80_FR_76044 80 FR 75811 - Drawbridge Operation Regulation; Upper Mississippi River, Dubuque, IA

80 FR 75811 - Drawbridge Operation Regulation; Upper Mississippi River, Dubuque, IA

DEPARTMENT OF HOMELAND SECURITY
Coast Guard

Federal Register Volume 80, Issue 233 (December 4, 2015)

Page Range75811-75811
FR Document2015-30637

The Coast Guard has issued a temporary deviation from the operating schedule that governs the Illinois Central Railroad Drawbridge across the Mississippi River, mile 579.9, at Dubuque, Iowa. The deviation is necessary to allow the bridge owner time to perform preventive maintenance that is essential to the safe operation of the drawbridge. Maintenance is scheduled in the winter when there is less impact on navigation, instead of scheduling work in the summer when river traffic increases. This deviation allows the bridge to open on signal if at least 24-hours advance notice is given. It further allows the bridge to remain closed for up to 120 hours in duration occasionally to replace larger components as long as 72-hours notice is given to the USCG District Eight Western Rivers Bridge Branch.

Federal Register, Volume 80 Issue 233 (Friday, December 4, 2015)
[Federal Register Volume 80, Number 233 (Friday, December 4, 2015)]
[Rules and Regulations]
[Page 75811]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-30637]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF HOMELAND SECURITY

Coast Guard

33 CFR Part 117

[Docket No. USCG-2015-0999]


Drawbridge Operation Regulation; Upper Mississippi River, 
Dubuque, IA

AGENCY: Coast Guard, DHS.

ACTION: Notice of deviation from drawbridge regulation.

-----------------------------------------------------------------------

SUMMARY: The Coast Guard has issued a temporary deviation from the 
operating schedule that governs the Illinois Central Railroad 
Drawbridge across the Mississippi River, mile 579.9, at Dubuque, Iowa. 
The deviation is necessary to allow the bridge owner time to perform 
preventive maintenance that is essential to the safe operation of the 
drawbridge. Maintenance is scheduled in the winter when there is less 
impact on navigation, instead of scheduling work in the summer when 
river traffic increases. This deviation allows the bridge to open on 
signal if at least 24-hours advance notice is given. It further allows 
the bridge to remain closed for up to 120 hours in duration 
occasionally to replace larger components as long as 72-hours notice is 
given to the USCG District Eight Western Rivers Bridge Branch.

DATES: This deviation is effective from 5 p.m., December 14, 2015 until 
9 a.m., February 29, 2016.

ADDRESSES: The docket for this deviation, (USCG-2015-0999) is available 
at http://www.regulations.gov. Type the docket number in the ``SEARCH'' 
box and click ``SEARCH''. Click on Open Docket Folder on the line 
associated with this deviation.

FOR FURTHER INFORMATION CONTACT: If you have questions on this 
temporary deviation, call or email Eric A. Washburn, Bridge 
Administrator, Western Rivers, Coast Guard; telephone 314-269-2378, 
email Eric.Washburn@uscg.mil.

SUPPLEMENTARY INFORMATION: The Chicago, Central & Pacific Railroad 
requested a temporary deviation for the Illinois Central Railroad 
Drawbridge, across the Upper Mississippi River, mile 579.9, at Dubuque, 
Iowa to open on signal if at least 24-hours advance notice is given for 
77 days from 5 p.m., December 14, 2015 until 9 a.m., February 29, 2016 
for scheduled maintenance on the bridge. The deviation further allows 
the bridge to remain closed for up to 120 hours in duration 
occasionally to replace larger components as long as 72-hours notice is 
given to the USCG District Eight Western Rivers Bridge Branch.
    The Illinois Central Railroad Drawbridge currently operates in 
accordance with 33 CFR 117.5, which states the general requirement that 
the drawbridge shall open on signal.
    There are no alternate routes for vessels transiting this section 
of the Upper Mississippi River. The bridge cannot open in case of 
emergency.
    Winter conditions on the Upper Mississippi River coupled with the 
closure of Army Corps of Engineer's Lock No. 13 (Mile 522.5 UMR) and 
Lock No. 21 (Mile 324.9 UMR) from 7 a.m. January 4, 2016 until 12 p.m., 
March 4, 2016 will preclude any significant navigation demands for the 
drawspan opening. In addition, Army Corps Lock No. 14 (Mile 493.3 UMR) 
and Lock No. 17 (Mile 437.1 UMR) will be closed from 7 a.m. December 
14, 2015 until 12 p.m. March 2, 2016.
    The Illinois Central Railroad Drawbridge provides a vertical 
clearance of 19.9 feet above normal pool in the closed-to-navigation 
position. Navigation on the waterway consists primarily of commercial 
tows and recreational watercraft and will not be significantly 
impacted. The drawbridge will open if at least 24-hours advance notice 
is given and will close for up to 120 hours provided 72-hours advance 
notice is given to the USCG District Eight Western Rivers Bridge 
Branch. This temporary deviation has been coordinated with waterway 
users. No objections were received.
    In accordance with 33 CFR 117.35(e), the drawbridge must return to 
its regular operating schedule immediately at the end of the effective 
period of this temporary deviation. This deviation from the operating 
regulations is authorized under 33 CFR 117.35.

    Dated: November 27, 2015.
Eric A. Washburn,
Bridge Administrator, Western Rivers.
[FR Doc. 2015-30637 Filed 12-3-15; 8:45 am]
 BILLING CODE 9110-04-P



                                                             Federal Register / Vol. 80, No. 233 / Friday, December 4, 2015 / Rules and Regulations                                        75811

                                           [FR Doc. 2015–30585 Filed 12–3–15; 8:45 am]             maintenance on the bridge. The                        DEPARTMENT OF HOMELAND
                                           BILLING CODE 4310–VH–P                                  deviation further allows the bridge to                SECURITY
                                                                                                   remain closed for up to 120 hours in
                                                                                                   duration occasionally to replace larger               Coast Guard
                                           DEPARTMENT OF HOMELAND                                  components as long as 72-hours notice
                                           SECURITY                                                is given to the USCG District Eight                   33 CFR Part 117
                                                                                                   Western Rivers Bridge Branch.                         [Docket No. USCG–2015–0975]
                                           Coast Guard
                                                                                                      The Illinois Central Railroad
                                                                                                                                                         Drawbridge Operation Regulation;
                                           33 CFR Part 117                                         Drawbridge currently operates in
                                                                                                                                                         Upper Mississippi River, Clinton, IA
                                                                                                   accordance with 33 CFR 117.5, which
                                           [Docket No. USCG–2015–0999]                             states the general requirement that the               AGENCY: Coast Guard, DHS.
                                                                                                   drawbridge shall open on signal.                      ACTION:Notice of deviation from
                                           Drawbridge Operation Regulation;
                                           Upper Mississippi River, Dubuque, IA                       There are no alternate routes for                  drawbridge regulation.
                                                                                                   vessels transiting this section of the                SUMMARY:   The Coast Guard has issued a
                                           AGENCY: Coast Guard, DHS.                               Upper Mississippi River. The bridge
                                           ACTION: Notice of deviation from
                                                                                                                                                         temporary deviation from the operating
                                                                                                   cannot open in case of emergency.                     schedule that governs the Clinton
                                           drawbridge regulation.
                                                                                                      Winter conditions on the Upper                     Railroad Drawbridge across the
                                           SUMMARY:    The Coast Guard has issued a                Mississippi River coupled with the                    Mississippi River, mile 518.0, at
                                           temporary deviation from the operating                  closure of Army Corps of Engineer’s                   Clinton, Iowa. The deviation is
                                           schedule that governs the Illinois                      Lock No. 13 (Mile 522.5 UMR) and Lock                 necessary to allow the bridge owner
                                           Central Railroad Drawbridge across the                  No. 21 (Mile 324.9 UMR) from 7 a.m.                   time to perform preventative
                                           Mississippi River, mile 579.9, at                       January 4, 2016 until 12 p.m., March 4,               maintenance that is essential to the
                                           Dubuque, Iowa. The deviation is                         2016 will preclude any significant                    continued safe operation of the
                                           necessary to allow the bridge owner                     navigation demands for the drawspan                   drawbridge. Maintenance is scheduled
                                           time to perform preventive maintenance                  opening. In addition, Army Corps Lock                 in the winter when there is less impact
                                           that is essential to the safe operation of              No. 14 (Mile 493.3 UMR) and Lock No.                  on navigation; instead of scheduling
                                           the drawbridge. Maintenance is                          17 (Mile 437.1 UMR) will be closed                    work in the summer, when river traffic
                                           scheduled in the winter when there is                                                                         increases. This deviation allows the
                                                                                                   from 7 a.m. December 14, 2015 until 12
                                           less impact on navigation, instead of                                                                         bridge to open on signal if at least 24-
                                                                                                   p.m. March 2, 2016.
                                           scheduling work in the summer when                                                                            hours advance notice is given. It further
                                           river traffic increases. This deviation                    The Illinois Central Railroad                      allows the bridge to remain closed for
                                           allows the bridge to open on signal if at               Drawbridge provides a vertical                        up to 120 hours in duration occasionally
                                           least 24-hours advance notice is given.                 clearance of 19.9 feet above normal pool              between January 4, 2016 and February
                                           It further allows the bridge to remain                  in the closed-to-navigation position.                 19, 2016 to replace larger bridge
                                           closed for up to 120 hours in duration                  Navigation on the waterway consists                   components as long as 72-hours notice
                                           occasionally to replace larger                          primarily of commercial tows and                      is given to the USCG District Eight
                                           components as long as 72-hours notice                   recreational watercraft and will not be               Western Rivers Bridge Branch.
                                           is given to the USCG District Eight                     significantly impacted. The drawbridge                DATES: This deviation is effective from
                                           Western Rivers Bridge Branch.                           will open if at least 24-hours advance                5 p.m., December 15, 2015 until 9 a.m.,
                                           DATES: This deviation is effective from                 notice is given and will close for up to              on March 1, 2016.
                                           5 p.m., December 14, 2015 until 9 a.m.,                 120 hours provided 72-hours advance                   ADDRESSES: The docket for this
                                           February 29, 2016.                                      notice is given to the USCG District                  deviation, (USCG–2015–0975) is
                                           ADDRESSES: The docket for this                          Eight Western Rivers Bridge Branch.                   available at http://www.regulations.gov.
                                           deviation, (USCG–2015–0999) is                          This temporary deviation has been                     Type the docket number in the
                                           available at http://www.regulations.gov.                coordinated with waterway users. No                   ‘‘SEARCH’’ box and click ‘‘SEARCH.’’
                                           Type the docket number in the                           objections were received.                             Click on Open Docket Folder on the line
                                           ‘‘SEARCH’’ box and click ‘‘SEARCH’’.                                                                          associated with this deviation.
                                                                                                      In accordance with 33 CFR 117.35(e),
                                           Click on Open Docket Folder on the line                                                                       FOR FURTHER INFORMATION CONTACT: If
                                                                                                   the drawbridge must return to its regular
                                           associated with this deviation.                                                                               you have questions on this temporary
                                                                                                   operating schedule immediately at the
                                           FOR FURTHER INFORMATION CONTACT: If                                                                           deviation, call or email Eric A.
                                                                                                   end of the effective period of this
                                           you have questions on this temporary                                                                          Washburn, Bridge Administrator,
                                                                                                   temporary deviation. This deviation
                                           deviation, call or email Eric A.                                                                              Western Rivers, Coast Guard; telephone
                                                                                                   from the operating regulations is                     314–269–2378, email Eric.Washburn@
                                           Washburn, Bridge Administrator,
                                           Western Rivers, Coast Guard; telephone                  authorized under 33 CFR 117.35.                       uscg.mil.
                                           314–269–2378, email Eric.Washburn@                        Dated: November 27, 2015.                           SUPPLEMENTARY INFORMATION: The Union
                                           uscg.mil.                                               Eric A. Washburn,                                     Pacific Railroad requested a temporary
                                           SUPPLEMENTARY INFORMATION: The                          Bridge Administrator, Western Rivers.                 deviation for the Clinton Railroad
                                           Chicago, Central & Pacific Railroad                     [FR Doc. 2015–30637 Filed 12–3–15; 8:45 am]           Drawbridge, across the Upper
                                           requested a temporary deviation for the                 BILLING CODE 9110–04–P                                Mississippi River, mile 518.0, at
                                           Illinois Central Railroad Drawbridge,                                                                         Clinton, Iowa to open on signal if at
wgreen on DSK2VPTVN1PROD with RULES




                                           across the Upper Mississippi River, mile                                                                      least 24-hours advance notice is given
                                           579.9, at Dubuque, Iowa to open on                                                                            for 76 days from 5 p.m., December 15,
                                           signal if at least 24-hours advance notice                                                                    2015 to 9 a.m., March 1, 2016 for
                                           is given for 77 days from 5 p.m.,                                                                             scheduled maintenance on the bridge.
                                           December 14, 2015 until 9 a.m.,                                                                               This deviation further allows the bridge
                                           February 29, 2016 for scheduled                                                                               to remain closed for up to 120 hours in


                                      VerDate Sep<11>2014   15:14 Dec 03, 2015   Jkt 238001   PO 00000   Frm 00027   Fmt 4700   Sfmt 4700   E:\FR\FM\04DER1.SGM   04DER1



Document Created: 2015-12-14 13:52:45
Document Modified: 2015-12-14 13:52:45
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionRules and Regulations
ActionNotice of deviation from drawbridge regulation.
DatesThis deviation is effective from 5 p.m., December 14, 2015 until 9 a.m., February 29, 2016.
ContactIf you have questions on this temporary deviation, call or email Eric A. Washburn, Bridge Administrator, Western Rivers, Coast Guard; telephone 314-269-2378, email [email protected]
FR Citation80 FR 75811 