80_FR_75920 80 FR 75688 - Government in the Sunshine Act Meeting Notice

80 FR 75688 - Government in the Sunshine Act Meeting Notice

INTERNATIONAL TRADE COMMISSION

Federal Register Volume 80, Issue 232 (December 3, 2015)

Page Range75688-75688
FR Document2015-30634

Federal Register, Volume 80 Issue 232 (Thursday, December 3, 2015)
[Federal Register Volume 80, Number 232 (Thursday, December 3, 2015)]
[Notices]
[Page 75688]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-30634]


=======================================================================
-----------------------------------------------------------------------

INTERNATIONAL TRADE COMMISSION

[USITC SE-15-041]


Government in the Sunshine Act Meeting Notice

AGENCY HOLDING THE MEETING: United States International Trade 
Commission.

TIME AND DATE: December 11, 2015 at 11:00 a.m.

PLACE: Room 101, 500 E Street SW., Washington, DC 20436, Telephone: 
(202) 205-2000.

STATUS: Open to the public.

MATTERS TO BE CONSIDERED: 
    1. Agendas for future meetings: None.
    2. Minutes.
    3. Ratification List.
    4. Vote in Inv. Nos. 701-TA-549 and 731-TA-1299-1303 (Preliminary) 
(Circular Welded Carbon-Quality Steel Pipe from Oman, Pakistan, the 
Philippines, the United Arab Emirates, and Vietnam). The Commission is 
currently scheduled to complete and file its determinations on December 
14, 2015; views of the Commission are currently scheduled to be 
completed and filed on December 21, 2015.
    5. Vote in Inv. Nos. 701-TA-550 and 731-TA-1304-1305 (Preliminary) 
(Certain Iron Mechanical Transfer Drive Components from Canada and 
China). The Commission is currently scheduled to be completed and filed 
on December 14, 2015; views of the Commission are currently scheduled 
to be completed and filed on December 21, 2015.
    6. Outstanding action jackets: None.
    In accordance with Commission policy, subject matter listed above, 
not disposed of at the scheduled meeting, may be carried over to the 
agenda of the following meeting.

    By order of the Commission.

    Issued: November 30, 2015.
William R. Bishop,
Supervisory Hearings and Information Officer.
[FR Doc. 2015-30634 Filed 12-1-15; 11:15 am]
BILLING CODE 7020-02-P



