80_FR_75906 80 FR 75674 - Eastern Shore Natural Gas Company; Notice of Amendment to Application for Certificate of Public Convenience and Necessity

80 FR 75674 - Eastern Shore Natural Gas Company; Notice of Amendment to Application for Certificate of Public Convenience and Necessity

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 80, Issue 232 (December 3, 2015)

Page Range75674-75674
FR Document2015-30570

Federal Register, Volume 80 Issue 232 (Thursday, December 3, 2015)
[Federal Register Volume 80, Number 232 (Thursday, December 3, 2015)]
[Notices]
[Page 75674]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-30570]



[[Page 75674]]

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP15-18-001]


Eastern Shore Natural Gas Company; Notice of Amendment to 
Application for Certificate of Public Convenience and Necessity

    Take notice that on November 18, 2015, Eastern Shore Natural Gas 
Company (Eastern Shore), 1110 Forrest Avenue, Dover, Delaware 19904, 
filed in the above referenced docket an amendment to the certificate 
application in Docket No. CP15-18-000, pursuant to section 7(c) of the 
Natural Gas Act (NGA) and Part 157 of the Commission's regulations. 
Eastern Shore proposes to construct Kemblesville Loop portion of the 
White Oak Mainline Expansion Project (Project) along existing right-of-
way rather than along a new right-of-way, as was originally proposed 
all in Chester County, Pennsylvania, all as more fully set forth in the 
application which is on file with the Commission and open to public 
inspection.
    The filing may also be viewed on the Web at http://www.ferc.gov 
using the ``eLibrary'' link. Enter the docket number excluding the last 
three digits in the docket number field to access the document. For 
assistance, please contact FERC Online Support at 
[email protected] or toll free at (866) 208-3676, or TTY, 
contact (202) 502-8659.
    Any questions concerning this application may be directed to 
William Rice, King & Spalding LLP, 1700 Pennsylvania Avenue NW, Suite 
200, Washington, DC 20006, by phone 202-626-9602, by fax 202-626-3737, 
or by email [email protected].
    Specifically, Eastern Shore originally proposed to construct a 3.9 
mile long 16-inch diameter pipeline loop near Kemblesville, 
Pennsylvania (Kemblesville Loop) along new right-of-way away from the 
existing structures. However, upon closer review of the environmental 
impacts, Eastern Shore became aware that Alternative 2 route in the 
original filing would be more preferable. Alternative 2 route will (1) 
reduce the total length of the Kemblesville loop by 1.8 miles; (2) 
reduce the acreage of mature tree clearance from approximately 12 to 
approximately 6; (3) open up less forested acreage to the potential 
spread of noxious weeds and vines that over time could kill mature 
trees; and (4) minimize the removal of other vegetation thus reducing 
potential adverse impacts to Delaware River Basin. Eastern Shore 
requests that the Commission issue the requested authorizations during 
the first quarter of 2016, in order to allow Eastern Shore complete and 
place the project in service no later than September 1, 2016.
    Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9, 
within 90 days of this Notice the Commission staff will either: 
complete its environmental assessment (EA) and place it into the 
Commission's public record (eLibrary) for this proceeding; or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the final environmental impact statement (FEIS) or EA for this 
proposal. The filing of the EA in the Commission's public record for 
this proceeding or the issuance of a Notice of Schedule for 
Environmental Review will serve to notify federal and state agencies of 
the timing for the completion of all necessary reviews, and the 
subsequent need to complete all federal authorizations within 90 days 
of the date of issuance of the Commission staff's FEIS or EA.
    There are two ways to become involved in the Commission's review of 
this project. First, any person wishing to obtain legal status by 
becoming a party to the proceedings for this project should, on or 
before the comment date stated below, file with the Federal Energy 
Regulatory Commission, 888 First Street NE., Washington, DC 20426, a 
motion to intervene in accordance with the requirements of the 
Commission's Rules of Practice and Procedure (18 CFR 385.214 or 
385.211) and the Regulations under the NGA (18 CFR 157.10). A person 
obtaining party status will be placed on the service list maintained by 
the Secretary of the Commission and will receive copies of all 
documents filed by the applicant and by all other parties. A party must 
submit 7 copies of filings made with the Commission and must mail a 
copy to the applicant and to every other party in the proceeding. Only 
parties to the proceeding can ask for court review of Commission orders 
in the proceeding.
    However, a person does not have to intervene in order to have 
comments considered. The second way to participate is by filing with 
the Secretary of the Commission, as soon as possible, an original and 
two copies of comments in support of or in opposition to this project. 
The Commission will consider these comments in determining the 
appropriate action to be taken, but the filing of a comment alone will 
not serve to make the filer a party to the proceeding. The Commission's 
rules require that persons filing comments in opposition to the project 
provide copies of their protests only to the party or parties directly 
involved in the protest.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission. Environmental commentors will be 
placed on the Commission's environmental mailing list, will receive 
copies of the environmental documents, and will be notified of meetings 
associated with the Commission's environmental review process. 
Environmental commentors will not be required to serve copies of filed 
documents on all other parties. However, the non-party commentors will 
not receive copies of all documents filed by other parties or issued by 
the Commission (except for the mailing of environmental documents 
issued by the Commission) and will not have the right to seek court 
review of the Commission's final order.
    The Commission strongly encourages electronic filings of comments, 
protests and interventions in lieu of paper using the ``eFiling'' link 
at http://www.ferc.gov. Persons unable to file electronically should 
submit an original and 14 copies of the protest or intervention to the 
Federal Energy regulatory Commission, 888 First Street NE., Washington, 
DC 20426.
    This filing is accessible on-line at http://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive email 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please email 
[email protected], or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.
    Comment Date: December 16, 2015.

    Dated: November 25, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-30570 Filed 12-2-15; 8:45 am]
 BILLING CODE 6717-01-P



                                             75674                      Federal Register / Vol. 80, No. 232 / Thursday, December 3, 2015 / Notices

                                             DEPARTMENT OF ENERGY                                    Basin. Eastern Shore requests that the                to the proceeding. The Commission’s
                                                                                                     Commission issue the requested                        rules require that persons filing
                                             Federal Energy Regulatory                               authorizations during the first quarter of            comments in opposition to the project
                                             Commission                                              2016, in order to allow Eastern Shore                 provide copies of their protests only to
                                             [Docket No. CP15–18–001]                                complete and place the project in                     the party or parties directly involved in
                                                                                                     service no later than September 1, 2016.              the protest.
                                             Eastern Shore Natural Gas Company;                         Pursuant to section 157.9 of the
                                                                                                     Commission’s rules, 18 CFR 157.9,                        Persons who wish to comment only
                                             Notice of Amendment to Application
                                                                                                     within 90 days of this Notice the                     on the environmental review of this
                                             for Certificate of Public Convenience
                                                                                                     Commission staff will either: complete                project should submit an original and
                                             and Necessity
                                                                                                     its environmental assessment (EA) and                 two copies of their comments to the
                                                Take notice that on November 18,                     place it into the Commission’s public                 Secretary of the Commission.
                                             2015, Eastern Shore Natural Gas                         record (eLibrary) for this proceeding; or             Environmental commentors will be
                                             Company (Eastern Shore), 1110 Forrest                   issue a Notice of Schedule for                        placed on the Commission’s
                                             Avenue, Dover, Delaware 19904, filed in                 Environmental Review. If a Notice of                  environmental mailing list, will receive
                                             the above referenced docket an                          Schedule for Environmental Review is                  copies of the environmental documents,
                                             amendment to the certificate application                issued, it will indicate, among other                 and will be notified of meetings
                                             in Docket No. CP15–18–000, pursuant to                  milestones, the anticipated date for the              associated with the Commission’s
                                             section 7(c) of the Natural Gas Act                     Commission staff’s issuance of the final              environmental review process.
                                             (NGA) and Part 157 of the Commission’s                  environmental impact statement (FEIS)                 Environmental commentors will not be
                                             regulations. Eastern Shore proposes to                  or EA for this proposal. The filing of the            required to serve copies of filed
                                             construct Kemblesville Loop portion of                  EA in the Commission’s public record                  documents on all other parties.
                                             the White Oak Mainline Expansion                        for this proceeding or the issuance of a              However, the non-party commentors
                                             Project (Project) along existing right-of-              Notice of Schedule for Environmental
                                                                                                                                                           will not receive copies of all documents
                                             way rather than along a new right-of-                   Review will serve to notify federal and
                                                                                                                                                           filed by other parties or issued by the
                                             way, as was originally proposed all in                  state agencies of the timing for the
                                             Chester County, Pennsylvania, all as                    completion of all necessary reviews, and              Commission (except for the mailing of
                                             more fully set forth in the application                 the subsequent need to complete all                   environmental documents issued by the
                                             which is on file with the Commission                    federal authorizations within 90 days of              Commission) and will not have the right
                                             and open to public inspection.                          the date of issuance of the Commission                to seek court review of the
                                                The filing may also be viewed on the                 staff’s FEIS or EA.                                   Commission’s final order.
                                             Web at http://www.ferc.gov using the                       There are two ways to become                          The Commission strongly encourages
                                             ‘‘eLibrary’’ link. Enter the docket                     involved in the Commission’s review of                electronic filings of comments, protests
                                             number excluding the last three digits in               this project. First, any person wishing to            and interventions in lieu of paper using
                                             the docket number field to access the                   obtain legal status by becoming a party               the ‘‘eFiling’’ link at http://
                                             document. For assistance, please contact                to the proceedings for this project                   www.ferc.gov. Persons unable to file
                                             FERC Online Support at                                  should, on or before the comment date                 electronically should submit an original
                                             FERCOnlineSupport@ferc.gov or toll                      stated below, file with the Federal
                                                                                                                                                           and 14 copies of the protest or
                                             free at (866) 208–3676, or TTY, contact                 Energy Regulatory Commission, 888
                                             (202) 502–8659.                                                                                               intervention to the Federal Energy
                                                                                                     First Street NE., Washington, DC 20426,
                                                Any questions concerning this                        a motion to intervene in accordance                   regulatory Commission, 888 First Street
                                             application may be directed to William                  with the requirements of the                          NE., Washington, DC 20426.
                                             Rice, King & Spalding LLP, 1700                         Commission’s Rules of Practice and                       This filing is accessible on-line at
                                             Pennsylvania Avenue NW, Suite 200,                      Procedure (18 CFR 385.214 or 385.211)                 http://www.ferc.gov, using the
                                             Washington, DC 20006, by phone 202–                     and the Regulations under the NGA (18                 ‘‘eLibrary’’ link and is available for
                                             626–9602, by fax 202–626–3737, or by                    CFR 157.10). A person obtaining party                 review in the Commission’s Public
                                             email wrice@kslaw.com.                                  status will be placed on the service list             Reference Room in Washington, DC
                                                Specifically, Eastern Shore originally               maintained by the Secretary of the                    There is an ‘‘eSubscription’’ link on the
                                             proposed to construct a 3.9 mile long                   Commission and will receive copies of                 Web site that enables subscribers to
                                             16-inch diameter pipeline loop near                     all documents filed by the applicant and              receive email notification when a
                                             Kemblesville, Pennsylvania                              by all other parties. A party must submit             document is added to a subscribed
                                             (Kemblesville Loop) along new right-of-                 7 copies of filings made with the
                                             way away from the existing structures.                                                                        docket(s). For assistance with any FERC
                                                                                                     Commission and must mail a copy to
                                             However, upon closer review of the                                                                            Online service, please email
                                                                                                     the applicant and to every other party in
                                             environmental impacts, Eastern Shore                                                                          FERCOnlineSupport@ferc.gov, or call
                                                                                                     the proceeding. Only parties to the
                                             became aware that Alternative 2 route in                proceeding can ask for court review of                (866) 208–3676 (toll free). For TTY, call
                                             the original filing would be more                       Commission orders in the proceeding.                  (202) 502–8659.
                                             preferable. Alternative 2 route will (1)                   However, a person does not have to                    Comment Date: December 16, 2015.
                                             reduce the total length of the                          intervene in order to have comments                     Dated: November 25, 2015.
                                             Kemblesville loop by 1.8 miles; (2)                     considered. The second way to
                                             reduce the acreage of mature tree                       participate is by filing with the                     Nathaniel J. Davis, Sr.,
                                             clearance from approximately 12 to                      Secretary of the Commission, as soon as               Deputy Secretary.
Lhorne on DSK5TPTVN1PROD with NOTICES




                                             approximately 6; (3) open up less                       possible, an original and two copies of               [FR Doc. 2015–30570 Filed 12–2–15; 8:45 am]
                                             forested acreage to the potential spread                comments in support of or in opposition               BILLING CODE 6717–01–P
                                             of noxious weeds and vines that over                    to this project. The Commission will
                                             time could kill mature trees; and (4)                   consider these comments in
                                             minimize the removal of other                           determining the appropriate action to be
                                             vegetation thus reducing potential                      taken, but the filing of a comment alone
                                             adverse impacts to Delaware River                       will not serve to make the filer a party


                                        VerDate Sep<11>2014   15:11 Dec 02, 2015   Jkt 238001   PO 00000   Frm 00018   Fmt 4703   Sfmt 9990   E:\FR\FM\03DEN1.SGM   03DEN1



Document Created: 2015-12-14 13:51:31
Document Modified: 2015-12-14 13:51:31
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
DatesDecember 16, 2015.
FR Citation80 FR 75674 