80_FR_73222 80 FR 72997 - Advisory Committee on Reactor Safeguards; Meeting of The ACRS Subcommittee on Power Uprates; Notice of Meeting

80 FR 72997 - Advisory Committee on Reactor Safeguards; Meeting of The ACRS Subcommittee on Power Uprates; Notice of Meeting

NUCLEAR REGULATORY COMMISSION

Federal Register Volume 80, Issue 225 (November 23, 2015)

Page Range72997-72998
FR Document2015-29775

Federal Register, Volume 80 Issue 225 (Monday, November 23, 2015)
[Federal Register Volume 80, Number 225 (Monday, November 23, 2015)]
[Notices]
[Pages 72997-72998]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-29775]


-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION


Advisory Committee on Reactor Safeguards; Meeting of The ACRS 
Subcommittee on Power Uprates; Notice of Meeting

    The ACRS Subcommittee on Power Uprates will hold a meeting on 
December 2, 2015, Room T-2B1, 11545 Rockville Pike, Rockville, 
Maryland.
    The meeting will be open to public attendance with the exception of 
a portion that may be closed to protect information that is propriety 
pursuant to 5 U.S.C. 552b(c)(4). The agenda for the subject meeting 
shall be as follows:

[[Page 72998]]

Wednesday, December 2, 2015--8:30 a.m. Until 12:00 p.m.

    The Subcommittee will review the Peach Bottom Maximum Extended Load 
Line Limit Analysis Plus License Amendment Request and the associated 
safety evaluation report. The Subcommittee will hear presentations by 
and hold discussions with Exelon Corporation, the NRC staff, and other 
interested persons regarding this matter. The Subcommittee will gather 
information, analyze relevant issues and facts, and formulate proposed 
positions and actions, as appropriate, for deliberation by the Full 
Committee.
    Members of the public desiring to provide oral statements and/or 
written comments should notify the Designated Federal Official (DFO), 
Weidong Wang (Telephone 301-415-6279 or Email: Weidong.Wang@nrc.gov) 
five days prior to the meeting, if possible, so that appropriate 
arrangements can be made. Thirty-five hard copies of each presentation 
or handout should be provided to the DFO thirty minutes before the 
meeting. In addition, one electronic copy of each presentation should 
be emailed to the DFO one day before the meeting. If an electronic copy 
cannot be provided within this timeframe, presenters should provide the 
DFO with a CD containing each presentation at least thirty minutes 
before the meeting. Electronic recordings will be permitted only during 
those portions of the meeting that are open to the public. Detailed 
procedures for the conduct of and participation in ACRS meetings were 
published in the Federal Register on October 21, 2015 (80 FR 63846).
    Detailed meeting agendas and meeting transcripts are available on 
the NRC Web site at http://www.nrc.gov/reading-rm/doc-collections/acrs. 
Information regarding topics to be discussed, changes to the agenda, 
whether the meeting has been canceled or rescheduled, and the time 
allotted to present oral statements can be obtained from the Web site 
cited above or by contacting the identified DFO. Moreover, in view of 
the possibility that the schedule for ACRS meetings may be adjusted by 
the Chairman as necessary to facilitate the conduct of the meeting, 
persons planning to attend should check with these references if such 
rescheduling would result in a major inconvenience.
    If attending this meeting, please enter through the One White Flint 
North building, 11555 Rockville Pike, Rockville, MD. After registering 
with security, please contact Mr. Theron Brown (Telephone 240-888-9835) 
to be escorted to the meeting room.

    Dated: November 13, 2015.
Michael Snodderly,
Acting Chief, Technical Support Branch, Advisory Committee on Reactor 
Safeguards.
[FR Doc. 2015-29775 Filed 11-20-15; 8:45 am]
 BILLING CODE 7590-01-P



                                                                        Federal Register / Vol. 80, No. 225 / Monday, November 23, 2015 / Notices                                                 72997

                                             ‘‘ADAMS Public Documents’’ and then                     II. Additional Information                            a manner that is inconsistent with any
                                             select ‘‘Begin Web-based ADAMS                            The DG–1275 was published in the                    issue finality provisions. If, in the
                                             Search.’’ For problems with ADAMS,                      Federal Register on September 9, 2013                 future, the NRC seeks to impose a
                                             please contact the NRC’s Public                         (78 FR 55117), for a 60-day public                    position in RG 1.27 in a manner which
                                             Document Room (PDR) reference staff at                  comment period. The public comment                    does not provide issue finality as
                                             1–800–397–4209, 301–415–4737, or by                     period closed on November 8, 2013.                    described in the applicable issue finality
                                             email to pdr.resource@nrc.gov. The                      Public comments on DG–1275 and the                    provision, then the NRC must address
                                             ADAMS accession number for each                         NRC staff responses to the public                     the criteria for avoiding issue finality as
                                             document referenced in this notice (if                  comments are available in ADAMS                       described in the applicable issue finality
                                             that document is available in ADAMS)                    under Accession No. ML14107A410.                      provision.
                                             is provided the first time that a                                                                                Existing 10 CFR part 50 construction
                                             document is referenced. Revision 3 to                   III. Congressional Review Act                         permit holders and 10 CFR part 50
                                             Regulatory Guide 1.27 and the                             This regulatory guide is a rule as                  operating license holders would not be
                                             regulatory analysis are available in                    defined in the Congressional Review                   required to comply with the positions
                                             ADAMS under Accession Nos.                              Act (5 U.S.C. 801–808). However, the                  set forth in RG 1.27, unless the
                                             ML14107A411 and ML14107A409,                            Office of Management and Budget has                   construction permit or operating license
                                             respectively.                                           not found it to be a major rule as                    holder makes a voluntary change to its
                                                • NRC’s PDR: You may examine and                     defined in the Congressional Review                   licensing basis with respect to the UHS
                                             purchase copies of public documents at                  Act.                                                  features of plant systems and the NRC
                                             the NRC’s PDR, Room O1–F21, One                                                                               determines that the safety review must
                                             White Flint North, 11555 Rockville                      IV. Backfitting and Issue Finality                    include consideration of the UHS
                                             Pike, Rockville, Maryland 20852.                           Regulatory Guide 1.27 provides                     features of plant systems.
                                                                                                     guidance on one possible means for                       Existing design certification rules
                                                Regulatory guides are not
                                                                                                     meeting the NRC’s regulatory                          would not be required to be amended to
                                             copyrighted, and NRC approval is not
                                                                                                     requirements of the GDC in appendix A,                comply with the positions set forth in
                                             required to reproduce them.
                                                                                                     ‘‘General Design Criteria for Nuclear                 RG 1.27, unless the NRC addresses the
                                             FOR FURTHER INFORMATION CONTACT:                                                                              issue finality provisions in 10 CFR
                                                                                                     Power Plants,’’ to 10 CFR part 50, which
                                             Bruce Lin, telephone: 301–415–2446,                                                                           52.63(a).
                                                                                                     are applicable to the ultimate heat sink
                                             email: Bruce.Lin@nrc.gov; and Steve                                                                              Existing combined license holders
                                                                                                     features of nuclear power plant systems.
                                             Burton, telephone: 301–415–7000,                                                                              (referencing the AP1000 design
                                                                                                     This regulatory guide does not
                                             email: Stephen.Burton@nrc.gov. Both                                                                           certification rule in 10 CFR part 52,
                                                                                                     constitute backfitting as defined in 10
                                             are staff of the Office of Nuclear                                                                            appendix D), would not be required to
                                                                                                     CFR 50.109 (the Backfit Rule) and is not
                                             Regulatory Research, U.S. Nuclear                                                                             comply with the positions set forth in
                                                                                                     otherwise inconsistent with the issue
                                             Regulatory Commission, Washington,                                                                            RG 1.27, unless the NRC addresses the
                                                                                                     finality provisions in 10 CFR part 52,
                                             DC 20555–0001.                                                                                                issue finality provisions in 10 CFR
                                                                                                     ‘‘Licenses, Certifications and Approvals
                                             SUPPLEMENTARY INFORMATION:                              for Nuclear Power Plants.’’ The NRC’s                 52.63(a).
                                                                                                                                                              Further information on the NRC staff’s
                                             I. Introduction                                         position is based upon the following
                                                                                                                                                           use of the regulatory guidance is
                                                                                                     considerations.
                                                The NRC is issuing a revision to an                                                                        contained in Section D.,
                                                                                                        Regulatory Guide 1.27 may be applied
                                             existing guide in the NRC’s ‘‘Regulatory                                                                      ‘‘Implementation,’’ of RG 1.27.
                                                                                                     to current applications for operating
                                             Guide’’ series. This series was                         licenses, combined licenses, early site                  Dated at Rockville, Maryland, this 17th day
                                             developed to describe and make                          permits, and certified design rules                   of November 2015.
                                             available to the public information                     docketed by the NRC as of the date of                    For the Nuclear Regulatory Commission.
                                             regarding methods that are acceptable to                issuance of the final regulatory guide, as            Thomas H. Boyce,
                                             the NRC staff for implementing specific                 well as future applications submitted                 Chief, Regulatory Guidance and Generic
                                             parts of the agency’s regulations,                      after the issuance of the regulatory                  Issues Branch, Division of Engineering, Office
                                             techniques that the NRC staff uses in                   guide. Such action would not constitute               of Nuclear Regulatory Research.
                                             evaluating specific issues or postulated                backfitting as defined in 10 CFR                      [FR Doc. 2015–29691 Filed 11–20–15; 8:45 am]
                                             events, and data that the NRC staff                     50.109(a)(1) or be otherwise inconsistent             BILLING CODE 7590–01–P
                                             needs in its review of applications for                 with the applicable issue finality
                                             permits and licenses.                                   provision in 10 CFR part 52. Neither the
                                                Revision 3 to RG 1.27 was issued with                Backfit Rule nor the issue finality                   NUCLEAR REGULATORY
                                             a temporary identification of Draft                     provisions under 10 CFR part 52, with                 COMMISSION
                                             Regulatory Guide, DG–1275. Regulatory                   certain exclusions discussed below,
                                             Guide 1.27 addresses revisions in                       were intended to apply to every NRC                   Advisory Committee on Reactor
                                             regulations and lessons learned from                    action which substantially changes the                Safeguards; Meeting of The ACRS
                                             operating experience since the guide                    expectations of current and future                    Subcommittee on Power Uprates;
                                             was last revised in January 1976,                       applicants.                                           Notice of Meeting
                                             including system design considerations,                    The exceptions to the general                         The ACRS Subcommittee on Power
                                             natural phenomena and site hazards                      principle are applicable whenever a                   Uprates will hold a meeting on
                                             design criteria, and periodic inspection                combined license applicant references a               December 2, 2015, Room T–2B1, 11545
wgreen on DSK2VPTVN1PROD with NOTICES




                                             and maintenance considerations. This                    10 CFR part 52 license (e.g., an early site           Rockville Pike, Rockville, Maryland.
                                             revised guide contains information                      permit) or NRC regulatory approval                       The meeting will be open to public
                                             applicable to both current operating                    (e.g., a design certification rule) with              attendance with the exception of a
                                             plants and new plants being licensed                    specified issue finality provisions. The              portion that may be closed to protect
                                             under both parts 50 and 52 of title 10                  NRC does not, at this time, intend to                 information that is propriety pursuant to
                                             of the Code of Federal Regulations (10                  impose the positions represented in RG                5 U.S.C. 552b(c)(4). The agenda for the
                                             CFR).                                                   1.27 on combined license applicants in                subject meeting shall be as follows:


                                        VerDate Sep<11>2014   14:25 Nov 20, 2015   Jkt 238001   PO 00000   Frm 00053   Fmt 4703   Sfmt 4703   E:\FR\FM\23NON1.SGM   23NON1


                                             72998                      Federal Register / Vol. 80, No. 225 / Monday, November 23, 2015 / Notices

                                             Wednesday, December 2, 2015—8:30                        Brown (Telephone 240–888–9835) to be                    To support its Request, the Postal
                                             a.m. Until 12:00 p.m.                                   escorted to the meeting room.                         Service filed a copy of the contract, a
                                                                                                      Dated: November 13, 2015.                            copy of the Governors’ Decision
                                                The Subcommittee will review the                                                                           authorizing the product, proposed
                                             Peach Bottom Maximum Extended Load                      Michael Snodderly,
                                                                                                                                                           changes to the Mail Classification
                                             Line Limit Analysis Plus License                        Acting Chief, Technical Support Branch,
                                                                                                     Advisory Committee on Reactor Safeguards.
                                                                                                                                                           Schedule, a Statement of Supporting
                                             Amendment Request and the associated                                                                          Justification, a certification of
                                             safety evaluation report. The                           [FR Doc. 2015–29775 Filed 11–20–15; 8:45 am]
                                                                                                                                                           compliance with 39 U.S.C. 3633(a), and
                                             Subcommittee will hear presentations                    BILLING CODE 7590–01–P
                                                                                                                                                           an application for non-public treatment
                                             by and hold discussions with Exelon                                                                           of certain materials. It also filed
                                             Corporation, the NRC staff, and other                                                                         supporting financial workpapers.
                                             interested persons regarding this matter.               POSTAL REGULATORY COMMISSION                          Request at 2.
                                             The Subcommittee will gather
                                             information, analyze relevant issues and                [Docket Nos. MC2016–15 and CP2016–20;                 II. Notice of Commission Action
                                             facts, and formulate proposed positions                 Order No. 2823]
                                                                                                                                                             The Commission establishes Docket
                                             and actions, as appropriate, for                                                                              Nos. MC2016–15 and CP2016–20 to
                                             deliberation by the Full Committee.                     New Postal Product
                                                                                                                                                           consider the Request pertaining to the
                                                Members of the public desiring to                    AGENCY:   Postal Regulatory Commission.               proposed Global Expedited Package
                                             provide oral statements and/or written                  ACTION:   Notice.                                     Services 5 Contracts product and the
                                             comments should notify the Designated                                                                         related contract, respectively.
                                             Federal Official (DFO), Weidong Wang                    SUMMARY:   The Commission is noticing a                 The Commission invites comments on
                                             (Telephone 301–415–6279 or Email:                       recent Postal Service filing concerning               whether the Postal Service’s filing is
                                             Weidong.Wang@nrc.gov) five days prior                   the addition of Global Expedited                      consistent with 39 U.S.C. 3632, 3633, or
                                             to the meeting, if possible, so that                    Package Services 5 Contracts to the                   3642, 39 CFR part 3015, and 39 CFR
                                             appropriate arrangements can be made.                   competitive product list. This notice                 part 3020, subpart B. Comments are due
                                             Thirty-five hard copies of each                         informs the public of the filing, invites             no later than November 24, 2015. The
                                             presentation or handout should be                       public comment, and takes other                       public portions of the filing can be
                                             provided to the DFO thirty minutes                      administrative steps.                                 accessed via the Commission’s Web site
                                             before the meeting. In addition, one                    DATES: Comments are due: November                     (http://www.prc.gov).
                                             electronic copy of each presentation                    24, 2015.                                               The Commission appoints Lyudmila
                                             should be emailed to the DFO one day                    ADDRESSES: Submit comments                            Y. Bzhilyanskaya to serve as Public
                                             before the meeting. If an electronic copy               electronically via the Commission’s                   Representative in these dockets.
                                             cannot be provided within this                          Filing Online system at http://                       III. Ordering Paragraphs
                                             timeframe, presenters should provide                    www.prc.gov. Those who cannot submit
                                             the DFO with a CD containing each                       comments electronically should contact                  It is ordered:
                                             presentation at least thirty minutes                    the person identified in the FOR FURTHER                1. The Commission establishes Docket
                                             before the meeting. Electronic                          INFORMATION CONTACT section by
                                                                                                                                                           Nos. MC2016–15 and CP2016–20 for
                                             recordings will be permitted only                       telephone for advice on filing                        consideration of the matters raised by
                                             during those portions of the meeting                    alternatives.                                         the Postal Service’s Request.
                                             that are open to the public. Detailed                                                                           2. Pursuant to 39 U.S.C. 505,
                                             procedures for the conduct of and                       FOR FURTHER INFORMATION CONTACT:                      Lyudmila Y. Bzhilyanskaya is appointed
                                             participation in ACRS meetings were                     David A. Trissell, General Counsel, at                to serve as an officer of the Commission
                                             published in the Federal Register on                    202–789–6820.                                         to represent the interests of the general
                                             October 21, 2015 (80 FR 63846).                         SUPPLEMENTARY INFORMATION:                            public in these proceeding (Public
                                                Detailed meeting agendas and meeting                                                                       Representative).
                                                                                                     Table of Contents
                                             transcripts are available on the NRC                                                                            3. Comments are due no later than
                                                                                                     I. Introduction                                       November 24, 2015.
                                             Web site at http://www.nrc.gov/reading-
                                                                                                     II. Notice of Commission Action                         4. The Secretary shall arrange for
                                             rm/doc-collections/acrs. Information                    III. Ordering Paragraphs
                                             regarding topics to be discussed,                                                                             publication of this order in the Federal
                                             changes to the agenda, whether the                      I. Introduction                                       Register.
                                             meeting has been canceled or                               In accordance with 39 U.S.C. 3642                    By the Commission.
                                             rescheduled, and the time allotted to                   and 39 CFR 3020.30 et seq., the Postal                Stacy L. Ruble,
                                             present oral statements can be obtained                 Service filed a formal request and                    Secretary.
                                             from the Web site cited above or by                     associated supporting information to                    Commissioner Goldway, abstaining.
                                             contacting the identified DFO.                          add Global Expedited Package Services                 [FR Doc. 2015–29724 Filed 11–20–15; 8:45 am]
                                             Moreover, in view of the possibility that               5 Contracts to the competitive product
                                             the schedule for ACRS meetings may be                                                                         BILLING CODE 7710–FW–P
                                                                                                     list.1
                                             adjusted by the Chairman as necessary                      The Postal Service
                                             to facilitate the conduct of the meeting,               contemporaneously filed a redacted
                                             persons planning to attend should check                                                                       RAILROAD RETIREMENT BOARD
                                                                                                     contract related to the proposed new
                                             with these references if such                           product under 39 U.S.C. 3632(b)(3) and                Proposed Collection; Comment
wgreen on DSK2VPTVN1PROD with NOTICES




                                             rescheduling would result in a major                    39 CFR 3015.5. Id., Attachment 4.
                                             inconvenience.                                                                                                Request
                                                If attending this meeting, please enter                1 Request of the United States Postal Service to    SUMMARY: In accordance with the
                                             through the One White Flint North                       Add Global Expedited Package Services 5 Contracts     requirement of Section 3506(c)(2)(A) of
                                                                                                     to the Competitive Products List, and Notice of
                                             building, 11555 Rockville Pike,                         Filing (Under Seal) of Contract and Application for
                                                                                                                                                           the Paperwork Reduction Act of 1995
                                             Rockville, MD. After registering with                   Non-Public Treatment of Materials Filed Under         which provides opportunity for public
                                             security, please contact Mr. Theron                     Seal, November 16, 2015 (Request).                    comment on new or revised data


                                        VerDate Sep<11>2014   14:25 Nov 20, 2015   Jkt 238001   PO 00000   Frm 00054   Fmt 4703   Sfmt 4703   E:\FR\FM\23NON1.SGM   23NON1



Document Created: 2018-03-01 11:17:38
Document Modified: 2018-03-01 11:17:38
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation80 FR 72997 

2024 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR