In compliance with the requirements of the Paperwork Reduction Act of 1995, 44 U.S.C. 3506(c)(2)(A), the Federal Energy Regulatory Commission (Commission or FERC) is soliciting public comment on the currently approved information collection, FERC-725 [Certification of Electric Reliability Organization; Procedures for Electric Reliability Standards]. The Commission previously issued a Notice in the Federal Register (80 FR 50846, 8/21/2015) requesting public comments. The Commission received no comments on the FERC-725 and is making this notation in its submittal to OMB.

Federal Register, Volume 80 Issue 214 (Thursday, November 5, 2015)
[Federal Register Volume 80, Number 214 (Thursday, November 5, 2015)]
[Notices]
[Pages 68532-68534]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-28211]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. IC15-12-000]


Commission Information Collection Activities (FERC-725); Comment 
Request; Extension

AGENCY: Federal Energy Regulatory Commission.

ACTION: Notice of information collection and request for comments.

-----------------------------------------------------------------------

SUMMARY: In compliance with the requirements of the Paperwork Reduction 
Act of 1995, 44 U.S.C. 3506(c)(2)(A), the Federal Energy Regulatory 
Commission (Commission or FERC) is soliciting public comment on the 
currently approved information collection, FERC-725 [Certification of 
Electric Reliability Organization; Procedures for Electric Reliability 
Standards]. The Commission previously issued a Notice in the Federal 
Register (80 FR 50846, 8/21/2015) requesting public comments. The 
Commission received no comments on the FERC-725 and is making this 
notation in its submittal to OMB.

DATES: Comments on the collection of information are due December 7, 
2015.

ADDRESSES: Comments filed with OMB, identified by the OMB Control No. 
1902-0225 or collection number (FERC-725), should be sent via email to 
the Office of Information and Regulatory Affairs: 
oira_submission@omb.gov. Attention: Federal Energy Regulatory 
Commission Desk Officer. The Desk Officer may also be reached via 
telephone at 202-395-0710.
    A copy of the comments should also be sent to the Commission, in 
Docket No. IC15-12-000, by either of the following methods:
     eFiling at Commission's Web site: http://www.ferc.gov/docs-filing/efiling.asp.
     Mail/Hand Delivery/Courier: Federal Energy Regulatory 
Commission, Secretary of the Commission, 888 First Street NE., 
Washington, DC 20426.
    Instructions: All submissions must be formatted and filed in 
accordance with submission guidelines at: http://www.ferc.gov/help/submission-guide.asp. For user assistance contact FERC Online Support 
by email at ferconlinesupport@ferc.gov, or by phone at: (866) 208-3676 
(toll-free), or (202) 502-8659 for TTY.
    Docket: Users interested in receiving automatic notification of 
activity in this docket or in viewing/downloading comments and 
issuances in this docket may do so at http://www.ferc.gov/docs-filing/docs-filing.asp.

FOR FURTHER INFORMATION CONTACT: Ellen Brown may be reached by email at 
DataClearance@FERC.gov, by telephone at (202) 502-8663, and by fax at 
(202) 273-0873.

SUPPLEMENTARY INFORMATION: 
    Title: FERC-725, Certification of Electric Reliability 
Organization; Procedures for Electric Reliability Standards.
    OMB Control No.:1902-0225.
    Type of Request: Three-year extension of the FERC-725 information 
collection requirements with no changes to the current reporting 
requirements.
    Abstract: The FERC-725 information collection contains the 
following information collection elements:
     Self Assessment and Electric Reliability Organization 
(ERO) Application: The Commission requires the ERO to submit to FERC a 
performance assessment report every five years. The next assessment is 
due in 2019. Each Regional Entity submits a performance assessment 
report to the

[[Page 68533]]

ERO. Submitting an application to become an ERO is also part of this 
collection.\1\
---------------------------------------------------------------------------

    \1\ The Commission does not expect any new ERO applications to 
be submitted in the next five years and is not including any burden 
for this requirement in the burden estimate. FERC still seeks to 
renew the regulations pertaining to a new ERO application under this 
renewal but is expecting the burden to be zero for the foreseeable 
future. 18 CFR 39.3 contains the regulation pertaining to ERO 
applications.
---------------------------------------------------------------------------

     Reliability Assessments: 18 CFR 39.11 requires the ERO to 
assess the reliability and adequacy of the Bulk-Power System in North 
America. Subsequently, the ERO must report to the Commission on its 
findings. Regional entities perform similar assessments within 
individual regions. Currently, the ERO submits to FERC three 
assessments each year: Long term, winter, and summer. In addition, NERC 
also submits various other assessments as needed.
     Reliability Standards Development: Under section 215 of 
the Federal Power Act (FPA), the ERO is charged with developing 
Reliability Standards. Regional Entities may also develop regional 
specific standards. Reliability Standards are one of the three 
principal mechanisms provided to FERC to ensure reliability on the 
Bulk-Power System.
     Reliability Compliance: Reliability Standards are 
mandatory and enforceable upon approval by FERC. In addition to the 
specific information collection requirements contained in each 
Reliability Standard (cleared under other information collections), 
there are general compliance, monitoring and enforcement information 
collection requirements imposed on applicable entities. Audits, spot 
checks, self-certifications, exception data submittals, violation 
reporting, and mitigation plan confirmation are included in this area.
     Stakeholder Survey: The ERO uses a stakeholder survey to 
solicit feedback from registered entities \2\ in preparation for its 
three year and five year self-performance assessment. The Commission 
assumes that the ERO will perform another survey prior to the 2019 
self- assessment.
---------------------------------------------------------------------------

    \2\ A ``registered entity'' is an entity that is registered with 
the ERO. All Bulk-Power System owners, operators and users are 
required to register with the ERO. Registration is the basis for 
determining the Reliability Standards with which an entity must 
comply. See http://www.nerc.com/page.php?cid=3%7C25 for more 
details.
---------------------------------------------------------------------------

     Other Reporting: This category refers to all other 
reporting requirements imposed on the ERO or regional entities in order 
to comply with the Commission's regulations. For example, FERC may 
require NERC to submit a special reliability assessment. This category 
is mentioned to capture these types of one-time filings required of 
NERC or the Regions.
    The Commission implements its responsibilities through 18 CFR part 
39. Without the FERC-725 information, the Commission, ERO, and Regional 
Entities will not have the data needed to determine whether sufficient 
and appropriate measures are being taken to ensure the reliability of 
the nation's electric grid.
    Type of Respondents: ERO and regional entities.
    Estimate of Annual Burden: \3\ The Commission estimates the total 
Public Reporting Burden for this information collection as:
---------------------------------------------------------------------------

    \3\ The Commission defines burden as the total time, effort, or 
financial resources expended by persons to generate, maintain, 
retain, or disclose or provide information to or for a Federal 
agency. For further explanation of what is included in the 
information collection burden, reference 5 Code of Federal 
Regulations 1320.3.
    \4\ In all instances below where the number of responses per 
respondent is ``1'' the Commission acknowledges that actual number 
of responses varies and cannot be estimated clearly.
    \5\ Uses the weighted hourly average wage (salary plus benefits) 
for electrical engineers and lawyers obtained from the Bureau of 
Labor Statistics (data for May 2014, posted on 4/1/2015 at http://www.bls.gov/oes/current/naics2_22.htm): $91.82/hour. The weighted 
average used the following calculation: [(0.20) * ($129.87) + (0.60) 
* ($66.45) + (0.2) * ($39.18)] = $73.68. $129.87/hour is the wage 
for lawyers. $66.45/hour is the wage for engineers. $39.17/hour is 
the wage for office and administrative support. Occupation codes are 
23-0000, 17-2071, and 43-0000 respectively.

                                    FERC-725: Certification of the ERO; Procedures for Electric Reliability Standards
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                                             Estimated
                                           Type of reporting                                 Number of     Total number   Average burden   total annual
          Type of respondent                  requirement         Number of  respondents   responses per         of       hours and cost    burden and
                                                                                             respondent      responses     per response        cost
                                                                 (A)....................          (B) \4\   (A) x (B) =              (D)       (C) x (D)
                                                                                                                    (C)
--------------------------------------------------------------------------------------------------------------------------------------------------------
Electric Reliability Organization      Self-Assessment.........  1......................               .2            .2            7,800           1,560
 (ERO) \1\.                                                                                                                 \5\ $574,704        $114,941
                                       Reliability Assessments.  .......................              5.5           5.5           15,600          85,800
                                                                                                                          \5\ $1,149,408      $6,321,744
                                       Reliability Compliance..  .......................                2             2           12,480          24,960
                                                                                                                            \5\ $919,526      $1,839,053
                                       Standards Development...  .......................                1             1           28,080          28,080
                                                                                                                          \6\ $1,865,916      $1,865,916
                                       Other Reporting.........  .......................                1             1            2,080           2,080
                                                                                                                            \7\ $270,130        $270,130
Regional Entities....................  Self-Assessment.........  8......................               .2           1.6           16,640          26,624
                                                                                                                          \6\ $1,105,728      $1,769,164
                                       Reliability Assessments.  .......................                1             8           15,600         124,800
                                                                                                                          \6\ $1,036,620      $8,292,960
                                       Reliability Compliance..  .......................                1             8           40,560         324,480
                                                                                                                          \5\ $2,988,461     $23,907,688
                                       Standards Development...  .......................                1             8            2,340          18,720
                                                                                                                            \6\ $155,493      $1,243,944
                                       Other Reporting.........  .......................                1             8            1,040           8,320
                                                                                                                            \7\ $135,065      $1,080,520
Registered Entities..................  Stakeholder Survey......  estimated 1,446........               .2           289                8           2,312
                                                                                                                                \5\ $589        $170,221
                                       Reliability Compliance..  .......................                1         1,446              400         578,400
                                                                                                                             \5\ $29,472     $42,616,512
                                      ------------------------------------------------------------------------------------------------------------------

[[Page 68534]]

 
    Subtotals:
      ERO                                                                                                                                      * 142,480
      Regional                                                                        N/A                                                      * 502,944
      Registered                                                                                                                               * 580,712
                                      ------------------------------------------------------------------------------------------------------------------
        Total Burden Hours...........                                                                                                        1,226,136 *
                                                                                                                                         ---------------
        Total Cost...................                                                                                                        $89,492,791
--------------------------------------------------------------------------------------------------------------------------------------------------------
* hrs.

    Comments: Comments are invited on: (1) Whether the collection of 
information is necessary for the proper performance of the functions of 
the Commission, including whether the information will have practical 
utility; (2) the accuracy of the agency's estimate of the burden and 
cost of the collection of information, including the validity of the 
methodology and assumptions used; (3) ways to enhance the quality, 
utility and clarity of the information collection; and (4) ways to 
minimize the burden of the collection of information on those who are 
to respond, including the use of automated collection techniques or 
other forms of information technology.
---------------------------------------------------------------------------

    \6\ Uses the hourly average wage (salary plus benefits) for 
electrical engineers obtained from the Bureau of Labor Statistics 
(data for May 2014, posted on 4/1/2015 at http://www.bls.gov/oes/current/naics2_22.htm): $66.45/hour. Occupation code is 17-2071.
    \7\ Uses the hourly average wage (salary plus benefits) for 
lawyers obtained from the Bureau of Labor Statistics (data for May 
2014, posted on 4/1/2015 at http://www.bls.gov/oes/current/naics2_22.htm): $129.87/hour. Occupation code is 23-0000.

    Dated: October 30, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-28211 Filed 11-4-15; 8:45 am]
BILLING CODE 6717-01-P



                                                  68532                      Federal Register / Vol. 80, No. 214 / Thursday, November 5, 2015 / Notices

                                                  County Wind, LLC, FPL Energy Illinois                      Filed Date: 10/29/15.                              public comments. The Commission
                                                  Wind, LLC, FPL Energy Marcus Hook,                         Accession Number: 20151029–5185.                   received no comments on the FERC–725
                                                  L.P., FPL Energy MH50 L.P., FPL Energy                     Comments Due: 5 p.m. ET 11/19/15.                  and is making this notation in its
                                                  Montezuma Wind, LLC, FPL Energy                            Docket Numbers: ER16–161–000.                      submittal to OMB.
                                                  Mower County, LLC, FPL Energy New                          Applicants: New-Indy Oxnard LLC.                   DATES: Comments on the collection of
                                                  Mexico Wind, LLC, FPL Energy North                         Description: Baseline eTariff Filing:              information are due December 7, 2015.
                                                  Dakota Wind, LLC, FPL Energy North                      Application for MBR to be effective                   ADDRESSES: Comments filed with OMB,
                                                  Dakota Wind II, LLC, FPL Energy                         1/1/2016.                                             identified by the OMB Control No.
                                                  Oklahoma Wind, LLC, FPL Energy                             Filed Date: 10/29/15.                              1902–0225 or collection number (FERC–
                                                  Oliver Wind I, LLC, FPL Energy Oliver                      Accession Number: 20151029–5187.                   725), should be sent via email to the
                                                  Wind II, LLC, FPL Energy Sooner Wind,                      Comments Due: 5 p.m. ET 11/19/15.                  Office of Information and Regulatory
                                                  LLC, FPL Energy South Dakota Wind,                         The filings are accessible in the                  Affairs: oira_submission@omb.gov.
                                                  LLC, FPL Energy Stateline II, Inc., FPL                 Commission’s eLibrary system by                       Attention: Federal Energy Regulatory
                                                  Energy Vansycle, L.L.C, FPL Energy                      clicking on the links or querying the                 Commission Desk Officer. The Desk
                                                  Wyman, LLC, FPL Energy Wyman IV,                        docket number.                                        Officer may also be reached via
                                                  LLC, Garden Wind, LLC, Genesis Solar,                      Any person desiring to intervene or                telephone at 202–395–0710.
                                                  LLC, Golden West Power Partners, LLC,                   protest in any of the above proceedings                  A copy of the comments should also
                                                  Gray County Wind Energy, LLC, Green                     must file in accordance with Rules 211                be sent to the Commission, in Docket
                                                  Mountain Storage, LLC, Hatch Solar                      and 214 of the Commission’s                           No. IC15–12–000, by either of the
                                                  Energy Center I, LLC, Hawkeye Power                     Regulations (18 CFR 385.211 and                       following methods:
                                                  Partners, LLC, High Majestic Wind                       385.214) on or before 5:00 p.m. Eastern                  • eFiling at Commission’s Web site:
                                                  Energy Center, LLC, High Majestic Wind                  time on the specified comment date.                   http://www.ferc.gov/docs-filing/
                                                  II, LLC, High Winds, LLC, Jamaica Bay                   Protests may be considered, but                       efiling.asp.
                                                  Peaking Facility, LLC, Lake Benton                      intervention is necessary to become a                    • Mail/Hand Delivery/Courier:
                                                  Power Partners II, LLC, Langdon Wind,                   party to the proceeding.                              Federal Energy Regulatory Commission,
                                                  LLC, Limon Wind, LLC, Limon Wind II,                       eFiling is encouraged. More detailed               Secretary of the Commission, 888 First
                                                  LLC, Limon Wind III, LLC, Logan Wind                    information relating to filing                        Street NE., Washington, DC 20426.
                                                  Energy LLC, Mammoth Plains Wind                         requirements, interventions, protests,                   Instructions: All submissions must be
                                                  Project, LLC.                                           service, and qualifying facilities filings            formatted and filed in accordance with
                                                     Description: Notice of Change in                     can be found at: http://www.ferc.gov/                 submission guidelines at: http://
                                                  Status of the NextEra Energy Companies                  docs-filing/efiling/filing-req.pdf. For               www.ferc.gov/help/submission-
                                                  [Part 1 of 2].                                          other information, call (866) 208–3676                guide.asp. For user assistance contact
                                                     Filed Date: 10/28/15.                                (toll free). For TTY, call (202) 502–8659.            FERC Online Support by email at
                                                     Accession Number: 20151028–5364.                                                                           ferconlinesupport@ferc.gov, or by phone
                                                     Comments Due: 5 p.m. ET 11/18/15.                      Dated: October 29, 2015.
                                                                                                          Nathaniel J. Davis, Sr.,
                                                                                                                                                                at: (866) 208–3676 (toll-free), or (202)
                                                     Docket Numbers: ER16–143–001.                                                                              502–8659 for TTY.
                                                     Applicants: Citizens Sunrise                         Deputy Secretary.
                                                                                                                                                                   Docket: Users interested in receiving
                                                  Transmission LLC.                                       [FR Doc. 2015–28205 Filed 11–4–15; 8:45 am]           automatic notification of activity in this
                                                     Description: Tariff Amendment:                       BILLING CODE 6717–01–P                                docket or in viewing/downloading
                                                  Amendment to TRBAA Filing to be                                                                               comments and issuances in this docket
                                                  effective 1/1/2016.                                                                                           may do so at http://www.ferc.gov/docs-
                                                     Filed Date: 10/28/15.                                DEPARTMENT OF ENERGY                                  filing/docs-filing.asp.
                                                     Accession Number: 20151028–5323.
                                                     Comments Due: 5 p.m. ET 11/18/15.                    Federal Energy Regulatory                             FOR FURTHER INFORMATION CONTACT:
                                                     Docket Numbers: ER16–158–000.                        Commission                                            Ellen Brown may be reached by email
                                                     Applicants: Southwest Power Pool,                                                                          at DataClearance@FERC.gov, by
                                                                                                          [Docket No. IC15–12–000]                              telephone at (202) 502–8663, and by fax
                                                  Inc.
                                                     Description: § 205(d) Rate Filing:                                                                         at (202) 273–0873.
                                                                                                          Commission Information Collection
                                                  Revisions to Attachment AE Regarding                    Activities (FERC–725); Comment                        SUPPLEMENTARY INFORMATION:
                                                  Pricing in the Context of Ramp                          Request; Extension                                       Title: FERC–725, Certification of
                                                  Constraints to be effective 12/27/2015.                                                                       Electric Reliability Organization;
                                                     Filed Date: 10/28/15.                                AGENCY: Federal Energy Regulatory                     Procedures for Electric Reliability
                                                     Accession Number: 20151028–5357.                     Commission.                                           Standards.
                                                     Comments Due: 5 p.m. ET 11/18/15.                    ACTION: Notice of information collection                 OMB Control No.:1902–0225.
                                                     Docket Numbers: ER16–159–000.                        and request for comments.                                Type of Request: Three-year extension
                                                     Applicants: ISO New England Inc.,                                                                          of the FERC–725 information collection
                                                  New England Power Pool Participants                     SUMMARY:   In compliance with the                     requirements with no changes to the
                                                  Committee.                                              requirements of the Paperwork                         current reporting requirements.
                                                     Description: § 205(d) Rate Filing:                   Reduction Act of 1995, 44 U.S.C.                         Abstract: The FERC–725 information
                                                  Removal of NEPOOL Review Board to                       3506(c)(2)(A), the Federal Energy                     collection contains the following
                                                  be effective 1/1/2016.                                  Regulatory Commission (Commission or                  information collection elements:
                                                                                                          FERC) is soliciting public comment on                    • Self Assessment and Electric
jstallworth on DSK7TPTVN1PROD with NOTICES




                                                     Filed Date: 10/29/15.
                                                     Accession Number: 20151029–5108.                     the currently approved information                    Reliability Organization (ERO)
                                                     Comments Due: 5 p.m. ET 11/19/15.                    collection, FERC–725 [Certification of                Application: The Commission requires
                                                     Docket Numbers: ER16–160–000.                        Electric Reliability Organization;                    the ERO to submit to FERC a
                                                     Applicants: New-Indy Ontario LLC.                    Procedures for Electric Reliability                   performance assessment report every
                                                     Description: Baseline eTariff Filing:                Standards]. The Commission previously                 five years. The next assessment is due
                                                  Application for MBR to be effective                     issued a Notice in the Federal Register               in 2019. Each Regional Entity submits a
                                                  1/1/2016.                                               (80 FR 50846, 8/21/2015) requesting                   performance assessment report to the


                                             VerDate Sep<11>2014   15:06 Nov 04, 2015   Jkt 238001   PO 00000   Frm 00041   Fmt 4703   Sfmt 4703   E:\FR\FM\05NON1.SGM   05NON1


                                                                                 Federal Register / Vol. 80, No. 214 / Thursday, November 5, 2015 / Notices                                                              68533

                                                  ERO. Submitting an application to                               • Reliability Compliance: Reliability                       in order to comply with the
                                                  become an ERO is also part of this                           Standards are mandatory and                                    Commission’s regulations. For example,
                                                  collection.1                                                 enforceable upon approval by FERC. In                          FERC may require NERC to submit a
                                                    • Reliability Assessments: 18 CFR                          addition to the specific information                           special reliability assessment. This
                                                  39.11 requires the ERO to assess the                         collection requirements contained in                           category is mentioned to capture these
                                                  reliability and adequacy of the Bulk-                        each Reliability Standard (cleared under                       types of one-time filings required of
                                                  Power System in North America.                               other information collections), there are                      NERC or the Regions.
                                                  Subsequently, the ERO must report to                         general compliance, monitoring and
                                                  the Commission on its findings.                              enforcement information collection                               The Commission implements its
                                                  Regional entities perform similar                            requirements imposed on applicable                             responsibilities through 18 CFR part 39.
                                                  assessments within individual regions.                       entities. Audits, spot checks, self-                           Without the FERC–725 information, the
                                                  Currently, the ERO submits to FERC                           certifications, exception data submittals,                     Commission, ERO, and Regional Entities
                                                  three assessments each year: Long term,                      violation reporting, and mitigation plan                       will not have the data needed to
                                                  winter, and summer. In addition, NERC                        confirmation are included in this area.                        determine whether sufficient and
                                                  also submits various other assessments                          • Stakeholder Survey: The ERO uses                          appropriate measures are being taken to
                                                  as needed.                                                   a stakeholder survey to solicit feedback                       ensure the reliability of the nation’s
                                                    • Reliability Standards Development:                       from registered entities 2 in preparation                      electric grid.
                                                  Under section 215 of the Federal Power                       for its three year and five year self-                           Type of Respondents: ERO and
                                                  Act (FPA), the ERO is charged with                           performance assessment. The
                                                  developing Reliability Standards.                                                                                           regional entities.
                                                                                                               Commission assumes that the ERO will
                                                  Regional Entities may also develop                           perform another survey prior to the                              Estimate of Annual Burden: 3 The
                                                  regional specific standards. Reliability                     2019 self- assessment.                                         Commission estimates the total Public
                                                  Standards are one of the three principal                        • Other Reporting: This category                            Reporting Burden for this information
                                                  mechanisms provided to FERC to ensure                        refers to all other reporting requirements                     collection as:
                                                  reliability on the Bulk-Power System.                        imposed on the ERO or regional entities

                                                                     FERC–725: CERTIFICATION OF THE ERO; PROCEDURES FOR ELECTRIC RELIABILITY STANDARDS
                                                                                                                                                        Number of                              Average burden      Estimated total
                                                                                                   Type of reporting          Number of                                     Total number
                                                           Type of respondent                                                                         responses per                            hours and cost      annual burden
                                                                                                     requirement             respondents                                    of responses
                                                                                                                                                        respondent                              per response          and cost

                                                                                                                                    (A)                       (B) 4          (A) × (B) =            (D)               (C) × (D)
                                                                                                                                                                                 (C)

                                                  Electric Reliability Organization              Self-Assessment .....     1 .....................                     .2              .2                 7,800            1,560
                                                    (ERO) 1.                                                                                                                                       5 $574,704           $114,941
                                                                                                 Reliability Assess-       ........................                   5.5             5.5              15,600             85,800
                                                                                                   ments.                                                                                         5 $1,149,408        $6,321,744
                                                                                                 Reliability Compli-       ........................                    2                   2           12,480             24,960
                                                                                                   ance.                                                                                           5 $919,526         $1,839,053
                                                                                                 Standards Develop-        ........................                    1                   1           28,080             28,080
                                                                                                   ment.                                                                                          6 $1,865,916        $1,865,916
                                                                                                 Other Reporting .......   ........................                    1                   1              2,080            2,080
                                                                                                                                                                                                   7 $270,130           $270,130
                                                  Regional Entities ..........................   Self-Assessment .....     8 .....................                     .2             1.6              16,640             26,624
                                                                                                                                                                                                  6 $1,105,728        $1,769,164
                                                                                                 Reliability Assess-       ........................                    1                   8           15,600            124,800
                                                                                                   ments.                                                                                         6 $1,036,620        $8,292,960
                                                                                                 Reliability Compli-       ........................                    1                   8           40,560            324,480
                                                                                                   ance.                                                                                          5 $2,988,461       $23,907,688
                                                                                                 Standards Develop-        ........................                    1                   8              2,340           18,720
                                                                                                   ment.                                                                                           6 $155,493         $1,243,944
                                                                                                 Other Reporting .......   ........................                    1                   8              1,040            8,320
                                                                                                                                                                                                   7 $135,065         $1,080,520
                                                  Registered Entities ......................     Stakeholder Survey        estimated                                   .2            289                      8            2,312
                                                                                                                              1,446.                                                                      5 $589        $170,221
                                                                                                 Reliability Compli-       ........................                    1           1,446                    400          578,400
                                                                                                   ance.                                                                                            5 $29,472        $42,616,512


                                                    1 The Commission does not expect any new ERO               an entity must comply. See http://www.nerc.com/                   5 Uses the weighted hourly average wage (salary

                                                  applications to be submitted in the next five years          page.php?cid=3%7C25 for more details.                          plus benefits) for electrical engineers and lawyers
                                                  and is not including any burden for this                       3 The Commission defines burden as the total                 obtained from the Bureau of Labor Statistics (data
                                                  requirement in the burden estimate. FERC still               time, effort, or financial resources expended by               for May 2014, posted on 4/1/2015 at http://www.bls.
                                                  seeks to renew the regulations pertaining to a new
jstallworth on DSK7TPTVN1PROD with NOTICES




                                                                                                               persons to generate, maintain, retain, or disclose or          gov/oes/current/naics2_22.htm): $91.82/hour. The
                                                  ERO application under this renewal but is
                                                                                                               provide information to or for a Federal agency. For            weighted average used the following calculation:
                                                  expecting the burden to be zero for the foreseeable
                                                  future. 18 CFR 39.3 contains the regulation                  further explanation of what is included in the                 [(0.20) * ($129.87) + (0.60) * ($66.45) + (0.2) *
                                                  pertaining to ERO applications.                              information collection burden, reference 5 Code of             ($39.18)] = $73.68. $129.87/hour is the wage for
                                                    2 A ‘‘registered entity’’ is an entity that is             Federal Regulations 1320.3.                                    lawyers. $66.45/hour is the wage for engineers.
                                                                                                                 4 In all instances below where the number of
                                                  registered with the ERO. All Bulk-Power System                                                                              $39.17/hour is the wage for office and
                                                  owners, operators and users are required to register         responses per respondent is ‘‘1’’ the Commission               administrative support. Occupation codes are 23–
                                                  with the ERO. Registration is the basis for                  acknowledges that actual number of responses                   0000, 17–2071, and 43–0000 respectively.
                                                  determining the Reliability Standards with which             varies and cannot be estimated clearly.



                                             VerDate Sep<11>2014     15:06 Nov 04, 2015      Jkt 238001   PO 00000   Frm 00042     Fmt 4703       Sfmt 4703    E:\FR\FM\05NON1.SGM    05NON1


                                                  68534                            Federal Register / Vol. 80, No. 214 / Thursday, November 5, 2015 / Notices

                                                              FERC–725: CERTIFICATION OF THE ERO; PROCEDURES FOR ELECTRIC RELIABILITY STANDARDS—Continued
                                                                                                                                                    Number of                        Average burden   Estimated total
                                                                                                    Type of reporting          Number of                             Total number
                                                              Type of respondent                                                                  responses per                      hours and cost   annual burden
                                                                                                      requirement             respondents                            of responses
                                                                                                                                                    respondent                        per response       and cost

                                                                                                                                    (A)                   (B) 4        (A) × (B) =        (D)            (C) × (D)
                                                                                                                                                                           (C)

                                                       Subtotals:
                                                         ERO                                                                                                                                               * 142,480
                                                         Regional                                                                                   N/A                                                    * 502,944
                                                         Registered                                                                                                                                        * 580,712

                                                               Total Burden Hours .......                                                                                                                1,226,136 *

                                                               Total Cost ......................                                                                                                        $89,492,791
                                                     * hrs.


                                                    Comments: Comments are invited on:                           Hydro, LLC’s proposed Newburgh                         Collection Request (ICR) to the Office of
                                                  (1) Whether the collection of                                  Hydroelectric Project No. 12962.                       Management and Budget (OMB). This
                                                  information is necessary for the proper                           The technical conference will begin at              ICR is scheduled to expire on May 31,
                                                  performance of the functions of the                            2:00 p.m. Eastern Standard Time. The                   2016. Before submitting the ICR to OMB
                                                  Commission, including whether the                              conference will be held at the Federal                 for review and approval, the EPA is
                                                  information will have practical utility;                       Energy Regulatory Commission                           soliciting comments on specific aspects
                                                  (2) the accuracy of the agency’s estimate                      headquarters building located at 888 1st               of the proposed information collection
                                                  of the burden and cost of the collection                       Street NE., Washington, DC, and will                   as described below.
                                                  of information, including the validity of                      include teleconference capabilities.                   DATES: Comments must be received on
                                                  the methodology and assumptions used;                             All local, state, and federal agencies,
                                                                                                                                                                        or before January 4, 2016.
                                                  (3) ways to enhance the quality, utility                       Indian tribes, and other interested
                                                                                                                 parties are invited to participate. There                 Public Hearing. The EPA does not
                                                  and clarity of the information collection;                                                                            plan to conduct a public hearing unless
                                                  and (4) ways to minimize the burden of                         will be no transcript of the conference,
                                                                                                                 but a summary of the meeting will be                   requested. To request a hearing, please
                                                  the collection of information on those                                                                                contact the person listed in the
                                                  who are to respond, including the use                          prepared for the project record. If you
                                                                                                                 are interested in participating in the                 following FOR FURTHER INFORMATION
                                                  of automated collection techniques or                                                                                 CONTACT section by November 12, 2015.
                                                  other forms of information technology.                         meeting you must contact Emily Carter
                                                                                                                 at (202) 502–6512 or emily.carter@                     If requested, the hearing will be
                                                    Dated: October 30, 2015.
                                                                                                                 ferc.gov by November 12, 2015 to                       conducted on November 20, 2015, in the
                                                  Nathaniel J. Davis, Sr.,                                       receive specific instructions on how to                Washington, DC area. The EPA will
                                                  Deputy Secretary.                                              participate.                                           provide further information about the
                                                  [FR Doc. 2015–28211 Filed 11–4–15; 8:45 am]                                                                           hearing on the Greenhouse Gas
                                                                                                                   Dated: October 30, 2015.                             Reporting Program Web site, http://
                                                  BILLING CODE 6717–01–P
                                                                                                                 Nathaniel J. Davis, Sr.,                               www.epa.gov/ghgreporting/index.html if
                                                                                                                 Deputy Secretary.                                      a hearing is requested.
                                                  DEPARTMENT OF ENERGY                                           [FR Doc. 2015–28212 Filed 11–4–15; 8:45 am]            ADDRESSES: Submit your comments,
                                                                                                                 BILLING CODE 6717–01–P                                 identified by Docket ID No. EPA–HQ–
                                                  Federal Energy Regulatory                                                                                             OAR–2012–0333 by any of the following
                                                  Commission                                                                                                            methods:
                                                                                                                 ENVIRONMENTAL PROTECTION                                  • Federal eRulemaking Portal: http://
                                                  [Project No. 12962–002]                                        AGENCY                                                 www.regulations.gov. Follow the online
                                                                                                                 [EPA–HQ–OAR–2012–0333; FRL–9936–53–                    instructions for submitting comments.
                                                  Newburgh Hydro, LLC; Notice of
                                                                                                                 OAR]                                                      • Email: A-and-R-Docket@epa.gov.
                                                  Technical Conference
                                                                                                                                                                        Include Docket ID No. EPA–HQ–OAR–
                                                    On Tuesday, November 17, 2015,                               Agency Information Collection                          2014–0831 or RIN No. 2060–AS37 in the
                                                  Commission staff will hold a technical                         Activities; Proposed Collection;                       subject line of the message.
                                                  conference to discuss the concerns of                          Comment Request; Information                              • Fax: (202) 566–9744.
                                                  Alcoa Inc. and Alcoa Power Generating                          Collection Request for the Greenhouse                     • Mail: Environmental Protection
                                                  Inc. related to navigation at Newburgh                         Gas Reporting Program                                  Agency, EPA Docket Center (EPA/DC),
                                                                                                                 AGENCY:  Environmental Protection                      Mailcode 28221T, Attention Docket ID
                                                    6 Uses the hourly average wage (salary plus                  Agency (EPA).                                          No. EPA–HQ–OAR–2012–0333, 1200
                                                  benefits) for electrical engineers obtained from the
                                                                                                                 ACTION: Notice of information collection               Pennsylvania Avenue NW., Washington,
                                                  Bureau of Labor Statistics (data for May 2014,                                                                        DC 20460. In addition, please mail a
jstallworth on DSK7TPTVN1PROD with NOTICES




                                                  posted on 4/1/2015 at http://www.bls.gov/oes/                  request renewal.
                                                  current/naics2_22.htm): $66.45/hour. Occupation                                                                       copy of your comments on the
                                                  code is 17–2071.                                               SUMMARY:  In compliance with the                       information collection provisions to the
                                                    7 Uses the hourly average wage (salary plus                  Paperwork Reduction Act, this                          Office of Information and Regulatory
                                                  benefits) for lawyers obtained from the Bureau of              document announces that                                Affairs, Office of Management and
                                                  Labor Statistics (data for May 2014, posted on 4/1/
                                                  2015 at http://www.bls.gov/oes/current/naics2_
                                                                                                                 Environmental Protection Agency is                     Budget (OMB), Attn: Desk Officer for
                                                  22.htm): $129.87/hour. Occupation code is 23–                  planning to submit a request to renew                  EPA, 725 17th Street NW., Washington,
                                                  0000.                                                          an existing approved Information                       DC 20503.


                                             VerDate Sep<11>2014       15:06 Nov 04, 2015      Jkt 238001   PO 00000   Frm 00043   Fmt 4703   Sfmt 4703    E:\FR\FM\05NON1.SGM   05NON1



Document Created: 2015-12-14 15:03:00
Document Modified: 2015-12-14 15:03:00
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice of information collection and request for comments.
DatesComments on the collection of information are due December 7, 2015.
ContactEllen Brown may be reached by email at [email protected], by telephone at (202) 502-8663, and by fax at (202) 273-0873.
FR Citation80 FR 68532 

2024 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR