80_FR_69095 80 FR 68880 - Northwest Medical Isotopes, LLC

80 FR 68880 - Northwest Medical Isotopes, LLC

NUCLEAR REGULATORY COMMISSION

Federal Register Volume 80, Issue 215 (November 6, 2015)

Page Range68880-68881
FR Document2015-28357

The U.S. Nuclear Regulatory Commission (NRC) has received and is making available the second and final part of a two-part application for a construction permit, submitted by Northwest Medical Isotopes, LLC (NWMI or the applicant). The applicant proposes to build a medical radioisotope facility located in Columbia, Missouri.

Federal Register, Volume 80 Issue 215 (Friday, November 6, 2015)
[Federal Register Volume 80, Number 215 (Friday, November 6, 2015)]
[Notices]
[Pages 68880-68881]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-28357]


=======================================================================
-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[Docket No. 50-609; NRC-2013-0235]


Northwest Medical Isotopes, LLC

AGENCY: Nuclear Regulatory Commission.

ACTION: Construction permit application; receipt.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) has received and 
is making available the second and final part of a two-part application 
for a

[[Page 68881]]

construction permit, submitted by Northwest Medical Isotopes, LLC (NWMI 
or the applicant). The applicant proposes to build a medical 
radioisotope facility located in Columbia, Missouri.

DATES: On July 20, 2015, the applicant filed the second and final part 
of a two-part application for a construction permit.

ADDRESSES: Please refer to Docket ID NRC-2013-0235 when contacting the 
NRC about the availability of information regarding this document. You 
may obtain publicly-available information related to this document 
using any of the following methods:
     Federal Rulemaking Web site: Go to http://www.regulations.gov and search for Docket ID NRC-2013-0235. Address 
questions about NRC dockets to Carol Gallagher; telephone: 301-415-
3463; email: [email protected]. For technical questions, contact 
the individual listed in the FOR FURTHER INFORMATION CONTACT section of 
this document.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly-available documents online in the 
ADAMS Public Documents collection at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and 
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS, 
please contact the NRC's Public Document Room (PDR) reference staff at 
1-800-397-4209, 301-415-4737, or by email to [email protected]. The 
ADAMS accession number for each document referenced (if it is available 
in ADAMS) is provided the first time that a document is referenced.
     NRC's PDR: You may examine and purchase copies of public 
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 
Rockville Pike, Rockville, Maryland 20852.

FOR FURTHER INFORMATION CONTACT: Michael F. Balazik, Office of Nuclear 
Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC 
20555-0001; telephone: 301-415-2856; email: [email protected].

SUPPLEMENTARY INFORMATION: On July 20, 2015, NWMI filed with the NRC, 
pursuant to Section 103 of the Atomic Energy Act of 1954, as amended, 
and part 50 of title 10 of the Code of Federal Regulations (10 CFR), 
the second and final part of a two-part application for a construction 
permit for a medical radioisotope production facility in Columbia, 
Missouri (ADAMS Accession No. ML15086A262). The applicant is requesting 
a combined license in accordance with 10 CFR 50.31 and 10 CFR 50.32.
    An exemption from certain requirements of 10 CFR 2.101(a)(5) 
granted by the Commission on October 7, 2013 (ADAMS Accession No. 
ML13238A333 and 78 FR 63501), in response to a letter from NWMI dated 
August 9, 2013 (ADAMS Accession No. ML13227A295), allowed for NWMI to 
submit its construction permit application in two parts. Specifically, 
the exemption allowed NWMI to submit a portion of its construction 
permit application for a construction permit up to six months prior to 
submitting the remainder of the application regardless of whether or 
not an environmental impact statement or a supplement to an 
environmental impact statement is prepared during the review of its 
application. By letter dated November 7, 2014, NWMI submitted part one 
of its construction permit application to the NRC. By letter dated 
February 5, 2015 (ADAMS Accession No. ML15086A262, Package No. 
ML15086A261), NWMI withdrew and resubmitted part one of its 
construction permit application and included a discussion of connected 
actions in its environmental report in response to a January 23, 2015, 
letter from the NRC (ADAMS Accession No. ML14349A501). A notice of 
receipt and availability of part one of the construction permit 
application was previously published in the Federal Register on April 
21, 2015 (80 FR 22227). The first part of NWMI's construction permit 
application contained the following information:
     The description and safety assessment of the site required 
by 10 CFR 50.34(a)(1),
     the environmental report required by 10 CFR 50.30(f),
     the filing fee information required by 10 CFR 50.30(e) and 
10 CFR 170.21,
     the general information required by 10 CFR 50.33, and
     the agreement limiting access to classified information 
required by 10 CFR 50.37.
    The NRC staff published in the Federal Register on June 8, 2015 (80 
FR 32418), its determination that part one of NWMI's construction 
permit application is acceptable for docketing.
    The NWMI states that part two of its application for a construction 
permit contains the remainder of the preliminary safety analysis report 
required by 10 CFR 50.34(a).
    Subsequent Federal Register notices will address the acceptability 
of this part of the tendered construction permit application for 
docketing and provisions for public participation in the construction 
permit application review process.

    Dated at Rockville, Maryland, this day 28 of October, 2015.

    For the Nuclear Regulatory Commission.
Alexander Adams, Jr.,
Chief, Research and Test Reactors Licensing Branch, Division of Policy 
and Rulemaking, Office of Nuclear Reactor Regulation.
[FR Doc. 2015-28357 Filed 11-5-15; 8:45 am]
BILLING CODE 7590-01-P



                                                  68880                        Federal Register / Vol. 80, No. 215 / Friday, November 6, 2015 / Notices

                                                  for the proper performance of the                       Division of Polar Programs, National                  DATES:  The meeting will be held on
                                                  functions of the agency, including                      Science Foundation, 4201 Wilson                       December 8th, 2015 from 2:00 p.m. to
                                                  whether the information will have                       Boulevard, Arlington, Virginia 22230.                 4:00 p.m. EST.
                                                  practical utility;                                      FOR FURTHER INFORMATION CONTACT:                      ADDRESSES: The meeting will take place
                                                    • Evaluate the accuracy of the                        Nature McGinn, ACA Permit Officer, at                 via teleconference.
                                                  agency’s estimate of the burden of the                  the above address or ACApermits@                      SUPPLEMENTARY INFORMATION: Pursuant
                                                  proposed collection of information,                     nsf.gov or (703) 292–7149.                            to section 10(a)(2) of the Federal
                                                  including the validity of the                           SUPPLEMENTARY INFORMATION: The                        Advisory Committee Act (5 U.S.C.,
                                                  methodology and assumptions used;                       National Science Foundation, as                       Appendix 2), the U.S. Small Business
                                                    • Enhance the quality, utility, and
                                                                                                          directed by the Antarctic Conservation                Administration (SBA) announces the
                                                  clarity of the information to be
                                                                                                          Act of 1978 (Pub. L. 95–541), as                      meeting of the National Women’s
                                                  collected; and
                                                    • Minimize the burden of the                          amended by the Antarctic Science,                     Business Council. The National
                                                  collection of information on those who                  Tourism and Conservation Act of 1996,                 Women’s Business Council is tasked
                                                  are to respond, including through the                   has developed regulations for the                     with providing policy recommendations
                                                  use of appropriate automated,                           establishment of a permit system for                  on issues of importance and impact to
                                                  electronic, mechanical, or other                        various activities in Antarctica and                  women entrepreneurs to the SBA,
                                                  technological collection techniques or                  designation of certain animals and                    Congress, and the White House.
                                                  other forms of information technology,                  certain geographic areas a requiring                     The program will include remarks
                                                  e.g., permitting electronic submission of               special protection. The regulations                   from the Council Chair, Carla Harris; an
                                                  responses.                                              establish such a permit system to                     update from each of the NWBC
                                                    Agency: DOL–ETA.                                      designate Antarctic Specially Protected               committees; and a discussion of the
                                                    Title of Collection: Distribution of                  Areas.                                                Council’s FY2016 agenda. The Council
                                                  Characteristics of the Insured                            Description of Permit Modification                  will also preview its FY2015 Annual
                                                  Unemployed.                                             Requested: The Foundation issued a                    Report, and introduce the official
                                                    OMB Control Number: 1205–0009.                        permit (ACA 2015–015) to Joseph A.                    recommendations—recommendations to
                                                    Affected Public: State, Local, and                    Covi on December 30, 2014. The issued                 improve the business climate for women
                                                  Tribal Governments.                                     permit allows the applicant to collect                based on Council’s research and
                                                    Total Estimated Number of                             sediment samples in ASPA 132 Potter                   engagement from this past year—which
                                                  Respondents: 53.                                        Peninsula, ASPA 150 Ardley Island, and                will be submitted, as part of the Annual
                                                    Total Estimated Number of                             ASPA 171 Narebski Point, Barton                       Report, to the SBA, Congress, and the
                                                  Responses: 636.                                         Peninsula, all on King George Island, in              White House later that month.
                                                    Total Estimated Annual Time Burden:                   order to study the viability and                      FOR FURTHER INFORMATION CONTACT: The
                                                  212 hours.                                              biodiversity of dormant zooplankton,                  meeting is open to the public, however
                                                    Total Estimated Annual Other Costs                    and the presence and origin of                        advance notice of attendance is
                                                  Burden: $0.                                             anthropogenic chemicals in lakes and                  requested. To RSVP and confirm
                                                    Dated: November 2, 2015.                              ephemeral ponds.                                      attendance, the general public should
                                                  Michel Smyth,                                             Now the applicant proposes a                        email info@nwbc.gov with subject line—
                                                  Departmental Clearance Officer.                         modification to his permit to add ASPA                ‘‘RSVP for 12/8 Public Meeting.’’
                                                  [FR Doc. 2015–28312 Filed 11–5–15; 8:45 am]
                                                                                                          125 Fildes Peninsula to the permit, as                Anyone wishing to make a presentation
                                                                                                          well as to change the sampling regime                 to the NWBC at this meeting must either
                                                  BILLING CODE 4510–FW–P
                                                                                                          and number of samples taken. 1 to 2                   email their interest to info@nwbc.gov or
                                                                                                          lakes would be sampled in each ASPA,                  call the main office number at 202–205–
                                                                                                          with 6 sediment grabs from each lake.                 3850.
                                                  NATIONAL SCIENCE FOUNDATION                             Up to 2 ephemeral ponds per ASPA                         For more information, please visit the
                                                  Notice of Permit Modification Received                  would be sampled, with 3 samples per                  National Women’s Business Council
                                                  Under the Antarctic Conservation Act                    pond, provided sampling is possible                   Web site at www.nwbc.gov.
                                                  of 1978                                                 without disturbing the surrounding
                                                                                                          sediment.                                             Miguel J. L’Heureux,
                                                  AGENCY:  National Science Foundation.                     Location: ASPA 125: Fildes                          SBA Committee Management Officer.
                                                  ACTION: Notice of permit modification                   Peninsula, King George Island, South                  [FR Doc. 2015–28348 Filed 11–5–15; 8:45 am]
                                                  request.                                                Shetland Islands.                                     BILLING CODE P
                                                                                                            Dates: January 6–March 1, 2016.
                                                  SUMMARY:   The National Science
                                                  Foundation (NSF) is required to publish                 Nadene G. Kennedy,
                                                                                                                                                                NUCLEAR REGULATORY
                                                  a notice of requests to modify permits                  Polar Coordination Specialist, Division of
                                                                                                          Polar Programs.                                       COMMISSION
                                                  issued to conduct activities regulated
                                                  under the Antarctic Conservation Act of                 [FR Doc. 2015–28337 Filed 11–5–15; 8:45 am]           [Docket No. 50–609; NRC–2013–0235]
                                                  1978. This is the required notice of a                  BILLING CODE 7555–01–P
                                                  requested permit modification.                                                                                Northwest Medical Isotopes, LLC
                                                  DATES: Interested parties are invited to                                                                      AGENCY:  Nuclear Regulatory
                                                  submit written data, comments, or                       NATIONAL WOMEN’S BUSINESS
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                                                                                                                                Commission.
                                                  views with respect to this permit                       COUNCIL                                               ACTION: Construction permit
                                                  application by December 7, 2015. Permit                                                                       application; receipt.
                                                  applications may be inspected by                        Quarterly Public Meeting
                                                  interested parties at the Permit Office,                AGENCY:  National Women’s Business                    SUMMARY:   The U.S. Nuclear Regulatory
                                                  address below.                                          Council.                                              Commission (NRC) has received and is
                                                  ADDRESSES: Comments should be                                                                                 making available the second and final
                                                                                                          ACTION: Notice of open public meeting.
                                                  addressed to Permit Office, Room 755,                                                                         part of a two-part application for a


                                             VerDate Sep<11>2014   17:21 Nov 05, 2015   Jkt 238001   PO 00000   Frm 00047   Fmt 4703   Sfmt 4703   E:\FR\FM\06NON1.SGM   06NON1


                                                                               Federal Register / Vol. 80, No. 215 / Friday, November 6, 2015 / Notices                                                 68881

                                                  construction permit, submitted by                       accordance with 10 CFR 50.31 and 10                   construction permit application review
                                                  Northwest Medical Isotopes, LLC                         CFR 50.32.                                            process.
                                                  (NWMI or the applicant). The applicant                     An exemption from certain                            Dated at Rockville, Maryland, this day 28
                                                  proposes to build a medical                             requirements of 10 CFR 2.101(a)(5)                    of October, 2015.
                                                  radioisotope facility located in                        granted by the Commission on October                    For the Nuclear Regulatory Commission.
                                                  Columbia, Missouri.                                     7, 2013 (ADAMS Accession No.                          Alexander Adams, Jr.,
                                                  DATES: On July 20, 2015, the applicant                  ML13238A333 and 78 FR 63501), in
                                                                                                                                                                Chief, Research and Test Reactors Licensing
                                                  filed the second and final part of a two-               response to a letter from NWMI dated                  Branch, Division of Policy and Rulemaking,
                                                  part application for a construction                     August 9, 2013 (ADAMS Accession No.                   Office of Nuclear Reactor Regulation.
                                                  permit.                                                 ML13227A295), allowed for NWMI to                     [FR Doc. 2015–28357 Filed 11–5–15; 8:45 am]
                                                  ADDRESSES: Please refer to Docket ID                    submit its construction permit
                                                                                                                                                                BILLING CODE 7590–01–P
                                                  NRC–2013–0235 when contacting the                       application in two parts. Specifically,
                                                  NRC about the availability of                           the exemption allowed NWMI to submit
                                                  information regarding this document.                    a portion of its construction permit                  NUCLEAR REGULATORY
                                                  You may obtain publicly-available                       application for a construction permit up              COMMISSION
                                                  information related to this document                    to six months prior to submitting the
                                                  using any of the following methods:                     remainder of the application regardless               [Docket Nos. 50–341; NRC–2014–0109]
                                                     • Federal Rulemaking Web site: Go to                 of whether or not an environmental
                                                  http://www.regulations.gov and search                   impact statement or a supplement to an                DTE Electric Company; Fermi 2
                                                  for Docket ID NRC–2013–0235. Address                    environmental impact statement is                     Nuclear Power Plant
                                                  questions about NRC dockets to Carol                    prepared during the review of its
                                                  Gallagher; telephone: 301–415–3463;                     application. By letter dated November 7,              AGENCY: Nuclear Regulatory
                                                  email: Carol.Gallagher@nrc.gov. For                     2014, NWMI submitted part one of its                  Commission.
                                                  technical questions, contact the                        construction permit application to the                ACTION: Draft supplemental
                                                  individual listed in the FOR FURTHER                    NRC. By letter dated February 5, 2015                 environmental impact statement;
                                                  INFORMATION CONTACT section of this                     (ADAMS Accession No. ML15086A262,                     issuance, public meeting, and request
                                                  document.                                               Package No. ML15086A261), NWMI                        for comment.
                                                     • NRC's Agencywide Documents                         withdrew and resubmitted part one of
                                                  Access and Management System                            its construction permit application and               SUMMARY:   The U.S. Nuclear Regulatory
                                                  (ADAMS): You may obtain publicly-                       included a discussion of connected                    Commission (NRC) is issuing for public
                                                  available documents online in the                       actions in its environmental report in                comment a draft plant-specific
                                                  ADAMS Public Documents collection at                    response to a January 23, 2015, letter                supplement, Supplement 56, to
                                                  http://www.nrc.gov/reading-rm/                          from the NRC (ADAMS Accession No.                     NUREG–1437, ‘‘Generic Environmental
                                                  adams.html. To begin the search, select                 ML14349A501). A notice of receipt and                 Impact Statement for License Renewal
                                                  ‘‘ADAMS Public Documents’’ and then                     availability of part one of the                       of Nuclear Plants’’ (GEIS), regarding the
                                                  select ‘‘Begin Web-based ADAMS                          construction permit application was                   renewal of DTE Electric Company (DTE)
                                                  Search.’’ For problems with ADAMS,                      previously published in the Federal                   operating license NPF–43 for Fermi 2
                                                  please contact the NRC’s Public                         Register on April 21, 2015 (80 FR                     for an additional 20 years of operation.
                                                  Document Room (PDR) reference staff at                  22227). The first part of NWMI’s                      Possible alternatives to the proposed
                                                  1–800–397–4209, 301–415–4737, or by                     construction permit application                       action (license renewal) include no
                                                  email to pdr.resource@nrc.gov. The                      contained the following information:                  action and reasonable alternative energy
                                                  ADAMS accession number for each                            • The description and safety                       sources. The NRC staff plans to hold one
                                                  document referenced (if it is available in              assessment of the site required by 10                 public meeting during the public
                                                  ADAMS) is provided the first time that                  CFR 50.34(a)(1),                                      comment period to present an overview
                                                  a document is referenced.                                  • the environmental report required                of the draft plant-specific supplements
                                                     • NRC's PDR: You may examine and                     by 10 CFR 50.30(f),                                   to the GEIS and to accept public
                                                  purchase copies of public documents at                     • the filing fee information required              comments on the document.
                                                  the NRC’s PDR, Room O1–F21, One                         by 10 CFR 50.30(e) and 10 CFR 170.21,                 DATES: Submit comments by December
                                                  White Flint North, 11555 Rockville                         • the general information required by              28, 2015. Comments received after this
                                                  Pike, Rockville, Maryland 20852.                        10 CFR 50.33, and                                     date will be considered, if it is practical
                                                  FOR FURTHER INFORMATION CONTACT:                           • the agreement limiting access to                 to do so, but the NRC staff is able to
                                                  Michael F. Balazik, Office of Nuclear                   classified information required by 10                 ensure consideration only for comments
                                                  Reactor Regulation, U.S. Nuclear                        CFR 50.37.                                            received on or before this date.
                                                  Regulatory Commission, Washington,                         The NRC staff published in the                     ADDRESSES: You may submit comments
                                                  DC 20555–0001; telephone: 301–415–                      Federal Register on June 8, 2015 (80 FR               by any of the following methods (unless
                                                  2856; email: Michael.Balazik@nrc.gov.                   32418), its determination that part one               this document describes a different
                                                  SUPPLEMENTARY INFORMATION: On July                      of NWMI’s construction permit                         method for submitting comments on a
                                                  20, 2015, NWMI filed with the NRC,                      application is acceptable for docketing.              specific subject):
                                                  pursuant to Section 103 of the Atomic                      The NWMI states that part two of its                 • Federal Rulemaking Web site: Go to
                                                  Energy Act of 1954, as amended, and                     application for a construction permit                 http://www.regulations.gov and search
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                  part 50 of title 10 of the Code of Federal              contains the remainder of the                         for Docket ID NRC–2014–0109. Address
                                                  Regulations (10 CFR), the second and                    preliminary safety analysis report                    questions about NRC dockets to Carol
                                                  final part of a two-part application for                required by 10 CFR 50.34(a).                          Gallagher; telephone: 301–415–3463;
                                                  a construction permit for a medical                        Subsequent Federal Register notices                email: Carol.Gallagher@nrc.gov. For
                                                  radioisotope production facility in                     will address the acceptability of this                technical questions, contact the
                                                  Columbia, Missouri (ADAMS Accession                     part of the tendered construction permit              individual listed in the FOR FURTHER
                                                  No. ML15086A262). The applicant is                      application for docketing and provisions              INFORMATION CONTACT section of this
                                                  requesting a combined license in                        for public participation in the                       document.


                                             VerDate Sep<11>2014   17:21 Nov 05, 2015   Jkt 238001   PO 00000   Frm 00048   Fmt 4703   Sfmt 4703   E:\FR\FM\06NON1.SGM   06NON1



Document Created: 2015-12-14 15:08:57
Document Modified: 2015-12-14 15:08:57
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionConstruction permit application; receipt.
DatesOn July 20, 2015, the applicant filed the second and final part of a two-part application for a construction permit.
ContactMichael F. Balazik, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; telephone: 301-415-2856; email: [email protected]
FR Citation80 FR 68880 