FR Document2015-30580

The National Park Service (NPS) announces the availability of the Final Environmental Impact Statement (EIS) for the acquisition of Florida Power & Light Company (FPL) land in the East Everglades Expansion Area (EEEA), Everglades National Park, Florida.

Federal Register, Volume 80 Issue 232 (Thursday, December 3, 2015)
[Federal Register Volume 80, Number 232 (Thursday, December 3, 2015)]
[Notices]
[Pages 75687-75688]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-30580]


-----------------------------------------------------------------------

DEPARTMENT OF THE INTERIOR

National Park Service

[NPS-SER-EVER-19669]; [PPSESEROC3, PPMPSAS1Y.YP0000]


Final Environmental Impact Statement for the Acquisition of 
Florida Power & Light Company Land in the East Everglades Expansion 
Area

AGENCY: National Park Service, Interior.

ACTION: Notice of availability.

-----------------------------------------------------------------------

SUMMARY: The National Park Service (NPS) announces the availability of 
the Final Environmental Impact Statement (EIS) for the acquisition of 
Florida Power & Light Company (FPL) land in the East Everglades 
Expansion Area (EEEA), Everglades National Park, Florida.

DATES: The NPS will execute the Record of Decision (ROD) no sooner than 
30 days following publication by the Environmental Protection Agency of 
its Notice of Availability of the Final EIS in the Federal Register.

ADDRESSES: Electronic copies of the Final EIS will be available online 
at http://parkplanning.nps/ever. A limited number of compact disks and 
printed copies of the Final EIS will be made available at Everglades 
National Park Headquarters, Everglades National Park, 40001 State 
Highway 9336, Homestead, Florida 33034-6733.

FOR FURTHER INFORMATION CONTACT: Brien Culhane, Everglades National 
Park, 40001 State Road 9336, Homestead, FL 33034-6733 or by telephone 
at (305) 242-7717.

SUPPLEMENTARY INFORMATION: The Final EIS addresses alternatives for NPS 
acquisition of existing FPL land located within the park, or of a 
sufficient interest in the property, to facilitate hydrologic and 
ecologic restoration of the park and the Everglades ecosystem. The 
acquisition of the existing FPL parcel is needed to support the goals 
of restoring the Northeast Shark River Slough and to fulfill the 
purposes of the Comprehensive Everglades Restoration Plan. Acquisition 
of land within the EEEA through an exchange of lands with FPL is 
legally authorized by Public Law 111-11 (March 30, 2009).
    The Final EIS describes five alternatives. The Final EIS addresses 
the potential impacts from the acquisition of FPL land in the park, as 
well as the indirect impacts that could result from the subsequent 
construction and operation of transmission lines, which could be built 
either inside or outside the park as a result of the land acquisition 
alternative selected. The following describes each of the alternatives 
included in the Final EIS:
    Alternative 1a, No NPS Action--No FPL Construction (environmental 
baseline): The NPS would not take action to acquire FPL property within 
the park. This alternative assumes that FPL would not construct 
transmission lines on its existing land in the park, in the exchange 
corridor, or in any area outside the park.
    Alternative 1b, No NPS Action--FPL Construction in the Park: the 
NPS would not take action to acquire FPL property within the park, the 
same as alternative 1a, but this alternative assumes that FPL would 
construct transmission lines on its existing land in the park.
    Alternative 2, NPS Acquisition of FPL Land: the NPS would acquire 
the FPL property by purchase or through the exercise of eminent domain 
authority by the United States. This alternative would result in an 
increase of 320 acres of NPS-owned land within the authorized boundary 
of the park and would allow for flowage of water on this property. This 
alternative assumes that FPL would likely acquire a replacement 
corridor east of the existing park boundary within or adjacent to the 
FPL and Miami-Dade Limestone Products Association (MDLPA) West 
Consensus Corridor to meet its transmission needs, and the transmission 
lines would be built outside the park. Alternative 2 is the 
environmentally preferable alternative.
    Alternative 3 (NPS Preferred Alternative), Fee for Fee Land 
Exchange: the NPS would acquire fee title to the FPL property through 
an exchange for park property, as authorized by the exchange 
legislation. NPS land conveyed to FPL (the ``exchange corridor'') would 
consist of 260 acres along 6.5 miles of the eastern boundary of the 
EEEA. The NPS would also convey to FPL a 90-foot-wide perpetual

[[Page 75688]]

nonnative vegetation management easement adjacent to the entire length 
of the exchange corridor. The fee for fee land exchange would be 
subject to terms and conditions that are to be agreed upon between NPS 
and FPL and incorporated into a binding exchange agreement. FPL would 
be required to allow the United States the perpetual right, power, and 
privilege to flood and submerge the exchange corridor consistent with 
hydrologic restoration requirements. The construction scenario 
associated with this alternative assumes that FPL would build the 
transmission lines in the exchange corridor.
    This alternative has been revised from the Draft EIS to the Final 
EIS due to updated transmission line siting requirements included in 
the state site certification process, which were not available in time 
for the Draft EIS. The final order directed FPL to avoid siting any 
transmission lines in the park and pursue the use of the West Consensus 
Corridor as the primary corridor for siting transmission lines. The FPL 
West Preferred Corridor (which includes the NPS exchange lands) would 
only be used for transmission lines if FPL cannot secure an adequate 
right-of-way within the FPL West Consensus Corridor (outside of the 
park boundary) in a timely manner and at a reasonable cost. FPL's 
success in acquiring interests in the West Consensus Corridor would 
minimize or eliminate the amount of property in the exchange corridor 
required for these transmission lines.
    In the Final EIS, this alternative now includes a commitment that 
FPL shall reconvey to the NPS all acreage in the exchange corridor that 
is determined to be unneeded by FPL to build the transmission lines. 
FPL would not develop land within the exchange corridor until 
completing the requirements of the site certification process and 
determining land ownership needs. The park boundary would be adjusted 
after the reconveyance, so that it reflects the actual final land 
ownership between FPL and NPS. These commitments would be identified in 
a binding exchange agreement between the two parties.
    Alternative 4, Easement for Fee Land Exchange: the NPS would 
acquire fee title to the FPL property through an exchange for an 
easement on NPS property. This is similar to alternative 3, except that 
NPS would grant FPL an easement for potential transmission line 
construction (not fee title) over the lands along the eastern boundary 
of the EEEA, in accordance with the terms and conditions developed for 
this easement for fee exchange. The NPS would retain ownership of the 
corridor, but would no longer have unencumbered use of it. The NPS 
would also convey a 90-foot-wide perpetual nonnative vegetation 
management easement to FPL adjacent to the entire length of the 
exchange corridor. The easement for fee land exchange would be subject 
to terms and conditions that are to be agreed upon between NPS and FPL 
and incorporated into a binding exchange agreement. Similar to 
alternative 3, the FPL easement corridor would be subject to a 
perpetual flowage easement.
    Alternative 5, Perpetual Flowage Easement on FPL Property: the NPS 
would acquire a perpetual flowage easement on FPL's property within the 
EEEA through purchase, condemnation, or donation by FPL. FPL would 
retain ownership of its corridor in the park during the term of the 
easement and could seek to site transmission lines there. The flowage 
allowed under this easement would allow sufficient water flow over this 
area to support ecosystem restoration projects. The construction 
scenario associated with this alternative would be the same as the one 
for alternative 1B (FPL construction of transmission lines on its 
existing land in the park).
    The Final EIS responds to, and incorporates, agency and public 
comments received on the Draft EIS. The Draft EIS was available for 
public review and comment for 60 days from January 17, 2014, through 
March 18, 2014. During the comment period, 275 pieces of correspondence 
were received. Two of these were petitions or letters containing 14,075 
total signatures; a third form letter contained 178 signatures and 70 
individual pieces of correspondence, which are included in the 275 
total comments received. Alternative 2 is the environmentally 
preferable alternative and alternative 3 is the NPS preferred 
alternative.
    The responsible official for this EIS is the Regional Director, NPS 
Southeast Region, 100 Alabama Street SW., 1924 Building, Atlanta, 
Georgia 30303.

    Dated: November 18, 2015.
Shawn Benge,
Deputy Regional Director, Southeast Region.
[FR Doc. 2015-30580 Filed 12-2-15; 8:45 am]
 BILLING CODE 4310-JD-P



                                                                        Federal Register / Vol. 80, No. 232 / Thursday, December 3, 2015 / Notices                                           75687

                                             SUMMARY:    In accordance with the                      renewable energy, Salton Sea, and                     The acquisition of the existing FPL
                                             Federal Land Policy and Management                      geothermal. Written comments may be                   parcel is needed to support the goals of
                                             Act of 1976 (FLPMA), and the Federal                    filed in advance of the meeting for the               restoring the Northeast Shark River
                                             Advisory Committee Act of 1972                          California Desert District Advisory                   Slough and to fulfill the purposes of the
                                             (FACA), the U.S. Department of the                      Council, c/o Bureau of Land                           Comprehensive Everglades Restoration
                                             Interior, Bureau of Land Management                     Management, External Affairs, 22835                   Plan. Acquisition of land within the
                                             (BLM) California Desert District                        Calle San Juan de Los Lagos, Moreno                   EEEA through an exchange of lands
                                             Advisory Council (DAC) will meet as                     Valley, CA 92553. Written comments                    with FPL is legally authorized by Public
                                             indicated below.                                        also are accepted at the time of the                  Law 111–11 (March 30, 2009).
                                             DATES: The DAC will participate in a                    meeting and, if copies are provided to                   The Final EIS describes five
                                             field tour of BLM-administered public                   the recorder, will be incorporated into               alternatives. The Final EIS addresses the
                                             lands on Friday, December 4, 2015, from                 the minutes.                                          potential impacts from the acquisition
                                             8:00 a.m. to 5:00 p.m. and will meet in                   Dated: November 23, 2015.
                                                                                                                                                           of FPL land in the park, as well as the
                                             formal session on Saturday, December 5,                                                                       indirect impacts that could result from
                                                                                                     Teresa A. Raml,
                                             2015, from 8:00 a.m. to 5:00 p.m. in El                                                                       the subsequent construction and
                                                                                                     California Desert District Manager.                   operation of transmission lines, which
                                             Centro, California. Members of the
                                                                                                     [FR Doc. 2015–30617 Filed 12–2–15; 8:45 am]           could be built either inside or outside
                                             public are welcome. They must provide
                                             their own transportation, meals and                     BILLING CODE 4310–40–P                                the park as a result of the land
                                             beverages. Final agendas for the Friday                                                                       acquisition alternative selected. The
                                             field trip and the Saturday public                                                                            following describes each of the
                                                                                                     DEPARTMENT OF THE INTERIOR                            alternatives included in the Final EIS:
                                             meeting, along with the Saturday
                                             meeting location, will be posted on the                                                                          Alternative 1a, No NPS Action—No
                                                                                                     National Park Service
                                             DAC Web page at http://www.blm.gov/                                                                           FPL Construction (environmental
                                             ca/st/en/info/rac/dac.html when                         [NPS–SER–EVER–19669]; [PPSESEROC3,                    baseline): The NPS would not take
                                                                                                     PPMPSAS1Y.YP0000]                                     action to acquire FPL property within
                                             finalized.
                                                                                                                                                           the park. This alternative assumes that
                                             FOR FURTHER INFORMATION CONTACT:                        Final Environmental Impact Statement                  FPL would not construct transmission
                                             Stephen Razo, BLM California Desert                     for the Acquisition of Florida Power &                lines on its existing land in the park, in
                                             District External Affairs, 1–951–697–                   Light Company Land in the East                        the exchange corridor, or in any area
                                             5217. Persons who use a                                 Everglades Expansion Area                             outside the park.
                                             telecommunications device for the deaf                                                                           Alternative 1b, No NPS Action—FPL
                                             (TDD) may call the Federal Information                  AGENCY:   National Park Service, Interior.
                                                                                                     ACTION:   Notice of availability.                     Construction in the Park: the NPS
                                             Relay Service (FIRS) at 1–800–877–8339                                                                        would not take action to acquire FPL
                                             to contact the above individual during                  SUMMARY:    The National Park Service                 property within the park, the same as
                                             normal business hours. The FIRS is                      (NPS) announces the availability of the               alternative 1a, but this alternative
                                             available 24 hours a day, 7 days a week,                Final Environmental Impact Statement                  assumes that FPL would construct
                                             to leave a message or question with the                 (EIS) for the acquisition of Florida                  transmission lines on its existing land in
                                             above individuals. You will receive a                   Power & Light Company (FPL) land in                   the park.
                                             reply during normal hours.                              the East Everglades Expansion Area                       Alternative 2, NPS Acquisition of FPL
                                             SUPPLEMENTARY INFORMATION: All DAC                      (EEEA), Everglades National Park,                     Land: the NPS would acquire the FPL
                                             meetings are open to the public. The 15-                Florida.                                              property by purchase or through the
                                             member council advises the Secretary of                                                                       exercise of eminent domain authority by
                                                                                                     DATES: The NPS will execute the Record
                                             the Interior, through the BLM, on a                                                                           the United States. This alternative
                                             variety of planning and management                      of Decision (ROD) no sooner than 30                   would result in an increase of 320 acres
                                             issues associated with public land                      days following publication by the                     of NPS-owned land within the
                                             management on BLM-administered                          Environmental Protection Agency of its                authorized boundary of the park and
                                             lands in the California desert. Public                  Notice of Availability of the Final EIS in            would allow for flowage of water on this
                                             comment for items not on the agenda                     the Federal Register.                                 property. This alternative assumes that
                                             will be scheduled at the beginning of                   ADDRESSES: Electronic copies of the                   FPL would likely acquire a replacement
                                             the meeting Saturday morning. Time for                  Final EIS will be available online at                 corridor east of the existing park
                                             public comment is made available by                     http://parkplanning.nps/ever. A limited               boundary within or adjacent to the FPL
                                             the council chairman during the                         number of compact disks and printed                   and Miami-Dade Limestone Products
                                             presentation of various agenda items,                   copies of the Final EIS will be made                  Association (MDLPA) West Consensus
                                             and is scheduled at the end of the                      available at Everglades National Park                 Corridor to meet its transmission needs,
                                             meeting for topics not on the agenda.                   Headquarters, Everglades National Park,               and the transmission lines would be
                                                While the Saturday meeting is                        40001 State Highway 9336, Homestead,                  built outside the park. Alternative 2 is
                                             tentatively scheduled from 8:00 a.m. to                 Florida 33034–6733.                                   the environmentally preferable
                                             5:00 p.m., the meeting could conclude                   FOR FURTHER INFORMATION CONTACT:                      alternative.
                                             prior to 5:00 p.m. should the council                   Brien Culhane, Everglades National                       Alternative 3 (NPS Preferred
                                             conclude its presentations and                          Park, 40001 State Road 9336,                          Alternative), Fee for Fee Land Exchange:
                                             discussions. Therefore, members of the                  Homestead, FL 33034–6733 or by                        the NPS would acquire fee title to the
                                             public interested in a particular agenda                telephone at (305) 242–7717.                          FPL property through an exchange for
Lhorne on DSK5TPTVN1PROD with NOTICES




                                             item or discussion should schedule                      SUPPLEMENTARY INFORMATION: The Final                  park property, as authorized by the
                                             their arrival accordingly. Agenda for the               EIS addresses alternatives for NPS                    exchange legislation. NPS land
                                             Saturday meeting will include updates                   acquisition of existing FPL land located              conveyed to FPL (the ‘‘exchange
                                             by council members, the BLM California                  within the park, or of a sufficient                   corridor’’) would consist of 260 acres
                                             Desert District Manager, five Field                     interest in the property, to facilitate               along 6.5 miles of the eastern boundary
                                             Managers, and council subgroups. Focus                  hydrologic and ecologic restoration of                of the EEEA. The NPS would also
                                             topics for the meeting will include                     the park and the Everglades ecosystem.                convey to FPL a 90-foot-wide perpetual


                                        VerDate Sep<11>2014   15:11 Dec 02, 2015   Jkt 238001   PO 00000   Frm 00031   Fmt 4703   Sfmt 4703   E:\FR\FM\03DEN1.SGM   03DEN1


                                             75688                      Federal Register / Vol. 80, No. 232 / Thursday, December 3, 2015 / Notices

                                             nonnative vegetation management                         ownership of the corridor, but would no               INTERNATIONAL TRADE
                                             easement adjacent to the entire length of               longer have unencumbered use of it.                   COMMISSION
                                             the exchange corridor. The fee for fee                  The NPS would also convey a 90-foot-
                                                                                                                                                           [USITC SE–15–041]
                                             land exchange would be subject to terms                 wide perpetual nonnative vegetation
                                             and conditions that are to be agreed                    management easement to FPL adjacent                   Government in the Sunshine Act
                                             upon between NPS and FPL and                            to the entire length of the exchange                  Meeting Notice
                                             incorporated into a binding exchange                    corridor. The easement for fee land
                                             agreement. FPL would be required to                     exchange would be subject to terms and                AGENCY HOLDING THE MEETING:     United
                                             allow the United States the perpetual                   conditions that are to be agreed upon                 States International Trade Commission.
                                             right, power, and privilege to flood and                                                                      TIME AND DATE: December 11, 2015 at
                                                                                                     between NPS and FPL and incorporated
                                             submerge the exchange corridor                                                                                11:00 a.m.
                                                                                                     into a binding exchange agreement.
                                             consistent with hydrologic restoration
                                             requirements. The construction scenario                 Similar to alternative 3, the FPL                     PLACE: Room 101, 500 E Street SW.,
                                             associated with this alternative assumes                easement corridor would be subject to a               Washington, DC 20436, Telephone:
                                             that FPL would build the transmission                   perpetual flowage easement.                           (202) 205–2000.
                                             lines in the exchange corridor.                            Alternative 5, Perpetual Flowage                   STATUS: Open to the public.
                                                This alternative has been revised from               Easement on FPL Property: the NPS                     MATTERS TO BE CONSIDERED:
                                             the Draft EIS to the Final EIS due to                   would acquire a perpetual flowage                        1. Agendas for future meetings: None.
                                             updated transmission line siting                        easement on FPL’s property within the                    2. Minutes.
                                             requirements included in the state site                 EEEA through purchase, condemnation,                     3. Ratification List.
                                             certification process, which were not                   or donation by FPL. FPL would retain                     4. Vote in Inv. Nos. 701–TA–549 and
                                             available in time for the Draft EIS. The                ownership of its corridor in the park                 731–TA–1299–1303 (Preliminary)
                                             final order directed FPL to avoid siting                during the term of the easement and                   (Circular Welded Carbon-Quality Steel
                                             any transmission lines in the park and                                                                        Pipe from Oman, Pakistan, the
                                                                                                     could seek to site transmission lines
                                             pursue the use of the West Consensus                                                                          Philippines, the United Arab Emirates,
                                                                                                     there. The flowage allowed under this
                                             Corridor as the primary corridor for                                                                          and Vietnam). The Commission is
                                             siting transmission lines. The FPL West                 easement would allow sufficient water
                                                                                                                                                           currently scheduled to complete and file
                                             Preferred Corridor (which includes the                  flow over this area to support ecosystem
                                                                                                                                                           its determinations on December 14,
                                             NPS exchange lands) would only be                       restoration projects. The construction                2015; views of the Commission are
                                             used for transmission lines if FPL                      scenario associated with this alternative             currently scheduled to be completed
                                             cannot secure an adequate right-of-way                  would be the same as the one for                      and filed on December 21, 2015.
                                             within the FPL West Consensus                           alternative 1B (FPL construction of                      5. Vote in Inv. Nos. 701–TA–550 and
                                             Corridor (outside of the park boundary)                 transmission lines on its existing land in            731–TA–1304–1305 (Preliminary)
                                             in a timely manner and at a reasonable                  the park).                                            (Certain Iron Mechanical Transfer Drive
                                             cost. FPL’s success in acquiring interests                 The Final EIS responds to, and                     Components from Canada and China).
                                             in the West Consensus Corridor would                    incorporates, agency and public                       The Commission is currently scheduled
                                             minimize or eliminate the amount of                     comments received on the Draft EIS.                   to be completed and filed on December
                                             property in the exchange corridor                       The Draft EIS was available for public                14, 2015; views of the Commission are
                                             required for these transmission lines.                                                                        currently scheduled to be completed
                                                                                                     review and comment for 60 days from
                                                In the Final EIS, this alternative now                                                                     and filed on December 21, 2015.
                                             includes a commitment that FPL shall                    January 17, 2014, through March 18,
                                                                                                     2014. During the comment period, 275                     6. Outstanding action jackets: None.
                                             reconvey to the NPS all acreage in the                                                                           In accordance with Commission
                                             exchange corridor that is determined to                 pieces of correspondence were received.
                                                                                                                                                           policy, subject matter listed above, not
                                             be unneeded by FPL to build the                         Two of these were petitions or letters
                                                                                                                                                           disposed of at the scheduled meeting,
                                             transmission lines. FPL would not                       containing 14,075 total signatures; a
                                                                                                                                                           may be carried over to the agenda of the
                                             develop land within the exchange                        third form letter contained 178                       following meeting.
                                             corridor until completing the                           signatures and 70 individual pieces of
                                                                                                     correspondence, which are included in                   By order of the Commission.
                                             requirements of the site certification
                                             process and determining land                            the 275 total comments received.                        Issued: November 30, 2015.
                                             ownership needs. The park boundary                      Alternative 2 is the environmentally                  William R. Bishop,
                                             would be adjusted after the                             preferable alternative and alternative 3              Supervisory Hearings and Information
                                             reconveyance, so that it reflects the                   is the NPS preferred alternative.                     Officer.
                                             actual final land ownership between                                                                           [FR Doc. 2015–30634 Filed 12–1–15; 11:15 am]
                                                                                                        The responsible official for this EIS is
                                             FPL and NPS. These commitments                                                                                BILLING CODE 7020–02–P
                                                                                                     the Regional Director, NPS Southeast
                                             would be identified in a binding
                                             exchange agreement between the two                      Region, 100 Alabama Street SW., 1924
                                             parties.                                                Building, Atlanta, Georgia 30303.
                                                                                                                                                           DEPARTMENT OF JUSTICE
                                                Alternative 4, Easement for Fee Land                   Dated: November 18, 2015.
                                             Exchange: the NPS would acquire fee                     Shawn Benge,                                          Drug Enforcement Administration
                                             title to the FPL property through an
                                                                                                     Deputy Regional Director, Southeast Region.           [Docket No. DEA–392]
                                             exchange for an easement on NPS
                                                                                                     [FR Doc. 2015–30580 Filed 12–2–15; 8:45 am]
                                             property. This is similar to alternative 3,                                                                   Importer of Controlled Substances
Lhorne on DSK5TPTVN1PROD with NOTICES




                                             except that NPS would grant FPL an                      BILLING CODE 4310–JD–P
                                                                                                                                                           Application: Mylan Technologies, Inc.
                                             easement for potential transmission line
                                             construction (not fee title) over the                                                                         ACTION:   Notice of application.
                                             lands along the eastern boundary of the
                                             EEEA, in accordance with the terms and                                                                        DATES:  Registered bulk manufacturers of
                                             conditions developed for this easement                                                                        the affected basic classes, and
                                             for fee exchange. The NPS would retain                                                                        applicants therefore, may file written


                                        VerDate Sep<11>2014   15:11 Dec 02, 2015   Jkt 238001   PO 00000   Frm 00032   Fmt 4703   Sfmt 4703   E:\FR\FM\03DEN1.SGM   03DEN1



Document Created: 2015-12-14 13:51:42
Document Modified: 2015-12-14 13:51:42
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice of availability.
DatesThe NPS will execute the Record of Decision (ROD) no sooner than 30 days following publication by the Environmental Protection Agency of its Notice of Availability of the Final EIS in the Federal Register.
ContactBrien Culhane, Everglades National Park, 40001 State Road 9336, Homestead, FL 33034-6733 or by telephone at (305) 242-7717.