80_FR_76918 80 FR 76681 - Clark Canyon Hydro, LLC; Notice of Application Tendered for Filing With the Commission, Soliciting Additional Study Requests, Intent To Waive Parts of the Pre-Filing Three Stage Consultation Process, and Intent To Waive Scoping and Establish an Expedited Schedule for Processing

80 FR 76681 - Clark Canyon Hydro, LLC; Notice of Application Tendered for Filing With the Commission, Soliciting Additional Study Requests, Intent To Waive Parts of the Pre-Filing Three Stage Consultation Process, and Intent To Waive Scoping and Establish an Expedited Schedule for Processing

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 80, Issue 237 (December 10, 2015)

Page Range76681-76682
FR Document2015-31127

Federal Register, Volume 80 Issue 237 (Thursday, December 10, 2015)
[Federal Register Volume 80, Number 237 (Thursday, December 10, 2015)]
[Notices]
[Pages 76681-76682]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-31127]



[[Page 76681]]

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14677-001]


Clark Canyon Hydro, LLC; Notice of Application Tendered for 
Filing With the Commission, Soliciting Additional Study Requests, 
Intent To Waive Parts of the Pre-Filing Three Stage Consultation 
Process, and Intent To Waive Scoping and Establish an Expedited 
Schedule for Processing

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: Original License for a Major Water Power 
Project at an Existing Dam, 5 Megawatts or Less.
    b. Project No.: 14677-001.
    c. Date filed: November 23, 2015.
    d. Applicant: Clark Canyon Hydro, LLC.
    e. Name of Project: Clark Canyon Dam Hydroelectric Project.
    f. Project Description: The Clark Canyon Dam Hydroelectric Project 
would utilize the U.S. Bureau of Reclamation's Clark Canyon Dam and 
outlet works including an intake structure and concrete conduit in the 
reservoir. The project would also consist of the following new 
facilities: (1) A 360-foot-long, 8-foot-diameter steel penstock within 
the existing concrete conduit, ending in a trifurcation; (2) two 35-
foot-long, 8-foot-diameter penstocks extending from the trifurcation to 
the powerhouse, transitioning to 6-foot-diameter before entering the 
powerhouse; (3) a 10-foot-long, 8-foot-diameter steel penstock leaving 
the trifurcation and ending in a 7-foot-diameter cone valve and reducer 
to control discharge into the existing outlet stilling basin; (4) a 65-
foot-long, 46-foot-wide reinforced concrete powerhouse containing two 
vertical Francis-type turbine/generator units with a total capacity of 
4.7 megawatts; (5) two 25-foot-long steel draft tubes transitioning to 
concrete draft tube/tailrace section; (6) a 17-foot-long, 15-foot-
diameter tailrace channel connecting with the existing spillway 
stilling basin; (7) a 45-foot-long, 10-foot-wide aeration basin 
downstream of the powerhouse with three frames containing 330 
diffusers; (8) a 1,100-foot-long, 4.16-kilovolt (kV) buried 
transmission line from the powerhouse to a substation; (9) a substation 
containing step-up transformers and switchgear; (10) a 7.9-mile-long, 
69-kV transmission line extending from the project substation to the 
Peterson Flat substation (the point of interconnection); and (11) 
appurtenant facilities. The estimated annual generation of the Clark 
Canyon Dam Project would be 15.4 gigawatt-hours. All project facilities 
would be located on federal lands owned by the U.S. Bureau of 
Reclamation and the U.S. Bureau of Land Management. The applicant 
proposes to operate the project as run-of-release.
    g. Location: The project is located on Beaverhead River near the 
town of Dillon, Beaverhead County, Montana. The project would occupy 
62.1 acres of land owned by the U.S. Bureau of Reclamation and 0.2 
acres of land owned by the U.S. Bureau of Land Management.
    h. Filed Pursuant to: 18 CFR 4.61 of the Commission's regulations.
    i. Applicant Contact: John Gangemi, (406) 249-3972, email at 
john.gangemi@erm.com.
    j. FERC Contact: Kelly Wolcott, (202) 502-6480, email at 
kelly.wolcott@ferc.gov.
    k. A copy of the application is available for review at the 
Commission in the Public Reference Room or may be viewed on the 
Commission's Web site at http://www.ferc.gov using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document (P-14677). For assistance, 
contact FERC Online Support at FERCONlineSupport@ferc.gov or toll free 
at 1-866-208-3676, or for TTY (202) 502-8659.
    Register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    l. Cooperating Agencies: We are asking Federal, state, and local 
agencies and Indian tribes with jurisdiction and/or special expertise 
with respect to environmental issues to cooperate with us in the 
preparation of the environmental document. Agencies who would like to 
request cooperating status should follow the instructions for filing 
comments described in item n below.
    Cooperating agencies should note the Commission's policy that 
agencies that cooperate in the preparation of the environmental 
document cannot also intervene. See 94 FERC ] 61,076 (2001).
    m. Deadline for filing additional study requests: Because the 
current proposal is substantially the same as the applicant's 
previously licensed but unconstructed project (P-12429), the 
applicant's close coordination with tribal, state, and federal agencies 
during the preparation of the application, and the lack of comments on 
the draft application, we are waiving the 60-day timeframe specified in 
18 CFR 4.32(b)(7) for filing additional study requests and requiring 
all additional study requests to be filed 30 days from the date the 
license application was filed.
    All documents may be filed electronically via the Internet in lieu 
of paper. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the 
Commission's Web site (http://www.ferc.gov/docs-filing/ferconline.asp) 
under the ``eFiling'' link. For a simpler method of submitting text 
only comments, click on ``Quick Comment.'' For assistance, please 
contact FERC Online Support at FERCOnlineSupport@ferc.gov; call toll-
free at (866) 208-3676; or, for TTY, contact (202) 502-8659. Although 
the Commission strongly encourages electronic filing, documents may 
also be paper-filed. To paper-file, mail an original and eight copies 
to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 
888 First Street NE., Washington, DC 20426.
    n. The applicant requested that the Commission only solicit 
competing applications for 30 days, and not notices of intent to file 
competing applications. For the reasons noted in item m and to expedite 
the licensing process, we intend to solicit competing applications for 
30 days, but will allow notices of intent to be filed to ensure 
sufficient opportunity for competing applications to be filed.
    o. Preliminary procedural schedule: Commission staff has determined 
that the issues that need to be addressed in its environmental analysis 
pursuant to the National Environmental Policy Act (NEPA) have been 
adequately identified in the previous licensing proceeding and during 
the applicant's public meeting and site visit, and no new issues are 
likely to be identified through additional scoping. Therefore, we 
intend to accept the consultation that has occurred on this project 
during the pre-filing period as satisfying our requirements for the 
standard 3-stage consultation process under 18 CFR 4.38 and for 
National Environmental Policy Act scoping and prepare a single 
environment assessment. To further expedite the licensing process, once 
we have found the application acceptable and ready for environmental 
analysis, we also intend to waive 4.34(b) of the Commission's 
regulations to require the filing of comments, terms and conditions or 
prescriptions within 30 days of the notice and the reply comments with 
45 days of the notice. The application will be processed according to 
the following preliminary

[[Page 76682]]

procedural schedule. Revisions to the schedule may be made as 
appropriate.

------------------------------------------------------------------------
              Milestone                           Target date
------------------------------------------------------------------------
Additional study requests and         December 23, 2015.
 comments on waivers due.
Issue notice of acceptance and ready  January 5, 2016.
 for environmental analysis.
Comments, recommendations, and terms  February 4, 2016.
 and conditions due.
Reply comments due..................  February 19, 2016.
Notice of the availability of the EA  May 1, 2016.
------------------------------------------------------------------------


    Dated: December 4, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-31127 Filed 12-9-15; 8:45 am]
 BILLING CODE 6717-01-P



                                                                            Federal Register / Vol. 80, No. 237 / Thursday, December 10, 2015 / Notices                                           76681

                                                  DEPARTMENT OF ENERGY                                    interconnection); and (11) appurtenant                the lack of comments on the draft
                                                                                                          facilities. The estimated annual                      application, we are waiving the 60-day
                                                  Federal Energy Regulatory                               generation of the Clark Canyon Dam                    timeframe specified in 18 CFR 4.32(b)(7)
                                                  Commission                                              Project would be 15.4 gigawatt-hours.                 for filing additional study requests and
                                                  [Project No. 14677–001]                                 All project facilities would be located               requiring all additional study requests
                                                                                                          on federal lands owned by the U.S.                    to be filed 30 days from the date the
                                                  Clark Canyon Hydro, LLC; Notice of                      Bureau of Reclamation and the U.S.                    license application was filed.
                                                  Application Tendered for Filing With                    Bureau of Land Management. The                           All documents may be filed
                                                  the Commission, Soliciting Additional                   applicant proposes to operate the                     electronically via the Internet in lieu of
                                                  Study Requests, Intent To Waive Parts                   project as run-of-release.                            paper. See 18 CFR 385.2001(a)(1)(iii)
                                                  of the Pre-Filing Three Stage                              g. Location: The project is located on             and the instructions on the
                                                  Consultation Process, and Intent To                     Beaverhead River near the town of                     Commission’s Web site (http://
                                                  Waive Scoping and Establish an                          Dillon, Beaverhead County, Montana.                   www.ferc.gov/docs-filing/ferconline.asp)
                                                  Expedited Schedule for Processing                       The project would occupy 62.1 acres of                under the ‘‘eFiling’’ link. For a simpler
                                                                                                          land owned by the U.S. Bureau of                      method of submitting text only
                                                     Take notice that the following                       Reclamation and 0.2 acres of land                     comments, click on ‘‘Quick Comment.’’
                                                  hydroelectric application has been filed                owned by the U.S. Bureau of Land                      For assistance, please contact FERC
                                                  with the Commission and is available                    Management.                                           Online Support at
                                                  for public inspection.                                     h. Filed Pursuant to: 18 CFR 4.61 of               FERCOnlineSupport@ferc.gov; call toll-
                                                     a. Type of Application: Original                     the Commission’s regulations.                         free at (866) 208–3676; or, for TTY,
                                                  License for a Major Water Power Project                    i. Applicant Contact: John Gangemi,                contact (202) 502–8659. Although the
                                                  at an Existing Dam, 5 Megawatts or Less.                (406) 249–3972, email at john.gangemi@                Commission strongly encourages
                                                     b. Project No.: 14677–001.                           erm.com.                                              electronic filing, documents may also be
                                                     c. Date filed: November 23, 2015.                       j. FERC Contact: Kelly Wolcott, (202)              paper-filed. To paper-file, mail an
                                                     d. Applicant: Clark Canyon Hydro,                    502–6480, email at kelly.wolcott@                     original and eight copies to: Kimberly D.
                                                  LLC.                                                    ferc.gov.                                             Bose, Secretary, Federal Energy
                                                     e. Name of Project: Clark Canyon Dam                    k. A copy of the application is                    Regulatory Commission, 888 First Street
                                                  Hydroelectric Project.                                  available for review at the Commission                NE., Washington, DC 20426.
                                                     f. Project Description: The Clark                    in the Public Reference Room or may be                   n. The applicant requested that the
                                                  Canyon Dam Hydroelectric Project                        viewed on the Commission’s Web site at                Commission only solicit competing
                                                  would utilize the U.S. Bureau of                        http://www.ferc.gov using the                         applications for 30 days, and not notices
                                                  Reclamation’s Clark Canyon Dam and                      ‘‘eLibrary’’ link. Enter the docket                   of intent to file competing applications.
                                                  outlet works including an intake                        number excluding the last three digits in             For the reasons noted in item m and to
                                                  structure and concrete conduit in the                   the docket number field to access the                 expedite the licensing process, we
                                                  reservoir. The project would also consist               document (P–14677). For assistance,                   intend to solicit competing applications
                                                  of the following new facilities: (1) A                  contact FERC Online Support at                        for 30 days, but will allow notices of
                                                  360-foot-long, 8-foot-diameter steel                    FERCONlineSupport@ferc.gov or toll                    intent to be filed to ensure sufficient
                                                  penstock within the existing concrete                   free at 1–866–208–3676, or for TTY                    opportunity for competing applications
                                                  conduit, ending in a trifurcation; (2) two              (202) 502–8659.                                       to be filed.
                                                  35-foot-long, 8-foot-diameter penstocks                    Register online at http://                            o. Preliminary procedural schedule:
                                                  extending from the trifurcation to the                  www.ferc.gov/docs-filing/                             Commission staff has determined that
                                                  powerhouse, transitioning to 6-foot-                    esubscription.asp to be notified via                  the issues that need to be addressed in
                                                  diameter before entering the                            email of new filings and issuances                    its environmental analysis pursuant to
                                                  powerhouse; (3) a 10-foot-long, 8-foot-                 related to this or other pending projects.            the National Environmental Policy Act
                                                  diameter steel penstock leaving the                     For assistance, contact FERC Online                   (NEPA) have been adequately identified
                                                  trifurcation and ending in a 7-foot-                    Support.                                              in the previous licensing proceeding
                                                  diameter cone valve and reducer to                         l. Cooperating Agencies: We are                    and during the applicant’s public
                                                  control discharge into the existing outlet              asking Federal, state, and local agencies             meeting and site visit, and no new
                                                  stilling basin; (4) a 65-foot-long, 46-foot-            and Indian tribes with jurisdiction and/              issues are likely to be identified through
                                                  wide reinforced concrete powerhouse                     or special expertise with respect to                  additional scoping. Therefore, we
                                                  containing two vertical Francis-type                    environmental issues to cooperate with                intend to accept the consultation that
                                                  turbine/generator units with a total                    us in the preparation of the                          has occurred on this project during the
                                                  capacity of 4.7 megawatts; (5) two 25-                  environmental document. Agencies who                  pre-filing period as satisfying our
                                                  foot-long steel draft tubes transitioning               would like to request cooperating status              requirements for the standard 3-stage
                                                  to concrete draft tube/tailrace section;                should follow the instructions for filing             consultation process under 18 CFR 4.38
                                                  (6) a 17-foot-long, 15-foot-diameter                    comments described in item n below.                   and for National Environmental Policy
                                                  tailrace channel connecting with the                       Cooperating agencies should note the               Act scoping and prepare a single
                                                  existing spillway stilling basin; (7) a 45-             Commission’s policy that agencies that                environment assessment. To further
                                                  foot-long, 10-foot-wide aeration basin                  cooperate in the preparation of the                   expedite the licensing process, once we
                                                  downstream of the powerhouse with                       environmental document cannot also                    have found the application acceptable
                                                  three frames containing 330 diffusers;                  intervene. See 94 FERC ¶ 61,076 (2001).               and ready for environmental analysis,
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                  (8) a 1,100-foot-long, 4.16-kilovolt (kV)                  m. Deadline for filing additional study            we also intend to waive 4.34(b) of the
                                                  buried transmission line from the                       requests: Because the current proposal                Commission’s regulations to require the
                                                  powerhouse to a substation; (9) a                       is substantially the same as the                      filing of comments, terms and
                                                  substation containing step-up                           applicant’s previously licensed but                   conditions or prescriptions within 30
                                                  transformers and switchgear; (10) a 7.9-                unconstructed project (P–12429), the                  days of the notice and the reply
                                                  mile-long, 69-kV transmission line                      applicant’s close coordination with                   comments with 45 days of the notice.
                                                  extending from the project substation to                tribal, state, and federal agencies during            The application will be processed
                                                  the Peterson Flat substation (the point of              the preparation of the application, and               according to the following preliminary


                                             VerDate Sep<11>2014   19:33 Dec 09, 2015   Jkt 238001   PO 00000   Frm 00028   Fmt 4703   Sfmt 4703   E:\FR\FM\10DEN1.SGM   10DEN1


                                                  76682                             Federal Register / Vol. 80, No. 237 / Thursday, December 10, 2015 / Notices

                                                  procedural schedule. Revisions to the
                                                  schedule may be made as appropriate.

                                                                                                                                   Milestone                                                                                               Target date

                                                  Additional study requests and comments on waivers due ......................................................................................................                         December 23, 2015.
                                                  Issue notice of acceptance and ready for environmental analysis .........................................................................................                            January 5, 2016.
                                                  Comments, recommendations, and terms and conditions due ...............................................................................................                              February 4, 2016.
                                                  Reply comments due ...............................................................................................................................................................   February 19, 2016.
                                                  Notice of the availability of the EA ..........................................................................................................................................      May 1, 2016.



                                                    Dated: December 4, 2015.                                                 This filing is accessible on-line at                                     Applicants: Pure Energy, Inc.
                                                  Nathaniel J. Davis, Sr.,                                                http://www.ferc.gov, using the                                              Description: Compliance filing:
                                                  Deputy Secretary.                                                       ‘‘eLibrary’’ link and is available for                                   Revised Compliance Filing to be
                                                  [FR Doc. 2015–31127 Filed 12–9–15; 8:45 am]                             review in the Commission’s Public                                        effective 11/17/2015.
                                                  BILLING CODE 6717–01–P                                                  Reference Room in Washington, DC.                                           Filed Date: 12/4/15.
                                                                                                                          There is an ‘‘eSubscription’’ link on the                                   Accession Number: 20151204–5193.
                                                                                                                          Web site that enables subscribers to                                        Comments Due: 5 p.m. ET 12/28/15.
                                                  DEPARTMENT OF ENERGY                                                    receive email notification when a                                           Docket Numbers: ER16–465–000.
                                                                                                                          document is added to a subscribed                                           Applicants: Duke Energy Progress,
                                                  Federal Energy Regulatory                                               docket(s). For assistance with any FERC                                  LLC.
                                                  Commission                                                              Online service, please email                                                Description: § 205(d) Rate Filing:
                                                  [Docket No. EL01–10–139]                                                FERCOnlineSupport@ferc.gov, or call                                      Amended RS No. 185—Town of
                                                                                                                          (866) 208–3676 (toll free). For TTY, call                                Waynesville to be effective 1/1/2016.
                                                  Puget Sound Energy, Inc. v. All                                         (202) 502–8659.                                                             Filed Date: 12/4/15.
                                                  Jurisdictional Sellers of Energy and/or                                    Comment Date: 5:00 p.m. Eastern                                          Accession Number: 20151204–5165.
                                                  Capacity at Wholesale Into Electric                                     Time on December 24, 2015.                                                  Comments Due: 5 p.m. ET 12/28/15.
                                                  Energy and/or Capacity Markets in the                                     Dated: December 4, 2015.                                                  Docket Numbers: ER16–466–000.
                                                  Pacific Northwest, Including Parties to                                                                                                             Applicants: Anahau Energy, LLC.
                                                                                                                          Nathaniel J. Davis, Sr.,
                                                  the Western Systems Power Pool                                                                                                                      Description: Compliance filing:
                                                                                                                          Deputy Secretary.                                                        Notification of Change in Status and
                                                  Agreement; Notice of Filing
                                                                                                                          [FR Doc. 2015–31122 Filed 12–9–15; 8:45 am]                              Tariff Amendment to be effective 12/5/
                                                     Take notice that on December 3, 2015,                                BILLING CODE 6717–01–P                                                   2015.
                                                  Idaho Power Company and IDACORP                                                                                                                     Filed Date: 12/4/15.
                                                  Energy Services Company submitted a                                                                                                                 Accession Number: 20151204–5211.
                                                  compliance filing pursuant to the                                       DEPARTMENT OF ENERGY                                                        Comments Due: 5 p.m. ET 12/28/15.
                                                  Commission’s November 3, 2015                                                                                                                       Docket Numbers: ER16–467–000.
                                                  Order.1                                                                 Federal Energy Regulatory
                                                                                                                                                                                                      Applicants: Midcontinent
                                                     Any person desiring to intervene or to                               Commission
                                                                                                                                                                                                   Independent System Operator, Inc.,
                                                  protest this filing must file in                                                                                                                 WPPI Energy.
                                                  accordance with Rules 211 and 214 of                                    Combined Notice of Filings #2
                                                                                                                                                                                                      Description: § 205(d) Rate Filing:
                                                  the Commission’s Rules of Practice and                                     Take notice that the Commission                                       2015–12–04_WPPI Cost Recovery Filing
                                                  Procedure (18 CFR 385.211, 385.214).                                    received the following exempt                                            to be effective 1/1/2016.
                                                  Protests will be considered by the                                      wholesale generator filings:                                                Filed Date: 12/4/15.
                                                  Commission in determining the                                              Docket Numbers: EG16–26–000.                                             Accession Number: 20151204–5212.
                                                  appropriate action to be taken, but will                                   Applicants: FTS Project Owner 1,                                         Comments Due: 5 p.m. ET 12/28/15.
                                                  not serve to make protestants parties to                                LLC.                                                                        The filings are accessible in the
                                                  the proceeding. Any person wishing to                                      Description: Notice of Self-                                          Commission’s eLibrary system by
                                                  become a party must file a notice of                                    Certification of Exempt Wholesale                                        clicking on the links or querying the
                                                  intervention or motion to intervene, as                                 Generator (EWG) Status of FTS Project                                    docket number.
                                                  appropriate. Such notices, motions, or                                  Owner 1, LLC.                                                               Any person desiring to intervene or
                                                  protests must be filed on or before the                                    Filed Date: 12/4/15.                                                  protest in any of the above proceedings
                                                  comment date. On or before the                                             Accession Number: 20151204–5176.                                      must file in accordance with Rules 211
                                                  comment date, it is not necessary to                                       Comments Due: 5 p.m. ET 12/28/15.                                     and 214 of the Commission’s
                                                  serve motions to intervene or protests                                     Docket Numbers: EG16–27–000.                                          Regulations (18 CFR 385.211 and
                                                  on persons other than the Applicant.                                       Applicants: FTS Master Tenant 1,
                                                     The Commission encourages                                                                                                                     385.214) on or before 5:00 p.m. Eastern
                                                                                                                          LLC.                                                                     time on the specified comment date.
                                                  electronic submission of protests and                                      Description: Notice of Self-
                                                  interventions in lieu of paper using the                                                                                                         Protests may be considered, but
                                                                                                                          Certification of Exempt Wholesale                                        intervention is necessary to become a
                                                  ‘‘eFiling’’ link at http://www.ferc.gov.                                Generator (EWG) Status of FTS Master
                                                  Persons unable to file electronically                                                                                                            party to the proceeding.
                                                                                                                          Tenant 1, LLC.
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                  should submit an original and 5 copies                                                                                                              eFiling is encouraged. More detailed
                                                                                                                             Filed Date: 12/4/15.                                                  information relating to filing
                                                  of the protest or intervention to the                                      Accession Number: 20151204–5177.
                                                  Federal Energy Regulatory Commission,                                                                                                            requirements, interventions, protests,
                                                                                                                             Comments Due: 5 p.m. ET 12/28/15.                                     service, and qualifying facilities filings
                                                  888 First Street NE., Washington, DC
                                                                                                                             Take notice that the Commission                                       can be found at: http://www.ferc.gov/
                                                  20426.
                                                                                                                          received the following electric rate                                     docs-filing/efiling/filing-req.pdf. For
                                                    1 Puget Sound Energy, Inc. v. All Jurisdictional                      filings:                                                                 other information, call (866) 208–3676
                                                  Sellers of Energy, 153 FERC ¶ 61,136 (2015).                               Docket Numbers: ER16–336–001.                                         (toll free). For TTY, call (202) 502–8659.


                                             VerDate Sep<11>2014        19:33 Dec 09, 2015        Jkt 238001      PO 00000       Frm 00029       Fmt 4703      Sfmt 4703      E:\FR\FM\10DEN1.SGM             10DEN1



Document Created: 2015-12-14 13:28:54
Document Modified: 2015-12-14 13:28:54
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation80 FR 76681 