80_FR_76542 80 FR 76307 - Information Collection Activities: Oil and Gas Production Requirements; Submitted for Office of Management and Budget (OMB) Review; Comment Request

80 FR 76307 - Information Collection Activities: Oil and Gas Production Requirements; Submitted for Office of Management and Budget (OMB) Review; Comment Request

DEPARTMENT OF THE INTERIOR
Bureau of Safety and Environmental Enforcement

Federal Register Volume 80, Issue 235 (December 8, 2015)

Page Range76307-76311
FR Document2015-30883

To comply with the Paperwork Reduction Act of 1995 (PRA), the Bureau of Safety and Environmental Enforcement (BSEE) is notifying the public that we have submitted to OMB an information collection request (ICR) to renew approval of the paperwork requirements in the regulations under subpart K, Oil and Gas Production Requirements. This notice also provides the public a second opportunity to comment on the revised paperwork burden of these regulatory requirements.

Federal Register, Volume 80 Issue 235 (Tuesday, December 8, 2015)
[Federal Register Volume 80, Number 235 (Tuesday, December 8, 2015)]
[Notices]
[Pages 76307-76311]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-30883]



[[Page 76307]]

-----------------------------------------------------------------------

DEPARTMENT OF THE INTERIOR

Bureau of Safety and Environmental Enforcement

[Docket ID BSEE-BSEE-2015-0011; OMB Control Number 1014-0019; 
15XE1700DX EEEE500000 EX1SF0000.DAQ000]


Information Collection Activities: Oil and Gas Production 
Requirements; Submitted for Office of Management and Budget (OMB) 
Review; Comment Request

ACTION: 30-day Notice.

-----------------------------------------------------------------------

SUMMARY: To comply with the Paperwork Reduction Act of 1995 (PRA), the 
Bureau of Safety and Environmental Enforcement (BSEE) is notifying the 
public that we have submitted to OMB an information collection request 
(ICR) to renew approval of the paperwork requirements in the 
regulations under subpart K, Oil and Gas Production Requirements. This 
notice also provides the public a second opportunity to comment on the 
revised paperwork burden of these regulatory requirements.

DATES: You must submit comments by January 7, 2016.

ADDRESSES: Submit comments by either fax (202) 395-5806 or email 
(OIRA_Submission@omb.eop.gov) directly to the Office of Information and 
Regulatory Affairs, OMB, Attention: Desk Officer for the Department of 
the Interior (1014-0019). Please provide a copy of your comments to 
BSEE by any of the means below.
     Electronically go to http://www.regulations.gov. In the 
Search box, enter BSEE-2015-0011 then click search. Follow the 
instructions to submit public comments and view all related materials. 
We will post all comments.
     Email cheryl.blundon@bsee.gov, fax (703) 787-1546, or mail 
or hand-carry comments to the Department of the Interior; Bureau of 
Safety and Environmental Enforcement; Regulations and Standards Branch; 
ATTN: Cheryl Blundon; 45600 Woodland Road, Sterling, VA 20166. Please 
reference ICR 1014-0019 in your comment and include your name and 
return address.

FOR FURTHER INFORMATION CONTACT: Cheryl Blundon, Regulations and 
Standards Branch, (703) 787-1607, to request additional information 
about this ICR. To see a copy of the entire ICR submitted to OMB, go to 
http://www.reginfo.gov (select Information Collection Review, Currently 
Under Review).

SUPPLEMENTARY INFORMATION: 
    Title: 30 CFR 250, Subpart K, Oil and Gas Production Requirements.
    Form(s): BSEE-0126 and BSEE-0128.
    OMB Control Number: 1014-0019.
    Abstract: The Outer Continental Shelf (OCS) Lands Act (OCSLA), at 
43 U.S.C. 1334 authorizes the Secretary of the Interior to prescribe 
rules and regulations necessary for the administration of the leasing 
provisions of that Act related to mineral resources on the OCS. Such 
rules and regulations will apply to all operations conducted under a 
lease, right-of-way, or a right-of-use and easement. Operations on the 
OCS must preserve, protect, and develop oil and natural gas resources 
in a manner that is consistent with the need to make such resources 
available to meet the Nation's energy needs as rapidly as possible; to 
balance orderly energy resource development with protection of human, 
marine, and coastal environments; to ensure the public a fair and 
equitable return on the resources of the OCS; and to preserve and 
maintain free enterprise competition.
    Section 5(a) of the OCS Lands Act requires the Secretary to 
prescribe rules and regulations ``to provide for the prevention of 
waste, and conservation of the natural resources of the Outer 
Continental Shelf, and the protection of correlative rights therein'' 
and to include provisions ``for the prompt and efficient exploration 
and development of a lease area.''
    Section 1334(g)(2) states ``. . . the lessee shall produce such oil 
or gas, or both, at rates . . . to assure the maximum rate of 
production which may be sustained without loss of ultimate recovery of 
oil or gas, or both, under sound engineering and economic principles, 
and which is safe for the duration of the activity covered by the 
approved plan.''
    In addition to the general authority of OCSLA, section 301(a) of 
the Federal Oil and Gas Royalty Management Act (FOGRMA), 30 U.S.C. 
1751(a), grants authority to the Secretary to prescribe such rules and 
regulations as are reasonably necessary to carry out FOGRMA's 
provisions. While the majority of FOGRMA is directed to royalty 
collection and enforcement, some provisions apply to offshore 
operations. For example, section 109(c)(2) and (d)(1), 30 U.S.C. 
1719(c)(2) and (d)(1), impose substantial civil penalties for failure 
to permit lawful inspections and for knowing or willful preparation or 
submission of false, inaccurate, or misleading reports, records, or 
other information. Because the Secretary has delegated some of the 
authority under FOGRMA to the Bureau of Safety and Environmental 
Enforcement (BSEE), 30 U.S.C. 1751 is included as additional authority 
for these requirements.
    The Independent Offices Appropriations Act (31 U.S.C. 9701), the 
Omnibus Appropriations Bill (Pub. L. 104-133, 110 Stat. 1321, April 26, 
1996), and OMB Circular A-25, authorize Federal agencies to recover the 
full cost of services that confer special benefits. Under the 
Department of the Interior's implementing policy, BSEE is required to 
charge the full cost for services that provide special benefits or 
privileges to an identifiable non-Federal recipient above and beyond 
those that accrue to the public at large. Several requests for approval 
required in Subpart K are subject to cost recovery and BSEE regulations 
specify service fees for these requests.
    Regulations implementing these responsibilities are among those 
delegated to BSEE.
    Responses are mandatory or are required to obtain or retain a 
benefit. No questions of a sensitive nature are asked. BSEE protects 
information considered proprietary under the Freedom of Information Act 
(5 U.S.C. 552) and DOI's implementing regulations (43 CFR 2), and under 
regulations at 30 CFR part 250.197, Data and information to be made 
available to the public or for limited inspection, 30 CFR part 252, OCS 
Oil and Gas Information Program.
    The information collected under Subpart K is used in our efforts to 
conserve natural resources, prevent waste, and protect correlative 
rights, including the Federal Government's royalty interest. 
Specifically, BSEE uses the information to:
     Evaluate requests to burn liquid hydrocarbons and vent and 
flare gas to ensure that these requests are appropriate;
     determine if a maximum production or efficient rate is 
required; and,
     review applications for downhole commingling to ensure 
that action does not result in harm to ultimate recovery.
    We collect the information required under this Subpart for 
reservoir, reserves, and conservation analyses, including the 
determination of maximum production rates (MPRs) when necessary for 
certain oil and gas completions and to evaluate the results of well 
tests to determine if reservoirs are being depleted in a manner that 
will lead to the greatest ultimate recovery of hydrocarbons.
    The current subpart K regulations also specify the use of forms 
BSEE-0126

[[Page 76308]]

(Well Potential Test Report) and BSEE-0128 (Semiannual Well Test 
Report). Under BSEE-0126, we use this information for reservoir, 
reserves, and conservation analyses, including the determination of 
maximum production rates (MPRs) when necessary for certain oil and gas 
completions. This requirement implements the conservation provisions of 
the OCS Lands Act and 30 CFR 250. The information obtained from the 
well potential test is essential to determine if an MPR is necessary 
for a well and to establish the appropriate rate. It is not possible to 
specify an MPR in the absence of information about the production rate 
capability (potential) of the well.
    Under BSEE-0128, we use this information to evaluate the results of 
well tests to determine if reservoirs are being depleted in a manner 
that will lead to the greatest ultimate recovery of hydrocarbons. This 
information is collected to determine the capability of hydrocarbon 
wells and to evaluate and verify an operator's approved maximum 
production rate if assigned. The form was designed to present current 
well data on a semiannual basis to permit the updating of permissible 
producing rates, and to provide the basis for estimates of currently 
remaining recoverable gas reserves.
    Frequency: On occasion, weekly, monthly, semi-annual, annual, and 
varies as required by regulations.
    Description of Respondents: Potential respondents comprise OCS 
Federal oil, gas, or sulphur lessees and/or operators.
    Estimated Reporting and Recordkeeping Hour Burden: The estimated 
annual hour burden for this information collection is a total of 46,136 
hours. The following chart details the individual components and 
estimated hour burdens. In calculating the burdens, we assumed that 
respondents perform certain requirements in the normal course of their 
activities. We consider these to be usual and customary and took that 
into account in estimating the burden.

                                                  Burden Table
----------------------------------------------------------------------------------------------------------------
                                                                            Non-hour cost burdens
                                          Reporting &       ----------------------------------------------------
 30 CFR 250 Subpart K and related        recordkeeping                                             Annual burden
               NTLs                      requirement *         Hour burden    Average number of        hours
                                                                               annual responses      (rounded)
----------------------------------------------------------------------------------------------------------------
                                  WELL TESTS/SURVEYS and CLASSIFYING RESERVOIRS
----------------------------------------------------------------------------------------------------------------
1151(a)(1), (c); 1167............  Conduct well production              3.4  587 forms and                 1,996
                                    test; submit Form BSEE-                   information.
                                    0126 (Well Potential
                                    Test Report) and
                                    supporting information
                                    within 15 days after
                                    end of test period.
----------------------------------------------------------------------------------------------------------------
1151(a)(2), (c); 1167............  Conduct well production              3.2  8,605 forms and              27,536
                                    test; submit Form BSEE-                   information.
                                    0128 (Semiannual Well
                                    Test Report) and
                                    supporting information
                                    within 45 days after
                                    end of calendar half-
                                    year.
----------------------------------------------------------------------------------------------------------------
1151(b)..........................  Request extension of                 0.6  8 requests.........               5
                                    time to submit results
                                    of semi-annual well
                                    test.
----------------------------------------------------------------------------------------------------------------
1152(b), (c);....................  Request approval to                  0.9  7 requests.........               6
                                    conduct well testing
                                    using alternative
                                    procedures.
----------------------------------------------------------------------------------------------------------------
1152(d)..........................  Provide advance notice               0.6  36 notices.........              22
                                    of time and date of
                                    well tests.
----------------------------------------------------------------------------------------------------------------
    Subtotal.....................  ........................  ..............  9,243 responses....          29,565
----------------------------------------------------------------------------------------------------------------
                                          APPROVALS PRIOR TO PRODUCTION
----------------------------------------------------------------------------------------------------------------
1156; 1167.......................  Request approval to                 8.75  20 requests........             175
                                    produce within 500 feet
                                    of a unit or lease
                                    line; submit supporting
                                    information/
                                    documentation; notify
                                    adjacent operators and
                                    provide BSEE proof of
                                    notice date.
                                                            ----------------------------------------------------
                                                                        $3,892 x 20 requests = $77,840
----------------------------------------------------------------------------------------------------------------
1156(b); 1158(b).................  Notify adjacent                     1.63  20 letters.........              33
                                    operators submit
                                    letters of acceptance
                                    or objection to BSEE
                                    within 30 days after
                                    notice; include proof
                                    of notice date.
----------------------------------------------------------------------------------------------------------------
1157; 1167.......................  Request approval to                 16.2  22 requests........             356
                                    produce gas-cap gas in
                                    an oil reservoir with
                                    an associated gas cap,
                                    or to continue
                                    producing an oil well
                                    showing characteristics
                                    of a gas well with an
                                    associated gas cap;
                                    submit producing an oil
                                    well showing
                                    characteristics of a
                                    gas well with an
                                    associated gas cap;
                                    submit supporting
                                    information.
                                                            ----------------------------------------------------
                                                                       $4,953 x 22 requests = $108,966
----------------------------------------------------------------------------------------------------------------

[[Page 76309]]

 
1158; 1167.......................  Request approval to                   24  30 applications....             720
                                    downhole commingle
                                    hydrocarbons; submit
                                    supporting information;
                                    notify operators and
                                    provide proof of notice
                                    date.
                                                            ----------------------------------------------------
                                                                     $5,779 x 30 applications = $173,370
----------------------------------------------------------------------------------------------------------------
    Subtotal.....................  ........................  ..............  92 responses.......           1,284
----------------------------------------------------------------------------------------------------------------
                                                      $360,176 non-hour costs
----------------------------------------------------------------------------------------------------------------
                                   FLARING, VENTING, and BURNING HYDROCARBONS
----------------------------------------------------------------------------------------------------------------
1160; 1161; 1163(e)..............  Request approval to                 2.55  231 requests/                   589
                                    flare or vent natural                     reports.
                                    gas or exceed specified
                                    time limits/volumes;
                                    submit evaluation/
                                    documentation; report
                                    flare/vent information
                                    due to blow down of
                                    transportation
                                    pipelines within 72
                                    hours after incident.
----------------------------------------------------------------------------------------------------------------
1160(b); 1164(b)(1), (2).........   H2S Contingency, Exploration, or Development and Production                0
                                     Plans and, Development Operations Coordination Documents--
                                        burdens covered under 1014-0018 and BOEM's 1010-0151.
                                     Monitor air quality and report--burdens covered under 1010-
                                                                0057.
----------------------------------------------------------------------------------------------------------------
1162; 1163(e)....................  Request approval to burn            1.25  3 requests/reports.               4
                                    produced liquid
                                    hydrocarbons;
                                    demonstrate no risk and/
                                    or submit documentation
                                    re transport. If
                                    approval needed, submit
                                    documentation with
                                    relevant information re
                                    hydrocarbons burned
                                    under the approval.
----------------------------------------------------------------------------------------------------------------
1163.............................  Initial purchase or               13 meters @$77,000 each--$1,001,000
                                    replacement of gas
                                    meters to measure the
                                    amount of gas flared or
                                    vented. This is a non-
                                    hour cost burden.
----------------------------------------------------------------------------------------------------------------
1163(a)(1).......................  Notify BSEE when                    1.25  33 notices.........              41
                                    facility begins to
                                    process more than an
                                    average of 2,000 bopd
                                    per month.
----------------------------------------------------------------------------------------------------------------
1163(b);.........................   Report to ONRR hydrocarbons produced, including measured gas               0
                                     flared/vented and liquid hydrocarbon burned--burden covered
                                                          under 1012-0004.
----------------------------------------------------------------------------------------------------------------
1163(a), (c), (d)................  Maintain records for 6              14.8  914 platforms (gas           13,527
                                    years detailing on a     ..............   flare/vent).        ..............
                                    daily and monthly                     1  60 liquid                        60
                                    cumulative basis gas                      hydrocarbon.
                                    flaring/venting, liquid
                                    hydrocarbon burning;
                                    and flare/vent meter
                                    recordings; make
                                    available for
                                    inspection or provide
                                    copies upon request.
----------------------------------------------------------------------------------------------------------------
1164(c)..........................  Submit monthly reports               3.6  15 operators x 12               648
                                    of flared or vented gas                   mos. = 180.
                                    containing H2S.
----------------------------------------------------------------------------------------------------------------
    Subtotal.....................  ........................  ..............  1,434 responses....          14,869
----------------------------------------------------------------------------------------------------------------
                                                     $1,001,000 non-hour costs
----------------------------------------------------------------------------------------------------------------
                                               OTHER REQUIREMENTS
----------------------------------------------------------------------------------------------------------------
1165.............................  Submit proposed plan and              12  18 plans...........             216
                                    supporting information
                                    for enhanced recovery
                                    operations.
----------------------------------------------------------------------------------------------------------------
1165(c)..........................     Submit periodic reports of volumes of oil, gas, or other                 0
                                       substances injected, produced, or produced for a second
                                            time--burden covered under ONRR's 1012-0004.
----------------------------------------------------------------------------------------------------------------
1166.............................  Alaska Region only:                    1  1 (req'd by State,                1
                                    submit annual reservoir                   BSEE gets copy).
                                    management report and
                                    supporting information.
                                                            ----------------------------------------------------
                                                                        100  1 new development               100
                                                                              not State lands.
                                                            ----------------------------------------------------
                                                                         20  1 revision.........              20
----------------------------------------------------------------------------------------------------------------

[[Page 76310]]

 
1150-1167........................  General departure or                 2.8  29 submissions.....              81
                                    alternative compliance
                                    requests not
                                    specifically covered
                                    elsewhere in Subpart K.
----------------------------------------------------------------------------------------------------------------
    Subtotal.....................  ........................  ..............  50 responses.......             418
                                  ------------------------------------------------------------------------------
        Total Burden.............  ........................  ..............  10,819 Responses...          46,136
                                  ------------------------------------------------------------------------------
                                                                       $1,361,176 non-hour cost burdens
----------------------------------------------------------------------------------------------------------------
* In the future, BSEE may require electronic filing of some submissions.

    Estimated Reporting and Recordkeeping Non-Hour Cost Burden: We have 
identified four non-hour cost burdens, for a total of $1,361,176. Three 
are service fees required to recover the Federal Government's 
processing costs of certain submissions. The fourth cost is an IC 
equipment expenditure. The details are as follows:

Sec.   250.1156 requires a service fee when submitting a          $3,892
 request for approval to produce within 500 feet of a unit
 or lease line.............................................
Sec.   250.1157 requires a service fee when submitting a          $4,953
 request for approval before producing gas-cap gas from
 each completion in an oil reservoir known to have an
 associated gas cap, or to continue producing if an oil
 reservoir is not initially known to have an associated gas
 cap, but begins to show characteristics of a gas well.....
Sec.   250.1158 requires a service fee for submitting a           $5,779
 request for approval to downhole commingle hydrocarbons...
Sec.   250.1163 requires respondents to purchase and             $77,000
 install gas meters to measure the amount of gas flared or
 vented gas for those that produce more than 2,000 bopd and
 do not already have a meter or need to replace a meter....
 

We have not identified any other non-hour cost burden associated with 
this collection of information.
    Public Disclosure Statement: The PRA (44 U.S.C. 3501, et seq.,) 
provides that an agency may not conduct or sponsor a collection of 
information unless it displays a currently valid OMB control number. 
Until OMB approves a collection of information, you are not obligated 
to respond.
    Comments: Section 3506(c)(2)(A) of the PRA (44 U.S.C. 3501, et 
seq.,) requires each agency ``. . . to provide notice . . . and 
otherwise consult with members of the public and affected agencies 
concerning each proposed collection of information . . .'' Agencies 
must specifically solicit comments to: (a) Evaluate whether the 
collection is necessary or useful; (b) evaluate the accuracy of the 
burden of the proposed collection of information; (c) enhance the 
quality, usefulness, and clarity of the information to be collected; 
and (d) minimize the burden on the respondents, including the use of 
technology.
    To comply with the public consultation process, on August 27, 2015, 
we published a Federal Register notice (80 FR 52061) announcing that we 
would submit this ICR to OMB for approval. The notice provided the 
required 60-day comment period. In addition, Sec.  250.199 provides the 
OMB Control Number for the information collection requirements imposed 
by the 30 CFR 250, subpart K regulations and forms. The regulation also 
informs the public that they may comment at any time on the collections 
of information and provides the address to which they should send 
comments. We received eight comments (seven of which were from the same 
individual) in response to the Federal Register notice or unsolicited 
comments from respondents covered under these regulations. While the 
majority of the comments were not germane to the paperwork burden of 
this collection; we have responded to the specific electronic burden 
comments, and some broad based reporting requirement comments.
    In response to the comment that ``BSEE is still in the paper 
collection and data entry paradigm'' regarding the Well Potential Test 
Report (Form BSEE-0126) and the Semiannual Well Test Report (Form BSEE-
0128), we offer the following. Regarding the Semiannual Well Test 
Report, starting in 2009, we strongly encouraged operators to submit 
the data electronically as there is no regulatory authority to require 
electronic submittals. BSEE estimates that 40-50 percent of this data 
is currently submitted electronically. When submitted electronically, 
there is obviously no need for a public information copy. BSEE 
continues to encourage operators to submit this data electronically. 
Regarding the Well Potential Test Report, they are not currently 
submitted electronically because in addition to the form, structure 
maps, well log sections, and other proprietary data are attached as 
part of the submittal. Therefore, it would not be efficient to have 
operators submit the data on the form separate from the structure maps, 
etc. BSEE does agree that a long term solution could be to have all 
such data submitted electronically and will continue to pursue.
    In response to the comment that we should ``streamline the 
reporting as to reduce the burden to the oil and gas companies'', if we 
did not collect the information required in this subpart, BSEE would be 
unable to effectively carry out: The mandate of the OCS Lands Act, 
administer the offshore program, and promote and ensure the safety of 
the environment and personnel working on the OCS.
    In response to the comment, ``the oil and gas companies should only 
be required to report oil and gas production and operations to one 
office. This will reduce the reporting requirements and costs to the 
companies and those savings, should hopefully be passed upon to the 
consumers. Therefore, BSEE and BOEM should have one central point of 
contact to receive information from the oil and gas companies. 
Duplicative reporting should be avoided''. Our response, BSEE agrees 
that duplicative reporting should be avoided. There is no one central 
reporting location for both BSEE

[[Page 76311]]

and BOEM. However, BSEE works closely with BOEM to review the 
regulatory reporting requirements and to ensure there is no duplicative 
reporting. For more information on BSEE and BOEM individual reporting 
requirements refer to 30 CFR 250 and 550 respectively.
    Public Availability of Comments: Before including your address, 
phone number, email address, or other personal identifying information 
in your comment, you should be aware that your entire comment--
including your personal identifying information--may be made publicly 
available at any time. While you can ask us in your comment to withhold 
your personal identifying information from public review, we cannot 
guarantee that we will be able to do so.

    Dated: November 19, 2015.
Robert W. Middleton,
Deputy Chief, Office of Offshore Regulatory Programs.
[FR Doc. 2015-30883 Filed 12-7-15; 8:45 am]
 BILLING CODE 4310-VH-P



                                                                         Federal Register / Vol. 80, No. 235 / Tuesday, December 8, 2015 / Notices                                           76307

                                             DEPARTMENT OF THE INTERIOR                              SUPPLEMENTARY INFORMATION:                            authority under FOGRMA to the Bureau
                                                                                                        Title: 30 CFR 250, Subpart K, Oil and              of Safety and Environmental
                                             Bureau of Safety and Environmental                      Gas Production Requirements.                          Enforcement (BSEE), 30 U.S.C. 1751 is
                                             Enforcement                                                Form(s): BSEE–0126 and BSEE–0128.                  included as additional authority for
                                                                                                        OMB Control Number: 1014–0019.                     these requirements.
                                             [Docket ID BSEE–BSEE–2015–0011; OMB                        Abstract: The Outer Continental Shelf
                                             Control Number 1014–0019; 15XE1700DX                                                                            The Independent Offices
                                                                                                     (OCS) Lands Act (OCSLA), at 43 U.S.C.                 Appropriations Act (31 U.S.C. 9701), the
                                             EEEE500000 EX1SF0000.DAQ000]
                                                                                                     1334 authorizes the Secretary of the                  Omnibus Appropriations Bill (Pub. L.
                                             Information Collection Activities: Oil                  Interior to prescribe rules and                       104–133, 110 Stat. 1321, April 26,
                                             and Gas Production Requirements;                        regulations necessary for the                         1996), and OMB Circular A–25,
                                             Submitted for Office of Management                      administration of the leasing provisions              authorize Federal agencies to recover
                                             and Budget (OMB) Review; Comment                        of that Act related to mineral resources              the full cost of services that confer
                                             Request                                                 on the OCS. Such rules and regulations                special benefits. Under the Department
                                                                                                     will apply to all operations conducted                of the Interior’s implementing policy,
                                             ACTION:   30-day Notice.                                under a lease, right-of-way, or a right-of-           BSEE is required to charge the full cost
                                                                                                     use and easement. Operations on the                   for services that provide special benefits
                                             SUMMARY:   To comply with the                           OCS must preserve, protect, and                       or privileges to an identifiable non-
                                             Paperwork Reduction Act of 1995                         develop oil and natural gas resources in              Federal recipient above and beyond
                                             (PRA), the Bureau of Safety and                         a manner that is consistent with the                  those that accrue to the public at large.
                                             Environmental Enforcement (BSEE) is                     need to make such resources available                 Several requests for approval required
                                             notifying the public that we have                       to meet the Nation’s energy needs as                  in Subpart K are subject to cost recovery
                                             submitted to OMB an information                         rapidly as possible; to balance orderly               and BSEE regulations specify service
                                             collection request (ICR) to renew                       energy resource development with                      fees for these requests.
                                             approval of the paperwork requirements                  protection of human, marine, and                        Regulations implementing these
                                             in the regulations under subpart K, Oil                 coastal environments; to ensure the                   responsibilities are among those
                                             and Gas Production Requirements. This                   public a fair and equitable return on the             delegated to BSEE.
                                             notice also provides the public a second                resources of the OCS; and to preserve                   Responses are mandatory or are
                                             opportunity to comment on the revised                   and maintain free enterprise                          required to obtain or retain a benefit. No
                                             paperwork burden of these regulatory                    competition.                                          questions of a sensitive nature are
                                             requirements.                                              Section 5(a) of the OCS Lands Act                  asked. BSEE protects information
                                                                                                     requires the Secretary to prescribe rules             considered proprietary under the
                                             DATES:  You must submit comments by
                                                                                                     and regulations ‘‘to provide for the                  Freedom of Information Act (5 U.S.C.
                                             January 7, 2016.
                                                                                                     prevention of waste, and conservation of              552) and DOI’s implementing
                                             ADDRESSES: Submit comments by either                    the natural resources of the Outer
                                             fax (202) 395–5806 or email (OIRA_                                                                            regulations (43 CFR 2), and under
                                                                                                     Continental Shelf, and the protection of              regulations at 30 CFR part 250.197, Data
                                             Submission@omb.eop.gov) directly to                     correlative rights therein’’ and to
                                             the Office of Information and Regulatory                                                                      and information to be made available to
                                                                                                     include provisions ‘‘for the prompt and               the public or for limited inspection, 30
                                             Affairs, OMB, Attention: Desk Officer                   efficient exploration and development
                                             for the Department of the Interior (1014–                                                                     CFR part 252, OCS Oil and Gas
                                                                                                     of a lease area.’’                                    Information Program.
                                             0019). Please provide a copy of your                       Section 1334(g)(2) states ‘‘. . . the
                                             comments to BSEE by any of the means                                                                            The information collected under
                                                                                                     lessee shall produce such oil or gas, or              Subpart K is used in our efforts to
                                             below.                                                  both, at rates . . . to assure the
                                               • Electronically go to http://                                                                              conserve natural resources, prevent
                                                                                                     maximum rate of production which may                  waste, and protect correlative rights,
                                             www.regulations.gov. In the Search box,                 be sustained without loss of ultimate
                                             enter BSEE–2015–0011 then click                                                                               including the Federal Government’s
                                                                                                     recovery of oil or gas, or both, under                royalty interest. Specifically, BSEE uses
                                             search. Follow the instructions to                      sound engineering and economic
                                             submit public comments and view all                                                                           the information to:
                                                                                                     principles, and which is safe for the                   • Evaluate requests to burn liquid
                                             related materials. We will post all                     duration of the activity covered by the               hydrocarbons and vent and flare gas to
                                             comments.                                               approved plan.’’                                      ensure that these requests are
                                               • Email cheryl.blundon@bsee.gov, fax                     In addition to the general authority of            appropriate;
                                             (703) 787–1546, or mail or hand-carry                   OCSLA, section 301(a) of the Federal                    • determine if a maximum
                                             comments to the Department of the                       Oil and Gas Royalty Management Act                    production or efficient rate is required;
                                             Interior; Bureau of Safety and                          (FOGRMA), 30 U.S.C. 1751(a), grants                   and,
                                             Environmental Enforcement;                              authority to the Secretary to prescribe                 • review applications for downhole
                                             Regulations and Standards Branch;                       such rules and regulations as are                     commingling to ensure that action does
                                             ATTN: Cheryl Blundon; 45600                             reasonably necessary to carry out                     not result in harm to ultimate recovery.
                                             Woodland Road, Sterling, VA 20166.                      FOGRMA’s provisions. While the                          We collect the information required
                                             Please reference ICR 1014–0019 in your                  majority of FOGRMA is directed to                     under this Subpart for reservoir,
                                             comment and include your name and                       royalty collection and enforcement,                   reserves, and conservation analyses,
                                             return address.                                         some provisions apply to offshore                     including the determination of
                                             FOR FURTHER INFORMATION CONTACT:                        operations. For example, section                      maximum production rates (MPRs)
                                             Cheryl Blundon, Regulations and                         109(c)(2) and (d)(1), 30 U.S.C. 1719(c)(2)            when necessary for certain oil and gas
Lhorne on DSK9F6TC42PROD with NOTICES




                                             Standards Branch, (703) 787–1607, to                    and (d)(1), impose substantial civil                  completions and to evaluate the results
                                             request additional information about                    penalties for failure to permit lawful                of well tests to determine if reservoirs
                                             this ICR. To see a copy of the entire ICR               inspections and for knowing or willful                are being depleted in a manner that will
                                             submitted to OMB, go to http://                         preparation or submission of false,                   lead to the greatest ultimate recovery of
                                             www.reginfo.gov (select Information                     inaccurate, or misleading reports,                    hydrocarbons.
                                             Collection Review, Currently Under                      records, or other information. Because                  The current subpart K regulations also
                                             Review).                                                the Secretary has delegated some of the               specify the use of forms BSEE–0126


                                        VerDate Sep<11>2014   14:17 Dec 07, 2015   Jkt 238001   PO 00000   Frm 00048   Fmt 4703   Sfmt 4703   E:\FR\FM\08DEN1.SGM   08DEN1


                                             76308                              Federal Register / Vol. 80, No. 235 / Tuesday, December 8, 2015 / Notices

                                             (Well Potential Test Report) and BSEE–                                   Under BSEE–0128, we use this                                                   Description of Respondents: Potential
                                             0128 (Semiannual Well Test Report).                                    information to evaluate the results of                                         respondents comprise OCS Federal oil,
                                             Under BSEE–0126, we use this                                           well tests to determine if reservoirs are                                      gas, or sulphur lessees and/or operators.
                                             information for reservoir, reserves, and                               being depleted in a manner that will                                             Estimated Reporting and
                                             conservation analyses, including the                                   lead to the greatest ultimate recovery of
                                                                                                                                                                                                   Recordkeeping Hour Burden: The
                                             determination of maximum production                                    hydrocarbons. This information is
                                                                                                                                                                                                   estimated annual hour burden for this
                                             rates (MPRs) when necessary for certain                                collected to determine the capability of
                                             oil and gas completions. This                                          hydrocarbon wells and to evaluate and                                          information collection is a total of
                                             requirement implements the                                             verify an operator’s approved maximum                                          46,136 hours. The following chart
                                             conservation provisions of the OCS                                     production rate if assigned. The form                                          details the individual components and
                                             Lands Act and 30 CFR 250. The                                          was designed to present current well                                           estimated hour burdens. In calculating
                                             information obtained from the well                                     data on a semiannual basis to permit the                                       the burdens, we assumed that
                                             potential test is essential to determine if                            updating of permissible producing rates,                                       respondents perform certain
                                             an MPR is necessary for a well and to                                  and to provide the basis for estimates of                                      requirements in the normal course of
                                             establish the appropriate rate. It is not                              currently remaining recoverable gas                                            their activities. We consider these to be
                                             possible to specify an MPR in the                                      reserves.                                                                      usual and customary and took that into
                                             absence of information about the                                         Frequency: On occasion, weekly,                                              account in estimating the burden.
                                             production rate capability (potential) of                              monthly, semi-annual, annual, and
                                             the well.                                                              varies as required by regulations.

                                                                                                                                            BURDEN TABLE
                                                                                                                                                                                                         Non-hour cost burdens
                                               30 CFR 250 Subpart K                           Reporting & recordkeeping requirement *                                                                                                           Annual burden
                                                 and related NTLs                                                                                                                                            Average number of
                                                                                                                                                                              Hour burden                                                           hours
                                                                                                                                                                                                             annual responses                     (rounded)

                                                                                                         WELL TESTS/SURVEYS and CLASSIFYING RESERVOIRS

                                             1151(a)(1), (c); 1167 .........          Conduct well production test; submit Form BSEE–                                                           3.4     587 forms and information                       1,996
                                                                                        0126 (Well Potential Test Report) and supporting
                                                                                        information within 15 days after end of test period.

                                             1151(a)(2), (c); 1167 .........          Conduct well production test; submit Form BSEE–                                                           3.2     8,605 forms and informa-                       27,536
                                                                                        0128 (Semiannual Well Test Report) and sup-                                                                       tion.
                                                                                        porting information within 45 days after end of cal-
                                                                                        endar half-year.

                                             1151(b) ..............................   Request extension of time to submit results of semi-                                                      0.6     8 requests ........................                 5
                                                                                       annual well test.

                                             1152(b), (c); ......................     Request approval to conduct well testing using alter-                                                     0.9     7 requests ........................                 6
                                                                                       native procedures.

                                             1152(d) ..............................   Provide advance notice of time and date of well                                                           0.6     36 notices ........................               22
                                                                                        tests.

                                                   Subtotal ......................    ....................................................................................   ........................   9,243 responses ..............                 29,565

                                                                                                                         APPROVALS PRIOR TO PRODUCTION

                                             1156; 1167 ........................      Request approval to produce within 500 feet of a                                                       8.75       20 requests ......................               175
                                                                                       unit or lease line; submit supporting information/
                                                                                       documentation; notify adjacent operators and pro-
                                                                                       vide BSEE proof of notice date.

                                                                                                                                                                                                    $3,892 × 20 requests = $77,840

                                             1156(b); 1158(b) ...............         Notify adjacent operators submit letters of accept-                                                     1.63      20 letters ..........................             33
                                                                                        ance or objection to BSEE within 30 days after
                                                                                        notice; include proof of notice date.

                                             1157; 1167 ........................      Request approval to produce gas-cap gas in an oil                                                       16.2      22 requests ......................               356
                                                                                        reservoir with an associated gas cap, or to con-
                                                                                        tinue producing an oil well showing characteristics
Lhorne on DSK9F6TC42PROD with NOTICES




                                                                                        of a gas well with an associated gas cap; submit
                                                                                        producing an oil well showing characteristics of a
                                                                                        gas well with an associated gas cap; submit sup-
                                                                                        porting information.

                                                                                                                                                                                                   $4,953 × 22 requests = $108,966




                                        VerDate Sep<11>2014       14:17 Dec 07, 2015      Jkt 238001        PO 00000        Frm 00049        Fmt 4703        Sfmt 4703       E:\FR\FM\08DEN1.SGM              08DEN1


                                                                                Federal Register / Vol. 80, No. 235 / Tuesday, December 8, 2015 / Notices                                                                                            76309

                                                                                                                                BURDEN TABLE—Continued
                                                                                                                                                                                                          Non-hour cost burdens
                                               30 CFR 250 Subpart K                            Reporting & recordkeeping requirement *                                                                                                          Annual burden
                                                 and related NTLs                                                                                                                                            Average number of
                                                                                                                                                                               Hour burden                                                          hours
                                                                                                                                                                                                             annual responses                     (rounded)

                                             1158; 1167 ........................       Request approval to downhole commingle hydro-                                                              24     30 applications .................               720
                                                                                        carbons; submit supporting information; notify op-
                                                                                        erators and provide proof of notice date.

                                                                                                                                                                                                 $5,779 × 30 applications = $173,370

                                                   Subtotal ......................     ....................................................................................   ........................   92 responses ...................               1,284

                                                                                                                                                                                                         $360,176 non-hour costs

                                                                                                             FLARING, VENTING, and BURNING HYDROCARBONS

                                             1160; 1161; 1163(e) .........             Request approval to flare or vent natural gas or ex-                                                    2.55      231 requests/reports ........                   589
                                                                                         ceed specified time limits/volumes; submit evalua-
                                                                                         tion/documentation; report flare/vent information
                                                                                         due to blow down of transportation pipelines with-
                                                                                         in 72 hours after incident.

                                             1160(b); 1164(b)(1), (2) ....             H2S Contingency, Exploration, or Development and Production Plans and, Development Oper-                                                                             0
                                                                                         ations Coordination Documents—burdens covered under 1014–0018 and BOEM’s 1010–0151.
                                                                                         Monitor air quality and report—burdens covered under 1010–0057.

                                             1162; 1163(e) ....................        Request approval to burn produced liquid hydro-                                                        1.25       3 requests/reports ............                    4
                                                                                         carbons; demonstrate no risk and/or submit docu-
                                                                                         mentation re transport. If approval needed, submit
                                                                                         documentation with relevant information re hydro-
                                                                                         carbons burned under the approval.

                                             1163 ..................................   Initial purchase or replacement of gas meters to                                                       13 meters @$77,000 each—$1,001,000
                                                                                          measure the amount of gas flared or vented. This
                                                                                          is a non-hour cost burden.

                                             1163(a)(1) .........................      Notify BSEE when facility begins to process more                                                        1.25      33 notices ........................              41
                                                                                        than an average of 2,000 bopd per month.

                                             1163(b); .............................    Report to ONRR hydrocarbons produced, including measured gas flared/vented and liquid hydro-                                                                         0
                                                                                                           carbon burned—burden covered under 1012–0004.

                                             1163(a), (c), (d) .................       Maintain records for 6 years detailing on a daily and                                                   14.8      914 platforms (gas flare/                     13,527
                                                                                        monthly cumulative basis gas flaring/venting, liq-                                                                 vent).
                                                                                        uid hydrocarbon burning; and flare/vent meter re-                                                           1    60 liquid hydrocarbon ......                     60
                                                                                        cordings; make available for inspection or provide
                                                                                        copies upon request.

                                             1164(c) ..............................    Submit monthly reports of flared or vented gas con-                                                      3.6      15 operators × 12 mos. =                        648
                                                                                         taining H2S.                                                                                                      180.

                                                   Subtotal ......................     ....................................................................................   ........................   1,434 responses ..............                14,869

                                                                                                                                                                                                         $1,001,000 non-hour costs

                                                                                                                                      OTHER REQUIREMENTS

                                             1165 ..................................   Submit proposed plan and supporting information                                                            12     18 plans ...........................            216
                                                                                         for enhanced recovery operations.

                                             1165(c) ..............................       Submit periodic reports of volumes of oil, gas, or other substances injected, produced, or pro-                                                                   0
                                                                                                     duced for a second time—burden covered under ONRR’s 1012–0004.

                                             1166 ..................................   Alaska Region only: submit annual reservoir man-                                                             1    1 (req’d by State, BSEE                            1
Lhorne on DSK9F6TC42PROD with NOTICES




                                                                                         agement report and supporting information.                                                                        gets copy).

                                                                                                                                                                                                100      1 new development not                           100
                                                                                                                                                                                                           State lands.

                                                                                                                                                                                                  20     1 revision .........................             20




                                        VerDate Sep<11>2014       17:45 Dec 07, 2015       Jkt 238001        PO 00000        Frm 00050        Fmt 4703        Sfmt 4703       E:\FR\FM\08DEN1.SGM              08DEN1


                                             76310                            Federal Register / Vol. 80, No. 235 / Tuesday, December 8, 2015 / Notices

                                                                                                                             BURDEN TABLE—Continued
                                                                                                                                                                                                       Non-hour cost burdens
                                               30 CFR 250 Subpart K                         Reporting & recordkeeping requirement *                                                                                                      Annual burden
                                                 and related NTLs                                                                                                                                         Average number of
                                                                                                                                                                            Hour burden                                                      hours
                                                                                                                                                                                                          annual responses                 (rounded)

                                             1150–1167 ........................     General departure or alternative compliance re-                                                           2.8     29 submissions ................              81
                                                                                     quests not specifically covered elsewhere in Sub-
                                                                                     part K.

                                                  Subtotal ......................   ....................................................................................   ........................   50 responses ...................            418

                                                        Total Burden .......        ....................................................................................   ........................   10,819 Responses ...........              46,136

                                                                                                                                                                                                $1,361,176 non-hour cost burdens
                                                * In the future, BSEE may require electronic filing of some submissions.


                                               Estimated Reporting and                                            burdens, for a total of $1,361,176. Three                                      of certain submissions. The fourth cost
                                             Recordkeeping Non-Hour Cost Burden:                                  are service fees required to recover the                                       is an IC equipment expenditure. The
                                             We have identified four non-hour cost                                Federal Government’s processing costs                                          details are as follows:

                                             § 250.1156 requires a service fee when submitting a request for approval to produce within 500 feet of a unit or lease line .....                                                                  $3,892
                                             § 250.1157 requires a service fee when submitting a request for approval before producing gas-cap gas from each completion
                                                in an oil reservoir known to have an associated gas cap, or to continue producing if an oil reservoir is not initially known
                                                to have an associated gas cap, but begins to show characteristics of a gas well ............................................................................                                    $4,953
                                             § 250.1158 requires a service fee for submitting a request for approval to downhole commingle hydrocarbons ...........................                                                             $5,779
                                             § 250.1163 requires respondents to purchase and install gas meters to measure the amount of gas flared or vented gas for
                                                those that produce more than 2,000 bopd and do not already have a meter or need to replace a meter ....................................                                                        $77,000


                                             We have not identified any other non-                                30 CFR 250, subpart K regulations and                                          because in addition to the form,
                                             hour cost burden associated with this                                forms. The regulation also informs the                                         structure maps, well log sections, and
                                             collection of information.                                           public that they may comment at any                                            other proprietary data are attached as
                                                Public Disclosure Statement: The PRA                              time on the collections of information                                         part of the submittal. Therefore, it
                                             (44 U.S.C. 3501, et seq.,) provides that                             and provides the address to which they                                         would not be efficient to have operators
                                             an agency may not conduct or sponsor                                 should send comments. We received                                              submit the data on the form separate
                                             a collection of information unless it                                eight comments (seven of which were                                            from the structure maps, etc. BSEE does
                                             displays a currently valid OMB control                               from the same individual) in response to                                       agree that a long term solution could be
                                             number. Until OMB approves a                                         the Federal Register notice or                                                 to have all such data submitted
                                             collection of information, you are not                               unsolicited comments from respondents                                          electronically and will continue to
                                             obligated to respond.                                                covered under these regulations. While                                         pursue.
                                                Comments: Section 3506(c)(2)(A) of                                the majority of the comments were not                                             In response to the comment that we
                                             the PRA (44 U.S.C. 3501, et seq.,)                                   germane to the paperwork burden of                                             should ‘‘streamline the reporting as to
                                             requires each agency ‘‘. . . to provide                              this collection; we have responded to                                          reduce the burden to the oil and gas
                                             notice . . . and otherwise consult with                              the specific electronic burden                                                 companies’’, if we did not collect the
                                             members of the public and affected                                   comments, and some broad based                                                 information required in this subpart,
                                             agencies concerning each proposed                                    reporting requirement comments.                                                BSEE would be unable to effectively
                                             collection of information . . .’’ Agencies                              In response to the comment that                                             carry out: The mandate of the OCS
                                             must specifically solicit comments to:                               ‘‘BSEE is still in the paper collection                                        Lands Act, administer the offshore
                                             (a) Evaluate whether the collection is                               and data entry paradigm’’ regarding the                                        program, and promote and ensure the
                                             necessary or useful; (b) evaluate the                                Well Potential Test Report (Form BSEE–                                         safety of the environment and personnel
                                             accuracy of the burden of the proposed                               0126) and the Semiannual Well Test                                             working on the OCS.
                                             collection of information; (c) enhance                               Report (Form BSEE–0128), we offer the                                             In response to the comment, ‘‘the oil
                                             the quality, usefulness, and clarity of                              following. Regarding the Semiannual                                            and gas companies should only be
                                             the information to be collected; and (d)                             Well Test Report, starting in 2009, we                                         required to report oil and gas
                                             minimize the burden on the                                           strongly encouraged operators to submit                                        production and operations to one office.
                                             respondents, including the use of                                    the data electronically as there is no                                         This will reduce the reporting
                                             technology.                                                          regulatory authority to require                                                requirements and costs to the
                                                To comply with the public                                         electronic submittals. BSEE estimates                                          companies and those savings, should
                                             consultation process, on August 27,                                  that 40–50 percent of this data is                                             hopefully be passed upon to the
                                             2015, we published a Federal Register                                currently submitted electronically.                                            consumers. Therefore, BSEE and BOEM
Lhorne on DSK9F6TC42PROD with NOTICES




                                             notice (80 FR 52061) announcing that                                 When submitted electronically, there is                                        should have one central point of contact
                                             we would submit this ICR to OMB for                                  obviously no need for a public                                                 to receive information from the oil and
                                             approval. The notice provided the                                    information copy. BSEE continues to                                            gas companies. Duplicative reporting
                                             required 60-day comment period. In                                   encourage operators to submit this data                                        should be avoided’’. Our response,
                                             addition, § 250.199 provides the OMB                                 electronically. Regarding the Well                                             BSEE agrees that duplicative reporting
                                             Control Number for the information                                   Potential Test Report, they are not                                            should be avoided. There is no one
                                             collection requirements imposed by the                               currently submitted electronically                                             central reporting location for both BSEE


                                        VerDate Sep<11>2014     17:45 Dec 07, 2015      Jkt 238001        PO 00000        Frm 00051        Fmt 4703        Sfmt 4703       E:\FR\FM\08DEN1.SGM             08DEN1


                                                                         Federal Register / Vol. 80, No. 235 / Tuesday, December 8, 2015 / Notices                                                                 76311

                                             and BOEM. However, BSEE works                           importers, and exporters of controlled                       classes of controlled substances.
                                             closely with BOEM to review the                         substances (other than final orders in                       Comments and requests for hearings on
                                             regulatory reporting requirements and to                connection with suspension, denial, or                       applications to import narcotic raw
                                             ensure there is no duplicative reporting.               revocation of registration) has been                         material are not appropriate. 72 FR 3417
                                             For more information on BSEE and                        redelegated to the Deputy Assistant                          (January 25, 2007). No comments or
                                             BOEM individual reporting                               Administrator of the DEA Office of                           objections were submitted for this
                                             requirements refer to 30 CFR 250 and                    Diversion Control (‘‘Deputy Assistant                        notice.
                                             550 respectively.                                       Administrator’’) pursuant to section 7 of                       The DEA has considered the factors in
                                               Public Availability of Comments:                      28 CFR part 0, appendix to subpart R.                        21 U.S.C. 823, 952(a) and 958(a) and
                                             Before including your address, phone                      In accordance with 21 CFR                                  determined that the registration of
                                             number, email address, or other                         1301.33(a), this is notice that on October                   Cambrex Charles City to import the
                                             personal identifying information in your                26, 2015, Johnson Matthey                                    basic classes of controlled substances is
                                             comment, you should be aware that                       Pharmaceutical Materials, Inc.,                              consistent with the public interest and
                                             your entire comment—including your                      Pharmaceutical Service, 25 Patton Road,                      with United States obligations under
                                             personal identifying information—may                    Devens, Massachusetts 01434 applied to                       international treaties, conventions, or
                                             be made publicly available at any time.                 be registered as a bulk manufacturer of                      protocols in effect on May 1, 1971. The
                                             While you can ask us in your comment                    the following basic classes controlled                       DEA investigated the company’s
                                             to withhold your personal identifying                   substances:                                                  maintenance of effective controls
                                             information from public review, we                                                                                   against diversion by inspecting and
                                             cannot guarantee that we will be able to                        Controlled substance                     Schedule    testing the company’s physical security
                                             do so.                                                                                                               systems, verifying the company’s
                                                                                                     Amphetamine (1100) ....................          II
                                               Dated: November 19, 2015.                                                                                          compliance with state and local laws,
                                                                                                     Methylphenidate (1724) ................          II
                                             Robert W. Middleton,                                    Nabilone (7379) ............................     II          and reviewing the company’s
                                             Deputy Chief, Office of Offshore Regulatory             Hydrocodone (9193) .....................         II          background and history.
                                             Programs.                                               Alfentanil (9737) ...........................    II             Therefore, pursuant to 21 U.S.C.
                                             [FR Doc. 2015–30883 Filed 12–7–15; 8:45 am]             Remifentanil (9739) ......................       II          952(a) and 958(a), and in accordance
                                             BILLING CODE 4310–VH–P
                                                                                                     Sufentanil (9740) ..........................     II          with 21 CFR 1301.34, the above-named
                                                                                                                                                                  company is granted registration as an
                                                                                                       The company plans to utilize this                          importer of the following basic classes
                                                                                                     facility to manufacture small quantities                     of controlled substances:
                                             DEPARTMENT OF JUSTICE
                                                                                                     of the listed controlled substances in
                                             Drug Enforcement Administration                         bulk and to conduct analytical testing in                             Controlled substance               Schedule
                                                                                                     support of the company’s primary
                                             [Docket No. DEA–392]                                    manufacturing facility in West Deptford,                     4-Anilino-N-phenethyl-4-piperidine          II
                                                                                                     New Jersey. The controlled substances                          (ANPP) (8333).
                                             Bulk Manufacturer of Controlled                                                                                      Phenylacetone (8501) ..................     II
                                                                                                     manufactured in bulk at this facility will                   Opium, raw (9600) .......................   II
                                             Substances Application: Johnson
                                                                                                     be distributed to its customers.                             Poppy Straw Concentrate (9670)              II
                                             Matthey Pharmaceutical Materials, Inc.
                                                                                                       Dated: November 30, 2015.
                                             ACTION:   Notice of application.                        Louis J. Milione,                                               The company plans to import the
                                                                                                     Deputy Assistant Administrator.                              listed controlled substances for internal
                                             DATES:  Registered bulk manufacturers of                                                                             use, and to manufacture bulk
                                                                                                     [FR Doc. 2015–30811 Filed 12–7–15; 8:45 am]
                                             the affected basic classes, and                                                                                      intermediates for sale to its customers.
                                                                                                     BILLING CODE 4410–09–P
                                             applicants therefore, may file written
                                                                                                                                                                    Dated: November 30, 2015.
                                             comments on or objections to the
                                             issuance of the proposed registration in                                                                             Louis J. Milione,
                                                                                                     DEPARTMENT OF JUSTICE                                        Deputy Assistant Administrator.
                                             accordance with 21 CFR 1301.33(a) on
                                             or before February 8, 2016.                                                                                          [FR Doc. 2015–30813 Filed 12–7–15; 8:45 am]
                                                                                                     Drug Enforcement Administration
                                             ADDRESSES: Written comments should                                                                                   BILLING CODE 4410–09–P
                                             be sent to: Drug Enforcement                            [Docket No. DEA–392]
                                             Administration, Attention: DEA Federal                  Importer of Controlled Substances
                                             Register Representative/OD/D, 8701                                                                                   DEPARTMENT OF JUSTICE
                                                                                                     Registration: Cambrex Charles City
                                             Morrissette Drive, Springfield, Virginia                                                                             Drug Enforcement Administration
                                             22152. Request for hearing should be                    ACTION:    Notice of registration.
                                             sent to: Drug Enforcement
                                                                                                     SUMMARY:   Cambrex Charles City applied                      [Docket No. DEA–392]
                                             Administration, Attention: Hearing
                                             Clerk/LJ, 8701 Morrissette Drive,                       to be registered as an importer of certain
                                                                                                                                                                  Importer of Controlled Substances
                                             Springfield, Virginia 22152.                            basic classes of controlled substances.
                                                                                                                                                                  Registration: Cody Laboratories, Inc.
                                             SUPPLEMENTARY INFORMATION: The                          The Drug Enforcement Administration
                                             Attorney General has delegated her                      (DEA) grants Cambrex Charles City                            ACTION:    Notice of registration.
                                             authority under the Controlled                          registration as an importer of those
                                             Substances Act to the Administrator of                  controlled substances.                                       SUMMARY:   Cody Laboratories, Inc.
                                                                                                                                                                  applied to be registered as an importer
Lhorne on DSK9F6TC42PROD with NOTICES




                                             the Drug Enforcement Administration                     SUPPLEMENTARY INFORMATION: By notice
                                             (DEA), 28 CFR 0.100(b). Authority to                    dated August 21, 2015, and published in                      of certain basic classes of controlled
                                             exercise all necessary functions with                   the Federal Register on August 31,                           substances. The Drug Enforcement
                                             respect to the promulgation and                         2015, 80 FR 52510, Cambrex Charles                           Administration (DEA) grants Cody
                                             implementation of 21 CFR part 1301,                     City, 1205 11th Street, Charles City,                        Laboratories, Inc. registration as an
                                             incident to the registration of                         Iowa 50616–3466 applied to be                                importer of those controlled substances.
                                             manufacturers, distributors, dispensers,                registered as an importer of certain basic                   SUPPLEMENTARY INFORMATION:



                                        VerDate Sep<11>2014   14:17 Dec 07, 2015   Jkt 238001   PO 00000   Frm 00052     Fmt 4703    Sfmt 4703       E:\FR\FM\08DEN1.SGM   08DEN1



Document Created: 2015-12-14 13:27:06
Document Modified: 2015-12-14 13:27:06
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
Action30-day Notice.
DatesYou must submit comments by January 7, 2016.
ContactCheryl Blundon, Regulations and Standards Branch, (703) 787-1607, to request additional information about this ICR. To see a copy of the entire ICR submitted to OMB, go to http://www.reginfo.gov (select Information Collection Review, Currently Under Review).
FR Citation80 FR 76307 

2024 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR