80_FR_8785 80 FR 8753 - Notice of Buy America Waiver for Track Turnout Components

80 FR 8753 - Notice of Buy America Waiver for Track Turnout Components

DEPARTMENT OF TRANSPORTATION
Federal Transit Administration

Federal Register Volume 80, Issue 32 (February 18, 2015)

Page Range8753-8754
FR Document2015-03242

In response to a request from the Long Island Rail Road Company (LIRR), a subsidiary of the New York Metropolitan Transportation Authority (MTA), for a Buy America waiver for track turnout components, the Federal Transit Administration (FTA) hereby waives its Buy America requirements for LIRR's procurement of the following track turnout components: Schwihag roller assemblies, Schwihag plates, ZU1-60 steel switch point rail sections, and movable point frogs. This waiver is limited to LIRR's procurement of these track turnout components for the nine (9) turnouts that LIRR needs for VHL03 LIRR Stage 3 of the East Side Access Project and the one (1) turnout that LIRR needs for VHL04 LIRR Stage 4 of the East Side Access Project. The turnouts themselves, however, are subject to FTA's Buy America requirements and, accordingly, the turnouts must be manufactured in the United States. This Buy America waiver does not apply to the track turnout components for Phase I of LIRR's Jamaica Capacity Improvements Project, and FTA will address that waiver request separately. Moreover, this Buy America waiver does not apply to the track turnout components for the Northeast Corridor Congestion Relief Project at Harold Interlocking, which is being addressed in a separate waiver decision published by the Federal Railroad Administration (FRA), as FRA funds are being used for that project.

Federal Register, Volume 80 Issue 32 (Wednesday, February 18, 2015)
[Federal Register Volume 80, Number 32 (Wednesday, February 18, 2015)]
[Notices]
[Pages 8753-8754]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-03242]


-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION

Federal Transit Administration

[Docket No. FTA-2014-0025]


Notice of Buy America Waiver for Track Turnout Components

AGENCY: Federal Transit Administration, DOT.

ACTION: Notice of Buy America Waiver.

-----------------------------------------------------------------------

SUMMARY: In response to a request from the Long Island Rail Road 
Company (LIRR), a subsidiary of the New York Metropolitan 
Transportation Authority (MTA), for a Buy America waiver for track 
turnout components, the Federal Transit Administration (FTA) hereby 
waives its Buy America requirements for LIRR's procurement of the 
following track turnout components: Schwihag roller assemblies, 
Schwihag plates, ZU1-60 steel switch point rail sections, and movable 
point frogs. This waiver is limited to LIRR's procurement of these 
track turnout components for the nine (9) turnouts that LIRR needs for 
VHL03 LIRR Stage 3 of the East Side Access Project and the one (1) 
turnout that LIRR needs for VHL04 LIRR Stage 4 of the East Side Access 
Project. The turnouts themselves, however, are subject to FTA's Buy 
America requirements and, accordingly, the turnouts must be 
manufactured in the United States.
    This Buy America waiver does not apply to the track turnout 
components for Phase I of LIRR's Jamaica Capacity Improvements Project, 
and FTA will address that waiver request separately. Moreover, this Buy 
America waiver does not apply to the track turnout components for the 
Northeast Corridor Congestion Relief Project at Harold Interlocking, 
which is being addressed in a separate waiver decision published by the 
Federal Railroad Administration (FRA), as FRA funds are being used for 
that project.

DATES: This waiver is effective immediately.

FOR FURTHER INFORMATION CONTACT: Richard L. Wong, FTA Attorney-Advisor, 
at (202) 366-4011 or [email protected].

SUPPLEMENTARY INFORMATION: The purpose of this notice is to announce 
that FTA is granting a non-availability waiver for LIRR's procurement 
of track turnout components--i.e., Schwihag roller assemblies, Schwihag 
plates, ZU1-60 steel switch point rail sections, and movable point 
frogs (MPFs)--that are needed for VHL03 LIRR Stage 3 and VHL04 LIRR 
Stage 4 of the East Side Access (ESA) Project.
    With certain exceptions, FTA's Buy America requirements prevent FTA 
from obligating an amount that may be appropriated to carry out its 
program for a project unless ``the steel, iron, and manufactured goods 
used in the project are produced in the United States.'' 49 U.S.C. 
5323(j)(1). A manufactured product is considered produced in the United 
States if: (1) All of the manufacturing processes for the product must 
take place in the United States; and (2) All of the components of the 
product must be of U.S. origin. 49 CFR 661.5(d). A component is 
considered of U.S. origin if it is manufactured in the United States, 
regardless of the origin of its subcomponents. 49 CFR 661.5(d)(2). If, 
however, FTA determines that ``the steel, iron, and goods produced in 
the United States are not produced in a sufficient and reasonably 
available amount or are not of a satisfactory quality,'' then FTA may 
issue a waiver (non-availability waiver). 49 U.S.C. 5323(j)(2)(B); 49 
CFR 661.7(c).
    On July 31, 2014, LIRR requested a non-availability Buy America 
waiver for the procurement of four specific track turnout components--
i.e., Schwihag roller assemblies, Schwihag plates, ZU1-60 steel switch 
point rail sections, and MPFs--that are needed for the ESA Project. MTA 
entered into an FTA Full Funding Grant Agreement in 2006 to build the 
ESA Project. As described by LIRR, the ESA Project will extend LIRR 
commuter rail service from Queens to the east side of Midtown Manhattan 
and will construct a new LIRR Terminal at Grand Central Terminal.
    On February 4, 2015, LIRR submitted a letter to FTA indicating that 
it has become aware of alternate turnout designs that may be compatible 
with LIRR's infrastructure, with some modifications, for the ESA 
Project and that may be available from a domestic source in the future. 
Accordingly, in its February 4, 2015 letter, LIRR narrowed its waiver 
request to apply only to VHL03 LIRR Stage 3 and VHL04 LIRR Stage 4 of 
the ESA Project. Specifically, LIRR explained that it critically needs 
the Buy America waiver for nine (9) turnouts that are necessary for 
VHL03 LIRR Stage 3 of the ESA Project in order for LIRR to meet its 
2016 installation schedule and to thereby avoid delays to the overall 
ESA project schedule. Additionally, LIRR specified that it needs the 
track turnout components waiver so that it may procure one (1) unique 
turnout--No. 32.75--for VHL04 LIRR Stage 4 of the ESA Project.
    LIRR has stated that the foreign-sourced MPFs are essential 
components of track turnouts for the following operational reasons: (1) 
turnouts with MPFs are necessary to withstand the frequent and heavy 
use by passenger and freight trains traveling along LIRR's right of 
way; (2) turnouts with MPFs allow trains to travel through the turnouts 
at higher speeds, ultimately providing more throughput during rush 
hour; (3) turnouts with MPFs reduce impact loading to the turnouts; and 
(4) turnouts with MPFs provide for less wear and tear, thereby 
requiring less overall maintenance, extending the useful lives of the 
turnouts, and resulting in fewer outages and negative impacts on LIRR's 
operations.
    Based on previous solicitations, market research, and manufacturer 
outreach, as set forth below, LIRR

[[Page 8754]]

concluded that it was unable to identify a domestic source for track 
turnout components--i.e., Schwihag roller assemblies, Schwihag plates, 
ZU1-60 steel switch point rail sections, and MPFs--that LIRR needs for 
VHL03 LIRR Stage 3 and VHL04 LIRR Stage 4 of the ESA Project.
    In February 2014, LIRR issued a competitive solicitation seeking 
vendors to provide five (5) turnouts for VHL03 LIRR Stage 3 of the ESA 
Project. LIRR received only one response, and it was from VAE Nortrak 
North America Inc. (Nortrak), which certified that it was not compliant 
with the Buy America requirements. Based on LIRR's prior experience in 
procuring the same or similar turnouts, LIRR has found that Nortrak and 
Progress Rail Services Corporation (Progress) are the only two vendors 
that are technically capable of manufacturing turnouts with the roller 
assemblies, plates, ZU1-60 steel switch point rail sections, and MPFs 
that LIRR requires for the ESA Project. According to LIRR, Nortrak and 
Progress manufacture the turnouts domestically, but the turnout 
components that are the subject of this waiver are presently 
manufactured only non-domestically.\1\ Progress did not submit a bid in 
response to the February 2014 solicitation related to VHL03 LIRR Stage 
3 of the ESA Project.
---------------------------------------------------------------------------

    \1\ The roller assemblies and plates are manufactured in 
Switzerland; the ZU1-60 steel switch point rail sections are 
manufactured in Austria; and the MPFs are manufactured in Germany.
---------------------------------------------------------------------------

    Furthermore, in support of its requests, LIRR also conducted market 
research and manufacturer outreach. In conducting this research, LIRR 
utilized the National Railroad Passenger Corporation's (Amtrak) 
previous market research regarding potential domestic manufacturers of 
the four component types that are the subject of this notice. Amtrak 
conducted its market research at the request of FRA, and the research 
included outreach to manufacturers that were previously identified by 
the U.S. Department of Commerce's National Institute of Standards and 
Technology (NIST) in a December 2012 Supplier Scouting Report.
    Additionally, LIRR conducted its own independent outreach and 
contacted seven potential manufacturers: Unitrac Railroad Materials, 
Inc., Arcelor Mittal, J. Manufacturing Inc., Steel Dynamics, Inc., 
Metal Tech, Compucision, LLC, and IAT International Inc.\2\ Three of 
the seven potential manufacturers failed to respond to repeated 
requests for information. Four manufacturers responded, but LIRR 
concluded that the four manufacturers were not potential domestic 
sources for the components because the manufacturers each stated that 
either it did not currently manufacture the components or it did not 
appear economically feasible for the manufacturer to manufacture the 
components in the quantities needed by LIRR. One of the four responsive 
manufacturers, Compucision, LLC, expressed interested, but it had never 
manufactured the components previously and had little knowledge of the 
technical requirements. Based on these efforts, LIRR determined that 
there are no U.S. manufacturers that are willing and capable of 
producing the turnout components that are presently required for VHL03 
LIRR Stage 3 and VHL04 LIRR Stage 4 the ESA Project.
---------------------------------------------------------------------------

    \2\ FTA defers to LIRR's spelling and punctuation of the 
manufacturers' names as presented in LIRR's July 31, 2014, letter.
---------------------------------------------------------------------------

    On December 19, 2014, FTA published a Federal Register notice 
requesting comment on LIRR's waiver request, pursuant to 49 CFR 661.7. 
79 FR 75857 (Dec. 19, 2014). No comments were received to the docket.
    Based upon LIRR's good faith efforts to identify potential domestic 
manufacturers for these track turnout components, LIRR's informed 
conclusion that there are presently no U.S. manufacturers that are 
willing and capable of producing the turnout components needed for 
VHL03 LIRR Stage 3 and VHL04 LIRR Stage 4 of the ESA Project, and the 
lack of responses to FTA's Federal Register Notice, FTA is issuing a 
non-availability waiver, pursuant to 49 CFR 661.7(c), for LIRR's 
procurement of the track turnout components--i.e., Schwihag roller 
assemblies, Schwihag plates, ZU1-60 steel switch point rail sections, 
and MPFs--but in connection with only the nine (9) turnouts needed for 
VHL03 LIRR Stage 3 and the one (1) turnout needed for VHL04 LIRR Stage 
4 of the East Side Access Project, as set forth above. Subsequent 
waiver requests for track turnout components will be subject to notice-
and-comment publication requirements. This waiver does not apply to the 
turnouts themselves, and, accordingly, the turnouts must be 
manufactured in the United States pursuant to FTA's Buy America 
requirements. See 49 CFR part 661.
    Furthermore, this Buy America waiver does not apply to the track 
turnout components for Phase I of LIRR's Jamaica Capacity Improvements 
Project, which will be addressed in a separate waiver decision by FTA. 
With respect to LIRR's Buy America waiver request from March 26, 2013 
(and supplemented on September 19, 2014) for track turnout components 
of one (1) #20 tangential geometry turnout for LIRR's State of Good 
Repair (SGR) Program, LIRR withdrew that waiver request on February 9, 
2015 due to a potential domestically produced alternative turnout for 
its SGR program.
    Furthermore, this Buy America waiver does not apply to the track 
turnout components for the Northeast Corridor Congestion Relief Project 
at Harold Interlocking, which is being addressed in a separate waiver 
decision published by FRA, as FRA funds are being used for that 
project.

Dana Nifosi,
Acting Chief Counsel.
[FR Doc. 2015-03242 Filed 2-17-15; 8:45 am]
BILLING CODE 4910-57-P



                                                                          Federal Register / Vol. 80, No. 32 / Wednesday, February 18, 2015 / Notices                                            8753

                                                0280; FMCSA–2012–0337; FMCSA–                           track turnout components, the Federal                 If, however, FTA determines that ‘‘the
                                                2012–0339’’ in the ‘‘Keyword’’ box, and                 Transit Administration (FTA) hereby                   steel, iron, and goods produced in the
                                                click ‘‘Search.’’ When the new screen                   waives its Buy America requirements                   United States are not produced in a
                                                appears, click on ‘‘Comment Now!’’                      for LIRR’s procurement of the following               sufficient and reasonably available
                                                button and type your comment into the                   track turnout components: Schwihag                    amount or are not of a satisfactory
                                                text box in the following screen. Choose                roller assemblies, Schwihag plates,                   quality,’’ then FTA may issue a waiver
                                                whether you are submitting your                         ZU1–60 steel switch point rail sections,              (non-availability waiver). 49 U.S.C.
                                                comment as an individual or on behalf                   and movable point frogs. This waiver is               5323(j)(2)(B); 49 CFR 661.7(c).
                                                of a third party and then submit. If you                limited to LIRR’s procurement of these                   On July 31, 2014, LIRR requested a
                                                submit your comments by mail or hand                    track turnout components for the nine                 non-availability Buy America waiver for
                                                delivery, submit them in an unbound                     (9) turnouts that LIRR needs for VHL03                the procurement of four specific track
                                                format, no larger than 81⁄2 by 11 inches,               LIRR Stage 3 of the East Side Access                  turnout components—i.e., Schwihag
                                                suitable for copying and electronic                     Project and the one (1) turnout that LIRR             roller assemblies, Schwihag plates,
                                                filing. If you submit comments by mail                  needs for VHL04 LIRR Stage 4 of the                   ZU1–60 steel switch point rail sections,
                                                and would like to know that they                        East Side Access Project. The turnouts                and MPFs—that are needed for the ESA
                                                reached the facility, please enclose a                  themselves, however, are subject to                   Project. MTA entered into an FTA Full
                                                stamped, self-addressed postcard or                     FTA’s Buy America requirements and,                   Funding Grant Agreement in 2006 to
                                                envelope. FMCSA will consider all                       accordingly, the turnouts must be                     build the ESA Project. As described by
                                                comments and material received during                   manufactured in the United States.                    LIRR, the ESA Project will extend LIRR
                                                the comment period and may change                          This Buy America waiver does not                   commuter rail service from Queens to
                                                this notice based on your comments.                     apply to the track turnout components                 the east side of Midtown Manhattan and
                                                                                                        for Phase I of LIRR’s Jamaica Capacity                will construct a new LIRR Terminal at
                                                Viewing Comments and Documents                          Improvements Project, and FTA will                    Grand Central Terminal.
                                                   To view comments, as well as any                     address that waiver request separately.                  On February 4, 2015, LIRR submitted
                                                documents mentioned in this preamble                    Moreover, this Buy America waiver                     a letter to FTA indicating that it has
                                                as being available in the docket, go to                 does not apply to the track turnout                   become aware of alternate turnout
                                                http://www.regulations.gov and in the                   components for the Northeast Corridor                 designs that may be compatible with
                                                search box insert the docket number,                    Congestion Relief Project at Harold                   LIRR’s infrastructure, with some
                                                ‘‘FMCSA–2006–25246; FMCSA–2006–                         Interlocking, which is being addressed                modifications, for the ESA Project and
                                                26066; FMCSA–2008–0340; FMCSA–                          in a separate waiver decision published               that may be available from a domestic
                                                2010–0327; FMCSA–2010–0385;                             by the Federal Railroad Administration                source in the future. Accordingly, in its
                                                FMCSA–2012–0280; FMCSA–2012–                            (FRA), as FRA funds are being used for                February 4, 2015 letter, LIRR narrowed
                                                0337; FMCSA–2012–0339’’ in the                          that project.                                         its waiver request to apply only to
                                                ‘‘Keyword’’ box and click ‘‘Search.’’                   DATES: This waiver is effective                       VHL03 LIRR Stage 3 and VHL04 LIRR
                                                Next, click ‘‘Open Docket Folder’’                      immediately.                                          Stage 4 of the ESA Project. Specifically,
                                                button choose the document listed to                                                                          LIRR explained that it critically needs
                                                review. If you do not have access to the                FOR FURTHER INFORMATION CONTACT:                      the Buy America waiver for nine (9)
                                                Internet, you may view the docket                       Richard L. Wong, FTA Attorney-                        turnouts that are necessary for VHL03
                                                online by visiting the Docket                           Advisor, at (202) 366–4011 or                         LIRR Stage 3 of the ESA Project in order
                                                Management Facility in Room W12–140                     Richard.Wong@dot.gov.                                 for LIRR to meet its 2016 installation
                                                on the ground floor of the DOT West                     SUPPLEMENTARY INFORMATION: The                        schedule and to thereby avoid delays to
                                                Building, 1200 New Jersey Avenue SE.,                   purpose of this notice is to announce                 the overall ESA project schedule.
                                                Washington, DC 20590, between 9 a.m.                    that FTA is granting a non-availability               Additionally, LIRR specified that it
                                                and 5 p.m., e.t., Monday through Friday,                waiver for LIRR’s procurement of track                needs the track turnout components
                                                except Federal holidays.                                turnout components—i.e., Schwihag                     waiver so that it may procure one (1)
                                                                                                        roller assemblies, Schwihag plates,                   unique turnout—No. 32.75—for VHL04
                                                  Issued On: February 6, 2015.
                                                                                                        ZU1–60 steel switch point rail sections,              LIRR Stage 4 of the ESA Project.
                                                Larry W. Minor,
                                                                                                        and movable point frogs (MPFs)—that                      LIRR has stated that the foreign-
                                                Associate Administrator for Policy.                     are needed for VHL03 LIRR Stage 3 and                 sourced MPFs are essential components
                                                [FR Doc. 2015–03241 Filed 2–17–15; 8:45 am]             VHL04 LIRR Stage 4 of the East Side                   of track turnouts for the following
                                                BILLING CODE 4910–EX–P                                  Access (ESA) Project.                                 operational reasons: (1) turnouts with
                                                                                                           With certain exceptions, FTA’s Buy                 MPFs are necessary to withstand the
                                                                                                        America requirements prevent FTA                      frequent and heavy use by passenger
                                                DEPARTMENT OF TRANSPORTATION                            from obligating an amount that may be                 and freight trains traveling along LIRR’s
                                                                                                        appropriated to carry out its program for             right of way; (2) turnouts with MPFs
                                                Federal Transit Administration
                                                                                                        a project unless ‘‘the steel, iron, and               allow trains to travel through the
                                                [Docket No. FTA–2014–0025]                              manufactured goods used in the project                turnouts at higher speeds, ultimately
                                                                                                        are produced in the United States.’’ 49               providing more throughput during rush
                                                Notice of Buy America Waiver for                        U.S.C. 5323(j)(1). A manufactured                     hour; (3) turnouts with MPFs reduce
                                                Track Turnout Components                                product is considered produced in the                 impact loading to the turnouts; and (4)
                                                AGENCY:    Federal Transit Administration,              United States if: (1) All of the                      turnouts with MPFs provide for less
emcdonald on DSK67QTVN1PROD with NOTICES




                                                DOT.                                                    manufacturing processes for the product               wear and tear, thereby requiring less
                                                ACTION:   Notice of Buy America Waiver.                 must take place in the United States;                 overall maintenance, extending the
                                                                                                        and (2) All of the components of the                  useful lives of the turnouts, and
                                                SUMMARY:   In response to a request from                product must be of U.S. origin. 49 CFR                resulting in fewer outages and negative
                                                the Long Island Rail Road Company                       661.5(d). A component is considered of                impacts on LIRR’s operations.
                                                (LIRR), a subsidiary of the New York                    U.S. origin if it is manufactured in the                 Based on previous solicitations,
                                                Metropolitan Transportation Authority                   United States, regardless of the origin of            market research, and manufacturer
                                                (MTA), for a Buy America waiver for                     its subcomponents. 49 CFR 661.5(d)(2).                outreach, as set forth below, LIRR


                                           VerDate Sep<11>2014   19:32 Feb 17, 2015   Jkt 235001   PO 00000   Frm 00165   Fmt 4703   Sfmt 4703   E:\FR\FM\18FEN1.SGM   18FEN1


                                                8754                      Federal Register / Vol. 80, No. 32 / Wednesday, February 18, 2015 / Notices

                                                concluded that it was unable to identify                information. Four manufacturers                       for track turnout components of one (1)
                                                a domestic source for track turnout                     responded, but LIRR concluded that the                #20 tangential geometry turnout for
                                                components—i.e., Schwihag roller                        four manufacturers were not potential                 LIRR’s State of Good Repair (SGR)
                                                assemblies, Schwihag plates, ZU1–60                     domestic sources for the components                   Program, LIRR withdrew that waiver
                                                steel switch point rail sections, and                   because the manufacturers each stated                 request on February 9, 2015 due to a
                                                MPFs—that LIRR needs for VHL03 LIRR                     that either it did not currently                      potential domestically produced
                                                Stage 3 and VHL04 LIRR Stage 4 of the                   manufacture the components or it did                  alternative turnout for its SGR program.
                                                ESA Project.                                            not appear economically feasible for the                 Furthermore, this Buy America
                                                   In February 2014, LIRR issued a                      manufacturer to manufacture the                       waiver does not apply to the track
                                                competitive solicitation seeking vendors                components in the quantities needed by                turnout components for the Northeast
                                                to provide five (5) turnouts for VHL03                  LIRR. One of the four responsive                      Corridor Congestion Relief Project at
                                                LIRR Stage 3 of the ESA Project. LIRR                   manufacturers, Compucision, LLC,                      Harold Interlocking, which is being
                                                received only one response, and it was                  expressed interested, but it had never                addressed in a separate waiver decision
                                                from VAE Nortrak North America Inc.                     manufactured the components                           published by FRA, as FRA funds are
                                                (Nortrak), which certified that it was not              previously and had little knowledge of                being used for that project.
                                                compliant with the Buy America                          the technical requirements. Based on
                                                requirements. Based on LIRR’s prior                     these efforts, LIRR determined that there             Dana Nifosi,
                                                experience in procuring the same or                     are no U.S. manufacturers that are                    Acting Chief Counsel.
                                                similar turnouts, LIRR has found that                   willing and capable of producing the                  [FR Doc. 2015–03242 Filed 2–17–15; 8:45 am]
                                                Nortrak and Progress Rail Services                      turnout components that are presently                 BILLING CODE 4910–57–P
                                                Corporation (Progress) are the only two                 required for VHL03 LIRR Stage 3 and
                                                vendors that are technically capable of                 VHL04 LIRR Stage 4 the ESA Project.
                                                manufacturing turnouts with the roller                     On December 19, 2014, FTA                          DEPARTMENT OF TRANSPORTATION
                                                assemblies, plates, ZU1–60 steel switch                 published a Federal Register notice
                                                point rail sections, and MPFs that LIRR                 requesting comment on LIRR’s waiver                   Maritime Administration
                                                requires for the ESA Project. According                 request, pursuant to 49 CFR 661.7. 79                 [Docket No. DOT–MARAD 2015 0020]
                                                to LIRR, Nortrak and Progress                           FR 75857 (Dec. 19, 2014). No comments
                                                manufacture the turnouts domestically,                  were received to the docket.                          Request for Comments of a Previously
                                                but the turnout components that are the                    Based upon LIRR’s good faith efforts               Approved Information Collection
                                                subject of this waiver are presently                    to identify potential domestic
                                                manufactured only non-domestically.1                    manufacturers for these track turnout                       Notice and request for
                                                                                                                                                              ACTION:
                                                Progress did not submit a bid in                        components, LIRR’s informed                           comments.
                                                response to the February 2014                           conclusion that there are presently no
                                                solicitation related to VHL03 LIRR Stage                U.S. manufacturers that are willing and               SUMMARY:  In compliance with the
                                                3 of the ESA Project.                                   capable of producing the turnout                      Paperwork Reduction Act of 1995 (44
                                                   Furthermore, in support of its                       components needed for VHL03 LIRR                      U.S.C. 3501 et seq.), this notice
                                                requests, LIRR also conducted market                    Stage 3 and VHL04 LIRR Stage 4 of the                 announces that the Information
                                                research and manufacturer outreach. In                  ESA Project, and the lack of responses                Collection Request (ICR) abstracted
                                                conducting this research, LIRR utilized                 to FTA’s Federal Register Notice, FTA                 below is being forwarded to the Office
                                                the National Railroad Passenger                         is issuing a non-availability waiver,                 of Management and Budget (OMB) for
                                                Corporation’s (Amtrak) previous market                  pursuant to 49 CFR 661.7(c), for LIRR’s               review and comments. A Federal
                                                research regarding potential domestic                   procurement of the track turnout                      Register Notice with a 60-day comment
                                                manufacturers of the four component                     components—i.e., Schwihag roller                      period soliciting comments on the
                                                types that are the subject of this notice.              assemblies, Schwihag plates, ZU1–60                   following information collection was
                                                Amtrak conducted its market research at                 steel switch point rail sections, and                 published on November 26, 2014
                                                the request of FRA, and the research                    MPFs—but in connection with only the                  (Federal Register 70610, Vol. 79, No.
                                                included outreach to manufacturers that                 nine (9) turnouts needed for VHL03                    228).
                                                were previously identified by the U.S.                  LIRR Stage 3 and the one (1) turnout                  DATES:  Comments must be submitted on
                                                Department of Commerce’s National                       needed for VHL04 LIRR Stage 4 of the                  or before March 20, 2015.
                                                Institute of Standards and Technology                   East Side Access Project, as set forth
                                                                                                        above. Subsequent waiver requests for                 FOR FURTHER INFORMATION CONTACT:
                                                (NIST) in a December 2012 Supplier                                                                            Elizabeth Gearhart, 202–366–1867,
                                                Scouting Report.                                        track turnout components will be
                                                                                                        subject to notice-and-comment                         Office of Shipyards and Marine
                                                   Additionally, LIRR conducted its own
                                                                                                        publication requirements. This waiver                 Engineering, Maritime Administration
                                                independent outreach and contacted
                                                                                                        does not apply to the turnouts                        1200 New Jersey Avenue SE.,
                                                seven potential manufacturers: Unitrac
                                                                                                        themselves, and, accordingly, the                     Washington, DC 20590.
                                                Railroad Materials, Inc., Arcelor Mittal,
                                                J. Manufacturing Inc., Steel Dynamics,                  turnouts must be manufactured in the                  SUPPLEMENTARY INFORMATION:
                                                Inc., Metal Tech, Compucision, LLC,                     United States pursuant to FTA’s Buy                     Title: Shipbuilding Orderbook and
                                                and IAT International Inc.2 Three of the                America requirements. See 49 CFR part                 Shipyard Employment.
                                                seven potential manufacturers failed to                 661.                                                    OMB Control Number: 2133–0029.
                                                respond to repeated requests for                           Furthermore, this Buy America                        Type of Request: Renewal of a
emcdonald on DSK67QTVN1PROD with NOTICES




                                                                                                        waiver does not apply to the track                    Previously Approved Information
                                                  1 The roller assemblies and plates are                turnout components for Phase I of                     Collection.
                                                manufactured in Switzerland; the ZU1–60 steel           LIRR’s Jamaica Capacity Improvements                    Abstract: MARAD collects this
                                                switch point rail sections are manufactured in          Project, which will be addressed in a                 information from the shipbuilding and
                                                Austria; and the MPFs are manufactured in               separate waiver decision by FTA. With                 ship repair industry primarily to
                                                Germany.
                                                  2 FTA defers to LIRR’s spelling and punctuation       respect to LIRR’s Buy America waiver                  determine if an adequate mobilization
                                                of the manufacturers’ names as presented in LIRR’s      request from March 26, 2013 (and                      base exists for national defense and for
                                                July 31, 2014, letter.                                  supplemented on September 19, 2014)                   use in a national emergency.


                                           VerDate Sep<11>2014   19:32 Feb 17, 2015   Jkt 235001   PO 00000   Frm 00166   Fmt 4703   Sfmt 4703   E:\FR\FM\18FEN1.SGM   18FEN1



Document Created: 2018-02-16 11:10:04
Document Modified: 2018-02-16 11:10:04
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice of Buy America Waiver.
DatesThis waiver is effective immediately.
ContactRichard L. Wong, FTA Attorney-Advisor, at (202) 366-4011 or [email protected]
FR Citation80 FR 8753 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR