The Federal Energy Regulatory Commission (Commission) invites public comment in Docket No. RD16-1-000 on a non-material or non- substantive change to the collection of information (FERC-725L) that the Commission is submitting to the Office of Management and Budget (OMB) pursuant to the Paperwork Reduction Act of 1995. Comments are invited on: (a) whether the proposed collection of information is necessary for the proper performance of the functions of the agency, including whether the information shall have practical utility; (b) the accuracy of the agency's estimate of the burden of the proposed collection of information, including the validity of the methodology and assumptions used; (c) ways to enhance the quality, utility, and clarity of the information to be collected; and (d) ways to minimize the burden of the collection of information on respondents, including through the use of automated collection techniques or other forms of information technology.

Federal Register, Volume 81 Issue 49 (Monday, March 14, 2016)
[Federal Register Volume 81, Number 49 (Monday, March 14, 2016)]
[Notices]
[Pages 13356-13357]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-05654]



[[Page 13356]]

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. RD16-1-000]


Notice on Agency Information Collection (FERC-725L)

AGENCY: Federal Energy Regulatory Commission.

ACTION: Notice and request for comments.

-----------------------------------------------------------------------

SUMMARY: The Federal Energy Regulatory Commission (Commission) invites 
public comment in Docket No. RD16-1-000 on a non-material or non-
substantive change to the collection of information (FERC-725L) that 
the Commission is submitting to the Office of Management and Budget 
(OMB) pursuant to the Paperwork Reduction Act of 1995. Comments are 
invited on: (a) whether the proposed collection of information is 
necessary for the proper performance of the functions of the agency, 
including whether the information shall have practical utility; (b) the 
accuracy of the agency's estimate of the burden of the proposed 
collection of information, including the validity of the methodology 
and assumptions used; (c) ways to enhance the quality, utility, and 
clarity of the information to be collected; and (d) ways to minimize 
the burden of the collection of information on respondents, including 
through the use of automated collection techniques or other forms of 
information technology.

DATES: Comments regarding this proposed information collection must be 
received on or before April 13, 2016.

ADDRESSES: Comments filed with OMB, identified by the OMB Control No. 
1902-0261 or collection number (FERC-725L), should be sent via email to 
the Office of Information and Regulatory Affairs at: 
oira_submission@omb.gov. Attention: Federal Energy Regulatory 
Commission Desk Officer. The Desk Officer may also be reached via 
telephone at 202-395-0710.
    A copy of the comments, identified by docket number, should also be 
sent to the Commission in one of the following ways:
     Electronic Filing through http://www.ferc.gov. Documents 
created electronically using word processing software should be filed 
in native applications or print-to-PDF format and not in a scanned 
format.
     Mail/Hand Delivery: Those unable to file electronically 
may mail or hand-deliver an original of their comments to: Federal 
Energy Regulatory Commission, Secretary of the Commission, 888 First 
Street NE., Washington, DC 20426.

FOR FURTHER INFORMATION CONTACT:  Ellen Brown may be reached by email 
at DataClearance@FERC.gov, telephone at (202) 502-8663, and fax at 
(202) 273-0873.

SUPPLEMENTARY INFORMATION: The Commission will submit the reporting and 
recordkeeping requirements of Reliability Standard MOD-031-2 to OMB for 
review of a non-material or non-substantive change. Reliability 
Standard MOD-031-2 replaces or supplements requirements from previous 
versions of the MOD-031 Reliability Standard, which are approved under 
FERC-725L (Mandatory Reliability Standards for the Bulk-Power System: 
MOD Reliability Standards).
    Type of Request: Approval of a non-material or non-substantive 
change to the FERC-725L information collection requirements.
    Abstract: The Commission requires the information collected by the 
FERC-725L to implement the statutory provisions of section 215 of the 
Federal Power Act (FPA).\1\ On August 8, 2005, Congress enacted into 
law the Electricity Modernization Act of 2005, which is Title XII, 
Subtitle A, of the Energy Policy Act of 2005 (EPAct 2005).\2\ EPAct 
2005 added a new section 215 to the FPA, which required a Commission-
certified Electric Reliability Organization (ERO) to develop mandatory 
and enforceable Reliability Standards, which are subject to Commission 
review and approval. Once approved, the Reliability Standards may be 
enforced by the ERO subject to Commission oversight, or the Commission 
can independently enforce Reliability Standards.\3\
---------------------------------------------------------------------------

    \1\ 16 U.S.C. 824o (2012).
    \2\ Energy Policy Act of 2005, Pub. L. 109-58, Title XII, 
Subtitle A, 119 Stat. 594, 941 (codified at 16 U.S.C. 824o).
    \3\ 16 U.S.C. 824o(e)(3).
---------------------------------------------------------------------------

    On February 3, 2006, the Commission issued Order No. 672, 
implementing section 215 of the FPA.\4\ Pursuant to Order No. 672, the 
Commission certified one organization, North American Electric 
Reliability Corporation (NERC), as the ERO.\5\ The Reliability 
Standards developed by the ERO and approved by the Commission apply to 
users, owners and operators of the Bulk-Power System as set forth in 
each Reliability Standard.
---------------------------------------------------------------------------

    \4\ Rules Concerning Certification of the Electric Reliability 
Organization; and Procedures for the Establishment, Approval, and 
Enforcement of Electric Reliability Standards, Order No. 672, FERC 
Stats. & Regs. ] 31,204, order on reh'g, Order No. 672-A, FERC 
Stats. & Regs. ] 31,212 (2006).
    \5\ North American Electric Reliability Corp., 116 FERC ] 
61,062, order on reh'g and compliance, 117 FERC ] 61,126 (2006), 
order on compliance, 118 FERC ] 61,190, order on reh'g, 119 FERC ] 
61,046 (2007), aff'd sub nom. Alcoa Inc. v. FERC, 564 F.3d 1342 
(D.C. Cir. 2009).
---------------------------------------------------------------------------

    The Reliability Standard MOD-031-2 achieves the same reliability 
purpose of the prior version MOD-031-1. This standard provides 
authority for Bulk-Power System planners and operators to collect 
demand, energy, and related data to support reliability studies and 
assessments, and enumerates the responsibilities and obligations of 
requestors and respondents of that data.
    In its November 13, 2015 petition, NERC states that Reliability 
Standard MOD-031-2 is an improvement to the existing version of the 
standard because it clarifies the compliance obligations related to (1) 
providing data to Regional Entities and (2) responding to a request for 
data subject to confidentiality restrictions. NERC also states that the 
improvements to the Reliability Standard are consistent with the 
Commission directives in Order No. 804.\6\ In Order No. 804, the 
Commission approved Reliability Standard MOD-031. However, the 
Commission also directed, pursuant to 215(d)(5) of the FPA, that NERC 
develop a modification to Reliability Standard MOD-031-1 to clarify 
that planning coordinators and balancing authorities must provide 
demand and energy data upon request of a Regional Entity, as necessary 
to support NERC's development of seasonal and long-term reliability 
assessments.
---------------------------------------------------------------------------

    \6\ NERC Petition at 2, n.8 citing Demand and Energy Data 
Reliability Standard, Order No. 804, 150 FERC ] 61,109 at PP 14-15 
(2015).
---------------------------------------------------------------------------

    In a Delegated Letter Order in Docket No. RD16-1, the Commission 
approved the proposed Reliability Standard MOD-031-2 on February 18, 
2016.\7\
---------------------------------------------------------------------------

    \7\ The Delegated Letter Order is available in FERC's eLibrary 
at http://elibrary.ferc.gov/idmws/common/opennat.asp?fileID=14148897.
---------------------------------------------------------------------------

    FERC is not changing the way the FERC-725L collection is being 
done, and is not modifying the burden, cost, or respondents. The 
reporting and recordkeeping requirements will be submitted to the OMB 
as a non-material or non-substantive change to the currently approved 
FERC-725L collection.
    Type of Respondents: Distribution Providers (DP), Load-Serving 
Entities (LSE), Transmission Planner (TP), and Balancing Authorities 
(BA).
    Estimate of Annual Burden.\8\ The burden and cost are not expected 
to

[[Page 13357]]

change from the figures currently approved by the OMB.\9\
---------------------------------------------------------------------------

    \8\ The Commission defines burden as the total time, effort, or 
financial resources expended by persons to generate, maintain, 
retain, or disclose or provide information to or for a federal 
agency. See 5 CFR part 1320 for more information.
    \9\ The current burden inventory for FERC-725L, as modified by 
the Final Rule (Order No. 804) in Docket No. RM14-12 (80 FR 9596, 2/
24/2015), was approved by the OMB on 4/24/2015.

    Dated: March 8, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016-05654 Filed 3-11-16; 8:45 am]
 BILLING CODE 6717-01-P



                                                  13356                         Federal Register / Vol. 81, No. 49 / Monday, March 14, 2016 / Notices

                                                  DEPARTMENT OF ENERGY                                    Secretary of the Commission, 888 First                  the Commission apply to users, owners
                                                                                                          Street NE., Washington, DC 20426.                       and operators of the Bulk-Power System
                                                  Federal Energy Regulatory                               FOR FURTHER INFORMATION CONTACT:                        as set forth in each Reliability Standard.
                                                  Commission                                              Ellen Brown may be reached by email                        The Reliability Standard MOD–031–2
                                                  [Docket No. RD16–1–000]                                 at DataClearance@FERC.gov, telephone                    achieves the same reliability purpose of
                                                                                                          at (202) 502–8663, and fax at (202) 273–                the prior version MOD–031–1. This
                                                  Notice on Agency Information                            0873.                                                   standard provides authority for Bulk-
                                                  Collection (FERC–725L)                                  SUPPLEMENTARY INFORMATION: The                          Power System planners and operators to
                                                                                                          Commission will submit the reporting                    collect demand, energy, and related data
                                                  AGENCY: Federal Energy Regulatory                                                                               to support reliability studies and
                                                                                                          and recordkeeping requirements of
                                                  Commission.                                                                                                     assessments, and enumerates the
                                                                                                          Reliability Standard MOD–031–2 to
                                                  ACTION: Notice and request for                          OMB for review of a non-material or                     responsibilities and obligations of
                                                  comments.                                               non-substantive change. Reliability                     requestors and respondents of that data.
                                                  SUMMARY:   The Federal Energy                           Standard MOD–031–2 replaces or                             In its November 13, 2015 petition,
                                                  Regulatory Commission (Commission)                      supplements requirements from                           NERC states that Reliability Standard
                                                  invites public comment in Docket No.                    previous versions of the MOD–031                        MOD–031–2 is an improvement to the
                                                  RD16–1–000 on a non-material or non-                    Reliability Standard, which are                         existing version of the standard because
                                                  substantive change to the collection of                 approved under FERC–725L (Mandatory                     it clarifies the compliance obligations
                                                  information (FERC–725L) that the                        Reliability Standards for the Bulk-Power                related to (1) providing data to Regional
                                                  Commission is submitting to the Office                  System: MOD Reliability Standards).                     Entities and (2) responding to a request
                                                                                                             Type of Request: Approval of a non-                  for data subject to confidentiality
                                                  of Management and Budget (OMB)
                                                                                                          material or non-substantive change to                   restrictions. NERC also states that the
                                                  pursuant to the Paperwork Reduction
                                                                                                          the FERC–725L information collection                    improvements to the Reliability
                                                  Act of 1995. Comments are invited on:
                                                                                                          requirements.                                           Standard are consistent with the
                                                  (a) whether the proposed collection of
                                                                                                             Abstract: The Commission requires                    Commission directives in Order No.
                                                  information is necessary for the proper
                                                                                                          the information collected by the FERC–                  804.6 In Order No. 804, the Commission
                                                  performance of the functions of the
                                                                                                          725L to implement the statutory                         approved Reliability Standard MOD–
                                                  agency, including whether the
                                                                                                          provisions of section 215 of the Federal                031. However, the Commission also
                                                  information shall have practical utility;
                                                                                                          Power Act (FPA).1 On August 8, 2005,                    directed, pursuant to 215(d)(5) of the
                                                  (b) the accuracy of the agency’s estimate
                                                                                                          Congress enacted into law the                           FPA, that NERC develop a modification
                                                  of the burden of the proposed collection
                                                                                                          Electricity Modernization Act of 2005,                  to Reliability Standard MOD–031–1 to
                                                  of information, including the validity of
                                                                                                          which is Title XII, Subtitle A, of the                  clarify that planning coordinators and
                                                  the methodology and assumptions used;
                                                                                                          Energy Policy Act of 2005 (EPAct                        balancing authorities must provide
                                                  (c) ways to enhance the quality, utility,
                                                                                                          2005).2 EPAct 2005 added a new section                  demand and energy data upon request
                                                  and clarity of the information to be
                                                                                                          215 to the FPA, which required a                        of a Regional Entity, as necessary to
                                                  collected; and (d) ways to minimize the
                                                                                                          Commission-certified Electric                           support NERC’s development of
                                                  burden of the collection of information
                                                                                                          Reliability Organization (ERO) to                       seasonal and long-term reliability
                                                  on respondents, including through the
                                                                                                          develop mandatory and enforceable                       assessments.
                                                  use of automated collection techniques
                                                                                                          Reliability Standards, which are subject                   In a Delegated Letter Order in Docket
                                                  or other forms of information
                                                                                                          to Commission review and approval.                      No. RD16–1, the Commission approved
                                                  technology.
                                                                                                          Once approved, the Reliability                          the proposed Reliability Standard
                                                  DATES:   Comments regarding this                        Standards may be enforced by the ERO                    MOD–031–2 on February 18, 2016.7
                                                  proposed information collection must                    subject to Commission oversight, or the
                                                  be received on or before April 13, 2016.                                                                           FERC is not changing the way the
                                                                                                          Commission can independently enforce
                                                                                                                                                                  FERC–725L collection is being done,
                                                  ADDRESSES: Comments filed with OMB,                     Reliability Standards.3
                                                                                                             On February 3, 2006, the Commission                  and is not modifying the burden, cost,
                                                  identified by the OMB Control No.                                                                               or respondents. The reporting and
                                                  1902–0261 or collection number (FERC–                   issued Order No. 672, implementing
                                                                                                          section 215 of the FPA.4 Pursuant to                    recordkeeping requirements will be
                                                  725L), should be sent via email to the                                                                          submitted to the OMB as a non-material
                                                  Office of Information and Regulatory                    Order No. 672, the Commission certified
                                                                                                                                                                  or non-substantive change to the
                                                  Affairs at: oira_submission@omb.gov.                    one organization, North American
                                                                                                                                                                  currently approved FERC–725L
                                                  Attention: Federal Energy Regulatory                    Electric Reliability Corporation (NERC),
                                                                                                                                                                  collection.
                                                  Commission Desk Officer. The Desk                       as the ERO.5 The Reliability Standards
                                                                                                          developed by the ERO and approved by                       Type of Respondents: Distribution
                                                  Officer may also be reached via
                                                                                                                                                                  Providers (DP), Load-Serving Entities
                                                  telephone at 202–395–0710.
                                                                                                            1 16 U.S.C. 824o (2012).                              (LSE), Transmission Planner (TP), and
                                                     A copy of the comments, identified by
                                                                                                            2 Energy  Policy Act of 2005, Pub. L. 109–58, Title   Balancing Authorities (BA).
                                                  docket number, should also be sent to
                                                                                                          XII, Subtitle A, 119 Stat. 594, 941 (codified at 16        Estimate of Annual Burden.8 The
                                                  the Commission in one of the following                  U.S.C. 824o).
                                                  ways:                                                     3 16 U.S.C. 824o(e)(3).
                                                                                                                                                                  burden and cost are not expected to
                                                     • Electronic Filing through http://                    4 Rules Concerning Certification of the Electric
                                                                                                                                                                    6 NERC Petition at 2, n.8 citing Demand and
                                                  www.ferc.gov. Documents created                         Reliability Organization; and Procedures for the
                                                                                                          Establishment, Approval, and Enforcement of             Energy Data Reliability Standard, Order No. 804,
                                                  electronically using word processing
jstallworth on DSK7TPTVN1PROD with NOTICES




                                                                                                          Electric Reliability Standards, Order No. 672, FERC     150 FERC ¶ 61,109 at PP 14–15 (2015).
                                                  software should be filed in native                      Stats. & Regs. ¶ 31,204, order on reh’g, Order No.        7 The Delegated Letter Order is available in
                                                  applications or print-to-PDF format and                 672–A, FERC Stats. & Regs. ¶ 31,212 (2006).             FERC’s eLibrary at http://elibrary.ferc.gov/idmws/
                                                  not in a scanned format.                                  5 North American Electric Reliability Corp., 116      common/opennat.asp?fileID=14148897.
                                                     • Mail/Hand Delivery: Those unable                   FERC ¶ 61,062, order on reh’g and compliance, 117         8 The Commission defines burden as the total

                                                                                                          FERC ¶ 61,126 (2006), order on compliance, 118          time, effort, or financial resources expended by
                                                  to file electronically may mail or hand-                FERC ¶ 61,190, order on reh’g, 119 FERC ¶ 61,046        persons to generate, maintain, retain, or disclose or
                                                  deliver an original of their comments to:               (2007), aff’d sub nom. Alcoa Inc. v. FERC, 564 F.3d     provide information to or for a federal agency. See
                                                  Federal Energy Regulatory Commission,                   1342 (D.C. Cir. 2009).                                  5 CFR part 1320 for more information.



                                             VerDate Sep<11>2014   14:27 Mar 11, 2016   Jkt 238001   PO 00000   Frm 00047   Fmt 4703   Sfmt 4703   E:\FR\FM\14MRN1.SGM     14MRN1


                                                                                          Federal Register / Vol. 81, No. 49 / Monday, March 14, 2016 / Notices                                                                              13357

                                                  change from the figures currently                                      northbound from Eunice to the                                           Secretary of the Commission, as soon as
                                                  approved by the OMB.9                                                  Celestine compressor station, and                                       possible, an original and two copies of
                                                    Dated: March 8, 2016.                                                appurtenances. ANR states that this                                     comments in support of or in opposition
                                                  Nathaniel J. Davis, Sr.,
                                                                                                                         abandonment of the short-haul capacity                                  to this project. The Commission will
                                                                                                                         will not affect the available,                                          consider these comments in
                                                  Deputy Secretary.
                                                                                                                         unsubscribed capacity remaining along                                   determining the appropriate action to be
                                                  [FR Doc. 2016–05654 Filed 3–11–16; 8:45 am]
                                                                                                                         this segment.                                                           taken, but the filing of a comment alone
                                                  BILLING CODE 6717–01–P                                                                                                                         will not serve to make the filer a party
                                                                                                                            Pursuant to Section 157.9 of the
                                                                                                                         Commission’s rules, 18 CFR 157.9,                                       to the proceeding. The Commission’s
                                                                                                                         within 90 days of this Notice the                                       rules require that persons filing
                                                  DEPARTMENT OF ENERGY
                                                                                                                         Commission staff will either: Complete                                  comments in opposition to the project
                                                  Federal Energy Regulatory                                              its environmental assessment (EA) and                                   provide copies of their protests only to
                                                  Commission                                                             place it into the Commission’s public                                   the party or parties directly involved in
                                                                                                                         record (eLibrary) for this proceeding, or                               the protest.
                                                  [Docket No. CP16–80–000]                                               issue a Notice of Schedule for                                             Persons who wish to comment only
                                                                                                                         Environmental Review. If a Notice of                                    on the environmental review of this
                                                  ANR Pipeline Company; Notice of                                                                                                                project should submit an original and
                                                                                                                         Schedule for Environmental Review is
                                                  Application                                                                                                                                    two copies of their comments to the
                                                                                                                         issued, it will indicate, among other
                                                     Take notice that on February 29, 2016,                              milestones, the anticipated date for the                                Secretary of the Commission.
                                                  ANR Pipeline Company (ANR), filed an                                   Commission staff’s issuance of the final                                Environmental commenters will be
                                                  application pursuant to section 7(b) of                                environmental impact statement (FEIS)                                   placed on the Commission’s
                                                  the Natural Gas Act (NGA), and Part 157                                or EA for this proposal. The filing of the                              environmental mailing list, will receive
                                                  of the Commission’s Regulations,                                       EA in the Commission’s public record                                    copies of the environmental documents,
                                                  requesting the Commission’s approval                                   for this proceeding or the issuance of a                                and will be notified of meetings
                                                  to abandon in place five compressor                                    Notice of Schedule will serve to notify                                 associated with the Commission’s
                                                  units installed in ANR’s Southeast                                     federal and state agencies of the timing                                environmental review process.
                                                  Mainline segment, located in Louisiana,                                for the completion of all necessary                                     Environmental commenters will not be
                                                  Mississippi, Tennessee, and Indiana.                                   reviews, and the subsequent need to                                     required to serve copies of filed
                                                  Also, ANR proposes to abandon                                          complete all federal authorizations                                     documents on all other parties.
                                                  associated short haul capacity and                                     within 90 days of the date of                                           However, the non-party commenters
                                                  appurtenances. The filing may also be                                  issuance of the Commission staff’s FEIS                                 will not receive copies of all documents
                                                  viewed on the web at http://                                           or EA.                                                                  filed by other parties or issued by the
                                                  www.ferc.gov using the ‘‘eLibrary’’ link.                                 There are two ways to become                                         Commission (except for the mailing of
                                                  Enter the docket number excluding the                                  involved in the Commission’s review of                                  environmental documents issued by the
                                                  last three digits in the docket number                                 this project. First, any person wishing to                              Commission) and will not have the right
                                                  field to access the document. For                                      obtain legal status by becoming a party                                 to seek court review of the
                                                  assistance, contact FERC at                                            to the proceedings for this project                                     Commission’s final order.
                                                  FERCOnlineSupport@gerc.gov or call                                     should, on or before the comment date                                      Motions to intervene, protests and
                                                  toll-free, (866) 208–3676 or TYY, (202)                                stated below, file with the Federal                                     comments may be filed electronically
                                                  502–8659.                                                              Energy Regulatory Commission, 888                                       via the internet in lieu of paper; see, 18
                                                     Any questions regarding this                                        First Street NE., Washington, DC 20426,                                 CFR 385.2001(a)(1)(iii) and the
                                                  application should be directed to Linda                                a motion to intervene in accordance                                     instructions on the Commission’s Web
                                                  Farquhar, Manager, Project                                             with the requirements of the                                            site under the ‘‘e-Filing’’ link. The
                                                  Determinations and Regulatory                                          Commission’s Rules of Practice and                                      Commission strongly encourages
                                                  Administration, ANR Pipeline                                           Procedure (18 CFR 385.214 or 385.211)                                   electronic filings.
                                                  Company, 700 Louisiana Street, Suite                                   and the Regulations under the NGA (18                                      Comment Date: 5:00 p.m. Eastern
                                                  700, Houston, Texas 77002–2700, phone                                  CFR 157.10). A person obtaining party                                   Time on March 29, 2016.
                                                  (832) 320–5685, email: linda_farquhar@                                 status will be placed on the service list                                 Dated: March 8, 2016.
                                                  transcanada.com.                                                       maintained by the Secretary of the                                      Nathaniel J. Davis, Sr.,
                                                     ANR states that after the evaluation of                             Commission and will receive copies of                                   Deputy Secretary.
                                                  the compressor units needed for                                        all documents filed by the applicant and
                                                                                                                                                                                                 [FR Doc. 2016–05658 Filed 3–11–16; 8:45 am]
                                                  transporting gas under the various flow                                by all other parties. A party must submit
                                                                                                                                                                                                 BILLING CODE 6717–01–P
                                                  and contractual scenarios, ANR                                         5 copies of filings made with the
                                                  determined to abandon in place one                                     Commission and must mail a copy
                                                  compressor unit at each of Delhi,                                      to the applicant and to every other
                                                                                                                                                                                                 DEPARTMENT OF ENERGY
                                                  Brownsville, and Shelbyville                                           party in the proceeding. Only parties to
                                                  compressor stations, and two units at                                  the proceeding can ask for court review                                 Federal Energy Regulatory
                                                  Sardis compressor station. The total                                   of Commission orders in the proceeding.                                 Commission
                                                  horsepower (hp) of the abandoned                                          However, a person does not have to
                                                  compressor units is 31,800 hp. ANR also                                intervene in order to have comments                                     Notice of Intent to Prepare
                                                  request to abandon 36 MMcf/day of                                      considered. The second way to                                           Environmental Assessments and
jstallworth on DSK7TPTVN1PROD with NOTICES




                                                  short-haul capacity on the segment                                     participate is by filing with the                                       Revised Procedural Schedule

                                                  FFP Missouri 16, LLC ...........................................................................................................................................   Project No. 13753–002
                                                  FFP Missouri 15, LLC ...........................................................................................................................................   Project No. 13762–002

                                                   9 The current burden inventory for FERC–725L, as                      Docket No. RM14–12 (80 FR 9596, 2/24/2015), was
                                                  modified by the Final Rule (Order No. 804) in                          approved by the OMB on 4/24/2015.



                                             VerDate Sep<11>2014        14:27 Mar 11, 2016        Jkt 238001     PO 00000       Frm 00048       Fmt 4703      Sfmt 4703      E:\FR\FM\14MRN1.SGM             14MRN1



Document Created: 2016-03-12 01:00:06
Document Modified: 2016-03-12 01:00:06
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice and request for comments.
DatesComments regarding this proposed information collection must be received on or before April 13, 2016.
ContactEllen Brown may be reached by email at [email protected], telephone at (202) 502-8663, and fax at (202) 273-0873.