                                             75688                      Federal Register / Vol. 80, No. 232 / Thursday, December 3, 2015 / Notices

                                             nonnative vegetation management                         ownership of the corridor, but would no               INTERNATIONAL TRADE
                                             easement adjacent to the entire length of               longer have unencumbered use of it.                   COMMISSION
                                             the exchange corridor. The fee for fee                  The NPS would also convey a 90-foot-
                                                                                                                                                           [USITC SE–15–041]
                                             land exchange would be subject to terms                 wide perpetual nonnative vegetation
                                             and conditions that are to be agreed                    management easement to FPL adjacent                   Government in the Sunshine Act
                                             upon between NPS and FPL and                            to the entire length of the exchange                  Meeting Notice
                                             incorporated into a binding exchange                    corridor. The easement for fee land
                                             agreement. FPL would be required to                     exchange would be subject to terms and                AGENCY HOLDING THE MEETING:     United
                                             allow the United States the perpetual                   conditions that are to be agreed upon                 States International Trade Commission.
                                             right, power, and privilege to flood and                                                                      TIME AND DATE: December 11, 2015 at
                                                                                                     between NPS and FPL and incorporated
                                             submerge the exchange corridor                                                                                11:00 a.m.
                                                                                                     into a binding exchange agreement.
                                             consistent with hydrologic restoration
                                             requirements. The construction scenario                 Similar to alternative 3, the FPL                     PLACE: Room 101, 500 E Street SW.,
                                             associated with this alternative assumes                easement corridor would be subject to a               Washington, DC 20436, Telephone:
                                             that FPL would build the transmission                   perpetual flowage easement.                           (202) 205–2000.
                                             lines in the exchange corridor.                            Alternative 5, Perpetual Flowage                   STATUS: Open to the public.
                                                This alternative has been revised from               Easement on FPL Property: the NPS                     MATTERS TO BE CONSIDERED:
                                             the Draft EIS to the Final EIS due to                   would acquire a perpetual flowage                        1. Agendas for future meetings: None.
                                             updated transmission line siting                        easement on FPL’s property within the                    2. Minutes.
                                             requirements included in the state site                 EEEA through purchase, condemnation,                     3. Ratification List.
                                             certification process, which were not                   or donation by FPL. FPL would retain                     4. Vote in Inv. Nos. 701–TA–549 and
                                             available in time for the Draft EIS. The                ownership of its corridor in the park                 731–TA–1299–1303 (Preliminary)
                                             final order directed FPL to avoid siting                during the term of the easement and                   (Circular Welded Carbon-Quality Steel
                                             any transmission lines in the park and                                                                        Pipe from Oman, Pakistan, the
                                                                                                     could seek to site transmission lines
                                             pursue the use of the West Consensus                                                                          Philippines, the United Arab Emirates,
                                                                                                     there. The flowage allowed under this
                                             Corridor as the primary corridor for                                                                          and Vietnam). The Commission is
                                             siting transmission lines. The FPL West                 easement would allow sufficient water
                                                                                                                                                           currently scheduled to complete and file
                                             Preferred Corridor (which includes the                  flow over this area to support ecosystem
                                                                                                                                                           its determinations on December 14,
                                             NPS exchange lands) would only be                       restoration projects. The construction                2015; views of the Commission are
                                             used for transmission lines if FPL                      scenario associated with this alternative             currently scheduled to be completed
                                             cannot secure an adequate right-of-way                  would be the same as the one for                      and filed on December 21, 2015.
                                             within the FPL West Consensus                           alternative 1B (FPL construction of                      5. Vote in Inv. Nos. 701–TA–550 and
                                             Corridor (outside of the park boundary)                 transmission lines on its existing land in            731–TA–1304–1305 (Preliminary)
                                             in a timely manner and at a reasonable                  the park).                                            (Certain Iron Mechanical Transfer Drive
                                             cost. FPL’s success in acquiring interests                 The Final EIS responds to, and                     Components from Canada and China).
                                             in the West Consensus Corridor would                    incorporates, agency and public                       The Commission is currently scheduled
                                             minimize or eliminate the amount of                     comments received on the Draft EIS.                   to be completed and filed on December
                                             property in the exchange corridor                       The Draft EIS was available for public                14, 2015; views of the Commission are
                                             required for these transmission lines.                                                                        currently scheduled to be completed
                                                                                                     review and comment for 60 days from
                                                In the Final EIS, this alternative now                                                                     and filed on December 21, 2015.
                                             includes a commitment that FPL shall                    January 17, 2014, through March 18,
                                                                                                     2014. During the comment period, 275                     6. Outstanding action jackets: None.
                                             reconvey to the NPS all acreage in the                                                                           In accordance with Commission
                                             exchange corridor that is determined to                 pieces of correspondence were received.
                                                                                                                                                           policy, subject matter listed above, not
                                             be unneeded by FPL to build the                         Two of these were petitions or letters
                                                                                                                                                           disposed of at the scheduled meeting,
                                             transmission lines. FPL would not                       containing 14,075 total signatures; a
                                                                                                                                                           may be carried over to the agenda of the
                                             develop land within the exchange                        third form letter contained 178                       following meeting.
                                             corridor until completing the                           signatures and 70 individual pieces of
                                                                                                     correspondence, which are included in                   By order of the Commission.
                                             requirements of the site certification
                                             process and determining land                            the 275 total comments received.                        Issued: November 30, 2015.
                                             ownership needs. The park boundary                      Alternative 2 is the environmentally                  William R. Bishop,
                                             would be adjusted after the                             preferable alternative and alternative 3              Supervisory Hearings and Information
                                             reconveyance, so that it reflects the                   is the NPS preferred alternative.                     Officer.
                                             actual final land ownership between                                                                           [FR Doc. 2015–30634 Filed 12–1–15; 11:15 am]
                                                                                                        The responsible official for this EIS is
                                             FPL and NPS. These commitments                                                                                BILLING CODE 7020–02–P
                                                                                                     the Regional Director, NPS Southeast
                                             would be identified in a binding
                                             exchange agreement between the two                      Region, 100 Alabama Street SW., 1924
                                             parties.                                                Building, Atlanta, Georgia 30303.
                                                                                                                                                           DEPARTMENT OF JUSTICE
                                                Alternative 4, Easement for Fee Land                   Dated: November 18, 2015.
                                             Exchange: the NPS would acquire fee                     Shawn Benge,                                          Drug Enforcement Administration
                                             title to the FPL property through an
                                                                                                     Deputy Regional Director, Southeast Region.           [Docket No. DEA–392]
                                             exchange for an easement on NPS
                                                                                                     [FR Doc. 2015–30580 Filed 12–2–15; 8:45 am]
                                             property. This is similar to alternative 3,                                                                   Importer of Controlled Substances
Lhorne on DSK5TPTVN1PROD with NOTICES




                                             except that NPS would grant FPL an                      BILLING CODE 4310–JD–P
                                                                                                                                                           Application: Mylan Technologies, Inc.
                                             easement for potential transmission line
                                             construction (not fee title) over the                                                                         ACTION:   Notice of application.
                                             lands along the eastern boundary of the
                                             EEEA, in accordance with the terms and                                                                        DATES:  Registered bulk manufacturers of
                                             conditions developed for this easement                                                                        the affected basic classes, and
                                             for fee exchange. The NPS would retain                                                                        applicants therefore, may file written


                                        VerDate Sep<11>2014   15:11 Dec 02, 2015   Jkt 238001   PO 00000   Frm 00032   Fmt 4703   Sfmt 4703   E:\FR\FM\03DEN1.SGM   03DEN1



Document Created: 2015-12-14 13:51:39
Document Modified: 2015-12-14 13:51:39
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
DatesDecember 11, 2015 at 11:00 a.m.
FR Citation80 FR 75688 

2025 Federal Register | Disclaimer | Privacy Policy