80_FR_8665 80 FR 8633 - Birch Power Company; Notice of Scoping Meetings and Environmental Site Review and Soliciting Scoping Comments

80 FR 8633 - Birch Power Company; Notice of Scoping Meetings and Environmental Site Review and Soliciting Scoping Comments

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 80, Issue 32 (February 18, 2015)

Page Range8633-8634
FR Document2015-03263

Federal Register, Volume 80 Issue 32 (Wednesday, February 18, 2015)
[Federal Register Volume 80, Number 32 (Wednesday, February 18, 2015)]
[Notices]
[Pages 8633-8634]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-03263]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 13102-003]


Birch Power Company; Notice of Scoping Meetings and Environmental 
Site Review and Soliciting Scoping Comments

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: Original License (Major Project).
    b. Project No.: 13102-003.
    c. Date Filed: July 2, 2013.
    d. Applicant: Birch Power Company.
    e. Name of Project: Demopolis Lock and Dam Hydroelectric Project.
    f. Location: At the U.S. Army Corps of Engineers' (Corps) Demopolis 
Lock and Dam, on theTombigbee River, west of the city of Demopolis in 
Marengo and Sumter Counties, Alabama. The proposed project would occupy 
approximately 23 acres of federal land administered by the Corps.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791 (a)-825(r).
    h. Applicant Contact: Nicholas E. Josten, GeoSense, 2742 Saint 
Charles Ave., Idaho Falls, ID 83404, (208) 528-6152.
    i. FERC Contact: Adam Peer, (202) 502-8449 or [email protected].
    j. Deadline for filing scoping comments: April 25, 2015.
    The Commission strongly encourages electronic filing. Please file 
additional study requests and requests for cooperating agency status 
using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. For assistance, please contact FERC Online Support 
at [email protected], (866) 208-3676 (toll free), or (202) 
502-8659 (TTY). In lieu of electronic filing, please send a paper copy 
to: Secretary, Federal Energy Regulatory Commission, 888 First Street 
NE., Washington, DC 20426. The first page of any filing should include 
docket number P-13102-003.
    The Commission's Rules of Practice and Procedures require all 
intervenors filing documents with the Commission to serve a copy of 
that document on each person on the official service list for the 
project. Further, if an intervenor files comments or documents with the 
Commission relating to the merits of an issue that may affect the 
responsibilities of a particular resource agency, they must also serve 
a copy of the document on that resource agency.
    k. This application is not ready for environmental analysis at this 
time.
    l. The proposed project would utilize the existing Corps' Demopolis 
Lock and Dam and Reservoir, and would consist of the following new 
facilities: (1) A 900-foot-long excavated intake channel (headrace); 
(2) two 60-foot-long by 32-foot-wide trash racks with 2.5-inch bar 
spacing; (3) a 201-foot-long by 80-foot-wide powerhouse containing two 
24-megawatt (MW) Kaplan turbines, having a total installed capacity of 
48 MW; (4) a substation; (5) a forebay oxygen diffuser line system to 
enhance dissolved oxygen; (6) a 1,880-foot-long excavated tailrace 
channel; (7) a 1,700-foot-long retaining wall along the north side of 
tailrace channel; (8) a 4.4-mile-long, 115-kilovolt transmission line; 
and (9) appurtenant facilities. The average annual generation would be 
about 213,000 megawatt-hours.
    m. A copy of the application is available for review at the 
Commission in the Public Reference Room or may be viewed on the 
Commission's Web site at http://www.ferc.gov using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. For assistance, contact 
FERC Online Support. A copy is also available for inspection and 
reproduction at the address in item h above.
    You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    n. Scoping Process:
    The Commission intends to prepare an environmental assessment (EA) 
on the project in accordance with the National Environmental Policy 
Act. The EA will consider both site-specific and cumulative 
environmental impacts and reasonable alternatives to the proposed 
action.

 Scoping Meetings

    FERC staff will conduct one agency scoping meeting and one public 
meeting. The agency scoping meeting will focus on resource agency and 
non-governmental organization (NGO) concerns, while the public scoping 
meeting is primarily for public input. All interested individuals, 
organizations, and agencies are invited to attend one or both of the 
meetings, and to assist the staff in identifying the scope of the 
environmental issues that should be analyzed in the EA. The times and 
locations of these meetings are as follows:

Agency Scoping Meeting

    DATE: Thursday, March 26, 2015.
    TIME: 9:00 a.m. (EDT).
    PLACE: Demopolis Civic Center.
    ADDRESS: 501 N. Commissioner's Avenue, Demopolis, AL 36732.

Public Scoping Meeting

    DATE: Thursday, March 26, 2015.
    TIME: 7:00 p.m. (EDT).
    PLACE: Demopolis Civic Center.
    ADDRESS: 501 N. Commissioner's Avenue, Demopolis, AL 36732.
    Copies of the Scoping Document (SD1) outlining the subject areas to 
be addressed in the EA were distributed to the parties on the 
Commission's mailing list. Copies of the SD1 will be available at the 
scoping meeting or may be viewed on the web at http://www.ferc.gov 
using the ``eLibrary'' link (see item m above).

Environmental Site Review

    The Applicant and FERC staff will conduct a project Environmental 
Site Review. The time and location of this meeting is as follows:
    PROJECT: Demopolis Lock and Dam Hydroelectric Project.
    DATE: Thursday, March 26, 2015.
    TIME: 2:00 p.m. (EDT).
    LOCATION: Demopolis Civic Center Parking Lot, 501 N. Commissioner's 
Avenue, Demopolis, AL 36732.
    All interested individuals, organizations, and agencies are invited 
to attend. All participants should meet at the time and location 
specified above. All participants are responsible for their own 
transportation to the site. Anyone with questions about the 
Environmental Site Review should contact Nicholas E. Josten, GeoSense, 
2742 Saint Charles Ave., Idaho Falls, ID 83404, (208) 528-6152 on or 
before March 19, 2015.

Objectives

    At the scoping meetings, the staff will: (1) Summarize the 
environmental issues tentatively identified for analysis in the EA; (2) 
solicit from the meeting participants all available information, 
especially quantifiable data, on the resources at issue; (3) encourage 
statements from experts and the public on issues that should be 
analyzed in the EA, including viewpoints in opposition to, or in 
support of, the staff's preliminary views; (4) determine the

[[Page 8634]]

resource issues to be addressed in the EA; and (5) identify those 
issues that require a detailed analysis, as well as those issues that 
do not require a detailed analysis.

Procedures

    The meetings are recorded by a stenographer and become part of the 
formal record of the Commission proceeding on the project.
    Individuals, organizations, and agencies with environmental 
expertise and concerns are encouraged to attend the meeting and to 
assist the staff in defining and clarifying the issues to be addressed 
in the EA.

     Dated: February 11, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-03263 Filed 2-17-15; 8:45 am]
BILLING CODE 6717-01-P



                                                                          Federal Register / Vol. 80, No. 32 / Wednesday, February 18, 2015 / Notices                                             8633

                                                  Dated: February 12, 2015.                             to serve a copy of that document on                   All interested individuals,
                                                Kate Mullan,                                            each person on the official service list              organizations, and agencies are invited
                                                Acting Director, Information Collection                 for the project. Further, if an intervenor            to attend one or both of the meetings,
                                                Clearance Division, Privacy, Information and            files comments or documents with the                  and to assist the staff in identifying the
                                                Records Management Services, Office of                  Commission relating to the merits of an               scope of the environmental issues that
                                                Management.                                             issue that may affect the responsibilities            should be analyzed in the EA. The times
                                                [FR Doc. 2015–03281 Filed 2–17–15; 8:45 am]             of a particular resource agency, they                 and locations of these meetings are as
                                                BILLING CODE 4000–01–P                                  must also serve a copy of the document                follows:
                                                                                                        on that resource agency.
                                                                                                           k. This application is not ready for               Agency Scoping Meeting
                                                DEPARTMENT OF ENERGY                                    environmental analysis at this time.                   DATE: Thursday, March 26, 2015.
                                                                                                           l. The proposed project would utilize               TIME: 9:00 a.m. (EDT).
                                                Federal Energy Regulatory                               the existing Corps’ Demopolis Lock and                 PLACE: Demopolis Civic Center.
                                                Commission                                              Dam and Reservoir, and would consist                   ADDRESS: 501 N. Commissioner’s
                                                                                                        of the following new facilities: (1) A                Avenue, Demopolis, AL 36732.
                                                [Project No. 13102–003]                                 900-foot-long excavated intake channel
                                                                                                        (headrace); (2) two 60-foot-long by 32-               Public Scoping Meeting
                                                Birch Power Company; Notice of
                                                                                                        foot-wide trash racks with 2.5-inch bar                  DATE: Thursday, March 26, 2015.
                                                Scoping Meetings and Environmental
                                                                                                        spacing; (3) a 201-foot-long by 80-foot-                 TIME: 7:00 p.m. (EDT).
                                                Site Review and Soliciting Scoping
                                                                                                        wide powerhouse containing two 24-                       PLACE: Demopolis Civic Center.
                                                Comments                                                                                                         ADDRESS: 501 N. Commissioner’s
                                                                                                        megawatt (MW) Kaplan turbines, having
                                                   Take notice that the following                       a total installed capacity of 48 MW; (4)              Avenue, Demopolis, AL 36732.
                                                hydroelectric application has been filed                a substation; (5) a forebay oxygen                       Copies of the Scoping Document
                                                with the Commission and is available                    diffuser line system to enhance                       (SD1) outlining the subject areas to be
                                                for public inspection.                                  dissolved oxygen; (6) a 1,880-foot-long               addressed in the EA were distributed to
                                                   a. Type of Application: Original                     excavated tailrace channel; (7) a 1,700-              the parties on the Commission’s mailing
                                                License (Major Project).                                foot-long retaining wall along the north              list. Copies of the SD1 will be available
                                                   b. Project No.: 13102–003.                           side of tailrace channel; (8) a 4.4-mile-             at the scoping meeting or may be
                                                   c. Date Filed: July 2, 2013.                         long, 115-kilovolt transmission line; and             viewed on the web at http://
                                                   d. Applicant: Birch Power Company.                   (9) appurtenant facilities. The average               www.ferc.gov using the ‘‘eLibrary’’ link
                                                   e. Name of Project: Demopolis Lock                   annual generation would be about                      (see item m above).
                                                and Dam Hydroelectric Project.                          213,000 megawatt-hours.
                                                   f. Location: At the U.S. Army Corps of                                                                     Environmental Site Review
                                                                                                           m. A copy of the application is
                                                Engineers’ (Corps) Demopolis Lock and                   available for review at the Commission                   The Applicant and FERC staff will
                                                Dam, on theTombigbee River, west of                     in the Public Reference Room or may be                conduct a project Environmental Site
                                                the city of Demopolis in Marengo and                    viewed on the Commission’s Web site at                Review. The time and location of this
                                                Sumter Counties, Alabama. The                           http://www.ferc.gov using the                         meeting is as follows:
                                                proposed project would occupy                           ‘‘eLibrary’’ link. Enter the docket                      PROJECT: Demopolis Lock and Dam
                                                approximately 23 acres of federal land                  number excluding the last three digits in             Hydroelectric Project.
                                                administered by the Corps.                              the docket number field to access the                    DATE: Thursday, March 26, 2015.
                                                   g. Filed Pursuant to: Federal Power                  document. For assistance, contact FERC                   TIME: 2:00 p.m. (EDT).
                                                Act, 16 U.S.C. 791 (a)–825(r).                          Online Support. A copy is also available                 LOCATION: Demopolis Civic Center
                                                   h. Applicant Contact: Nicholas E.                    for inspection and reproduction at the                Parking Lot, 501 N. Commissioner’s
                                                Josten, GeoSense, 2742 Saint Charles                    address in item h above.                              Avenue, Demopolis, AL 36732.
                                                Ave., Idaho Falls, ID 83404, (208) 528–                    You may also register online at                       All interested individuals,
                                                6152.                                                   http://www.ferc.gov/docs-filing/                      organizations, and agencies are invited
                                                   i. FERC Contact: Adam Peer, (202)                    esubscription.asp to be notified via                  to attend. All participants should meet
                                                502–8449 or adam.peer@ferc.gov.                         email of new filings and issuances                    at the time and location specified above.
                                                   j. Deadline for filing scoping                       related to this or other pending projects.            All participants are responsible for their
                                                comments: April 25, 2015.                               For assistance, contact FERC Online                   own transportation to the site. Anyone
                                                   The Commission strongly encourages                   Support.                                              with questions about the Environmental
                                                electronic filing. Please file additional                  n. Scoping Process:                                Site Review should contact Nicholas E.
                                                study requests and requests for                            The Commission intends to prepare                  Josten, GeoSense, 2742 Saint Charles
                                                cooperating agency status using the                     an environmental assessment (EA) on                   Ave., Idaho Falls, ID 83404, (208) 528–
                                                Commission’s eFiling system at http://                  the project in accordance with the                    6152 on or before March 19, 2015.
                                                www.ferc.gov/docs-filing/efiling.asp. For               National Environmental Policy Act. The
                                                assistance, please contact FERC Online                                                                        Objectives
                                                                                                        EA will consider both site-specific and
                                                Support at FERCOnlineSupport@                           cumulative environmental impacts and                    At the scoping meetings, the staff will:
                                                ferc.gov, (866) 208–3676 (toll free), or                reasonable alternatives to the proposed               (1) Summarize the environmental issues
                                                (202) 502–8659 (TTY). In lieu of                        action.                                               tentatively identified for analysis in the
                                                electronic filing, please send a paper                                                                        EA; (2) solicit from the meeting
                                                                                                        Scoping Meetings
emcdonald on DSK67QTVN1PROD with NOTICES




                                                copy to: Secretary, Federal Energy                                                                            participants all available information,
                                                Regulatory Commission, 888 First Street                   FERC staff will conduct one agency                  especially quantifiable data, on the
                                                NE., Washington, DC 20426. The first                    scoping meeting and one public                        resources at issue; (3) encourage
                                                page of any filing should include docket                meeting. The agency scoping meeting                   statements from experts and the public
                                                number P–13102–003.                                     will focus on resource agency and non-                on issues that should be analyzed in the
                                                   The Commission’s Rules of Practice                   governmental organization (NGO)                       EA, including viewpoints in opposition
                                                and Procedures require all intervenors                  concerns, while the public scoping                    to, or in support of, the staff’s
                                                filing documents with the Commission                    meeting is primarily for public input.                preliminary views; (4) determine the


                                           VerDate Sep<11>2014   19:32 Feb 17, 2015   Jkt 235001   PO 00000   Frm 00045   Fmt 4703   Sfmt 4703   E:\FR\FM\18FEN1.SGM   18FEN1


                                                8634                      Federal Register / Vol. 80, No. 32 / Wednesday, February 18, 2015 / Notices

                                                resource issues to be addressed in the                     Comments Due: 5 p.m. ET 3/3/15.                       Comments Due: 5 p.m. ET 3/3/15.
                                                EA; and (5) identify those issues that                     Docket Numbers: ER15–359–002.                        Docket Numbers: ER15–1019–000.
                                                require a detailed analysis, as well as                    Applicants: Samchully Power &
                                                those issues that do not require a                      Utilities 1 LLC.                                        Applicants: Fowler Ridge IV Wind
                                                detailed analysis.                                         Description: Notice of Non-Material                Farm LLC.
                                                Procedures                                              Change in Status of Samchully Power &                   Description: Initial rate filing per
                                                                                                        Utilities 1 LLC.                                      35.12 Application for MBR to be
                                                  The meetings are recorded by a                           Filed Date: 2/10/15.                               effective 2/11/2015.
                                                stenographer and become part of the                        Accession Number: 20150210–5179.
                                                formal record of the Commission                                                                                 Filed Date: 2/10/15.
                                                                                                           Comments Due: 5 p.m. ET 3/3/15.
                                                proceeding on the project.                                                                                      Accession Number: 20150210–5089.
                                                                                                           Docket Numbers: ER15–746–001.
                                                  Individuals, organizations, and                                                                               Comments Due: 5 p.m. ET 3/3/15.
                                                                                                           Applicants: RC Cape May Holdings,
                                                agencies with environmental expertise
                                                                                                        LLC.                                                    Docket Numbers: ER15–1020–000.
                                                and concerns are encouraged to attend
                                                                                                           Description: Tariff Amendment per
                                                the meeting and to assist the staff in                                                                          Applicants: Rising Tree Wind Farm III
                                                                                                        35.17(b): Supplement to Reactive Rate
                                                defining and clarifying the issues to be                                                                      LLC.
                                                                                                        Schedule Change Request to be effective
                                                addressed in the EA.
                                                                                                        12/31/9998.                                             Description: Initial rate filing per
                                                  Dated: February 11, 2015.                                Filed Date: 2/10/15.                               35.12 MBR Application to be effective
                                                Nathaniel J. Davis, Sr.,                                   Accession Number: 20150210–5169.                   4/11/2015.
                                                Deputy Secretary.                                          Comments Due: 5 p.m. ET 3/3/15.
                                                                                                                                                                Filed Date: 2/10/15.
                                                [FR Doc. 2015–03263 Filed 2–17–15; 8:45 am]                Docket Numbers: ER15–786–000.
                                                BILLING CODE 6717–01–P                                     Applicants: Midcontinent                             Accession Number: 20150210–5114.
                                                                                                        Independent System Operator, Inc.                       Comments Due: 5 p.m. ET 3/3/15.
                                                                                                           Description: Report Filing: 2015–02–
                                                DEPARTMENT OF ENERGY                                                                                            Take notice that the Commission
                                                                                                        10_SA 2523 Supplement ITC-Pheasant
                                                                                                        Run GIA (J075) to be effective N/A.                   received the following land acquisition
                                                Federal Energy Regulatory                                  Filed Date: 2/10/15.                               reports:
                                                Commission                                                 Accession Number: 20150210–5062.                     Docket Numbers: LA14–3–000.
                                                                                                           Comments Due: 5 p.m. ET 3/3/15.                      Applicants: NextEra Energy
                                                Combined Notice of Filings #1
                                                                                                           Docket Numbers: ER15–1015–000.                     Companies.
                                                   Take notice that the Commission                         Applicants: AltaGas Brush Energy Inc.
                                                                                                                                                                Description: Quarterly Land
                                                received the following electric corporate                  Description: Section 205(d) rate filing
                                                filings:                                                                                                      Acquisition Report of the NextEra
                                                                                                        per 35.13(a)(2)(iii): AltaGas Brush
                                                   Docket Numbers: EC15–71–000.                         Energy Inc. Notice of Succession to be                Energy Companies.
                                                   Applicants: Enel Cove Fort, LLC, Enel                effective 2/10/2015.                                    Filed Date: 2/9/15.
                                                Stillwater, LLC,EGP Stillwater Solar,                      Filed Date: 2/9/15.                                  Accession Number: 20150209–5277.
                                                LLC, Origin Wind Energy, LLC,EFS                           Accession Number: 20150209–5147.
                                                Green Power Holdings, LLC.                                                                                      Comments Due: 5 p.m. ET 3/2/15.
                                                                                                           Comments Due: 5 p.m. ET 3/2/15.
                                                   Description: Application for                            Docket Numbers: ER15–1016–000.                        The filings are accessible in the
                                                Authorization under section 203 of the                     Applicants: Shafter Solar, LLC.                    Commission’s eLibrary system by
                                                Federal Power Act and Request for                          Description: Baseline eTariff Filing               clicking on the links or querying the
                                                Expedited Action of Enel Cove Fort,                     per 35.1: Shafter Solar, LLC Application              docket number.
                                                LLC, et al.                                             for Market-Based Rates to be effective 3/
                                                   Filed Date: 2/9/15.                                                                                           Any person desiring to intervene or
                                                                                                        15/2015.                                              protest in any of the above proceedings
                                                   Accession Number: 20150209–5278.                        Filed Date: 2/9/15.
                                                   Comments Due: 5 p.m. ET 3/2/15.                                                                            must file in accordance with Rules 211
                                                                                                           Accession Number: 20150209–5256.
                                                   Take notice that the Commission                                                                            and 214 of the Commission’s
                                                                                                           Comments Due: 5 p.m. ET 3/2/15.
                                                received the following electric rate                                                                          Regulations (18 CFR 385.211 and
                                                filings:                                                   Docket Numbers: ER15–1017–000.                     385.214) on or before 5:00 p.m. Eastern
                                                   Docket Numbers: ER14–822–000.                           Applicants: Southern California                    time on the specified comment date.
                                                   Applicants: PJM Interconnection,                     Edison Company.
                                                                                                                                                              Protests may be considered, but
                                                L.L.C.                                                     Description: Section 205(d) rate filing
                                                                                                                                                              intervention is necessary to become a
                                                   Description: Report Filing:                          per 35.13(a)(2)(iii): Tie-Line Facilities
                                                                                                                                                              party to the proceeding.
                                                Informational Report per May, 9, 2014                   Agreement with Valle Del Sol Energy,
                                                Order in Docket No. ER14–822–000. to                    LLC to be effective 4/12/2015.                           eFiling is encouraged. More detailed
                                                be effective N/A.                                          Filed Date: 2/10/15.                               information relating to filing
                                                   Filed Date: 2/9/15.                                     Accession Number: 20150210–5000.                   requirements, interventions, protests,
                                                   Accession Number: 20150209–5219.                        Comments Due: 5 p.m. ET 3/3/15.                    service, and qualifying facilities filings
                                                   Comments Due: 5 p.m. ET 3/2/15.                         Docket Numbers: ER15–1018–000.                     can be found at: http://www.ferc.gov/
                                                   Docket Numbers: ER15–266–001.                           Applicants: Southern California                    docs-filing/efiling/filing-req.pdf. For
emcdonald on DSK67QTVN1PROD with NOTICES




                                                   Applicants: Public Service Company                   Edison Company.                                       other information, call (866) 208–3676
                                                of Colorado.                                               Description: Section 205(d) rate filing            (toll free). For TTY, call (202) 502–8659.
                                                   Description: Tariff Amendment per                    per 35.13(a)(2)(iii): LGIA and                          Dated: February 10, 2015.
                                                35.17(b): 2015–2–10_PSCo Sttlmnt                        Distribution Service Agmt with Valle
                                                                                                                                                              Nathaniel J. Davis, Sr.,
                                                Losses Amend Filing to be effective 1/                  Del Sol Energy, LLC to be effective 4/12/
                                                1/2015.                                                 2015.                                                 Deputy Secretary.
                                                   Filed Date: 2/10/15.                                    Filed Date: 2/10/15.                               [FR Doc. 2015–03198 Filed 2–17–15; 8:45 am]
                                                   Accession Number: 20150210–5145.                        Accession Number: 20150210–5001.                   BILLING CODE 6717–01–P




                                           VerDate Sep<11>2014   19:32 Feb 17, 2015   Jkt 235001   PO 00000   Frm 00046   Fmt 4703   Sfmt 9990   E:\FR\FM\18FEN1.SGM   18FEN1



Document Created: 2018-02-16 11:10:10
Document Modified: 2018-02-16 11:10:10
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
DatesThursday, March 26, 2015.
FR Citation80 FR 8633 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR