80_FR_68745 80 FR 68531 - Combined Notice of Filings #1

80 FR 68531 - Combined Notice of Filings #1

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 80, Issue 214 (November 5, 2015)

Page Range68531-68532
FR Document2015-28205

Federal Register, Volume 80 Issue 214 (Thursday, November 5, 2015)
[Federal Register Volume 80, Number 214 (Thursday, November 5, 2015)]
[Notices]
[Pages 68531-68532]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-28205]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #1

    Take notice that the Commission received the following exempt 
wholesale generator filings:

    Docket Numbers: EG16-14-000.
    Applicants: Utah Red Hills Renewable Park, LLC.
    Description: Notice of Self-Certification of Exempt Wholesale 
Generator Status of Utah Red Hills Renewable Park, LLC.
    Filed Date: 10/29/15.
    Accession Number: 20151029-5259.
    Comments Due: 5 p.m. ET 11/19/15.

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER15-1883-001; ER15-1418-001; ER10-1836-008; ER10-
2005-008; ER11-26-008; ER10-1838-008; ER10-2551-007; ER10-1915-007; 
ER12-569-009; ER15-1925-001; ER10-1841-008; ER13-712-009; ER10-1843-
008; ER10-1844-008; ER10-1845-008; ER10-1846-007; ER13-1991-005; ER13-
1992-005; ER10-1847-007; ER10-1849-008; ER11-2037-008; ER13-752-007; 
ER12-2227-008; ER10-1851-006; ER10-1852-012; ER10-1855-007; ER10-1856-
007; ER10-1857-007; ER10-1887-008; ER10-1890-007; ER10-1897-008; ER10-
1899-008; ER10-1902-008; ER10-1903-008; ER11-2160-007; ER10-1905-008; 
ER10-1906-006; ER10-1907-008; ER10-1918-008; ER10-1920-010; ER10-1925-
008; ER10-1927-008; ER10-1928-010; ER11-2642-008; ER10-1930-006; ER10-
1931-007; ER10-1932-007; ER10-1935-007; ER10-1950-008; ER13-2112-003; 
ER15-2101-002; ER10-1952-008; ER15-2601-001; ER11-3635-007; ER10-2006-
009; ER10-1961-008; ER12-1228-010; ER10-1962-007; ER10-1963-007; ER10-
1964-008; ER10-1965-008; ER12-2226-006; ER12-2225-006; ER14-2138-003; 
ER10-1966-007; ER14-2707-005.
    Applicants: Adelanto Solar, LLC, Adelanto Solar II, LLC, Ashtabula 
Wind, LLC, Ashtabula Wind II, LLC, Ashtabula Wind III, LLC, Backbone 
Mountain Windpower LLC, Baldwin Wind, LLC, Bayswater Peaking Facility, 
LLC, Blackwell Wind, LLC, Breckinridge Wind Project, LLC, Butler Ridge 
Wind Energy Center, LLC, Cimarron Wind Energy, LLC, Crystal Lake Wind, 
LLC, Crystal Lake Wind II, LLC, Crystal Lake Wind III, LLC, Day County 
Wind, LLC, Desert Sunlight 250, LLC, Desert Sunlight 300, LLC, Diablo 
Winds, LLC, Elk City Wind, LLC, Elk City II Wind, LLC, Energy Storage 
Holdings, LLC, Ensign Wind, LLC, ESI Vansycle Partners, L.P., Florida 
Power & Light Company, FPL Energy Burleigh County Wind, LLC, FPL Energy 
Cabazon Wind, LLC, FPL Energy Cape, LLC, FPL Energy Cowboy Wind, LLC, 
FPL Energy Green Power Wind, LLC, FPL Energy Hancock

[[Page 68532]]

County Wind, LLC, FPL Energy Illinois Wind, LLC, FPL Energy Marcus 
Hook, L.P., FPL Energy MH50 L.P., FPL Energy Montezuma Wind, LLC, FPL 
Energy Mower County, LLC, FPL Energy New Mexico Wind, LLC, FPL Energy 
North Dakota Wind, LLC, FPL Energy North Dakota Wind II, LLC, FPL 
Energy Oklahoma Wind, LLC, FPL Energy Oliver Wind I, LLC, FPL Energy 
Oliver Wind II, LLC, FPL Energy Sooner Wind, LLC, FPL Energy South 
Dakota Wind, LLC, FPL Energy Stateline II, Inc., FPL Energy Vansycle, 
L.L.C, FPL Energy Wyman, LLC, FPL Energy Wyman IV, LLC, Garden Wind, 
LLC, Genesis Solar, LLC, Golden West Power Partners, LLC, Gray County 
Wind Energy, LLC, Green Mountain Storage, LLC, Hatch Solar Energy 
Center I, LLC, Hawkeye Power Partners, LLC, High Majestic Wind Energy 
Center, LLC, High Majestic Wind II, LLC, High Winds, LLC, Jamaica Bay 
Peaking Facility, LLC, Lake Benton Power Partners II, LLC, Langdon 
Wind, LLC, Limon Wind, LLC, Limon Wind II, LLC, Limon Wind III, LLC, 
Logan Wind Energy LLC, Mammoth Plains Wind Project, LLC.
    Description: Notice of Change in Status of the NextEra Energy 
Companies [Part 1 of 2].
    Filed Date: 10/28/15.
    Accession Number: 20151028-5364.
    Comments Due: 5 p.m. ET 11/18/15.

    Docket Numbers: ER16-143-001.
    Applicants: Citizens Sunrise Transmission LLC.
    Description: Tariff Amendment: Amendment to TRBAA Filing to be 
effective 1/1/2016.
    Filed Date: 10/28/15.
    Accession Number: 20151028-5323.
    Comments Due: 5 p.m. ET 11/18/15.

    Docket Numbers: ER16-158-000.
    Applicants: Southwest Power Pool, Inc.
    Description: Sec.  205(d) Rate Filing: Revisions to Attachment AE 
Regarding Pricing in the Context of Ramp Constraints to be effective 
12/27/2015.
    Filed Date: 10/28/15.
    Accession Number: 20151028-5357.
    Comments Due: 5 p.m. ET 11/18/15.

    Docket Numbers: ER16-159-000.
    Applicants: ISO New England Inc., New England Power Pool 
Participants Committee.
    Description: Sec.  205(d) Rate Filing: Removal of NEPOOL Review 
Board to be effective 1/1/2016.
    Filed Date: 10/29/15.
    Accession Number: 20151029-5108.
    Comments Due: 5 p.m. ET 11/19/15.

    Docket Numbers: ER16-160-000.
    Applicants: New-Indy Ontario LLC.
    Description: Baseline eTariff Filing: Application for MBR to be 
effective 1/1/2016.
    Filed Date: 10/29/15.
    Accession Number: 20151029-5185.
    Comments Due: 5 p.m. ET 11/19/15.

    Docket Numbers: ER16-161-000.
    Applicants: New-Indy Oxnard LLC.
    Description: Baseline eTariff Filing: Application for MBR to be 
effective 1/1/2016.
    Filed Date: 10/29/15.
    Accession Number: 20151029-5187.
    Comments Due: 5 p.m. ET 11/19/15.

    The filings are accessible in the Commission's eLibrary system by 
clicking on the links or querying the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: http://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: October 29, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-28205 Filed 11-4-15; 8:45 am]
 BILLING CODE 6717-01-P



                                                                             Federal Register / Vol. 80, No. 214 / Thursday, November 5, 2015 / Notices                                        68531

                                                  so, are these transmission projects                     comments during those discussions for                    Docket Numbers: EG16–14–000.
                                                  eligible to use PJM’s regional cost                     participating parties. The specific                      Applicants: Utah Red Hills Renewable
                                                  allocation method?                                      agenda and procedures to be followed at               Park, LLC.
                                                     2. The process through which                         the conference will be announced by                      Description: Notice of Self-
                                                  Supplemental Projects become                            staff at the opening of the conference.               Certification of Exempt Wholesale
                                                  transmission projects eligible for                         The technical conference will not be               Generator Status of Utah Red Hills
                                                  selection in the regional transmission                  transcribed. However, there will be a                 Renewable Park, LLC.
                                                  plan for purposes of cost allocation.                   free audio cast of the conference.                       Filed Date: 10/29/15.
                                                     a. If a Supplemental Project is                      Anyone wishing to listen to the meeting                  Accession Number: 20151029–5259.
                                                  transitioned into a Required                            should send an email to Sarah McKinley                   Comments Due: 5 p.m. ET 11/19/15.
                                                  Transmission Enhancement that is                        at sarah.mckinley@ferc.gov by                            Take notice that the Commission
                                                  eligible for regional cost allocation in                November 3, 2015, to request call-in                  received the following electric rate
                                                  PJM’s RTEP, does it undergo the same                    information. Please reference ‘‘call                  filings:
                                                  analysis as a transmission project first                information for ER15–1344/1387                           Docket Numbers: ER15–1883–001;
                                                  proposed as a Subregional RTEP                          technical conference’’ in the subject line            ER15–1418–001; ER10–1836–008;
                                                  Project?                                                of the email. The call-in information                 ER10–2005–008; ER11–26–008; ER10–
                                                     b. How are Supplemental Projects                     will be provided prior to the meeting.                1838–008; ER10–2551–007; ER10–1915–
                                                  distinguished from transmission                         Persons listening to the technical                    007; ER12–569–009; ER15–1925–001;
                                                  projects that address transmission                      conference may participate by                         ER10–1841–008; ER13–712–009; ER10–
                                                  owner local planning criteria?                          submitting questions, either prior to or
                                                     3. The proposal window process for                                                                         1843–008; ER10–1844–008; ER10–1845–
                                                                                                          during the technical conference, by                   008; ER10–1846–007; ER13–1991–005;
                                                  transmission project proposals intended                 emailing RTEPconference@ferc.gov.
                                                  to address transmission owner local                                                                           ER13–1992–005; ER10–1847–007;
                                                                                                             Commission conferences are
                                                  planning criteria.                                                                                            ER10–1849–008; ER11–2037–008;
                                                                                                          accessible under section 508 of the
                                                     a. Except for Immediate-need                                                                               ER13–752–007; ER12–2227–008; ER10–
                                                                                                          Rehabilitation Act of 1973. For
                                                  Reliability Projects, does PJM currently                                                                      1851–006; ER10–1852–012; ER10–1855–
                                                                                                          accessibility accommodations please
                                                  open proposal windows for all                                                                                 007; ER10–1856–007; ER10–1857–007;
                                                                                                          send an email to accessibility@ferc.gov
                                                  transmission needs identified in its                                                                          ER10–1887–008; ER10–1890–007;
                                                                                                          or call toll free 1–866–208–3372 (voice)
                                                  regional transmission planning process,                                                                       ER10–1897–008; ER10–1899–008;
                                                                                                          or 202–502–8659 (TTY); or send a fax to
                                                  including those needs that arise as a                                                                         ER10–1902–008; ER10–1903–008;
                                                                                                          202–208–2106 with the required
                                                  result of local transmission needs and                                                                        ER11–2160–007; ER10–1905–008;
                                                                                                          accommodations.
                                                  transmission owner local planning                          Following the technical conference,                ER10–1906–006; ER10–1907–008;
                                                  criteria?                                               the Commission will consider post-                    ER10–1918–008; ER10–1920–010;
                                                     b. If PJM does not currently open                    technical conference comments                         ER10–1925–008; ER10–1927–008;
                                                  proposal windows for all transmission                   submitted on or before December 10,                   ER10–1928–010; ER11–2642–008;
                                                  needs identified in PJM’s regional                      2015. Reply comments will be due on or                ER10–1930–006; ER10–1931–007;
                                                  transmission planning process, how                      before January 7, 2016. The written                   ER10–1932–007; ER10–1935–007;
                                                  does PJM determine whether to open a                    comments will be included in the                      ER10–1950–008; ER13–2112–003;
                                                  proposal window for a given                             formal record of the proceeding, which,               ER15–2101–002; ER10–1952–008;
                                                  transmission need?                                      together with the record developed to                 ER15–2601–001; ER11–3635–007;
                                                     c. If a PJM Transmission Owner                       date, will form the basis for further                 ER10–2006–009; ER10–1961–008;
                                                  proposes an upgrade to its existing                     Commission action.                                    ER12–1228–010; ER10–1962–007;
                                                  transmission facilities to address a local                 For more information about this                    ER10–1963–007; ER10–1964–008;
                                                  transmission need, does PJM open a                      technical conference, please contact                  ER10–1965–008; ER12–2226–006;
                                                  proposal window to solicit other                        Katherine Scott, 202–502–6495,                        ER12–2225–006; ER14–2138–003;
                                                  possible solutions to address the local                 katherine.scott@ferc.gov, regarding                   ER10–1966–007; ER14–2707–005.
                                                  transmission need that would be                         Docket Nos. ER15–1344–001 and ER15–                      Applicants: Adelanto Solar, LLC,
                                                  addressed by the upgrade?                               1344–002; Nicole Buell, 202–502–6846,                 Adelanto Solar II, LLC, Ashtabula Wind,
                                                     d. If a PJM Transmission Owner                       nicole.buell@ferc.gov, regarding Docket               LLC, Ashtabula Wind II, LLC, Ashtabula
                                                  proposes a new 500 kV transmission                      No. ER15–1387–001; or Sarah                           Wind III, LLC, Backbone Mountain
                                                  facility to address a local transmission                McKinley, 202–502–8368,                               Windpower LLC, Baldwin Wind, LLC,
                                                  need, does PJM currently open a                         sarah.mckinley@ferc.gov, regarding                    Bayswater Peaking Facility, LLC,
                                                  proposal window to solicit other                        logistical issues.                                    Blackwell Wind, LLC, Breckinridge
                                                  possible solutions to address the local                                                                       Wind Project, LLC, Butler Ridge Wind
                                                  transmission need that would be                         Kimberly D. Bose,                                     Energy Center, LLC, Cimarron Wind
                                                  addressed by PJM Transmission                           Secretary.                                            Energy, LLC, Crystal Lake Wind, LLC,
                                                  Owner’s proposed new 500 kV                             [FR Doc. 2015–28157 Filed 11–4–15; 8:45 am]           Crystal Lake Wind II, LLC, Crystal Lake
                                                  transmission facility?                                  BILLING CODE 6717–01–P                                Wind III, LLC, Day County Wind, LLC,
                                                     The technical conference will be led                                                                       Desert Sunlight 250, LLC, Desert
                                                  by Commission staff, and is open to the                                                                       Sunlight 300, LLC, Diablo Winds, LLC,
                                                  public. Pre-registration through the                    DEPARTMENT OF ENERGY                                  Elk City Wind, LLC, Elk City II Wind,
                                                  Commission’s Web site (https://                                                                               LLC, Energy Storage Holdings, LLC,
jstallworth on DSK7TPTVN1PROD with NOTICES




                                                  www.ferc.gov/whats-new/registration/                    Federal Energy Regulatory                             Ensign Wind, LLC, ESI Vansycle
                                                  11-10-15-form.asp) is encouraged but                    Commission                                            Partners, L.P., Florida Power & Light
                                                  not required. The conference will                                                                             Company, FPL Energy Burleigh County
                                                                                                          Combined Notice of Filings #1
                                                  include discussions responding to                                                                             Wind, LLC, FPL Energy Cabazon Wind,
                                                  Commission staff’s questions led by PJM                   Take notice that the Commission                     LLC, FPL Energy Cape, LLC, FPL Energy
                                                  and the PJM Transmission Owners, with                   received the following exempt                         Cowboy Wind, LLC, FPL Energy Green
                                                  opportunity for questions and                           wholesale generator filings:                          Power Wind, LLC, FPL Energy Hancock


                                             VerDate Sep<11>2014   15:06 Nov 04, 2015   Jkt 238001   PO 00000   Frm 00040   Fmt 4703   Sfmt 4703   E:\FR\FM\05NON1.SGM   05NON1


                                                  68532                      Federal Register / Vol. 80, No. 214 / Thursday, November 5, 2015 / Notices

                                                  County Wind, LLC, FPL Energy Illinois                      Filed Date: 10/29/15.                              public comments. The Commission
                                                  Wind, LLC, FPL Energy Marcus Hook,                         Accession Number: 20151029–5185.                   received no comments on the FERC–725
                                                  L.P., FPL Energy MH50 L.P., FPL Energy                     Comments Due: 5 p.m. ET 11/19/15.                  and is making this notation in its
                                                  Montezuma Wind, LLC, FPL Energy                            Docket Numbers: ER16–161–000.                      submittal to OMB.
                                                  Mower County, LLC, FPL Energy New                          Applicants: New-Indy Oxnard LLC.                   DATES: Comments on the collection of
                                                  Mexico Wind, LLC, FPL Energy North                         Description: Baseline eTariff Filing:              information are due December 7, 2015.
                                                  Dakota Wind, LLC, FPL Energy North                      Application for MBR to be effective                   ADDRESSES: Comments filed with OMB,
                                                  Dakota Wind II, LLC, FPL Energy                         1/1/2016.                                             identified by the OMB Control No.
                                                  Oklahoma Wind, LLC, FPL Energy                             Filed Date: 10/29/15.                              1902–0225 or collection number (FERC–
                                                  Oliver Wind I, LLC, FPL Energy Oliver                      Accession Number: 20151029–5187.                   725), should be sent via email to the
                                                  Wind II, LLC, FPL Energy Sooner Wind,                      Comments Due: 5 p.m. ET 11/19/15.                  Office of Information and Regulatory
                                                  LLC, FPL Energy South Dakota Wind,                         The filings are accessible in the                  Affairs: oira_submission@omb.gov.
                                                  LLC, FPL Energy Stateline II, Inc., FPL                 Commission’s eLibrary system by                       Attention: Federal Energy Regulatory
                                                  Energy Vansycle, L.L.C, FPL Energy                      clicking on the links or querying the                 Commission Desk Officer. The Desk
                                                  Wyman, LLC, FPL Energy Wyman IV,                        docket number.                                        Officer may also be reached via
                                                  LLC, Garden Wind, LLC, Genesis Solar,                      Any person desiring to intervene or                telephone at 202–395–0710.
                                                  LLC, Golden West Power Partners, LLC,                   protest in any of the above proceedings                  A copy of the comments should also
                                                  Gray County Wind Energy, LLC, Green                     must file in accordance with Rules 211                be sent to the Commission, in Docket
                                                  Mountain Storage, LLC, Hatch Solar                      and 214 of the Commission’s                           No. IC15–12–000, by either of the
                                                  Energy Center I, LLC, Hawkeye Power                     Regulations (18 CFR 385.211 and                       following methods:
                                                  Partners, LLC, High Majestic Wind                       385.214) on or before 5:00 p.m. Eastern                  • eFiling at Commission’s Web site:
                                                  Energy Center, LLC, High Majestic Wind                  time on the specified comment date.                   http://www.ferc.gov/docs-filing/
                                                  II, LLC, High Winds, LLC, Jamaica Bay                   Protests may be considered, but                       efiling.asp.
                                                  Peaking Facility, LLC, Lake Benton                      intervention is necessary to become a                    • Mail/Hand Delivery/Courier:
                                                  Power Partners II, LLC, Langdon Wind,                   party to the proceeding.                              Federal Energy Regulatory Commission,
                                                  LLC, Limon Wind, LLC, Limon Wind II,                       eFiling is encouraged. More detailed               Secretary of the Commission, 888 First
                                                  LLC, Limon Wind III, LLC, Logan Wind                    information relating to filing                        Street NE., Washington, DC 20426.
                                                  Energy LLC, Mammoth Plains Wind                         requirements, interventions, protests,                   Instructions: All submissions must be
                                                  Project, LLC.                                           service, and qualifying facilities filings            formatted and filed in accordance with
                                                     Description: Notice of Change in                     can be found at: http://www.ferc.gov/                 submission guidelines at: http://
                                                  Status of the NextEra Energy Companies                  docs-filing/efiling/filing-req.pdf. For               www.ferc.gov/help/submission-
                                                  [Part 1 of 2].                                          other information, call (866) 208–3676                guide.asp. For user assistance contact
                                                     Filed Date: 10/28/15.                                (toll free). For TTY, call (202) 502–8659.            FERC Online Support by email at
                                                     Accession Number: 20151028–5364.                                                                           ferconlinesupport@ferc.gov, or by phone
                                                     Comments Due: 5 p.m. ET 11/18/15.                      Dated: October 29, 2015.
                                                                                                          Nathaniel J. Davis, Sr.,
                                                                                                                                                                at: (866) 208–3676 (toll-free), or (202)
                                                     Docket Numbers: ER16–143–001.                                                                              502–8659 for TTY.
                                                     Applicants: Citizens Sunrise                         Deputy Secretary.
                                                                                                                                                                   Docket: Users interested in receiving
                                                  Transmission LLC.                                       [FR Doc. 2015–28205 Filed 11–4–15; 8:45 am]           automatic notification of activity in this
                                                     Description: Tariff Amendment:                       BILLING CODE 6717–01–P                                docket or in viewing/downloading
                                                  Amendment to TRBAA Filing to be                                                                               comments and issuances in this docket
                                                  effective 1/1/2016.                                                                                           may do so at http://www.ferc.gov/docs-
                                                     Filed Date: 10/28/15.                                DEPARTMENT OF ENERGY                                  filing/docs-filing.asp.
                                                     Accession Number: 20151028–5323.
                                                     Comments Due: 5 p.m. ET 11/18/15.                    Federal Energy Regulatory                             FOR FURTHER INFORMATION CONTACT:
                                                     Docket Numbers: ER16–158–000.                        Commission                                            Ellen Brown may be reached by email
                                                     Applicants: Southwest Power Pool,                                                                          at DataClearance@FERC.gov, by
                                                                                                          [Docket No. IC15–12–000]                              telephone at (202) 502–8663, and by fax
                                                  Inc.
                                                     Description: § 205(d) Rate Filing:                                                                         at (202) 273–0873.
                                                                                                          Commission Information Collection
                                                  Revisions to Attachment AE Regarding                    Activities (FERC–725); Comment                        SUPPLEMENTARY INFORMATION:
                                                  Pricing in the Context of Ramp                          Request; Extension                                       Title: FERC–725, Certification of
                                                  Constraints to be effective 12/27/2015.                                                                       Electric Reliability Organization;
                                                     Filed Date: 10/28/15.                                AGENCY: Federal Energy Regulatory                     Procedures for Electric Reliability
                                                     Accession Number: 20151028–5357.                     Commission.                                           Standards.
                                                     Comments Due: 5 p.m. ET 11/18/15.                    ACTION: Notice of information collection                 OMB Control No.:1902–0225.
                                                     Docket Numbers: ER16–159–000.                        and request for comments.                                Type of Request: Three-year extension
                                                     Applicants: ISO New England Inc.,                                                                          of the FERC–725 information collection
                                                  New England Power Pool Participants                     SUMMARY:   In compliance with the                     requirements with no changes to the
                                                  Committee.                                              requirements of the Paperwork                         current reporting requirements.
                                                     Description: § 205(d) Rate Filing:                   Reduction Act of 1995, 44 U.S.C.                         Abstract: The FERC–725 information
                                                  Removal of NEPOOL Review Board to                       3506(c)(2)(A), the Federal Energy                     collection contains the following
                                                  be effective 1/1/2016.                                  Regulatory Commission (Commission or                  information collection elements:
                                                                                                          FERC) is soliciting public comment on                    • Self Assessment and Electric
jstallworth on DSK7TPTVN1PROD with NOTICES




                                                     Filed Date: 10/29/15.
                                                     Accession Number: 20151029–5108.                     the currently approved information                    Reliability Organization (ERO)
                                                     Comments Due: 5 p.m. ET 11/19/15.                    collection, FERC–725 [Certification of                Application: The Commission requires
                                                     Docket Numbers: ER16–160–000.                        Electric Reliability Organization;                    the ERO to submit to FERC a
                                                     Applicants: New-Indy Ontario LLC.                    Procedures for Electric Reliability                   performance assessment report every
                                                     Description: Baseline eTariff Filing:                Standards]. The Commission previously                 five years. The next assessment is due
                                                  Application for MBR to be effective                     issued a Notice in the Federal Register               in 2019. Each Regional Entity submits a
                                                  1/1/2016.                                               (80 FR 50846, 8/21/2015) requesting                   performance assessment report to the


                                             VerDate Sep<11>2014   15:06 Nov 04, 2015   Jkt 238001   PO 00000   Frm 00041   Fmt 4703   Sfmt 4703   E:\FR\FM\05NON1.SGM   05NON1



Document Created: 2015-12-14 15:03:49
Document Modified: 2015-12-14 15:03:49
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
Dates10/29/15.
FR Citation80 FR 68531 