888                     NE., Washington, DC 20426.
                                                  000 as noted in the caption of this                     First Street NE., Washington, DC 20426,                  Comment Date: November 12, 2015.
                                                  Notice.                                                 a motion to intervene in accordance
                                                     Texas Eastern states the Projects will               with the requirements of the                            Dated: October 22, 2015.
                                                  enable it to transport up to an additional              Commission’s Rules of Practice and                    Kimberly D. Bose,
                                                  622,000 dekatherms per day (Dth/d) of                   Procedure (18 CFR 385.214 or 385.211)                 Secretary.
                                                  natural gas on Texas Eastern’s existing                 and the Regulations under the NGA (18                 [FR Doc. 2015–27399 Filed 10–27–15; 8:45 am]
                                                  mainline facilities from a receipt point                CFR 157.10). A person obtaining party                 BILLING CODE 6717–01–P




                                             VerDate Sep<11>2014   19:16 Oct 27, 2015   Jkt 238001   PO 00000   Frm 00016   Fmt 4703   Sfmt 9990   E:\FR\FM\28OCN1.SGM   28OCN1



Document Created: 2018-02-27 08:58:02
Document Modified: 2018-02-27 08:58:02
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
DatesNovember 12, 2015.
FR Citation80 FR 65998 

2025 Federal Register | Disclaimer | Privacy Policy