80_FR_70472 80 FR 70253 - Opportunity To Comment on Changes to the Nevada and California Greater Sage-Grouse Bi-State Distinct Population Segment Carson City Field Office Consolidated Resource Management Plan and the Tonopah Field Office Resource Management Plan Amendment, Nevada

80 FR 70253 - Opportunity To Comment on Changes to the Nevada and California Greater Sage-Grouse Bi-State Distinct Population Segment Carson City Field Office Consolidated Resource Management Plan and the Tonopah Field Office Resource Management Plan Amendment, Nevada

DEPARTMENT OF THE INTERIOR
Bureau of Land Management

Federal Register Volume 80, Issue 219 (November 13, 2015)

Page Range70253-70254
FR Document2015-28876

The Bureau of Land Management (BLM) is soliciting comments on significant changes to the Proposed Plan as set forth in the Greater Sage-Grouse Bi-State Distinct Population Segment (BSSG) Forest Plan Amendment and Final Environmental Impact Statement (EIS), announced on February 13, 2015. Following consideration of any comments on these changes, the BLM intends to issue a Record of Decision (ROD) amending the Carson City Field Office Consolidated Resource Management Plan and the Tonopah Field Office Resource Management Plan.

Federal Register, Volume 80 Issue 219 (Friday, November 13, 2015)
[Federal Register Volume 80, Number 219 (Friday, November 13, 2015)]
[Notices]
[Pages 70253-70254]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-28876]


-----------------------------------------------------------------------

DEPARTMENT OF THE INTERIOR

Bureau of Land Management

[LLNVC00000.L16100000.DR0000; 14-08807; MO# 4500080864]


Opportunity To Comment on Changes to the Nevada and California 
Greater Sage-Grouse Bi-State Distinct Population Segment Carson City 
Field Office Consolidated Resource Management Plan and the Tonopah 
Field Office Resource Management Plan Amendment, Nevada

AGENCY: Bureau of Land Management, Interior.

ACTION: Notice.

-----------------------------------------------------------------------

SUMMARY: The Bureau of Land Management (BLM) is soliciting comments on 
significant changes to the Proposed Plan as set forth in the Greater 
Sage-Grouse Bi-State Distinct Population Segment (BSSG) Forest Plan 
Amendment and Final Environmental Impact Statement (EIS), announced on 
February 13, 2015. Following consideration of any comments on these 
changes, the BLM intends to issue a Record of Decision (ROD) amending 
the Carson City Field Office Consolidated Resource Management Plan and 
the Tonopah Field Office Resource Management Plan.

DATES: Written comments on the changes to the Proposed Plan will be 
accepted until December 14, 2015.

ADDRESSES: You may submit comments related to the significant changes 
to the Proposed Plan by any of the following methods:
     Email: [email protected].
     Fax: 775-885-6147.
     Mail: BLM Carson City District, Attn: Colleen Sievers, 
Project Manager, 5665 Morgan Mill Rd., Carson City, NV 89701.

FOR FURTHER INFORMATION CONTACT: Colleen Sievers, Project Manager, 
telephone: 775-885-6168; address: 5665 Morgan Mill Rd., Carson City, NV 
89701; email: [email protected]. Persons who use a 
telecommunications device for the deaf (TDD) may call the Federal 
Information Relay Service (FIRS) at 1-800-877-8339 to contact the above 
individual during normal business hours. The FIRS is available 24 hours 
a day, 7 days a week, to leave a message or question with the above 
individual. You will receive a reply during normal business hours.

SUPPLEMENTARY INFORMATION: The United States Forest Service (USFS) was 
the lead agency for preparing the BSSG Forest Plan Amendment (Plan 
Amendment) and Final EIS. As part of that effort and based on the 
analysis in the Final EIS, the BLM, a cooperating agency, proposes to 
amend the Carson City Field Office Consolidated Resource Management 
Plan and the Tonopah Field Office Resource Management Plan. Following 
the release of the Proposed Plan and the conclusion of the protest 
process, the BLM identified changes and a clarification for the 
Proposed Plan as explained below and determined, pursuant to the 
applicable authorities (43 CFR 1610.2(f)(5) and 43 CFR 1610.5-1(b)), 
that public comment on those measures is necessary. The environmental 
consequences of the proposed changes and clarification have been 
analyzed as part of the Plan Amendment and Final EIS. After considering 
any comments on these changes, the BLM expects to issue a ROD amending 
the Carson City Field Office Consolidated Resource Management Plan and 
the Tonopah Field Office Resource Management Plan.
    The Environmental Protection Agency (EPA) published the Notice of 
Availability (NOA) for the BSSG Forest Plan Amendment/Draft EIS in the 
Federal Register on August 23, 2013 (78 FR 52524), which initiated a 
90-day comment period. An NOA for the BSSG Forest Plan Amendment/
Revised Draft EIS was published by the EPA on July 11, 2014 (79 FR 
40100), which initiated a second 90-day comment period. The EPA 
published the NOA for the BSSG Forest Plan Amendment and Final EIS in 
the Federal Register on February 13, 2015 (80 FR 8081), which initiated 
a 30-day BLM protest period and 60-day Governors consistency review 
period. The Plan Amendment and Final EIS identified the BLM Plan as the 
Proposed Plan. The BLM received three protest letters. In response to 
those protests and based on additional policy discussions, the BLM has 
determined that it will clarify and make changes to the Proposed Plan.
    The clarification and changes include: (1) Identifying disturbance 
levels within BSSG habitat; (2) Adjusting buffers for tall structures 
near active or pending leks; (3) Adding a restriction for new high-
power transmission lines; and (4) Changing on-the-ground management for 
habitat connectivity. This notice identifies those clarifications and 
changes and initiates a 30-day public comment period (43 CFR 
1610.2(f)(5) and 43 CFR 1610.5-1(b)).

Habitat Disturbance--Proposed Change

    The BLM is changing the Proposed Plan, as it was set forth in the 
Plan Amendment and Final EIS, to set a total anthropogenic disturbance 
of no more than 3 percent of the total BSSG habitat on Federal lands 
within the Bodie Mountain/Grant, Desert Creek/Fales, and White 
Mountains population management unit boundaries (C-Wild-S-04), and a 
total anthropogenic disturbance of no more than 1.5 percent of the 
total BSSG habitat on Federal lands within the Pine Nut Mountains 
population management unit (PMU)

[[Page 70254]]

boundaries (C-Wild-S-05), due to higher presence of risk factors in the 
PMU as analyzed under Final EIS Alternative C. This change is being 
made in response to issues raised during the protest period and based 
on additional policy discussions.
    Concerns were raised by the public that the BLM action was not 
adequate to protect BSSG and its habitat. Disturbance levels identified 
in the Final EIS will require site-specific project mitigation to 
insure no unmitigated net loss of habitat. This requires assessing 
habitat availability at the landscape scale.

Tall Structure Buffer--Proposed Change

    As part of the protest process, the BLM found that it needed to 
correct an error in the Proposed Plan Amendment and Final EIS. The BLM 
found that it should have identified the buffer distance for tall 
structures as 4 miles from active or pending leks. This is consistent 
with management prescriptions proposed by the USFS. Specifically, the 
BLM proposes to adopt the action from Alternative C which states that 
tall structures, which could serve as predator perches, will not be 
authorized within 4 miles of an active or pending lek (C-LUSU-S-04). 
The 4-mile lek buffer accords with other prescriptions of surface 
disturbance in sage-grouse habitat and is consistent with best science 
available.

High-Voltage (>=120kV) Transmission Line--Proposed Change

    The BLM is designating exclusion areas for new high-power (>=120kV) 
transmission lines in BSSG habitat. Specifically, new high-power 
(>=120kV) transmission line corridors, rights-of-way, facilities, or 
construction areas in habitat (outside of existing corridors) will not 
be authorized (C-Min-S-09). This change is being made in response to 
issues raised during the protest period and based on additional policy 
discussions and was analyzed under Alternative C in the EIS.

Connectivity Habitat--Proposed Change

    The BLM is clarifying language from Alternative C to provide for 
management of connectivity habitat. The BSSG landscape is fragmented by 
areas of agriculture and urbanization, as well as areas of naturally 
occurring and encroaching pinyon-juniper vegetation. Sage-grouse 
habitats within and between PMU are often separated by stretches of 
unsuitable areas that may inhibit sage-grouse movements across the 
landscape. Alternative C provides a limited amount of management 
direction to maintain or enhance suitability of connective area. 
Alternative C includes a goal about habitat and movement and an 
objective of improving degraded habitat, including areas with conifer 
encroachment (i.e., pinyon-juniper). Actions and Best Management 
Practices relating to connectivity apply primarily to mineral uses. 
Alternative C states that where valid existing rights exist, in 
connective habitat areas, vegetation characteristics suitable to sage-
grouse should be maintained to the extent technically feasible (C-Min-
S-01). In addition, Alternative C provides additional direction not 
specific to connectivity which states, ``Vegetation treatments and 
post-disturbance restoration should seed and/or transplant sagebrush to 
restore large patches of sagebrush cover and connect existing patches'' 
(C-Wild-S-02). Given the fragmented nature of the bi-state landscape 
and the level of apparent isolation of subpopulations, additional 
management direction for connective habitat area is necessary to 
facilitate sage-grouse movement, reduce isolation, and increase genetic 
interchange between subpopulations. This change is being made in 
response to policy discussions.
    Please note that public comments and information submitted 
including names, street addresses, and email addresses of persons who 
submit comments will be available for public review and disclosure at 
the above address during regular business hours (7:30 a.m. to 4:30 
p.m.), Monday through Friday, except holidays.
    Before including your address, phone number, email address, or 
other personal identifying information in your comment, you should be 
aware that your entire comment--including your personal identifying 
information--may be made publicly available at any time. While you can 
ask us in your comment to withhold your personal identifying 
information from public review, we cannot guarantee that we will be 
able to do so.

    Authority: 40 CFR 1506.6, 40 CFR 1506.10, 43 CFR 1610.2

John F. Ruhs,
Acting State Director, Nevada.
[FR Doc. 2015-28876 Filed 11-12-15; 8:45 am]
BILLING CODE 4310-HC-P



                                                                                 Federal Register / Vol. 80, No. 219 / Friday, November 13, 2015 / Notices                                             70253

                                                               Dates & times                                                      Locations                                              BLM contact

                                                       5 p.m. to 7 p.m. .......................   Elko Conference Center, 724 Moren Way, Elko, NV 89801 .................      Steve Clutter, 775–861–6629.



                                                     The EIS will consider a No Action                       comments on significant changes to the                environmental consequences of the
                                                  alternative and consider reasonably                        Proposed Plan as set forth in the Greater             proposed changes and clarification have
                                                  foreseeable mineral development                            Sage-Grouse Bi-State Distinct                         been analyzed as part of the Plan
                                                  activities. The EIS does not support a                     Population Segment (BSSG) Forest Plan                 Amendment and Final EIS. After
                                                  land-use plan or a land-use plan                           Amendment and Final Environmental                     considering any comments on these
                                                  amendment. It will provide a                               Impact Statement (EIS), announced on                  changes, the BLM expects to issue a
                                                  comprehensive programmatic NEPA                            February 13, 2015. Following                          ROD amending the Carson City Field
                                                  analysis for the proposed action of the                    consideration of any comments on these                Office Consolidated Resource
                                                  Secretary of the Interior withdrawing                      changes, the BLM intends to issue a                   Management Plan and the Tonopah
                                                  these public lands from operation of the                   Record of Decision (ROD) amending the                 Field Office Resource Management Plan.
                                                  mining law for the conservation benefit                    Carson City Field Office Consolidated                    The Environmental Protection Agency
                                                  of the Greater Sage-grouse.                                Resource Management Plan and the                      (EPA) published the Notice of
                                                     The BLM has initially identified the                    Tonopah Field Office Resource                         Availability (NOA) for the BSSG Forest
                                                  following issues for analysis in this EIS:                 Management Plan.                                      Plan Amendment/Draft EIS in the
                                                  Air quality/climate, American Indian                       DATES: Written comments on the                        Federal Register on August 23, 2013 (78
                                                  resources, cultural resources, wilderness                  changes to the Proposed Plan will be                  FR 52524), which initiated a 90-day
                                                  and wilderness characteristics, mineral                    accepted until December 14, 2015.                     comment period. An NOA for the BSSG
                                                  resources, public health and safety,                       ADDRESSES: You may submit comments                    Forest Plan Amendment/Revised Draft
                                                  recreation, social and economic                            related to the significant changes to the             EIS was published by the EPA on July
                                                  conditions, soil resources, soundscapes,                   Proposed Plan by any of the following                 11, 2014 (79 FR 40100), which initiated
                                                  special status species, vegetation                         methods:                                              a second 90-day comment period. The
                                                  resources, visual resources, water                            • Email: blm_nv_ccdowebmail@                       EPA published the NOA for the BSSG
                                                  resources, and fish and wildlife habitat.                  blm.gov.                                              Forest Plan Amendment and Final EIS
                                                     In addition, the BLM expects to                            • Fax: 775–885–6147.                               in the Federal Register on February 13,
                                                  address economic effects of                                   • Mail: BLM Carson City District,                  2015 (80 FR 8081), which initiated a 30-
                                                  withdrawing these public lands from                        Attn: Colleen Sievers, Project Manager,               day BLM protest period and 60-day
                                                  operation of the mining law, wildlife                      5665 Morgan Mill Rd., Carson City, NV                 Governors consistency review period.
                                                  habitat conservation; improvement,                         89701.                                                The Plan Amendment and Final EIS
                                                  restoration of ecosystem processes;                        FOR FURTHER INFORMATION CONTACT:                      identified the BLM Plan as the Proposed
                                                  protection of cultural resources,                          Colleen Sievers, Project Manager,                     Plan. The BLM received three protest
                                                  watershed and vegetative community                         telephone: 775–885–6168; address: 5665                letters. In response to those protests and
                                                  health, new listings of threatened and                     Morgan Mill Rd., Carson City, NV                      based on additional policy discussions,
                                                  endangered species and consideration of                    89701; email: blm_nv_ccdowebmail@                     the BLM has determined that it will
                                                  other sensitive and special status                         blm.gov. Persons who use a                            clarify and make changes to the
                                                  species.                                                   telecommunications device for the deaf                Proposed Plan.
                                                                                                             (TDD) may call the Federal Information                   The clarification and changes include:
                                                  Steve Ellis,                                               Relay Service (FIRS) at 1–800–877–8339                (1) Identifying disturbance levels within
                                                  Deputy Director, Bureau of Land                            to contact the above individual during
                                                  Management.
                                                                                                                                                                   BSSG habitat; (2) Adjusting buffers for
                                                                                                             normal business hours. The FIRS is                    tall structures near active or pending
                                                  [FR Doc. 2015–28877 Filed 11–12–15; 8:45 am]               available 24 hours a day, 7 days a week,              leks; (3) Adding a restriction for new
                                                  BILLING CODE 4310–84–P                                     to leave a message or question with the               high-power transmission lines; and (4)
                                                                                                             above individual. You will receive a                  Changing on-the-ground management
                                                                                                             reply during normal business hours.                   for habitat connectivity. This notice
                                                  DEPARTMENT OF THE INTERIOR
                                                                                                             SUPPLEMENTARY INFORMATION: The                        identifies those clarifications and
                                                  Bureau of Land Management                                  United States Forest Service (USFS) was               changes and initiates a 30-day public
                                                                                                             the lead agency for preparing the BSSG                comment period (43 CFR 1610.2(f)(5)
                                                  [LLNVC00000.L16100000.DR0000; 14–                          Forest Plan Amendment (Plan                           and 43 CFR 1610.5–1(b)).
                                                  08807; MO# 4500080864]                                     Amendment) and Final EIS. As part of
                                                                                                             that effort and based on the analysis in              Habitat Disturbance—Proposed Change
                                                  Opportunity To Comment on Changes
                                                                                                             the Final EIS, the BLM, a cooperating                   The BLM is changing the Proposed
                                                  to the Nevada and California Greater
                                                                                                             agency, proposes to amend the Carson                  Plan, as it was set forth in the Plan
                                                  Sage-Grouse Bi-State Distinct
                                                                                                             City Field Office Consolidated Resource               Amendment and Final EIS, to set a total
                                                  Population Segment Carson City Field
                                                                                                             Management Plan and the Tonopah                       anthropogenic disturbance of no more
                                                  Office Consolidated Resource
                                                                                                             Field Office Resource Management Plan.                than 3 percent of the total BSSG habitat
                                                  Management Plan and the Tonopah
                                                                                                             Following the release of the Proposed                 on Federal lands within the Bodie
                                                  Field Office Resource Management
                                                                                                             Plan and the conclusion of the protest                Mountain/Grant, Desert Creek/Fales,
jstallworth on DSK7TPTVN1PROD with NOTICES




                                                  Plan Amendment, Nevada
                                                                                                             process, the BLM identified changes and               and White Mountains population
                                                  AGENCY:   Bureau of Land Management,                       a clarification for the Proposed Plan as              management unit boundaries (C–Wild–
                                                  Interior.                                                  explained below and determined,                       S–04), and a total anthropogenic
                                                  ACTION: Notice.                                            pursuant to the applicable authorities                disturbance of no more than 1.5 percent
                                                                                                             (43 CFR 1610.2(f)(5) and 43 CFR                       of the total BSSG habitat on Federal
                                                  SUMMARY:The Bureau of Land                                 1610.5–1(b)), that public comment on                  lands within the Pine Nut Mountains
                                                  Management (BLM) is soliciting                             those measures is necessary. The                      population management unit (PMU)


                                             VerDate Sep<11>2014    15:03 Nov 12, 2015     Jkt 238001   PO 00000   Frm 00070   Fmt 4703   Sfmt 4703   E:\FR\FM\13NON1.SGM   13NON1


                                                  70254                       Federal Register / Vol. 80, No. 219 / Friday, November 13, 2015 / Notices

                                                  boundaries (C–Wild–S–05), due to                        direction to maintain or enhance                      DEPARTMENT OF THE INTERIOR
                                                  higher presence of risk factors in the                  suitability of connective area.
                                                  PMU as analyzed under Final EIS                         Alternative C includes a goal about                   Bureau of Land Management
                                                  Alternative C. This change is being                     habitat and movement and an objective                 [LLCA932000.L13400000.DQ0000.
                                                  made in response to issues raised during                of improving degraded habitat,                        LXSSB0020000.16X]
                                                  the protest period and based on                         including areas with conifer
                                                  additional policy discussions.                          encroachment (i.e., pinyon-juniper).                  Notice of Availability of the Desert
                                                    Concerns were raised by the public                    Actions and Best Management Practices                 Renewable Energy Conservation Plan
                                                  that the BLM action was not adequate to                                                                       Proposed Land Use Plan Amendment
                                                                                                          relating to connectivity apply primarily
                                                  protect BSSG and its habitat.                                                                                 to the California Desert Conservation
                                                                                                          to mineral uses. Alternative C states that
                                                  Disturbance levels identified in the                                                                          Plan and the Bakersfield and Bishop
                                                  Final EIS will require site-specific                    where valid existing rights exist, in
                                                                                                                                                                Resource Management Plans and Final
                                                  project mitigation to insure no                         connective habitat areas, vegetation
                                                                                                                                                                Environmental Impact Statement
                                                  unmitigated net loss of habitat. This                   characteristics suitable to sage-grouse
                                                  requires assessing habitat availability at              should be maintained to the extent                    AGENCY:   Bureau of Land Management,
                                                  the landscape scale.                                    technically feasible (C–Min–S–01). In                 Interior.
                                                                                                          addition, Alternative C provides                      ACTION: Notice.
                                                  Tall Structure Buffer—Proposed                          additional direction not specific to
                                                  Change                                                                                                        SUMMARY:   In accordance with the
                                                                                                          connectivity which states, ‘‘Vegetation
                                                     As part of the protest process, the                                                                        National Environmental Policy Act of
                                                                                                          treatments and post-disturbance                       1969, as amended, and the Federal Land
                                                  BLM found that it needed to correct an                  restoration should seed and/or
                                                  error in the Proposed Plan Amendment                                                                          Policy and Management Act of 1976, as
                                                                                                          transplant sagebrush to restore large                 amended (FLPMA), the Bureau of Land
                                                  and Final EIS. The BLM found that it                    patches of sagebrush cover and connect                Management (BLM) has prepared a
                                                  should have identified the buffer                       existing patches’’ (C–Wild–S–02). Given               Proposed Land Use Plan Amendment
                                                  distance for tall structures as 4 miles                 the fragmented nature of the bi-state                 (LUPA) and Final Environmental Impact
                                                  from active or pending leks. This is                    landscape and the level of apparent                   Statement (EIS) for the Desert
                                                  consistent with management                              isolation of subpopulations, additional               Renewable Energy Conservation Plan
                                                  prescriptions proposed by the USFS.                     management direction for connective                   (DRECP). This LUPA would amend the
                                                  Specifically, the BLM proposes to adopt
                                                                                                          habitat area is necessary to facilitate               California Desert Conservation Area
                                                  the action from Alternative C which
                                                                                                          sage-grouse movement, reduce isolation,               (CDCA) Plan and the Bakersfield and
                                                  states that tall structures, which could
                                                                                                          and increase genetic interchange                      Bishop Resource Management Plans
                                                  serve as predator perches, will not be                                                                        (RMPs). By this notice, the BLM is
                                                  authorized within 4 miles of an active                  between subpopulations. This change is
                                                                                                          being made in response to policy                      announcing the availability of the
                                                  or pending lek (C–LUSU–S–04). The 4-                                                                          Proposed LUPA and Final EIS.
                                                  mile lek buffer accords with other                      discussions.
                                                                                                                                                                DATES: BLM planning regulations state
                                                  prescriptions of surface disturbance in                    Please note that public comments and
                                                                                                                                                                that any person who meets the
                                                  sage-grouse habitat and is consistent                   information submitted including names,
                                                                                                                                                                conditions as described in the
                                                  with best science available.                            street addresses, and email addresses of              regulations may protest the BLM’s
                                                  High-Voltage (≥120kV) Transmission                      persons who submit comments will be                   Proposed LUPA/Final EIS. A person
                                                  Line—Proposed Change                                    available for public review and                       who meets the conditions and files a
                                                                                                          disclosure at the above address during                protest must do so within 30 days of the
                                                     The BLM is designating exclusion
                                                                                                          regular business hours (7:30 a.m. to 4:30             date that the Environmental Protection
                                                  areas for new high-power (≥120kV)
                                                                                                          p.m.), Monday through Friday, except                  Agency publishes its Notice of
                                                  transmission lines in BSSG habitat.
                                                                                                          holidays.                                             Availability in the Federal Register.
                                                  Specifically, new high-power (≥120kV)
                                                  transmission line corridors, rights-of-                    Before including your address, phone               ADDRESSES: Copies of the DRECP
                                                  way, facilities, or construction areas in               number, email address, or other                       Proposed LUPA and Final EIS have
                                                  habitat (outside of existing corridors)                 personal identifying information in your              been sent to affected Federal, State, and
                                                  will not be authorized (C–Min–S–09).                    comment, you should be aware that                     local government agencies, affected
                                                  This change is being made in response                   your entire comment—including your                    tribal governments, and to other
                                                  to issues raised during the protest                     personal identifying information—may                  stakeholders. The Proposed LUPA and
                                                  period and based on additional policy                   be made publicly available at any time.               Final EIS are available for review online
                                                  discussions and was analyzed under                      While you can ask us in your comment                  at www.drecp.org and www.blm.gov/ca/
                                                  Alternative C in the EIS.                               to withhold your personal identifying                 drecp. See the SUPPLEMENTARY
                                                                                                                                                                INFORMATION section below for a list of
                                                  Connectivity Habitat—Proposed Change                    information from public review, we
                                                                                                                                                                locations where copies of the Proposed
                                                                                                          cannot guarantee that we will be able to
                                                     The BLM is clarifying language from                                                                        LUPA and Final EIS are available for
                                                                                                          do so.
                                                  Alternative C to provide for                                                                                  public inspection.
                                                  management of connectivity habitat.                       Authority: 40 CFR 1506.6, 40 CFR 1506.10,              All protests must be in writing and
                                                  The BSSG landscape is fragmented by                     43 CFR 1610.2                                         mailed to one of the following
                                                  areas of agriculture and urbanization, as                                                                     addresses: Regular Mail: BLM Director
                                                                                                          John F. Ruhs,
                                                  well as areas of naturally occurring and                                                                      (210), Attention: Protest Coordinator,
jstallworth on DSK7TPTVN1PROD with NOTICES




                                                  encroaching pinyon-juniper vegetation.                  Acting State Director, Nevada.                        P.O. Box 71383, Washington, DC 20024–
                                                  Sage-grouse habitats within and                         [FR Doc. 2015–28876 Filed 11–12–15; 8:45 am]          1383; Overnight Delivery: BLM Director
                                                  between PMU are often separated by                      BILLING CODE 4310–HC–P                                (210), Attention: Protest Coordinator, 20
                                                  stretches of unsuitable areas that may                                                                        M Street SE., Room 2134LM,
                                                  inhibit sage-grouse movements across                                                                          Washington, DC 20003.
                                                  the landscape. Alternative C provides a                                                                       FOR FURTHER INFORMATION CONTACT:
                                                  limited amount of management                                                                                  Vicki Campbell, Program Manager,


                                             VerDate Sep<11>2014   15:03 Nov 12, 2015   Jkt 238001   PO 00000   Frm 00071   Fmt 4703   Sfmt 4703   E:\FR\FM\13NON1.SGM   13NON1



Document Created: 2018-03-01 11:23:30
Document Modified: 2018-03-01 11:23:30
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice.
DatesWritten comments on the changes to the Proposed Plan will be accepted until December 14, 2015.
ContactColleen Sievers, Project Manager,
FR Citation80 FR 70253 

2025 Federal Register | Disclaimer | Privacy Policy